NBS Source
I'm a manufacturer

"metal internal wall finishes"

15,259 results found

Sort by:

Showing 2017-2052 of 2191

Sponsored
Priscilla Bacon Lodge, Norfolk

Priscilla Bacon Lodge, Norfolk

Knauf Insulation Ltd

The Priscilla Bacon Lodge in Norfolk is a new £12.5 million hospice that will provide state-of-the-art palliative care for 24 patients alongside day care facilities, a wellness centre, gym and community hub for those being cared for at home. It will also be used for education and research into palliative and end-of-life care. The facility, designed by LSI Architects and delivered by Morgan Sindall Construction, features both traditional masonry cavity walls, and a masonry rainscreen façade.  Meeting the brief At just two stories high, the building doesn’t fall under building regulations that ban combustible materials in the wall build-up. But even so, combustibility was a key factor when it came to specifying the insulation. Jordan Armstrong, Associate at LSI Architects explained: “As a practice we always try to minimise fire risk, especially for a project like The Priscilla Bacon Lodge, which will house extremely vulnerable people. So, it was essential that the materials we used were non-combustible, which meant mineral wool insulation was the only solution. “We regularly use Knauf Insulation products, so we specified DriTherm® Cavity Slab 32 for the cavity walls because it’s a high-performing glass mineral wool insulation that we expected could meet our required 0.16 W/m2K U-value. We were also keen to specify their Rocksilk® RainScreen Slab for partially filled cavity walls because then we would have one manufacturer for the whole build, and we think the products will work well together.” DriTherm® Cavity Slab 32 is full-fill insulation solution with a thermal conductivity of 0.032W/mK. While Rocksilk® RainScreen Slab for partially filled cavity walls is a rock mineral wool product with a thermal conductivity of 0.034W/mK. Both products are BBA certified for the application. In addition to non-combustibility and thermal performance, both products also offer sound reduction characteristics. Ease of installation Both DriTherm® Cavity Slab 32 and Rocksilk® RainScreen Slab contain a water repellent additive that preserves the integrity of the slabs while they are exposed during construction.  The products are also designed to be easy to install correctly. They are sized to suit standard centres for installation between wall ties or brick restraint systems. Slabs are robust so they can be manoeuvred into place while maintaining the flexibility required to adapt to minor imperfections in the substrate to prevent gaps that reduce thermal, fire and acoustic performance.  Lastly, they are both manufactured using ECOSE® Technology, Knauf Insulation’s unique bio-based binder, which contains no added formaldehyde or phenol. It is made from natural raw materials that are rapidly renewable, and is 70% less energy-intensive to manufacture than traditional binders, so it is more environmentally friendly. The product is soft to touch, easy to handle, and generates low levels of dust and VOCs. So, when it came to specifying the insulation for the Priscilla Bacon Lodge, Knauf Insulation’s DriTherm® Cavity Slab 32 and Rocksilk® RainScreen Slab for partially filled cavity walls ticked all the boxes. 
Sponsored
Addenbrookes Hospital - walkway canopy

Addenbrookes Hospital - walkway canopy

Able Canopies Ltd

he BriefAddenbrooke’s Hospital in Cambridgeshire were looking for a wall mounted canopy to provide shade and shelter over the main entrance of their Accident and Emergency department. At the time of enquiry, they didn’t have any form of shelter over the entrance and patients and visitors were exposed to the elements when queuing or waiting outside.Cambridge University Hospitals NHS Foundation Trust’s Project Manager came to Able Canopies for a quotation in hope that we could offer a product that met their design needs, whilst providing the weather protection required. The canopy specification presented to Able Canopies was a wall mounted canopy with a polycarbonate roof and toughened glass or polycarbonate front panels.
Sponsored
Ayrshire College Main Hall

Ayrshire College Main Hall

LSA Projects Ltd

Ayrshire College Main HallArchitect: Keppie DesignInstaller: DV McCollProduct: Shiluvit by Oranit250m2 of Shiluvit panels in 7-501A formation and Western Red Cedar were installed to the impressive wrap over wall and ceiling space at Ayrshire College in Scotland.Shiluvit panels were chosen in part for their ability to easily incorporate lighting and ventilation into the ceiling whilst also giving ease of access with the tip-and-tilt demountable design.In addition the Western Red Cedar chosen has significant natural colour and texture variation which gives the vast ceiling and wall space extra depth as well as a creative and bespoke feel.
Sponsored
DORMA HüPPE TARGETS EDUCATION SECTOR

