NBS Source
I'm a manufacturer

"access equipment and safety systems"

9,301 results found

Sort by:

Showing 2161-2196 of 2357

Sponsored
Milliners Wharf, Manchester

Milliners Wharf, Manchester

Technal

Manchester's Milliners Wharf development is a part of the "Hat Box" regeneration of New Islington. This high-end residential development was designed to ensure residents feel safe in their home by specifying products with high security features. As such, our aluminium door was chosen for the ground floor apartments and top floor duplex apartments, which incorporates an invisible door closer as well as concealed locking groover for a tight and secure mechanisam. These features, along with the single-leaf open in and open-out hinged doors that meet PAS24 certification for burglar resistance, resulted in the Secured by Design certification.Along this door system, aluminium sliding doors were used for the balconies and was specified for their durability alongside aluminium windows. This further assisted in the Secured by Design certification. There are several optional additions to the window system which provides the ability to customise for each project. In this case, the Hat Box development benefits from tilt before turn windows made possible with the systems durability and strength. The hinge mechanism can support glazing up to 130kg. As well as a safety element, it was important to ensure that the building's occupants would be living in a healthy environment. In building's where there is a difference of U values between the walls, windows and doors, there is a risk of high humidity which could potentially cause issues with condensation and mold. The issue was overcome at Milliners Wharf through the thermal efficiency offered by our aluminium curtain walling. Less energy is lost between the inside and the outside of the facade. This consistancy in temperature and improvement of the air quality in the room means that the room needs much less energy to heat and cool it.
Sponsored
Case Study - Proteus Pro-Felt® - Hilton Hotel, Cobham

Case Study - Proteus Pro-Felt® - Hilton Hotel, Cobham

Proteus Waterproofing

As part of an on-going, planned flat roofs refurbishment, the Hotel flat roofs existing, ageing coverings were found to be in various state of deterioration. Following surveys by Proteus Waterproofing, some of the flat roofs were assessed to be still suitable to be overlaid, some had aged beyond economic recovery, requiring removal. Proteus Waterproofing were asked to design and supply a high-performance replacement, selecting the most suitable roof system from its wide range, for each roof. This phase required:One roof to be overlaidOne roof to be stripped back and upgrading the roof deck by over-decking with new 18mm plywood.Once prepared, both roofs received the new Proteus Pro- Felt® Ultima Plus Built Up Roof system with Proteus Pro- Therm Insulation PIR to deliver the required performance to comply with Building Regulations Part L and BS 6229:2018.  Long Term PerformancePro-Felt® Ultima Plus BUR offers a durable waterproofing and protection solution for new build and refurbishment projects, is BBA Certified and available with a range of guarantees.High Performance WaterproofingWorking on occupied buildings, safety is always of the utmost importance. Pro-Felt® Ultima Plus BUR system reduces risk by incorporating a cold installed, self-adhesive air vapour control to be bonded to the new plywood roof deck. Proteus Pro-Therm Insulation is cold bonded to the air vapour control, to comply with current Building Regulations Part L. The specification was prepared according to the NFRC ‘Safe2Torch’ guidelines.
Sponsored
South Asia Gallery at Manchester Museum

South Asia Gallery at Manchester Museum

Junckers Ltd

Manchester Museum has opened a new gallery dedicated to South Asian culture where Junckers’ solid wood flooring forms an integral part of the interior scheme. The new gallery celebrates the lived experiences and contributions of the South Asian diaspora and is part of the Hello Future initiative, a Heritage Lottery Fund project to encourage diverse communities to visit the museum. Architects Purcell created a new two-storey extension which includes two new galleries, as well as re-designing the original buildings to add a new main entrance, foyer, and visitor facilities. The new building has achieved BREEAM Very Good standard and was designed to adhere to the conditions required for museum collections. The design also places a strong focus on inclusivity, with improved accessibility for all visitors. The interior, designed by Studio C102 and Mobile Studio Architects, takes its inspiration from South Asian architecture and design with a material palette of rich colours and textures. Junckers Oak Natural Pearl flooring is paired with hand-patinated brass panels and a deep ochre wall colour that brings South Asian culture and creativity to life, a fitting backdrop to the many interesting exhibits on display. Junckers’ oak flooring provides the museum with a durable surface to accommodate high foot traffic. Made in solid wood, the floor is easy to care for and maintain and with a proven long lifespan, the floor can easily outlast the building’s design life of 60 years. Junckers flooring contributes to a healthy indoor climate and helps minimise any static from electrical devices and equipment. Having undergone rigorous degassing and odour tests to ensure there are no chemical substances in the flooring which adversely affect the air quality in a room, all Junckers floors carry the Danish Indoor Climate label certificate. The South Asia Gallery is a British Museum partnership. 
Sponsored
ROYAL PAPWORTH HOSPITAL

ROYAL PAPWORTH HOSPITAL

SuperFoil Insulation

The unique and stunning curved blue glass cladding specified for the new hospital posed several design challenges. The insulation used needed to provide high thermal performance, be able to conform the curved surface and be completely non-combustible since the building is in excess of 18m. SuperFOIL Insulation was approached to provide replacement insulation that would meet all fire safety standards and which could be applied without requiring changes to the exterior or interior design of the building. After careful consideration as to what would be the most suitable solution, we supplied 5,500m² of our non-combustible SFNC insulation. SuperFOIL SFNC is the only insulation of its kind to be certified by the Building Research Establishment (BRE) as European Class A1 Non-Combustible, which is the highest possible rating of fire safety.
Sponsored
Royal Papworth Hospital

