NBS Source
I'm a manufacturer

"circulation fittings signs etc"

6,114 results found

Sort by:

Showing 217-252 of 652

Sponsored
A14 Integrated Delivery Team, A14/M11, Cambridge to Huntingdon.

A14 Integrated Delivery Team, A14/M11, Cambridge to Huntingdon.

Hahn Plastics Ltd

The ChallengeIn 2015 a joint venture of Balfour Beatty, Costain, and Skanksa (A14 integrated delivery team) was awarded £1.5bn by Highways England to improve the A14. These improvements included a new major 12-mile bypass, the widening of the A1 and the existing A14, improving the junctions on the A14, and building new access roads.The A14 carries around 85,000 vehicles per day; 26% of this is HGV traffic. It is frequently congested and traffic is often disrupted by breakdowns, accidents, and roadworks.As part of the A14 major scheme, a new retaining wall was needed to be constructed as new road works were encroaching on the pre-existing embankments. A durable, long-lasting, and low-maintenance wall solution with a Highway Authorities Product Approval Scheme and British Board of Agreement (BBA) certificate was required.The SolutionA vast number of EcoCrib mass gravity retaining walls are now constructed to support the embankments along the A14. The EcoCrib Mass Gravity Retaining Wall began its erection on 24th July and was completed on 10th October 2019. With a design life of over 120 years, EcoCrib is durable, and the most highly sustainable retaining solution. Designed, supplied, and installed by PC Construction, certified by the BBA and HAPAS in 2012.EcoCrib profiles are manufactured entirely from recycled UK plastic (bottle tops, car bumpers, etc) with any wastage or surplus material re-processed to form new EcoCrib profiles. Developed from timber crib technology, the 50mm x 125mm EcoCrib profiles are considerably more durable than treated timber but hold many environmental benefits.EcoCrib can be recycled when it reaches the end of its useful life.When considering solutions for developments of all kinds, the lifetime cost means EcoCrib is the more efficient choice.1838 SQM of EcoCrib was used in the scheme, equivalent to 212 tonnes of plastic waste diverted from landfill.
Sponsored
Anson House Residential Apartments in Westminster Receives Falco Cycle Hub

Anson House Residential Apartments in Westminster Receives Falco Cycle Hub

Falco UK Ltd

Falco recently took to the design, manufacture, supply and installation of a bespoke cycle hub based on the traditional FalcoLok-500 design. Installed at Anson House, south Westminster, in view of the River Thames, the new cycle hub has been coupled with the FalcoVert-Pro cycle rack to provide secure accommodate for up to 24 bikes.Installed on behalf of Westminster City Council, the new cycle hub features electrogalvanised perforated sheet cladding, powder coated in a Jet Black RAL colour, along with a secure access system.The whole shelter is a bespoke contemporary design of the classic FalcoLok-500 shelter, which features clean lines through the glass cladding and supported by stainless steel glass clamps. The steelwork is hot dip galvanised to BS EN ISO 1461 and also meets UK structural design laws with EN 1090 accreditation. Rainwater is collected via innovative integral gutters as part of the roof system and a bespoke bund ensure that the cycle hub is weather proof!The cycle hub was commisioned to help reduce congestion and provide greater cycling accessibility for residents of Anson House.The FalcoVert-Pro as shown here at Anson House, is a space saving cycle rack design ideal for highly popular densities such as stations, cycle hubs, shopping centres, high streets and car parks etc. Bicycles are parked semi vertically with both front and rear wheels located in a custom designed trough.Falco cycle hubs can also incorporate a world of features including; smart LED lighting, green sedum roofs, CCTV and Help Point facilities as well as numerous other cost-effective features for the cyclist such as lock holders, helmet lockers, seating and bike repair facilities. For more information about the FalcoHub cycle store, a demonstration of the FalcoSmart app-based lock, the FalcoPod bike hangar or any other Falco product, then please speak to one of our friendly customer service staff on (01538) 380080.
Sponsored
SMART FIRE PREVENTION SYSTEM INSTALLED IN ASSISTED HOUSING DEVELOPMENT IN YORK