DORMA HüPPE TARGETS EDUCATION SECTOR

Style - Moveable Partition Specialists

Over the last 12 months, partitioning experts Style, sole UK distributor for Dorma Hüppe, has seen a noticeable increase in demand for glass partitions from within the education sector. Combining transparency with exceptional acoustic privacy, glass systems create bright, open spaces which can be quickly reconfigured to meet the teaching requirements. Another trend in the education sector Style has witnessed is a shift towards fully automatic moveable walls, allowing teachers to change the space available at the push of a button. Automatic movable walls avoid any manual handling and ensure the most effective acoustic seal is formed every time.
Sponsored
Vibration Isolation of Residential Building over Tube Lines

Vibration Isolation of Residential Building over Tube Lines

Total Vibration Solutions Limited t/a TVS Group

TVS Group was tasked with the isolation of a residential property in St. John’s Wood as part of a redevelopment and basement extension. With the property in close proximity to the Jubilee line and the Metropolitan line passing only 5m away from the new basement extension, radiated noise and vibration was a serious concern for the client.An isolation layer utilising varying stiffnesses of Sylomer materials spanned the underside of the basement slab, continued up between the contiguous piled wall and the lining wall, and then across the top of the capping beam and to the side of the ground floor slab.Close work with the design team throughout the planning and specification process, provided a solution that integrated seamlessly with the structure and waterproofing detail.
Sponsored
Devonshire Square, London

Devonshire Square, London

Washroom Washroom Ltd

Washroom's Forza SGL lockers and Legato benches combine to create a colourful new changing area for an office cycle centre. The Forza lockers, fitted with key operated locks, were specified with doors in HPL using four different colours from Sonae to create the distinctive eye-catching design. The changing area also features freestanding island Legato bench units manufactured with solid grade laminate slats and back rest plus wall-mounted Legato benching units in the combined changing and shower cubicles. Washroom's Arpeggio Corian trough-style vanity in white feature inset square sinks, integrated waste bins and wall-mounted taps.
Sponsored
Pole d'Echange Serra

Pole d'Echange Serra

Lindner Group

The Pôle d`Échange Serra is located directly opposite the Luxexpo exhibition and congress centre in Kirchberg, Luxembourg. The area combines a new bus terminal regional buses and city buses, a Park & Ride car park with around 600 parking spaces and two office buildings with a total area of approx. 8,000 m². With the help of charging points for electric cars, a small kiosk and high security measures at the bus station, the project aims to make the switch from car to public transport more attractive. Lindner Group was involved in the development of the office space. The originalcontract covered the floor and partition trades, including the installation of the NORTEC raised floor with fitted carpet and the use of timber and glass partitions. These were complemented by matching door systems and wooden wall claddings. Due to thecustomer's high level of satisfaction with Lindner's services, the order was quickly extended during the interior fit-out work: As a result, Lindner realised impressive Ecophon acoustic baffles for the meeting rooms. In addition, mobile partition walls should now find their way into the 4th and 7th floors. The room height of over 5 m on the 7th floor made the installation challenging: However, thanks to the static design and subsequent execution of a steel construction clad with plaster, the connection of the 4m high partition wall could be carried out without any problems. Another highlight of the interior fit-out are the wall absorbers in the meeting rooms, which also serve as acoustic pictures. The perforated CPL panel was created in cooperation with Topakustik using a new production method. The perforation pattern corresponds to a Morse code, which stands for the Luxembourg national anthem.
Sponsored
Lidl store, London