Royal Papworth Hospital

SuperFoil Insulation

The unique and stunning curved blue glass cladding specified for the new hospital posed several design challenges. The insulation used needed to provide high thermal performance, be able to conform the curved surface and be completely non-combustible since the building is in excess of 18m. SuperFOIL Insulation was approached to provide replacement insulation that would meet all fire safety standards and which could be applied without requiring changes to the exterior or interior design of the building. After careful consideration as to what would be the most suitable solution, we supplied 5,500m² of our non-combustible SFNC insulation. SuperFOIL SFNC is the only insulation of its kind to be certified by the Building Research Establishment (BRE) as European Class A1 Non-Combustible, which is the highest possible rating of fire safety.
Sponsored
Heavy Duty Serving Window Drive Thru

Heavy Duty Serving Window Drive Thru

Next Doors Ltd

Our client approached us with a unique challenge: they needed to convert their existing restaurant into a drive-thru establishment. Departing from conventional construction methods involving brick buildings, we proposed an innovative solution: a comprehensive aluminium bolt-on pod system. This system offered unparalleled advantages, allowing for rapid on-site expansion while minimising disruption to ongoing operations. Fabricated entirely off-site in our workshops, the pod system was swiftly assembled on-site, providing ample space for the drive-thru restaurant within a remarkably short timeframe. This modular approach not only streamlined the construction process but also empowered the main contractor to efficiently carry out internal fit-out works tailored to the client’s specific requirements.The aluminium pod system we implemented catered to carious needs, seamlessly integrating essential functionalities into its design. Within the structure, we incorporated designated spaces for a stockroom and an electrical intake room, ensuring optimal organisation and efficiency. Moreover, the pod featured a dedicated drive-thru serving booth, complete with a strategically positioned side access door and a robust, heavy duty drive-thru window system. Crafted from commercial-grade aluminium sections, the pod system was meticulously customised to reflect the client’s corporate identity, incorporating their distinctive colour schemes throughout. Solid infill panels, positioned below waist height and above the suspended ceiling height, added both aesthetic appeal and structural integrity to the design. By embracing innovation and customisation, we delivered a turnkey solution that not only met but exceeded our client’s expectations for their drive-thru restaurant conversion project.
Sponsored
Queens Crescent, London

Queens Crescent, London

Polyroof Products Ltd

Queens Crescent is a bustling retail street situated in London’s Kentish Town. The roof area above the Post Office building, which also served as a communal walkway area with access to the upper level of the adjacent buildings, had been suffering from leaks. To add to the issues, the aged promenade tiles had worn and become a slip hazard when trafficked. Looking for a lasting waterproof solution that can also provide heavy duty anti-slip surfacing, the client turned to Polyroof for a solution. To minimise access disruption to the upper level adjacent buildings, the client had organised a 5-day window for the waterproofing and surfacing works to be completed.The SolutionThe main contractor had removed the old paving slabs and membrane back to the concrete deck underneath and carried out repairs to create a level surface.Approved Polyroof Contractor Emperor Roofing began by priming the concrete surface to create a sealed, non-porous substrate. With its quick-curing properties, the Polyroof primer was ready to be over-coated only 30 minutes after its installation.A specialist twin-pack epoxy metallic primer was applied to metal detailing sections, including ducting vents and the intricate balustrade detail alongside the communal stairwell, which also formed part of the specified works.Local reinforcements were carried out to these details involving taking Protec resin and PolyMat 450 up by 150mm before applying the full waterproofing system.Upon completion, the balustrades were re-painted, with the paint being taken over the waterproofing membrane to create a neat detail. A key advantage of liquid systems in general is their ability to seamlessly seal around complex detailing; in this instance, quite simply, the balustrades could not have been sealed effectively using a traditional waterproofing technology.Polyroof’s Protec System enjoys exceptionally fast detailing speeds, where its formulation allows it to rapidly break down the chopped strand mat reinforcement and neatly moulds around the detail it is covering. To the left of the stairwell, the Protec system was chased in at a height of 150mm above the level of the stairs.The termination point of the waterproofing membrane was sealed with mastic to create a fully weatherproof detail. The Protec system was dressed onto the wall abutments to the main areas but left self-terminated as new render is to be applied to the walls and taken down over the top of the Protec system.After local reinforcements were completed the main waterproofing system was applied to the walkway and stair areas.The two-coat Protec system was able to be rapidly installed with its 30-60 minutes cure times, meaning the project was comfortably ahead of schedule by the time it was complete.Next, the designated anti-slip areas were carefully masked off, leaving the exposed waterproofing to the roof perimeters, detailing and vertical sides of the step and stairs. A third coat of Protec was applied to the masked sections and, whilst the liquid was still wet, 0.7-1.2mm quartz sand aggregate was broadcast into the resin.Once dried, the aggregate is embedded within the membrane and lose sand was brushed off and collected to be re-used. In order to provide an extra-tough surface that sealed that aggregate in place, a coating of PolyFinish was applied over the aggregate in the client’s choice of light grey.
Sponsored
Automated Cycle Wheel Travelators Installed in the Heart of the City

