NBS Source
I'm a manufacturer

"cavity barriers"

1,216 results found

Sort by:

Showing 217-220 of 220

Sponsored
Kings College Residences Repair Stands

Kings College Residences Repair Stands

Cyclehoop

Kings College London Residences manage accommodation for students at sites across central London. They provide facilities, support, and a programme of activities to help ensure their students have the best possible university experience. With close proximity to the cycle super highway, cycling is a fast, fun and practical solution for students’ transport needs. However, for many students, bike maintenance can be a barrier to cycling.Sustainability is a key theme within KCL residences and the university as a whole. Throughout February the university runs daily events on the topic, including a seminar on cycling in London. With this in mind, the residences team identified our Deluxe Bike Repair Stations as a great way remove the bike maintenance barrier, and to boost cycling culture within their student and staff cohorts.KCL GDSA Residences chose Cyclehoop following similar successful projects undertaken on KCL campuses. Our teams surveyed various locations across two sites, facilitated the eye-catching custom KCL branding, supplied the units and completed the installations. The repair stations offer a dedicated space for bike maintenance, convenient access to high quality tools and a focal point for the cycling community to meet and connect.The bike repair and pump stations are a brilliant asset to enhance our students’ university experience. They promote the benefits of cycling and empower students to choose a sustainable mode of transport, helping fight poor air quality and climate change. Cyclehoop managed the project from supply to installation, the whole process was entirely stress-free.Maddie JammehResidence Manager, King’s Residences
Sponsored
Floor impact sound reduction in snooker room, Cheshire

Floor impact sound reduction in snooker room, Cheshire

Hush Acoustics

Hush Acoustics were tasked with providing a solution to reduce an impact noise issue on the upper floor of a luxury five-bedroom detached home in Knutsford, Cheshire.Home to a professional football player, the issue stemmed from the noise on the flooring of his snooker room. Impact noise from footsteps when using the room was generating nuisance noise within the living area directly below, which was making it difficult for others in the family to enjoy this space.Working with Short Construction, building contractors based in Wilmslow, Hush supplied 167x sheets of our Hush Panel 33 to solve the issue. This is a versatile, high performing acoustic flooring which is widely used in timber construction, making it ideal for the timber separating floors in this property.With a combination of our eco-friendly acoustic felt and our rubber barrier mat, the Hush Panel 33 performs to all UK Building Regulation requirements as well as the Robust Detail performance targets for timber frame developments. Its unique composition makes it easy to install and quick to use.The product works by creating a high mass barrier and isolating the floor finish from the structure. As the nuisance noise issue in this situation was due to impact noise, it was key to introduce a high performing acoustic floor product to break the connection of the floor finish from the structure. This, in turn, improved the impact performance of noise transmission through the floor structure, giving the client the desired effect and enabling him to use the snooker room as intended.
Sponsored
Lorton Park

Lorton Park

Catnic, a Tata Steel Enterprise

Lorton Park development has been designed and built with energy and water conservation in mind. With a particular importance placed on the selection and quality of the materials used, Catnic’s innovative TBL was specified for all 46 luxury properties.BRE certified, the Catnic TBL range delivers industry leading linear thermal transmittance Psi values of 0.02 to 0.05 W/mK and safe working loads in line with Catnic’s existing Cavity wall lintels.Chris Watts, Sales Manager at Jewson, worked with Mr Hidari on the product specification,“After comparing different lintels on the market it became clear that Catnic TBL’s were best suited to the specific project requirements.“Due to the medium density concrete blocks being used onsite, AKI Ltd needed a product that could meet its thermal performance requirements and easily achieve the build’s load requirements – the composite design of the TBL made it the perfect choice.”The specifically designed flat top of Catnic’s Thermally Broken Lintel provides a simple, consistent junction with the cavity wall insulation. This removes the reliance on site workmanship, reducing the risk of a ‘performance gap’. There are also no brackets connecting the inner and outer leaf of the lintel and therefore there are no additional point thermal bridges that need to be considered.The large scale development project also benefited from Catnic Lintel Advance Scheduling System (CLASS). Through the fully comprehensive scheduling service, Catnic’s expert team created a concise document which detailed lintel descriptions, price, delivery time and a guaranteed structural accuracy.“This has been a huge, complex project and we needed a product that could deliver on the specific structural and thermal requirements,” commented Mr Hidari. “As the only lintel on the market with a complete thermal break, it seemed like the ideal product. I was particularly impressed by the Catnic team who provided us with a full design and specification for the entire development.”For further information on Catnic’s Thermally Broken Lintel range, please visit https://catnic.com/products/lintels/thermally-broken-lintels/overview
Sponsored
Albion Works, Manchester

Albion Works, Manchester

K Systems Insulated Facades

BackgroundLocated in the Ancoats area of Manchester, the Albion Works strip and re-fit project was funded by the Building Safety Fund, a Government Fund to remove unsafe non-ACM cladding on residential and mixed-use properties that are 18 metres and over and do not meet building safety regulations.K Systems Approved Installer QFF Façades were contracted to complete the exterior wall insulation and rendering of the 8-storey residential building.The original 60mm EPS system was stripped from the building and replaced with a safe, thermally efficient façade solution, which upgraded the fire performance of the cladding, ensuring the safety of both the building and residents.Our ServiceK Systems provided support throughout the application process for this Building Safety Fund project. The Technical team offered on-site technical and installation support throughout the build process and supported QFF to ensure quality and reliability.We produced a bespoke specification and worked closely with Thomason Consulting and QFF Façades to agree and deliver specifics such as fire stopping and abutment details.From design advice through to installation, we offered a partnership approach which aided a smooth installation process with minimal disruption.Technical Project DetailsThe original sheathing boards were replaced, and the K Systems Exicco M drained cavity façade system was installed. This high performing drained cavity system was specified as a requirement for this steel frame residential building. 60mm mineral wool insulation was specified to retain the line of the existing façade.Fire safety with high rise buildings like Albion Works is of utmost importance and this solution generates high levels of fire resistance and non-combustibility (A2, s1-d0 rating), meaning the latest building regulations were complied with. Additionally, the thermal performance of the building improved with a U-value of 0.28 W/m²K being achieved. Residents will therefore enjoy reduced heating costs and better living conditions.For the finish, silicone thin coat render ensured that aesthetically Albion Works had a clean, crisp attractive appearance. This durable, low maintenance render transformed the outside of the building and will ensure a longlasting finish to the property.

Showing 217-220 of 220

Feedback