Lidl store, London

Senior Architectural Systems Ltd

The creation of this new store for supermarket chain Lidl is a part of the larger residential led mixed-use Waterline development which has seen the creation of a striking 27 storey residential tower block providing 251 new homes in Wembley, London.Formerly known as Minavil House, the demolition of the derelict commercial building has provided ample scope for the regeneration of the wider area and the new mixed use scheme provides a variety of facilities including retail and office space.The ground floor level supermarket has been designed to complement the main buildings whilst providing a practical solution for a high traffic retail space.Our SF52 aluminium curtain wall has been used to great effect on the main façade of the store, with feature fins and sloped glazing elements. To provide safe and secure access, and help reduce maintenance requirements, our robust SPW501 aluminium commercial doors were also installed by our supply chain partner Soundcraft. Designed by Alan Camp Architects, the Waterline development has been built by HG Construction.As well as adding to Senior’s order book in London and the South East, the creation of the new Lidl supermarket also draws on our expertise of delivering curtain wall and commercial door solutions for the retail sector. The thermal efficiency of our slim line SF52 aluminium curtain wall system makes it ideally suited to reducing the environmental impact of retail buildings, by meeting the requirements of Part L, and also maximising the use of natural light. In fact, our SF52 aluminium curtain wall system made its debut on the flagship Sainsbury’s superstore in Sheffield.
Sponsored
University of Hull  `Staggering difference`

University of Hull `Staggering difference`

TK-Team Limited

TK-Team were asked to help with reverberation issues in a room used for VC. Below are comments made by Kevin Close of Hull University.With more and more meetings being scheduled online since the pandemic, we had a request to enable a meeting room with video conference facilities. One thing that was immediately noticed, post install, was that people at the far end we’re having issues hearing people in the meeting room due to the acoustics in the room. The configuration of the room with flat solid walls, ceiling and whiteboards meant this space had a lot of reverb/echo. After some thought, it was obvious acoustic treatment was required in the space, we consulted with GVAV who offered us some solutions, we then spoke in depth with Lee from TK-Team who visited us and surveyed the room. Lee identified the main issue being reflection from the ceiling and explained that is where we should start. TK-Team worked with us and designed us a tailor-made solution for the room using Hush Acoustic ceiling tiles, all in our choice of colours and shapes, the solution was procured via GVAV and installation was very smooth and finished in a timely manner.The acoustic quality of the room, not just for local meetings but for remote participants was vastly improved. The difference in the room has been described as ‘staggering’. As such, this is now a heavily used meeting space and has highlighted the advantages of looking at and dealing with acoustic issues within meeting spaces on campus going forward.Kev Close
Sponsored
Cork, Ireland

Cork, Ireland

Zyle Fenster

Timber curtain wallsThe use of wood-alum systems and large glass panes allow for the creation of amazing design features that will bring light and the feeling of space to rooms of all shapes and sizes.
Sponsored
Dubai Airport

Dubai Airport

FSi Limited

Installation - Upgrade of perimeter walls Main Contractor - BKS, Specialist Installer - Steel tech, Client - Government of Dubai Date - 2004—2008 the extensive use of Stopseal Batt and Pyrocoustic Sealant
Sponsored
Type 100SE and Type G100 Combination - QEII Centre

Type 100SE and Type G100 Combination - QEII Centre

Movawall Systems Ltd

Movawall Systems Ltd have recently worked closely with the team at the QEII Conference Centre in Westminster to launch five completely refurbished spaces with both Type 100SE and Type G100 walls.
Sponsored
Meadowbank Sports Arena - Curved retention

Meadowbank Sports Arena - Curved retention

Tobermore

A retaining wall was the perfect solution at Meadowbank Sports Arena for resisting pressures from the heightened land beside the running track as well as creating a safe boundary area for the outdoor facilities on site.
Sponsored
Royal Liverpool Hospital

Royal Liverpool Hospital

SMR PROJECTS LIMITED

Below ground waterproofing to the perimeter retaining walls of Royal Liverpool Hospital, as well as across the entire sloping site. Additional protection was also required for the lift pits and a link tunnel for this project.
Sponsored
Anti Ligature Access Panels

Anti Ligature Access Panels

Rapid Access Ltd

Our Anti Ligature Panels are suitable for medical and custodial settings to limit any risk.Supplied with a high security lock so that the panel cannot be tampered with after application into a wall or ceiling.
Sponsored
NO. 1 PALACE STREET