Automated Cycle Wheel Travelators Installed in the Heart of the City

Falco UK Ltd

Falco is pleased to announce another installation of the UK’s only automated cycle wheeling ramp, for 20 Ropemaker Street, located within the heart of the city. The new automatic cycle wheel ramps have been installed by Falco as part of a £240m state-of-the-art development bringing a new commercial building of more than 450,000ft² of Grade A, BREEAM ‘Outstanding’ office space and premium retail provision to a prominent corner site just north of Moorgate Station.The automated bike wheeling ramp known as the ‘VeloComfort®’ is a huge innovation and Falco is once again delighted to bring what is standard Dutch cycling technology to the UK market. These wheeling ramps provide cyclists with the next generation of accessibility and are designed to assist users with manoeuvring their bikes up and down stairs with virtually no effort.This is particularly important where a bike is either heavy or perhaps has a basket or panniers and makes carrying a bike up stairs or even using a traditional wheeling ramp difficult. The VeloComfort® range comes in two patented innovative designs, one for manoeuvring bicycles up the stairs - VeloComfortUp®, and one for down - VeloComfortDown®!Falco supplied and installed 22m of both VeloComfortUp® and VeloComfortDown® designed to meet the client’s exact stair dimensions.The VeloComfortUp® is essentially a mini ‘travellator’ or conveyor belt which starts once the integrated sensors detect a bike and automatically stops if the conveyor is completely free of bicycles. The high quality conveyor (kevlar-based) belt runs in a durable, low-maintenance aluminium double-sided channel and is powered by an electric motor. The entrance and exit of the conveyor are aesthetically, functionally and safely integrated into the system, with the electric motor positioned on the side of the conveyor belt.The VeloComfortDown® is a simple and effective non-electric cycle / bike wheeling ramp designed with a gutter brush to reduce the speed of the bike. The gutter brush is made from a high quality, durable and low-maintenance aluminium double-sided channel, which is equipped with brush strip on both sides. The friction of the gutter brush ensures that the bike slows down, allowing the user to determine his/her own pace during the descent.Falco provide complete supply and installation of the VeloComfort® cycle wheeling ramps as well as free rendering graphics to help the client to visualise the scheme, free UK-wide site surveys and free CAD design and schematics.A video demonstrating the VeloComfort® Bike Wheeling Ramp can be viewed by clicking here.For more information about the innovative VeloComfort® Bike Wheeling Ramp, please contact our helpful sales team on 01538 380080.
Sponsored
Burton Rugby Club, Burton-on-Trent

Burton Rugby Club, Burton-on-Trent

Smart Balustrades

Client: RL HarrisonContract value: £50kProducts used:3kN loading rectangular post balustrade with glass infill panels to viewing areas1.5kN loading 48mm diameter stainless steel balustrade to main staircaseWe were appointed to provide more than 90 metres of balustrades and 25 metres of handrails to Burton Rugby Club’s new Battlestead Croft site in Burton-on-Trent. This project involved supplying and installing balustrades and handrails to the viewing areas and main staircase of the new facility – with two important factors to consider: ensuring we stayed within the client’s budget, and selecting the most suitable products to provide an optimum viewing experience for visitors. The initial design drawings showed a vertical bar system along the viewing area, but this was not aesthetically pleasing and would have limited the view of the pitch for wheelchair users. We worked closely with the client to find the correct solution – as structural glass would have exceeded the client’s budget, we chose a balustrade system with 60×30 rectangular posts that are capable of achieving 3kN loading, with clear toughened glass infill panels. We also increased the height of the handrails, both for additional safety and to ensure it would not obscure the view of the pitch for wheelchair users. 
Sponsored
KaDeWe department store

KaDeWe department store

Villeroy & Boch AG

KaDeWe in Berlin, one of the world’s most renowned department stores for more than 100 years, introduces its customers to new shopping experiences time and again. In doing so, KaDeWe constantly reinvents itself and undergoes constant change. Numerous structural modifications ensure that the building keeps in step with the times, both spatially and architecturally. During the project, customer toilets were equipped with sanitary products from the Aveo and Loop & Friends from Villeroy & Boch in the scope of a renovation of the sales area by Architect Udo Landgraf and Ingenieurbüro Trache IBT.
Sponsored
Cladding Stairs in Engineered Herringbone Parquet Flooring

Cladding Stairs in Engineered Herringbone Parquet Flooring

The Solid Wood Flooring Company

Few people realise that it is possible to clad old stairs with our engineered herringbone parquet floors. It is a specialist skill and you should only employ trusted professionals who have the specialist equipment. The parquet blocks used here are unfinished so that you get perfect square edges. They are then oiled after all other works are completed so that you get your perfect floor. There is no separate stair nose piece as the top layer of solid Oak is a good 4mm thick and this allows the fitters to create an accurate mitre join.
Sponsored
Rockfon answer acoustic challenges with intelligent solutions

Rockfon answer acoustic challenges with intelligent solutions

Rockfon

Delivered under the 21st Century Schools and Education Programme, the new Caldicot School building in Monmouthshire offer the innovative and flexible learning facilities demanded by a contemporary secondary school. There are spacious classrooms, a multi-use hall, theatre-style learning areas and studio spaces for students to study informally. The building is designed to be energy efficient and natural light has been optimised throughout. Monmouth Comprehensive is equipped with state of the art facilities. Rockfon acoustic products play a pivotal role in both schools by creating stimulating learning environments that are at the heart of the architect’s vision.
Sponsored
Living space as a power plant: Solar house

Living space as a power plant: Solar house

Hawa Sliding Solutions AG

The «Plus-Energie-Haus» constructed by the Technische Universität Darmstadt is a Solar Decathlon winner. The competition has been held each year since 2002 by the US Ministry for Energy. The task is to design and build a residential house to suit life that is self-sufficient with regard to energy. The houses must cover their entire energy requirements through self-produced solar power. Between two layers is a protected external area with sliding windows and folding slat shutters that can be opened and closed as needed. The folding sliding shutters are equipped with HAWA Variofold 80 H.
Sponsored
STEPS Rehabilitation Centre, Sheffield