SMART FIRE PREVENTION SYSTEM INSTALLED IN ASSISTED HOUSING DEVELOPMENT IN YORK

Firechief Global

The Wilberforce Trust is a charity dedicated to helping and empowering those with sight and hearing loss and impairment in the York and North Yorkshire area to live fulfilling and independent lives. The Trust had tenants in community based supported housing and family homes around York but wanted to deliver an innovative ‘extra care’ housing scheme designed especially for people with a visual impairment and other disabilities; the first of its kind in the area.Wilberforce House offers 30 one-bed, open-plan purpose-built, self-contained apartments along with a Living & Learning Zone – providing education and leisure activities – a courtyard cafe and offices for the Trust itself, all set in four acres of accessible landscaped gardens, including a large sensory garden. The apartments utilise smart home and assistive technology personalised to their lifestyle needs.A consultant was employed to review the development’s plans with regard to fire safety. His report included recommendations for additional fire safety measures including the ability for cooker hobs to be switched off by an alarm, as kitchen fires are a significant risk with 50% of all accidental house fires starting in the kitchen. WHY THE FIRECHIEF KITCHEN STOVE GUARD? The initial solution proposed was costly as it meant hob alarms would need to be hard wired into each apartment’s fuse board. Damian Pocknell, Head of Housing, Facilities & IT at the Wilberforce Trust recalled having seen and read about the Firechief Kitchen Stove Guard and realised that this would be much more cost effective. The fire consultant agreed and subsequently signed off on the Kitchen Stove Guard as the approved solution.  
Sponsored
Emseal Colorseal celebrates 3 decades of successfully sealing wide expansion joints between the original building and its 10-story extension added back in 1992 at the Guggenheim Museum in NYC

Emseal Colorseal celebrates 3 decades of successfully sealing wide expansion joints between the original building and its 10-story extension added back in 1992 at the Guggenheim Museum in NYC

NCC – Emseal Movement Joints

Client: Solomon R. Guggenheim Foundation Architects & Engineers: Thelwell Gwathmey Siegal Kaufman (concept by Wright in 1951) Main Emseal Products Used: Emseal Colorseal is on Permanent Exhibition at this Landmark Museum following a hugely successful 24- year ‘run’ at the Guggenheim in New York City. Twenty-four years ago Emseal Colorseal system was installed between a neighbouring building and the 10-story Guggenheim museum office extension completed in 1992; it is clearly still as resilient and watertight as the day it was put in. Where’s the Emseal Colorseal? - The joint is between the limestone-faced building extension on the left of Frank Lloyd Wright’s iconic original and the darker neighbouring brick building to its left. For most designers expansion joints are a necessary evil – and ‘Evil’ for their disruption of design aesthetics – although when cleverly positioned, as in this case returned and rebated slightly back from the building face, the joint becomes a part of the shadow line. From just 2-3m away the joint remains essentially an insignificant 'shadow-line', and back in 1992 it was colour matched with the limestone façade as seen when viewed close-up. Today in 2022, the Emseal Colorseal joints are still fully intact and securely non-invasively bonded in position on both sides of the joint. The material is resilient and responsive, the stored energy of pre-compression remains very evident and there are no signs at all that the material is starting to degrade in the joints, even after this length of service in the exposed environment of NYC in Manhattan.
Sponsored
Westfield, Stratford

Westfield, Stratford

Berry Systems

Vehicle and pedestrian safety barriers for edge protection on perimeters, ramps and other areas in three multi-storey car parking at a new shopping mall adjacent to the London Olympic Park.Berry Systems installed one of our largest ever car park safety barriers projects at Westfield Stratford City with over 7 kilometres of Berry Beam barrier, all mounted on our impact absorbing spring steel buffers.The £1.5bn Westfield Stratford City complex covers an area of 1.9 square miles and houses 300 retail outlets, 70 food outlets, 3 hotels, multiplex cinema, bowling alley and casino. It also has 5, 000 parking spaces across 1 adjacent and 2 integral multi-storey car parks. The safety barriers were very carefully specified by architects: Buchan Group International. The car park structures are metal framed with concrete decks with an exterior expanded metal mesh surround and cladding. All floors have our Berry safety beams mounted on RB1X and GH spring steel buffers to provide full perimeter protection meeting BS EN 1991-1-1 and BS 6180 standards.All the ramps in the two overground car parks have curved Berry Beam barriers to match the varying radius of the ramps. On tighter bends and at ramp exits, chevron signs have been mounted directly to the barriers. All ramp returns and split level areas are protected by our barriers, again mounted on RB1X buffers with handrail extensions and anti-climb mesh.
Sponsored
BATHROOM FURNISHINGS AT THE OUTER ALSTER LAKE IN HAMBURG