NO. 1 PALACE STREET

Majestic Showers

No.1 Palace Street is one of the most desirable collection of homes in the capital today. A palatial development, located opposite Buckingham Palace in the prized SW1 postcode. Sensitively restored, the interiors boast rich textural finishes and materials for a classic feel with a witty dash of modernism.Majestic were invited to supply Monaco, Rio and Portofino screens from The Frameless Portfolio with component finishes in matt white, matt black and brushed and polished chrome.
Sponsored
Cambridge University - Faculty of History

Cambridge University - Faculty of History

Castle Composites

The Cambridge University Faculty of History required a solution to level the existing flat roofs of the historical Stirling Building. The aim was to create a vibrant and attractive area, mainly used as a throughway, it was paramount that the tiles would match the existing colour of the surrounding building.Our Castlepave GRC Promenade slab (450x450x38mm) was selected, and a custom-made colour was created to blend effectively into the existing architecture. We manufactured various test batches each with a different shade of red, and hand finished aged effect. Once the colour was selected from the various test batches, they were manufactured by hand to the customers specification and delivered to site.We assessed the fall and height tolerances of the roof to determine the number and size of pedestals required to provide a completely level finish. Adjustable Pedestals ranging from 30-120mm,10mm fixed height stackable pedestals, levelling shims, and self-levelling heads were used.The outer row of slabs was cut to size on site, using a circular saw. As shown the results are a flush finish that minimizes the gaps between the slabs and the exterior perimeter. The glass reinforced concrete composition of the slabs mean they are strong and easy to work with on site.The Client was very happy with this stylish and unique finish.
Sponsored
IWA 14/PAS 68 HVM Terra Bifold Gate

IWA 14/PAS 68 HVM Terra Bifold Gate

Frontier Pitts Ltd

IWA 14 – 7.2t @ 30mph Introducing the latest Terra Bi-folding Speed Gate which has been successfully impact tested to the International IWA14 Specification, stopping a 7.2 ton vehicle travelling at 30mph (48kph). **** Unique to the market this double leaf HVM Bi-folding Gate impact test resulted in minimal penetration *** This HVM Bi-fold Gate is the perfect solution for any building or perimeter fence line bringing together protection from the threat of VBIED’s (vehicle borne improvised explosive devices) and LPS1175 Security Rated Automatic Gates. Double bi-folding gate leaves Hinged Gates leaves can be automated with Actuators.
Sponsored
Hempaline Defend makes the grade at Shell storage depot in The Netherlands

Hempaline Defend makes the grade at Shell storage depot in The Netherlands

Hempel A/S

Shell Nederland operates a large fuel storage depot in Arnhem distributing fuel to gas stations throughout The Netherlands. With a number of storage tanks on site, regular maintenance to protect against corrosion is essential. In this instance, they required an internal lining for their Tank 214.Poor linings can result in substantial losses due to asset downtime as tanks and vessels are left out of action as a result of corrosion. It was essential that the tank was protected with a coating that would perform exceptionally with extremely corrosive contents, whilst maximising the assets lifetime and minimising downtime.Originally the project was set to be completed with another lining, but ultimately it was Hempaline Defend 630 Cure 72 Epoxy that was used.
Sponsored
St Marks Student Accommodation

St Marks Student Accommodation

Leviat

Leviat’s Ancon MDC Masonry Support and Ancon CombiDeck, along with Ibstock Kevington’s Nexus® Brick-Faced Units have played key roles in constructing a major student accommodation complex in the heart of Lincoln, offering overall efficiency and ease of construction.The complex is spread across ten blocks, ranging from 4 to 10 storeys in height, which have been sub-divided to reduce scale and facilitate a progressive change in character across the development. The first phase included 1,222 bedrooms in apartments, comprising six to 12 en-suite bedrooms. Students will also benefit from associated internal and external amenity space.
Sponsored
Woodcote House