STEPS Rehabilitation Centre, Sheffield

Innova Care Concepts

We were originally contacted by STEPS Rehabilitation when they were researching products to include in their new-build centre. they chose to go with us because of how subtle and sophisticated our product range is. The team wanted to make their facilities feel as comfortable and cosy as possible, and we provided equipment that could match that on all fronts. We also supplied and installed a completely bespoke stainless steel hydrotherapy pool complete with air jets and colour-changing LED lights! See videos of our work at STEPS over on our website.
Sponsored
Science & Technology Facilities Council (STFC) Rutherford Appleton Laboratory

Science & Technology Facilities Council (STFC) Rutherford Appleton Laboratory

Kingspan Light + Air

The Science and Technology Facilities Council’s Rutherford Appleton Laboratory in Oxfordshire is recognised across the globe for its innovative research across a number of scientific fields. The lab employs over 1600 scientists and, as its work has developed, it became clear there was a need for a new, flexible space for testing the latest equipment. Oxford Architects created an iconic, curved design for the R105 Facilities Support Building and, in a break from the standard metal-clad facades of the surrounding buildings, specified a colourful façade using Kingspan Day-Lite Klick wall lights.
Sponsored
NBPC, Belle Vue Sports Village, Manchester

NBPC, Belle Vue Sports Village, Manchester

DYNAMIK Sports Flooring

DYNAMIK installed the purpose built sprung flooring at Belle Vue Sports Village which is home to Basketball England, the National Governing Body for Basketball in England. As their Official Sports Flooring Partner, DYNAMIK has contributed to grass roots sport in terms of gifting sports equipment as well as being headline sponsors of the National Schools Basketball Championships. Coaches and teams were delighted to have played on a sports floor where professional athletes train and winners are made. DYNAMIK excel in providing the best solutions and provide free of charge quotations and school surveys.
Sponsored
Private Hospital London

Private Hospital London

Specialist Door Solutions

Based in Central London, this private hospital boasts a clean, sharp design.The entire hospital is fitted with bespoke products to accentuate the premium setting. This Private Healthcare branch has been refurbished to equip SDS DFendoor doorsets in Woodgrain effect combining stunning looks, durability and hygiene.This great looking project boasts many bespoke features including 3 metre high woodgrain encapsulated SDS DFendoor’s, including doors with a different finish and colour on each side and colour matched cladding. SDS is proud to have added to the overall design and execution quality.
Sponsored
Wall Protection - BMI Healthcare Facility

Wall Protection - BMI Healthcare Facility

Gradus

BMI The Somerfield Hospital is part of BMI Healthcare, a leading provider of independent healthcare with a nationwide network of hospitals. Gradus SureProtect Pure hygienic wall protection in White was specified for use in the anaesthetic and sluice rooms, specifically designed for areas of a hospital where cleanliness is a priority, the hygienic wall cladding creates an impermeable barrier to moisture and bacteria and has a smooth, easy to clean surface. It offers a tough and durable finish helping to protect against impact and abrasion from passing equipment, trolleys and beds, thus reducing any ongoing repair and maintenance costs.
Sponsored
IKEA Hammersmith

IKEA Hammersmith

RYNO

The Ikea Hammersmith roof terrace project was an exciting one to be involved with as it is a perfect example of when to use a rail-based support system over pedestals.Ikea is a global brand known for its simple design solutions that can be used by everyone.The system – TerraSmart Rail IGNOThere was 6600m2 of the TerraSmart Rail system installed across the terrace to support concrete pavers and porcelain pavers. The lattice make-up of the paving system meant that the insulation layer placed upon the original roof was held down. This framework offered a robust and reliable substructure to the walking surface that will experience a lot of foot traffic.As it is part of our IGNO range, the system is fully non-combustible.The ChallengesThe roof had existing features in the structural slab, which meant that pedestals alone wouldn’t have been able to successfully support the surface, and therefore, a rail system was employed. The rail system allowed easy adjustment to the height creating level plains across the terrace. This system also became an advantage when forming the ramp featured in the design because the TerraSmart Rail can provide non-combustible multidirectional support to the pavers maximising stability and reliability, creating a robust and safe incline a the desired angle.Two different pavers were used as part of the project, a 50mm concrete tile and a 20mm porcelain tile. The transition between the two pavers took place at the same level. The seamless transition between the two finishes was achieved by ‘zoning’ the areas and changing the paving support heights.As it was part of a larger building, the terrace had to account for the expansion and contraction felt over time by differences in the residual temperature. The paving supports had to account for this so that any heat-induced changes would have minimal impact on the safety of the surface. An expansion profile was manufactured to slot between the tiles found over the expansion seam in the insulation to overcome this issue. The expansion profile rises above the gap between pavers and creates an L-shaped cover, hiding any expected movement.Why the project succeededThe success of this project was down to the collaborative effort between everyone involved in the project. The unique features of the project were worked on by the project, innovation and specification teams at Ryno and were complemented by the installation carried out by Greenside Landscapes.
Sponsored
SMART GATE AND MESH IN PAVILION MAKEOVER