BATHROOM FURNISHINGS AT THE OUTER ALSTER LAKE IN HAMBURG

KEUCO

Black, modern fittings and accessories made by KEUCO in the Design Hotel Le Méridien, Hamburg. KEUCO offers an exclusive black-brushed finish which cannot be underquoted. The matt fittings and accessories are a result of a PVD process that guarantees a surface that is extremely insensitive with a luscious tone of colour and a very high grade of hardness.
Sponsored
Fire Rated Decking and Class A substructure

Fire Rated Decking and Class A substructure

Wallbarn Ltd

Refurbishment of terrace with Class A fire rated non-combustible decking system. Exadeck porcelain decking boards were fitted to Wallbarn aluminium rail substructure with Class A MetalPad EX adjustable height pedestals. Retro-fitting of entire terrace to comply with fire regulations Approved Doc B and BS 8579.
Sponsored
National Bank of Kuwait – Rutland TS.9205

National Bank of Kuwait – Rutland TS.9205

Rutland

Project DetailProject: National Bank of KuwaitLocation: London, UKProduct: TS.9205 High usage architectural door closerProject DescriptionThe National Bank of Kuwait’s London head office required 36 fully adjustable door closers to fit a range of door sizes. They chose the TS.9205 because it:Is easy to install, as it is power adjustable by spring from size EN 2-5, meaning it can be fitted and then adjusted afterwardsHas fire rating on all fitting applicationsCan be installed on the push or pull side of the doorIs easy to open for any age or person, for compliance with the Equalities Act
Sponsored
Premier Loft Ladders add loft hatches and loft doors to their growing product portfolio

Premier Loft Ladders add loft hatches and loft doors to their growing product portfolio

Premier Loft Ladders Ltd

Premier Loft Ladders understand that ‘one-size does not fit all’. That is why our Designo and ISO loft doors are made-to-measure. These insulated doors are available in a wide range of sizes and can be fitted with security locks and other accessories. CAD drawings are now available for download from Premier Loft Ladders website.
Sponsored
The Royal Academy of Arts

The Royal Academy of Arts

In Opera (UK) Limited

Burlington House has been a home of the Royal Academy of Arts, the oldest art school in Britain, since 1867. Over the years this canonic site has seen impressive additions by a number of acclaimed architects. Continuing this rich history, in 2018, David Chipperfield Architects completed a major redevelopment of the building, delivering a brand new home to the RA.InOpera Group supplied and installed the terrazzo floors for the major parts of this new space, including Benjamin West Lecture theatre, Cast Corridor, Collection Gallery, hallways and staircases leading to the galleries, and public restrooms.In 2001, the RA purchased Burlington Gardens, the building that sits right behind the Burlington House. Since then, they’ve embarked on a bold masterplan to join the two buildings together for the first time in history.The project was undertaken by, none other than, David Chipperfield Architects. The practice has won more than 100 international awards and citations for design excellence, including the RIBA Stirling Prize in 2007 for The Museum of Modern Literature in Marbach, Germany.With the bold reconfiguration, they’ve created new workshops, library and more studio space for the Schools. Existing spaces, which were built in 1870, were restored to maximize space and light, with improved access and circulation.The requirements for the floor materials prioritised high-traffic endurance, slip-resistance and design that will blend in with the existing interiors of the buildings, which are rich with natural stone and classical elements.For this project, we supplied custom-made cement-based terrazzo with two types of finishes. The polished finish was installed for the gallery spaces, and the honed for the areas with more traffic. The material guarantees even colouration and consistent texture throughout the entire floor area. For the Benjamin West Lecture Theatre, staircases were carved out from custom-sized terrazzo blocks.
Sponsored
Absorb-R WoodTec Wall Slats at Newcastle University