Woodcote House

Michelmersh Brick Holdings PLC

Woodcote House is the contemporary, carefully designed and sustainable replacement for what was previously a series of buildings that had fallen into disrepair amongst the beautiful scenery provided by the South Downs National Park.Designed by Design Engine and Paul Cashin Architects, Woodcote House consists of four large bedrooms, an open plan living, dining and kitchen area and fitted with bespoke joinery the interior is flooded with natural light. Huge windows that allow for picturesque scenes to filter into the internal spaces.Freshfield Lane’s First Quality Multi were used to provide a homage to the original brick buildings that sat on the site prior to development, as well as allowing the structure to impact the environment minimally.
Sponsored
Ingliston Equestrian Centre

Ingliston Equestrian Centre

Metrotile UK Ltd

When Ingliston Equestrian Centre, a stunning Show Jumping ground based near Glasgow entered into a multi-million pound refurbishment project, they specified Metrotile Lightweight Steel Roofing to help raise the centre to international standards.Metrotile supplied over three thousand square metres of roofing materials to two new stable blocks and numerous new Chalet buildings at the site. Metrotile Slate in Bronze was specified as it combines a stunning traditional look with a swift installation and a low weight that reduces stress upon the supporting timber frame structures of both the chalets and the stables. Stunning countryside surrounds Ingliston Equestrian Centre and the Metrotile Slate compliments the local area gracefully
Sponsored
Tunbridge Wells Hospital in Pembury, Kent

Tunbridge Wells Hospital in Pembury, Kent

Selectaglaze Ltd

The £226m, 513 single bedroomed hospital features a dedicated Women and Children’s unit with a Level 2 Neo-Natal Unit providing special and high dependency care. The imposing primary windows have been supplemented with secondary units providing better internal environment control, offering additional guarding and allowing for remote controlled privacy blinds. Together with main contractor Laing O’Rourke, Selectaglaze developed a design that met all criteria. Most windows were treated with Series 40 hinged and fixed panels featuring a chamfer bead to avoid dust ledges. Glazed with 8.8mm laminated glass, the units meet the required safety levels.
Sponsored
Premier Inn Scarborough Isogrid

Premier Inn Scarborough Isogrid

CMS Danskin Acoustics

Isolating Hotel Rooms from RestaurantsPreventing noise transmission between the noisy areas of a building to the quiet areas is an ongoing challenge. When the quiet areas are people sleeping and the noisy area is a busy hotel dining room, the problem is particularly acute, but can be resolved by using the appropriate products which are cost effective and easy to install correctly.The ProjectPremier Inn Scarborough North is a new build 105 room, 5-storey hotel with a 68-cover restaurant, which was completed in March 2021. The new hotel was granted planning permission in 2018 and construction was slightly delayed over the Covid lockdown period.Owner of the Premier Inn brand, Whitbread, continues to see strong growth with their UK business continuing to outperform in the midscale and economy market and now has over 800 hotels in the UK. Key to the brand’s message is that wherever you stay in a Premier Inn, you will always get great levels of comfort.The ChallengeSources of noise which affect hotel guests include:External sources of noise and vibrationTransmission between rooms and between rooms and corridorsTransmission from engineering systems (ventilation and air conditioning, heating systems, lifts and so on)Transmission from public areas – reception, conference facilities and in particular restaurants.Noise transmission from restaurants, bars and reception areas becomes a significant challenge where the design of the hotel incorporates these areas on the ground floor of a block, with hotel rooms directly above.Reducing the transmission of noise from a large common area to individual hotel rooms rests principally on isolating the plasterboard or suspended ceiling. To overcome this challenge, a frequent recommendation is to design a ceiling incorporating neoprene isolation hangers.Neoprene Isolation Hangers for HotelsNeoprene isolation hangers are primarily used to isolate suspended sources of audible frequency vibration, such as piping and ductwork systems. They also provide very effective vibration isolation for hanging acoustic ceilings by preventing transmission of noise to the building structure.The isolation hangers supplied for use in the ceiling at Premier Inn Scarborough North were Isogrid Quick-Connect Ceiling Hangers, supplied by CMS Danskin Acoustics.The IsoGrid Quick Connect Ceiling Hanger has a specially designed dual deflection neoprene isolator which allows internal bulging. This enables the neoprene element to achieve greater deflections whilst maintaining lateral stability. Greater deflection translates to greater performance for noise control ceilings.IsoGrid Quick-Connect Ceiling Hangers have several other benefits:They are more cost effective than similar products;The simple design makes them quick and easy to install, providing significant labour savings over conventional sound control ceiling hangers;The known deflection rates ensure acoustical performance under design loads;Tested for airborne, impact and frequency performance to BS EN ISO 10140 requirements;Various attachment methods allow for installation on a variety of ceiling structures, including concrete, metal deck or structural framing;A bronze core serves to prevent poor acoustic performance due to over compression or due to accidental short circuiting of the transmission pathway.InstallationThe ceiling was installed by specialist contractor B W Shrimpton Limited. This was the first time that Shrimpton’s had used IsoGrid hangers, but they were well received.Supervisor Kirk Talbot, who has worked closely with the CMS Danskin Acoustics Team on several projects, explained his preference for the hangers is very much about the ease of installation:“We used Hilti pan head HUS fixings into the soffit for fixing them up, and the lads on site had no issues with them at all.“The IsoGrid hangers are definitely robust enough and easy to fix angle or wires to. On that basis and the cheapness compared to other hangers out there, I’d definitely use them again and will recommend that others do too.”Kirk Talbot, BW Shrimpton LtdTechnical Advice on Acoustics in HotelsCMS Danskin Acoustics are specialists in soundproofing materials and acoustic insulation. Our expert technical team can advise on the specification of a wide range of specialist acoustic and vibration control systems – balancing performance, aesthetics and budget. We provide solutions to treat floors, walls and ceilings, as required, delivering a holistic design approach to sound control for the complete gym or sports hall environment.We don’t just design, manufacture and deliver market leading products. We work with the entire supply chain and project teams to ensure a smooth path from conception to completion.
Sponsored
MediCity Nottingham