SMART GATE AND MESH IN PAVILION MAKEOVER

Zaun Limited

The Trumpington Residents’ Association and Cambridge City Council wanted to update a 60-year-old pavilion at the heart of the village in a £600,000 community project.Cambridge architects 5th Studio designed a striking colourful exterior cladding. They turned to an artist specialising in the treatment and perimeter fencing manufacturer Zaun to create the multi-coloured stripe effect with a specialist bright green protective steel mesh ‘cage’.The SolutionTrumpington Pavilion employs an unusual multi-coloured exterior treatment. An artist specialing in the technique has dribbled green, blue, red and yellow randomly onto a corrugated plastic sandwich sheet, which is then covered with Zaun’s Duo8 mesh in bright green, fixed to coloured timber battens.The pavilion includes a main building with a hall, youth room, kitchen, toilets, office and inter-connected changing rooms for two teams plus an officials’ room.The doors to the changing rooms are in boldly contrasting colours. At the same time, an eight-metre green mesh electric sliding gate protects the building but opens to provide unrestricted access to the patio and the King George V Playing Fields beyond.Zaun installed the Diamond cantilever sliding gate with Duo8 mesh in-fill, KeyFob and internally mounted switchto ensure both the safety of all users of the pavilion when the gates are operated especially children, and the security of the contents when the pavilion is not in use.The original pavilion, built in the early 1950s, was about half the size of the new main building, including a small hall and changing rooms.
Sponsored
Bi-Fold Gates at Chelsea Waterfront

Bi-Fold Gates at Chelsea Waterfront

Bolton Gate Company

Chelsea Waterfront is a high-specification new development centred around the iconic Lots Road Power Station where car parking is facilitated by a basement accessed by automatic bi-fold gates. Having been specified by Terry Farrell, Bolton Gate Company were chosen to design, manufacture and install a set of gates which included two automatic bi-fold gates with an adjacent personnel gate. The main gates provided secure vehicular access being activated by card reader and the adjacent hinged gate allowed selective personnel access by key fob. A polyester powder coated finish in Basalt Grey was applied to blend in with the surrounding structure.
Sponsored
Supreme Vertical loft ladder specification available from NBS Source

Supreme Vertical loft ladder specification available from NBS Source

Premier Loft Ladders Ltd

Premier Loft Ladders has released technical data and a BIM object on NBS Source for the Supreme Vertical loft ladder. This heavy-duty retractable ladder offers safe and easy access to loft spaces and plant rooms that can only be accessed via an elevated wall hatch. As such, it is easier for architects and designers to find and specify a solution for this otherwise challenging access requirement.The heavy-duty concertina ladder offers a load rating of 200 kg per tread, making it suitable for both residential and commercial projects. It also benefits from being very easy to operate.The product data can be found within section L30 (clause 41 and clause 421).
Sponsored
Holne Chase

Holne Chase

Next Generation Rooflights

Significant remodelling benefits from Electric Access Hatch Rooflight, Pyramid Rooflight and & Lantern RooflightThe ChallengeThe homeowner wanted to undertake significant remodelling of their substantial London family home including partial demolition, conversion of garage into habitable space and other works to create a truly unique space.The solutionWorking closely with them we provided a range of product solutions including Electric Access Hatch Rooflight, Pyramid Rooflight and & Lantern Rooflight for their part single, part two-storey rear extension.At the end of the project our rooflights had helped provide a greater feeling of light and space with the Electric Access Hatch Rooflight providing easy access to their roof space.Whether you’re at planning or construction stage why not see how we could help you add natural light and space to your home project; you can call us on 01223 792244 or pop us an email via info@nextgenrooflights.co.uk outlining what help you need.
Sponsored
Silverstone uses Resuflor HB for world-class visitor experience

Silverstone uses Resuflor HB for world-class visitor experience

Sherwin-Williams

The Silverstone Experience is a new technology driven and interactive visitor attraction opened in the summer of 2019 celebrating the exciting past, present and future of Silverstone and British motor sport.Fuelled by the most comprehensive and accessible collection of British motor sport records, the visitor can delve deep into the history of both Silverstone and British motor racing through an immersive state-of-the-art visitor journey.The system specified was Resuflor Topcoat which uses the Resuflor HB high build epoxy resin product incorporating an aggregate scatter used to create a hard wearing anti-slip finish which could be cleaned and also provide a safe surface for busy footfall. Resuflor Topcoat is regularly specified in automotive type workshops.
Sponsored
Rolec Provides Smart Chargepoint Solutions to North Middlesex University Hospital

Rolec Provides Smart Chargepoint Solutions to North Middlesex University Hospital

Rolec EV

North Middlesex University Hospital NHS Trust, serving over 350,000 people in North London, has been a pillar of healthcare for a century. Embracing innovation, they recently expanded their services to include on-site electric vehicle (EV) charging, aligning with the government's Net Zero goals. In collaboration with Rolec, they installed 23 dual socketed BasicCharge pedestals, providing 46 EV bays in their new parking garage. Compliant with regulations and designed for accessibility, the solution includes LED amenity lighting and a Smart back-office management system for tailored charge point management and tariff settings. This initiative reflects the hospital's commitment to both public health and environmental sustainability.Click "view more" to read the full case study.
Sponsored
9 to 11 Richmond Buildings, Soho London

9 to 11 Richmond Buildings, Soho London

BTS Fabrications Limited

Installer – Richardson RoofingMain Contractor – John F Hunt LtdArchitect – Scott BrownriggClient – Firmdale Hotels plcSystem(s) – Vantage®️ SF and bespoke flashingsThis is our premium CWCT tested secret fix rainscreen located in this trendy part of London.The rainscreen is 3mm aluminium and powder coated to RAL 7016 and RAL 7037.It is showcased on all 4 elevations of this residential and office development directly adjacent to the Soho hotel.It was an interesting challenge for our logistics team delivering to this urban development with very limited access and plant.BTS Facades & Fabrications smaller sprinter vehicles were used for handball unload on site.BTS are proud to be involved with yet another Scott Brownrigg architectural design.
Sponsored
Duo D410, D411 and D431 Balustrades at Stockland Green College