Absorb-R WoodTec Wall Slats at Newcastle University

Soundis

Flagship of the University’s Science Central site...The building is a living laboratory dedicated to the aim of making urban centres more sustainable for future generations.We were contracted to supply & install various major acoustic elements required on this project. From the get go, our client and architect loved Soundis Absorb-R WoodTec range due to their versatility, and the fact we were able to manufacture the products exactly to the project specific specification. One of the Soundis products from the range were the Absorb-R Micro Perforated Timber Panels which were located and installed on the curved rear wall of the auditorium. The timber core panels were faced with Micro Perforated Formica and the client decided upon the colour red which contrasted the other products within the auditorium tremendously. Another major element of our acoustic package were the Absorb-R WoodTec Grooved Timber Panels which were installed within the main classrooms and smaller teaching spaces to provide excellent working spaces for the students by reducing reverberation times and enhancing the quality of Soundis within the areas. The panels in these areas were RAL painted to the colour chosen by the architect to provide the envisaged aesthetic look and feel of the spaces. Finally Soundis Absorb-R WoodTec Timber slats were installed not only on the walls of the corridors and staircases from ground level all the way to the third floor but they were also used as freestanding dividers in large open atrium and circulation spaces throughout the Learning and Teaching Centre. These timber slats were manufactured the exact specification of what the architect wanted to create a modern but sophisticated look within the newly constructed building. All installation carried out by our installation partner UK Acoustics.
Sponsored
Sutton Academy Chose Yeoman Shield Hessianex Wall Protection Panels to help protect the white plaster walls on corridors and study areas from becoming damaged and grubby

Sutton Academy Chose Yeoman Shield Hessianex Wall Protection Panels to help protect the white plaster walls on corridors and study areas from becoming damaged and grubby

Yeoman Shield, trading name of Harrison Thompson & Co Ltd

Yeoman Shield HessianEx wall panels at 1250mm high and 50x50mm Corner Protection Angles in Lilac was fitted on the ground & 1st floor corridors and plaza area. HessianEx panels, cut to 300mm wide was fitted as an attractive protection strip in waiting areas, to protect against chairs being pushed up against walls and causing marks and scuffs.
Sponsored
Newton Primary School Derbyshire

Newton Primary School Derbyshire

Broxap Ltd

Sunshine Gym have provided a brand new outdoor gym at Newton Primary School in Derbyshire.Newton Primary School decided upon the Primary School Outdoor Fitness Package which provided a pre-determined mixture of equipment specially selected by our experts to encourage fitness within primary schools. The equipment can be used by eight pupils simultaneously. Inclusive of both multi and single user equipment this package can be used as a gentle cardiovascular workout. It features two pieces of multi-user equipment, and these ‘dual’ units promote social interaction whilst still allowing the pupils to exercise at their own pace.The equipment was installed on grass saver matting. This additional safety surface, over time, will encourage the grass to grow through and be mowed. Thus allowing it blend with the natural surroundings.This specific outdoor fitness package is to be used by children under 140cm. This makes it perfect for the KS1 & KS2 pupils, and they can use it for small classes for PE pupils or even as an after school fitness initiative.
Sponsored
Ronald McDonald House

Ronald McDonald House

Record U.K. Limited

This record THERMCORD sliding door provides thermal insulation helping maintain an even temperature in the facility. This installation was fitted with a push pad for entry and safety beam radar activation presence sensors to detect traffic from either side of the door. The system was also fitted with battery back up to ensure safe door opening in the event of power failure. 
Sponsored
How to incorporate a fire or stove installation into a self-build project.

How to incorporate a fire or stove installation into a self-build project.

DRU Fires

How to incorporate a fire or stove installation into a self-build project.By Niall Deiraniya, UK general manager, DRU FiresAlways ask for the fireplace specification at the design stage. Modern gas fires and wood stoves require careful planning in order to work as part of the general home heating system.Gas, wood or other fuels?Decide which fuel type best suits your home. Modern gas fires have realistic flame pictures and are much more energy efficient than older models.Wood stoves and fires also have greatly improved energy efficiency due to Ecodesign regulations. The only downside is that there is much more work involved with buying and storing the wood and cleaning the stove after use.Both gas and wood have room sealed options. This means that no air from inside the home is used for combustion and all waste emissions are expelled outside, resulting in clean burning and high efficiency.Finally, sustainable fuels such as Bioethanol produce a very attractive flame picture, burn cleanly with no smell or emissions and are available in a large selection of design formats. Built-in or freestandingIf you are converting a house with an existing chimney, you may wish to retain the chimney, to incorporate a more modern fire. Conventional flue gas fires are designed to fit seamlessly into standard chimneys and require minimal building work. The chimney will almost certainly need sweeping before installation and the fire may require a chimney liner for essential safety.Most wood fires are also designed for chimney installation and make full use of the air circulation properties to provide visually attractive and energy efficient fires. You can either elect for a basic ‘insert’ fire, which matches the dimensions of a Class 1 chimney or a widescreen model, which will require some structural changes.Freestanding stoves are very popular, as they offer greater flexibility of location and provide dramatic room features. They are available in gas, wood or bioethanol and generally need a flue connection to an outside wall or through the roof. No chimney optionsContemporary balanced flue gas fires are designed to be installed without a chimney, so you can incorporate them almost anywhere in a self-build project. However, they still need to be specified at the earliest possible stage. A typical installation will require the fire to be flued through an outside wall, with the flue concealed behind a false chimneybreast. Fires can be located in room-dividing walls and other architectural features so they can be seen from both sides. You can also enjoy fires in kitchens, bedrooms, loft conversions and many other places. These types of installations are made possible by extended, fan-assisted balanced flue systems. They allow for multiple fires to be placed in larger properties, with the flues hidden in crawl spaces and other discreet areas, terminating on the roof.In conclusion, the secret to having attractive and energy efficient fires and stoves in any self-build project is design, plan, cost and implement. And always consult a fully qualified Gas Safe or HETAS engineer.For further information visit www.drufire.com
Sponsored
St Ann's Hospital in Poole, Dorset