MediCity Nottingham

Komfort Partitioning Ltd

Background & BuildingSituated within an Art Deco Grade 1 listed building is MediCity Nottingham, the pharma incubator. MediCity is a collaboration between Boots and BioCity, the UK’s leading life sciences incubation business. To provide and encourage a stimulating and supportive business development environment for innovators, their premises was completely refurbished.The Brief in BriefThe co-working space is a stylish art deco alternative, which was designed to encourage collaboration and productivity for all.Hot desks and “pods” were designed and installed to create a flexible working environment for individuals or small teams. The facilities include laboratory and office space, access to high-end equipment, shared services, training, business support and access to investment. Aligning to the purpose of the facility, building performance was a key aspect of the brief.Komfort’s SolutionWith the intent of meeting performance requirements, Komfort’s glazed Firescreens were installed in the reception area. Komfort’s technical and project management teams worked closely with the design team to provide a solution to fully glaze the reception area from floor to ceiling.Our specialist internal glazing and firescreens provide a fire rating of up to 2 hours, along with sound and structural performance. Utilising thin glass, minimal framing and exceptional structural performance the specialist internal glazing and firescreens are unique, combining aesthetics with performance.The End ResultKomfort thoroughly enjoyed being a part of the design process and working so closely with Roshal Space Consultants. The building now serves the purpose of providing an ideal and inspiring environment for both start-up and established companies to grow and achieve success, whilst adhering to building performance requirements.
Sponsored
The Slate Yard, Salford

The Slate Yard, Salford

Akzo Nobel Powder Coatings Ltd

Finishes: Interpon D2525 Ordos Sable YW387I, Ambre Sable Y2316F & Patah YW267I
Sponsored
Lagan Bridge

Lagan Bridge

Spanwall Facades Ltd

RF50 3mm Aluminum PPC finish. Asymmetrical curvature along 120m of the bridges span
Sponsored
Pavilion Mexico featuring EQUITONE facade materials

Pavilion Mexico featuring EQUITONE facade materials

EQUITONE

This Pavilion, designed and installed by Broissin architects, was finished with EQUITONE [natura] and [tectiva] facade materials.
Sponsored
Spike Island