Duo D410, D411 and D431 Balustrades at Stockland Green College

Delta Balustrades Ltd

Duo D410/D411 Glass InfillDuo D431 Perforated Infill Top FixDelta Balustrades were pleased to play a part in of the large Birmingham BSF Scheme with the completion of several hundreds of metres of balustrades in this new build project. Balustrades were installed to far reaching street areas with feature stairs leading to 2nd floor. Continuing across atrium bridge links on both 1st and 2nd floors, several staircases, and external terraces the Duo system provided a focal point for the building.In line with Birmingham City Council’s requirements for schools, guarding to atrium edge and external terrace was required to be 1500mm high above FFL. A number of special access gates were required to match adjoining balustrades.
Sponsored
Focus Dursley

Focus Dursley

Planet

Focus is a new ‘ultra-modern working space’ in Dursley, designed to provide comfortable, flexible and convenient working and collaboration spaces to freelancers and local businesses in the surrounding area in the Cotswolds.Planet’s western contracting team worked directly with clients the Cullen Group on this fit-out to bring the eye-catching by design interiors experts OMO to life.Our popular and versatile PURE20 (40dB Rw) partition system was used to great effect for Focus’ office fronts and single person phone booth spaces, with the slim profile IsoClear glass doors (34dB Rw) providing access.Curved PURE20 glazing was also manufactured by Planet at our in-house facilities and used with IsoClear for two of the space’s larger ’domed’ meeting rooms.
Sponsored
The Steading - Scottish Borders

The Steading - Scottish Borders

Advanced

An intelligent Advanced Go panel has been installed in The Steading, the home of sculptor and furniture maker, Tim Stead MBE.The Steading is an A-Listed building, located in Blainslie near Lauder in the Scottish Borders, and was both the creative centre and home to the Stead family across several decades. It was purchased by the Tim Stead Trust in 2021 and a programme of restoration work has included the addition of an Advanced Go new-generation, single-loop fire alarm control panel to protect this historic home.The Steading is considered Tim’s masterpiece with an interior that was transformed over many years. The interior is completely clad in sculpted wood: floors, walls, ceilings, stairs, cupboards, beds, a grandfather clock, sink, conservatory, hanging sculptures, desks and so on – all made by Stead himself. This exceptional building now aims to become a hub for practical expertise in everything to do with wood and the environment, hosting a variety of day and residential courses in the unique environment of The Steading.Fire and security service providers, Safe Services, installed the Advanced Go fire alarm panel in The Steading and were involved from the design stage though to installation and commissioning. The Advanced Go panel is integrated with EMS Firecell radio equipment for a complete cable-free fire system – which was an essential requirement to preserve and protect the unique interior of the building.
Sponsored
Aluminium work platforms for industrial tipper trailers

Aluminium work platforms for industrial tipper trailers

Elefant Gratings T/A PcP Gratings Ltd

The project was to provide an existing system with the new solution that offers high slip resistance according to evaluation group R13/V10* and to make it processable for a series production. For the new work platform on the trailers, a high-quality standard was to be achieved.The task included strict criteria for using recyclable metal with a minimum of waste without compromising with quality. Furthermore, the platform solution needed to achieve a very high standard in terms of quality with an outstanding finish and dimensional accuracy. outstanding surface finish and dimensional accuracy.The solutionAluminium floors for tipper work platforms “From coil to finished product”Optimal production technology in combination with high-performance materials enables production "from the coil to finished product" in terms of reproducible quality / extremely high dimensional accuracy / a perfect surface finish and economical production.In cooperation with our customer and our suppliers in the field of material and surface protection, we have developed a solution that allows us to develop an aluminium floor for the working platform on our customer's tipper trailer, true to our motto of manufacturing "from the coil to finished product".Due to our production technology of a sequence of several processing steps on a production line, we were able to develop a new floor for the working platform on our customer's tipper trailer using surface profiling (PcP Safety Grating Type US), we were able to achieve the slip-resistance classification required by the customer and certification by the Institute for Occupational Safety and Health (IFA in Sankt Augustin) - according to evaluation group R13/V10. Furthermore, the tools and materials used have enabled the process accuracy and the processing speed to be optimized and improved to a large extent. In particular, the excellent cooperation with our material suppliers (special foils in order not to contaminate the tools with foil residues) enabled us to achieve a perfect surface finish as required by the customer. Further processing is therefore not necessary and minimizes operational ways and resources.Quality assurance of products and series productionDue to the process-guided production, only the slightest deviations from the specified dimensional and quality requirements are possible. These are monitored and documented by instructed personnel and employees trained in the area of quality at specified inspection intervals. In particular, the product test bench set up for this purpose enables our employees to carry out a comprehensive test on the component and immediately correct deviations in series production.The resultCustom made flooring meets the strictest safety criteria for tipper trailersDue to the partly optimized tool technologies and adapted or partly new procedures and processes, the requirements of our customer's specifications could be fulfilled to 100%. The requirements of the employers' liability insurance association and occupational health and safety could be achieved with a certification (IFA) according to slip resistance class R13/V10. This decisive requirement was accompanied by the demands for process-optimized series production while meeting the requirements for dimensional accuracy and perfect surface finish.As a result, we are confident that we can supply our customers with a product that lives up to their name and market position.
Sponsored
Box And Walk-On Rooflights Enhance Extensive Roof Terrace In Luxurious London Mews House

Box And Walk-On Rooflights Enhance Extensive Roof Terrace In Luxurious London Mews House