St Ann's Hospital in Poole, Dorset

David Bailey Furniture Systems Ltd

Enhancing Mental Health Care with Specialised Fitted Furniture SolutionsWith the rising number of mental health issues, companies like David Bailey Furniture Systems Ltd are facing new challenges in providing specialised fitted furniture systems to the NHS. The demand for furniture with anti-ligature properties, unbreakable polycarbonate mirrors, and anti-ligature hooks has increased as mental health care places more emphasis on patient safety and well-being. This case study highlights David Bailey Furniture's collaboration with Medical Architecture and Kier to supply bespoke specialist fitted furniture for Kimmeridge Court. An innovative inpatient unit at St Ann's Hospital in Poole, Dorset, designed to provide a therapeutic retreat for individuals seeking treatment for eating disorders.The treatment of eating disorders necessitates a safe and therapeutic environment. David Bailey Furniture understands the importance of incorporating anti-ligature designs into fitted furniture to reduce the risk of self-harm. By minimising ligature attachment points, these specialised fitted furniture units help prevent individuals from using fixtures as a means of self-inflicted harm, prioritising patient safety and facilitating a supportive environment for recovery.Traditional mirrors can pose significant risks when broken. To mitigate this, Kimmeridge Court incorporates unbreakable polycarbonate mirrors from David Bailey Furniture, that can withstand impact, reducing potential harm and ensuring patient well-being. Additionally, anti-ligature hooks with magnet or adhesive fixings are utilised, providing a secure alternative to traditional hooks and eliminating points of vulnerability. These innovative fixtures maintain a therapeutic space while preventing ligature attachment and ensuring patient safety.David Bailey Furniture played a crucial role in the development of Kimmeridge Court, supplying a wide range of other specialised fitted furniture systems. The company provided shelving, wall-mounted units for TVs, and other bespoke units for 10 bedrooms and ensuites. These fitted units incorporated polycarbonate mirrors, magnetic hooks, hygiene-friendly sloping tops, and secure fixings to prevent the removal of components that might cause injury. Additionally, disabled-friendly units and worktops were supplied for the kitchens, offices, and other areas of the building, emphasising inclusivity and accessibility.With over 40 years of experience, David Bailey Furniture has been a trusted supplier of fitted furniture systems to the NHS. The company works closely with Hospital Trusts to ensure that their fitted furniture meets modern medical needs, particularly in the realm of mental health care. Through its collaboration on the Kimmeridge Court project, David Bailey Furniture has contributed to the advancement of mental health care in the NHS and as its importance continues to grow, the company remains committed to playing its part in supporting initiatives that improve mental well-being.
Sponsored
Concrete Lamp Shades

Concrete Lamp Shades

LIVING CONCRETE LTD

Project: Manufacture and installation of 10 bespoke concrete pendant light fittings for newly refurbished London gym and changing rooms. Materials used: Hand-cast concrete sphere shaped lamp shades with hand applied metallic internal finish and stainless steel fittings. We were asked to manufacture 10 bespoke extra large sphere-shaped concrete pendant lamps with hand applied metallic internal finish and stainless steel fittings. Product Spec: Size: diameter 47cm, shade height 28cm, maximum suspension height 120cm Weight 6.25kg Finish/ Colour: Rough finish – GREY Cable / cord : Herringbone brown linen Ceiling rose : Concrete GREY Colour temperature: 3000k LED WARM WHITE
Sponsored
Emergency Evacuation Passenger Lift Rebuilds Access in Restoration of the Chapel, Royal Victoria Country Park