Spike Island

Anderson, GEC Ltd

Studio facilities for a community of hardworking contemporary artists need to be durable and easy to maintain yet aesthetically pleasing, so architects Caruso St John specified made-to-measure stainless steel sinktops from GEC Anderson as part of the £2.25 million redevelopment of the Spike Island art complex on Bristol’s harbourside. GEC Anderson stainless steel sinktops were also specified for the IT suite tea-point, artists’ and visitors’ toilets and baby-change areas. Spike Island, a former tea packing warehouse, has housed local artists’ studios since the 1990s when it replaced the earlier Artspace venture. It has grown to become a national centre for the research and development of contemporary visual arts – including painting, sculpture and print-making – with 70 affordable long-let studios and a series of spaces for more commercial cultural industries, such as design studios. The redevelopment, just completed, includes a welcoming entrance, while the new café is Spike Island’s first shared social space. In addition, studio spaces have been improved and the vast exhibition galleries are among the UK’s most impressive. Caruso St John project architect Rod Heyes says: “When it came to specifying the big washing out sinks, we needed something reliable that would still clean up and look good after the artists had poured plaster, paint and various chemicals over them. We have used GEC Anderson products on several other projects and they are our default supplier for stainless steel. We are impressed by the quality of their products as well as their design detailing.”GEC Anderson Managing Director Martin Tye says “Quality stainless steel is a highly versatile material that can be deployed very effectively in applications across the spectrum from workshops to designer kitchens. Stainless steel is also ultimately durable and hygienic. “Spike Island may prove to be one of the tougher environments for GEC Anderson sinks, but with a modest amount of care these sinktops will still perform well and look good after many years.”With creativity uppermost in the minds of Spike Island’s tenants, their surrounding facilities and those also provided for the visiting public were selected for functionality, aesthetics and durability. The Spike Island specification includes made-to-measure stainless steel sinktops all with integrally welded bowls. Within the metal work space, extra large Le70 (700 x 500 x 300mm) bowls, were specified. The baby-change area includes an 800mm wide surface. All sinktops are made from satin finish domestic grade stainless steel.
Sponsored
Britmet Lightweight Roofing: Slate 2000 Social Housing Roof Renovation Case Study

Britmet Lightweight Roofing: Slate 2000 Social Housing Roof Renovation Case Study

Britmet Lightweight Roofing

This case study highlights the successful implementation of Britmet’s Slate 2000 product in a housing association project. The project, carried out by Saltash Construction, encompassed a total area of 290 square meters and aimed to improve the infrastructure of the existing leaking roof. This case study examines the benefits, challenges, and outcomes of utilising Slate 2000. The housing association sector plays a vital role in providing affordable and secure housing to individuals and families. To support their mission, housing associations often undertake infrastructure improvement projects to enhance the living conditions of their residents. This case study focuses on a project to revamp a housing association's infrastructure using the lightweight metal roofing panel, Slate 2000.The Slate 2000 is a durable and aesthetically pleasing lightweight roofing material with long-term performance and weather resistance. Its stylish design and robust properties make it an ideal choice for enhancing the visual appeal and durability of residential buildings. The project involved upgrading the roofing system of a housing association's properties spanning a total area of 290 square meters. Saltash Construction, a reputable main contractor, was tasked with implementing the project. Benefits and Challenges Slate 2000's robust composition ensured long-lasting performance, reducing the need for frequent maintenance and repairs. The product's Titanium Grey colour provided a modern and visually appealing finish to the housing association's properties, significantly improving their appeal for residents and building owners. The roofing material demonstrated excellent resistance to harsh weather conditions, including heavy rain, strong winds, and extreme temperatures, thus ensuring the longevity of the roofs. The installation of the Slate 2000 required skilled labour and meticulous attention to detail due to its specific design and interlocking mechanism whilst coordinating the installation across multiple housing association properties within a specified timeframeProject Outcomes The application of Slate 2000 transformed the appearance of the housing association's existing roof, making it more visually appealing and modern. The durable properties of the Slate 2000 lightweight roofing panels significantly increased the lifespan of the roof, reducing the need for frequent maintenance and repair costs. This also improved the long-term value of the housing association, offering improved durability, weather resistance, and a refreshed aesthetic, which contributed to the overall satisfaction of the residents. Conclusion The utilization of Slate 2000 in the housing association project executed by Saltash Construction proved to be a successful choice. The product's aesthetic appeal, durability, and weather-resistance qualities enhanced the project's overall value, ultimately benefiting the housing association and its residents. This case study demonstrates the positive impact of choosing high-quality construction materials and the importance of skilled execution in infrastructure improvement projects.
Sponsored
Why Knauf were first choice for Ladderswood Development