Glazing Vision Ltd

Glazing Vision rooflights were used in the re-construction of this mews house situated in the prime real estate and conservation area of Mayfair, London. The building is an exceptional example of stunning architecture and elegant, contemporary interiors. Whilst adding a majestic character to the mews itself with its dark brick façade and impactful balcony, the outer appearance belies the vast size of the residence internally. After the demolition of the former mews house and after 2 years of construction, which had even necessitated underpinning the neighbouring houses, this property now accommodates a basement with indoor pool, lower ground floor with cinema room, open plan living and dining space, 2 floors of bedrooms and bathrooms, as well as additional terraced balconies.Keeping the interiors bright and airy throughout was key to the design concept – floor to ceiling windows and Flushglaze Walk On Rooflights from Glazing Vision were installed to maximise the daylight where it would have been otherwise compromised on the ground and second floors. In addition, a Glazing Vision 3 Wall Box Rooflight provides unimpeded access from an internal staircase to the impressive roof terrace, which is recessed down 1 1/2metres between 2 pitched roofs and which offers a vast outdoor space for entertaining, dining and relaxing.Two Flushglaze Walk On rooflights were specified by the architect to negate the risk of potential dark spots appearing in the dining zone and living area on the ground floor. Engineered by Glazing Vision to bespoke sizes and to meet the future projected foot traffic upon them, they were seamlessly integrated into the balconied terrace on the second floor, thus shedding light through to the bench seating in the kitchen and lounge.Their minimal internal framework was in keeping with the contemporary aesthetic of the interior, and both rooflights augment the quality and quantity of light entering this open plan area, even extending out towards the central stairwell and landing.Two further custom-sized Flushglaze Walk On Rooflights installed on the roof terrace add an intricate design detail but also create a wow factor. Perfect for flat roof terraces, these rooflights lie flush with the wooden decking. Again tested to allow for regular foot traffic and to bear the weight of terrace furniture, the rooflights offer complete safety and watertight integrity. On the second floor below, the two windowless bathrooms are flooded with the light coming through these rooflights – indeed such is the brightness of these rooms that privacy blinds have been installed for occasional use.Seeking to optimise the very large roof space that had been created (4m x 8m) the architect specified Glazing Vision’s 3 Wall Box Rooflight, which would offer easy access all year round to the roof terrace and also provide a contemporary glass feature. For the accommodation of the 3 wall mounted box rooflight a timber box frame had to be built which abutted the exposed brick wall behind.The property’s imposing central staircase provides access to the box rooflight, which in turn maximises the light falling down the stairwell to the bottom of the house. At a touch of a button from an access keypad, the sliding roof retracts to give a 50% clear opening with no “bowing of the head” necessary. The operation is quiet and safe, and the provision of a rain sensor ensures closure from inclement weather.
Sponsored
Princess Anne Hospital - When a gift from Banksy turned a window into an automatic door

Princess Anne Hospital - When a gift from Banksy turned a window into an automatic door

FAAC Entrance Solutions UK

Part of the University Hospital Southampton NHS Foundation Trust, Princess Anne Hospital opened in 1981 and is known as a centre of excellence for maternity care. Providing specialist care for women during pregnancy, as well as genetics and breast screening.Project Year: 2023Product: ASSA ABLOY SL500 FrameArchitect: Strata DesignClient: West End ConstructionProject Background: During the first wave of Covid, a piece of art named 'Game Changer' appeared at Southampton Hospital, this was a gift from Banksy to thank the 14000 staff members, as well as honour the work of NHS workers everywhere. The canvas was auctioned to raise money for NHS charities and organisations, raising a total £16.8m.Part of these funds have been used to improve the facilities, and this is where Landscape Architects Strata Design and West End Construction were engaged, to design and build a rooftop oasis for all the hospital staff, to have a place to enjoy and unwind.Solution: Working collaboratively and having surveyed the site where a window was to be turned into a door, FAAC Entrance Solutions proposed a framed SL500 bi-parting sliding door, in order to both maximise the opening width as well as keep the natural light into the building. Being a staff restricted area, access control was also a must, so this was integrated with existing staff passes to facilitate swipe access and with our QFlow traffic light system which regulates occupancy. The SL500’s framed system is a robust resilient door, making it perfect to manage high volumes of traffic as well Southampton coastal wind loads. Additionally, with its thermally broken profiles, additional tight-fitting brushes, it will contribute to keeping energy costs down in comparison to slimmer or manual door entrances.For more information or assistance with any project, please contact enquiries.esuk@faactechnologies.com where we can provide expert guidance and detailed documentation.
Sponsored
Heavy duty and porous asphalts for business park

Heavy duty and porous asphalts for business park

Tarmac

Heavy duty surfacing was required for new access roads and car parking areas as part of a project to extend this business park located close to the A1 near Biggleswade. Using HGV resisting Ultiphalt HD asphalt on access roads combined with ULTIPOROUS free draining asphalt on parking areas provided both sustainable drainage and long term durability.
Sponsored
RSPL Case Study

RSPL Case Study

Abloy UK

Creating Safe Spaces with Hands-free Access
Sponsored
Environment at the heart of Eden/A3 Bailey