Emergency Evacuation Passenger Lift Rebuilds Access in Restoration of the Chapel, Royal Victoria Country Park

Stannah Lifts

Situated in an existing stairwell, the lift had to be installed within Historic England guidelines: the guide brackets could not be fitted to the Chapel’s historic walls, so the lift was supplied and fitted within Stannah’s FX structure—a cost-efficient, shaft-within-a-shaft solution that overcomes such obstacles. This BS 9999-compliant evacuation lift plays a vital role in an evacuation strategy by a designated warden for t
Sponsored
The Hotel Bridget – Rutland TS.3204

The Hotel Bridget – Rutland TS.3204

Rutland

Project DetailProject: Hotel BridgetLocation: ParisProduct: TS.3204The Hotel Bridget in Paris is a authentically Parisian corner building in the district of Menilmontant. Inside the decor blends styles to bring to life the culture of eastern Paris. Here, design is taken very seriously and every aspect is cleverly fitted together from Metro-style blue tiling to stonework and word.The TS.3204 in Polished Brass was used for the hotel, an ideal fit to the elegant corner hotel. The classic scissor arm is a perfect addition to the authentic and charming fit out with the Polished Brass finish bringing out the modern aspects of the hotel. The TS.3204 is a fixed power size EN 3 and is Fire tested to one hundred and twenty minutes. With a ten year guarantee, you can’t go wrong with this closer.
Sponsored
Waterplein Revaleiland Amsterdam - gratings

Waterplein Revaleiland Amsterdam - gratings

Elefant Gratings T/A PcP Gratings Ltd

The Waterplein Revaleiland Amsterdam project was constructed by the contractor Knipscheer Infrastructuur BV, a medium-sized construction company specialising in infrastructure (roads, bridges etc.). With about 120 employees, Knipscheer carries out civil engineering work in the Netherlands.The criteriaAs the contractor, Knipscheer’s role was to construct a new and modern square for use by the general public at Waterplein Revaleiland. The project to build a pier presented challenges because the design criteria specified a wooden pier to match the existing environment. High safety standards and a modern design were the ultimate criteria for constructing the pier. Knipscheer chose PcP as a partner to supply the gratings for creating the wooden pier, with wood planks being installed into the gratings to create a perfectly straight line the full breadth of the structure. In such cases, steel beams are often used as a substrate for wooden planks, but this requires large quantities of steel and results in higher costs, and therefore mesh gratings were chosen for this project.The solutionTo create the new public square at Amsterdam Waterplein Revaleiland comprising one large wooden pier, Knipscheer chose PcP to supply 1,400 square metres of press-welded gratings. The mesh gratings are placed upside down on a concrete surface to ensure the wooden planks are stable.Each press-welded grating is tailormade to meet the specific dimensions, with a mesh size of 111 x 99/60 x 3 mm. Customised mesh sizes can only be made with a press-welded grating, and therefore this option was optimal for this particular project. The gratings were placed upside down on the concrete. Knipscheer then laid 28 mm thick hardwood planks into the gratings. The challenge here was to draw and produce mesh sizes in one line, so the wooden planks in each grating could meet the visual design criteria of appearing to be continuous wooden planks extending the full width of the pier.The collaborationThe collaboration with the contractor Knipscheer commenced in 2018. PcP worked close with the contractor throughout the entire project to meet the design and technical criteria of both Knipscheer and the client. Drawings and samples were supplied by PcP, Approved by the contractor’s customer.
Sponsored
CEDARWOOD HOUSE, BATH

CEDARWOOD HOUSE, BATH

Stratum Resin Flooring Limited

CEDARWOOD HOUSE, BATH Customer: ST8 LimitedProject Installation Dates: 2021Flooring Systems Installed: Unique Character – Bolidtop FiftyFiftyColour: HazeArea: 200m2  This high end property developer from Bath knew exactly what to expect from Stratum, being a returning customer. Stratum were a part of this new build design for an eco-friendly modern family home. Since the developer experienced a Stratum resin floor in his previous new build property, he was keen for it to feature across a larger area on this project, with the installation taking place in the kitchen and main living space, hallway, utility room, cinema room and the garage. Challenge-      To select a colour and finish that would sit alongside and compliment a range of different materials chosen for the interior spaces.-      To carefully programme in the work and coordinate with the other trades on the project.-      To achieve the desired level of liveliness in the character of the floor when being mixed and applied. -      To install the floor system alongside a mechanical car lift within the garage Solution-      Bolidtop FiftyFifty was selected for all of the living spaces to create a seamless flow with a bespoke, warm, modern aesthetic. An anti-slip epoxy resin floor was selected to meet the demands of a garage.-      Stratum consistently communicated with the project manager, navigating around the project whilst maintaining access to adjoining areas for other key trades.-      To invite the customer to watch the pour.-      To arrange delivery of materials to site at just the right time. Benefits/Installation-      The developer had experience of working with Stratum and our floor systems which helped with the planning and design stages of the build, e.g substrate, underfloor heating, skirting detail etc.Result-      A beautiful unique floor, for a stunning, environmentally friendly new build home. This floor provides comfort and pleasure with ease of cleaning and will provide many years of use.“This was to be a quality high-end, energy efficient new build family home. We used resin throughout the lower ground floor with under floor heating. The installation was brilliant. We look forward to working with Stratum again.”Nick Sandy | Director at ST8 LIMITED 
Sponsored
Heritage Open Gas Fireplace

Heritage Open Gas Fireplace

Kompozit'All UK

application area: domestic heatinguse type: gas fireplaceproject scope: reline leaking chimneys while maximising the flue sizeadded value: 25-year guarantee on liner, no need to fit and maintain chimney fansBackgroundTwo chimneys failed the smoke test in this heritage property located in Hertfordshire. The chimneys had to be lined to comply with fire safety regulations. Domestic chimneys often require a chimney fan after lining as traditional rigid liners restrict much of the original flue opening. Chimney fans can be expensive to fit and maintain. FuranFlex-25 linings use the maximum flue opening, which often means there's no need to fit a noisy fan.Statement of workThe had to line both chimneys and prevent further leaks before the gas fireplaces could be fitted. This was achieved using FuranFlex-25 RWV liners, which are rated for operating temperatures up to 450 degrees C. The liners were specially produced to fit the flue diameter and length, accommodating any flue bends. The soft FuranFlex liners tube are inflated using pressurised steam which will gently push the liners to extend into the chimney flue. Inflating with steam will also cause a chemical reaction which sets the material harder than steel. The finished liner is smooth, jointless and highly corrosion resistant. Thanks to the expert installation and strong product quality control, both liners are guaranteed to work for 25 years.
Sponsored
Victoria Station Refurbishment

Victoria Station Refurbishment

Twinfix Limited

We reglazed the porte cochere at Victoria Station using our aluminium-framed Multi-Link-Panel fitted with our Georgian wired polycarbonate glazing. This virtually unbreakable glazing mimics the traditional Georgian wired glass that would have been fitted to the three roofing areas when it was first built, but it has all the many benefits of polycarbonate, as well as Heritage approval for use at this prestigious and busy London station.
Sponsored
Colditz castle: Teckentrups fire-protection in a historical building with all glass fire doors and fire doorsets creates a brilliantly sympathetic fire protection solution

Colditz castle: Teckentrups fire-protection in a historical building with all glass fire doors and fire doorsets creates a brilliantly sympathetic fire protection solution

Teckentrup UK Ltd

The recently renovated 'schloss Colditz' in Saxony, Germany is a great example of how to reconcile the often conflicting demands of historic preservation and fire-protection. The renovation has not just fulfilled fire-protection requirements but the planners have used extremely discreet solutions that fit with historic preservation requirements. Many of the passageways have been fitted with Teckentrup T30 all-glass doors, which combine functionality with aesthetics and maximum transparency.
Sponsored
Wimbledon AFC

Wimbledon AFC

Concept Cubicle Systems

A full washroom fit-out service for the concourse and corporate hospitality areas at Wimbledon AFC
Sponsored
Cereal Shed featuring Eternit FarmTec

Cereal Shed featuring Eternit FarmTec

Eternit

Cereal shed constructed of Eternit's FarmTec fibre cement profiled sheeting and fittings in Natural Grey.
Sponsored
Dairy Shed featuring Eternit FarmTec - Gaec de la Guinguette

Dairy Shed featuring Eternit FarmTec - Gaec de la Guinguette

Eternit

Dairy shed constructed of Eternit FarmTec fibre cement profiled sheeting and fittings in colour Black.
Sponsored
Equestrian Stable - Le Tronquay featuring Eternit FarmTec

Equestrian Stable - Le Tronquay featuring Eternit FarmTec

Eternit

Equestrian stable constructed of Eternit FarmTec fibre cement profiled sheeting and fittings in Natural Grey.
Sponsored
A Microbiological Analysis of BioClad PVC Wall Cladding Installed in a Food Preparation Environment.