Environment at the heart of Eden/A3 Bailey

Knauf UK

The 115,000 square feet, 12-storey office scheme Eden/A3 Bailey in Manchester is designed with the ambitious goal of becoming one of the most environmentally friendly offices in the UK.  This ambitious goal included one of the biggest green wall façades in Europe in accordance with Passivhaus principles. As such, it was imperative the products specified were both sustainable and high performing to meet the demands of the brief.The challenge would be to strike a balance between performance on site and sustainability in the long term. This meant suppliers who could demonstrate a commitment to sustainability within their supply chain were at an advantage. Combined with their quality and high-performance products, Knauf were chosen.Neil O’Toole, sub-contractor for Linear Projects elaborates: “Given the aim of the project, we needed to use specialist products. This combined with the familiarity we had with Knauf meant that they were specified for use within the building itself.”Rahul Vishwakarma, the architect for the project from Make Architects continues. “Knauf offered guidance not just on their own products but on overall wall build ups which assisted in making design decisions . Furthermore, we found that their sustainability credentials aligned with the project.”The specialist products used included Knauf Shaftwall. Designed to meet fire safety requirements and building codes, Shaftwall provides high levels of fire protection enhancing the level of safety within the building for occupants. Using Knauf Shaftwall also allows for greater space optimization, by allowing for the creation of fire-rated vertical shafts, including elevator or stairway enclosures and horizontal shafts for electrical and plumbing services. Ensuring centralized services within designated areas and freeing up space.What made Knauf Shaftwall really stand out for Rahul though was the versatility it offered. As he explains. “Knauf Shaftwall was perfect for use on this project because it can be adapted to different building designs and configurations. Giving us much greater flexibility in terms of the build-up and layout, thus allowing us to customize the system to meet the specific needs of the project. That it is durable and long-lasting was an additional benefit.”A range of Knauf High Performance Plasterboard was used to meet the acoustic requirements of the office space. Knauf Soundshield Plus and Performance Plus were used to ensure a quieter more comfortable working environment and to provide Knauf Performer wall types as partitions throughout the building.  Furthermore, Knauf boards contain Recycled Gypsum along with Natural and FGD gypsum to form a strong core and system performance.Knauf Encasement system with Fire Panel was used to meet the safety requirements for the building, by offering fire protection to encase the steel work throughout the building.Knauf Test Data was used to enable the boards to contribute to the holistic performance required. This was particularly attractive for the architects given the use of heat pumps throughout the building.Knauf Ready Mix Finish provided a sustainable addition to the products used. As not only did reduce the amount of water that needed to be introduced into the build, but it also reduced the amount of waste produced. This is because any unused product can be put back into the bucket and used for another project.Whilst these products assisted in the development of the Eden/A3 Bailey, there were challenges.Something that Neil elaborated on. “At the start there wasn’t a full design, which meant we had to be agile and smart with how we approached the build. We were having to adapt as we went along, something we were only able to do thanks to Knauf. Their familiarity with the systems we were using meant they gave us advice on the best way to put things together. And if we had any questions or needed help, they were always on hand to provide it.”Neil Shaw, Contractor at B&K expanded on these issues. “Initially, there were a few challenges regarding getting a fire system installed. We needed one that had fire test data to meet the requirements of the project and be compliant with regulations. We tested a few systems and eventually settled on Knauf Fire Panel as it was the system that best met our needs.”Throughout all these challenges, both Neils felt that Knauf were incredibly helpful and supportive.As Neil O’Toole explained. “I’ve known some of the team at Knauf for a long time. They were fantastic, they assisted with the design and provided site audits, ensuring that any questions we had were answered and any help we needed was provided.”Rahul agreed with the sentiment. “The project is quite a tricky one in terms of what we are hoping to achieve, but the team at Knauf are brilliant. It’s been really helpful being able to talk to the team at Knauf who are really knowledgeable about the field and are always quick to respond to any questions we’ve got.”The project is ongoing, but the signs are there that it will achieve its aim of being one of the most environmentally friendly building within the UK.
Sponsored
Ahl Masr Hospital, New Cairo - F. Ball chosen for Cairo Hospital Installation

Ahl Masr Hospital, New Cairo - F. Ball chosen for Cairo Hospital Installation

Ball, F and Co Ltd

A high-performance levelling compound and adhesives from F. Ball and Co. Ltd. have been chosen to install floorcoverings in the Middle East and Africa’s principal healthcare and research centre for the treatment of burns and trauma, the Ahl Masr Hospital in New Cairo, Egypt.Flooring contractors from Cairo-based Tradelink installed floorcoverings throughout the newly built hospital, including in inpatient rooms, intensive care units, nurse stations, blood donation areas, emergency department, administration centre and corridors, a total area of over 5,500m2.Tradelink began by undertaking moisture tests to ensure that the building’s subfloors were dry enough to receive floorcoverings. Surfaces were then primed using Stopgap P131 general-purpose primer to promote the application characteristics of subsequently applied subfloor preparation products.Stopgap Red Bag was then applied throughout to create a perfectly smooth base for floorcoverings to be installed. The water-mix, self-smoothing underlayment is designed for areas that are subject to light wheeled traffic and can be used over normal underfloor heating installations.Styccobond F44 solvent-free acrylic emulsion adhesive was used to install Gerflor Taralay Impression Compact safety flooring throughout the hospital, with the exception of operating theatres and X-ray rooms. Styccobond F44 provides a high bond strength, strong initial tack along with a long open time and is protected against biodegradation.Gerflor Mipolam Elegance EL5 conductive flooring was installed using Styccobond F57 in the operating theatres and X-ray rooms. Carbon fibres in the adhesive mean that when set it will conduct electricity, so when used to install conductive/anti-static floorcoverings, it stops the build-up of electrical charges that can affect sensitive electronic equipment. The solvent-free adhesive also offers strong initial tack and a high bond strength.Finally, Tradelink used Styccobond F60 contact adhesive to install skirting and capping and coving, as well as anti-bacterial PVC wall-guards, throughout the hospital.

Showing 2161-2196 of 2357

Feedback