A Microbiological Analysis of BioClad PVC Wall Cladding Installed in a Food Preparation Environment.

BioClad

This study aimed to compare levels of bacterial contamination isolated from surfaces in a busy kitchen situated in a UK care home. The study’s main objective was to compare bacterial contamination on the antimicrobial wall cladding with other surfaces in the kitchen. The care home kitchen had been fitted with BioClad PVC wall cladding at the time of construction in 2011. All walls in the rectangular-shaped room were fitted with BioClad from ceiling to floor. The antimicrobial performance of the wall cladding was to be appraised according to the findings of the study.
Sponsored
Livingstone Brussels - Solar Shading Brise Soleil

Livingstone Brussels - Solar Shading Brise Soleil

Duco Ventilation & Sun Control NV

The elliptical louvre blades on the DucoSun Ellips 150 that are incorporated in the construction as a terrace cover, fulfil both a functional and an aesthetic role. "This type of solar shading system with its elegantly shaped blades, minimalist fixings, simple fitting system and the way that the shade tapers at off at the end with the inclination angle of the blades, fits seamlessly into Livingstone's architectural concept", states Archi 2000. "In addition the light grey of the DucoSun Ellips 150 reflects the light perfectly so that the blades blend in beautifully with the sky."
Sponsored
Tate Britain

Tate Britain

Fixfast Ltd

As part of the renovation of this famous old institution, the gutters needed protection from foot traffic. The old system was unsightly and had left rust stains throughout the extensive network of guttering.DukMat could be rolled into place and easily cut to fit the varying width and protrusions, saving time and minimising joins. The result is a clean, neat and hardwearing solution fit for this grand landmark building."It's a good product, easy to install...takes the incongruities out of the gutter"Heine Vasson - Project Manager at Richardson Roofing
Sponsored
Tottenham Hotspur FC Stadium - Classic G50 High Performance louvre grilles

Tottenham Hotspur FC Stadium - Classic G50 High Performance louvre grilles

Duco Ventilation & Sun Control NV

A lot of DucoGrille Classic G50 High Performance louvre grilles can be found in the new Tottenham Hotspur FC Football stadium, North London. Energy Design Solutions fabricated, supplied and fitted this project. The DucoGrille Classic 50HP has been developed especially for intensive ventilation. The uniquely shaped ‘High Performance’ louvre blade with a low resistance factor ensures excellent airflow. All types are manufactured from extruded aluminium sections. Insect mesh is fitted as standard.
Sponsored
The Ecco concertina loft ladder is the ideal solution for small ceiling openings

The Ecco concertina loft ladder is the ideal solution for small ceiling openings

Premier Loft Ladders Ltd

Manufactured from light-weight, durable aluminium components, the Ecco concertina loft ladder is easy to operate yet still offers excellent performance. Capable of supporting loads of 150 kg per step, it is also tested to EN 14975 (DN 4570). It is supplied as a ready to fit unit for ceiling apertures as small as 800mm long by 550mm wide. Furthermore, the ladder is fitted within an insulated and airtight wooden hatch box. Technical drawing NBS Specification and BIM object available.
Sponsored
Fairisle Junior School, Southampton

Fairisle Junior School, Southampton

Broxap Ltd

Playground equipment helps to keep children fit and active by encouraging them to play outdoors at Fairisle Primary School.
Sponsored
Kingsway Hall, London

Kingsway Hall, London

Nymas

The washrooms at this stunning hotel, feature accessible bathroom fixtures and fittings from our Fitzroy of London Gosfield collection.
Sponsored
EuroPipe at Manchester Airport - Case Study

EuroPipe at Manchester Airport - Case Study

BLÜCHER UK Ltd

BLÜCHER recently supplied our BLÜCHER EuroPipe system to the new Terminal 2 car park at Manchester Airport. The new multi-story car park has space for 3,800 vehicles and is part of the £1 billion transformation programme at the airport. The installation was overseen by G Beverley & Son on behalf of the M&E Contractor, Crown House. Our stainless steel drainage systems are the ideal choice due to our lightweight push-fit pipes and fittings are easy to handle and install, and provide rapid discharge of rainwater and waste water.

Showing 217-252 of 652

Feedback