Why Knauf were first choice for Ladderswood Development

Knauf UK

The Ladderswood Development is a regenerative project based in the London Borough of Enfield. There are 112 properties, all overlooking a central sculpted landscaped area within the development. Given the interior shape and goal of creating comfortable living spaces, both contractor and installer agreed that Knauf offered the performance they needed. The project was award to drylining specialists S&R London Ltd. in April 2022. Interior work began in January 2023, and they were tasked with bringing the internal aspects of the development up to specification. Elion Mucaj, Quality Manager for S&R London explains. “When we got the project at Ladderswood early last year, we were initially asked how we were going to ensure it was completed to a high standard that would make the development attractive to future residents. We explained our operating process, and what we were aiming to do to ensure that the client’s needs were met.”“Once the client was satisfied, they mentioned they wanted Knauf products used internally because of their previous experience using their range. Coincidentally that was our thoughts too! We knew when we saw the specification, we wanted to use Knauf throughout to hit those performance targets.”Meeting the brief.Being a residential development, fire performance and safety was one of the key considerations for product choice. To achieve this, it was decided that Knauf Fire Panel should be used, with Elion commenting. “Knauf Fire Panel was brilliant; it has the fire performance we needed for the project and of course the warranty it comes with means that we had peace of mind that the product would be secure.” To achieve the level of acoustic performance and comfort for the apartments, Knauf Soundshield Plus was put to good use. “We knew we needed a solution which would ensure minimal sound transfer between the homes. From using the product before and speaking with Knauf, we opted for Soundshield Plus. It was ideal for use within the main walls of the properties.” To round out the overall performance of the properties, Knauf Moisture Panel was used in each of the bathrooms. Chosen for its excellent moisture resistant properties, Moisture Panel helped to minimise any potential damp-related issues and reduce snagging.“Knauf Moisture Panel was the first thing we thought of when it came to the bathrooms. We knew that it is perfect for places that get very humid, and with its material makeup it can really reduce the amount of damp related issues that could develop in the properties. In the long run, it would save everyone a lot of hassle.”Supporting factors.When looking back over the reasons for specifying Knauf for the interior, Elion recalls it wasn’t just the performance guarantees which helped swing the decision.“We have used Knauf in the past and the benefits of using their products are many, but the key thing for us is the technical support. It’s phenomenal and is available as and when we need it.”“Whenever we had questions, we’d get in touch with Knauf and they’d happily answer, no matter how big or small. They also made regular site visits to make sure that everything was going well and that we were all on the same page.”With performance being at the heart of the offer, Knauf was the first choice for both S&R London Ltd. and the client, Mulalley. However, it highlights the importance of the support behind the products which can make the difference on site. Being able to quickly answer technical queries, offer visits to site, and performance guarantees, all adds up for a compelling manufacturer offer. 
Sponsored
Improving acoustic comfort in Doncaster school learning pods

Improving acoustic comfort in Doncaster school learning pods

Hush Acoustics

After embarking on a project to create high quality new learning pods to enhance its facilities, the last thing teachers, staff and children at Carr Lodge Academy in Doncaster were expecting was for excessive background noise to be so much of an issue that it stood in the way of their ability to use and enjoy them.The school wanted to create learning pods for each of its 1-6 year groups to provide a facility that could be used for extra learning, small group teaching or a break-out space for teachers and children. The building contractor appointed to construct the pods worked to an agreed specification and design, but the acoustic conditions that would result from the proposed usage of the spaces, the positioning of the pods and choice of materials for their fit-out was not fully realised. It was only when teachers and staff started using the learning pods that problems with echo and excessive sound reverberation were fully realised. This is a common acoustic issue which results from interiors that feature lots of hard, harsh reflective surfaces with the ultimate impact at Carr Lodge being that the pods were unsuitable for their purpose.The school sought specialist assistance to resolve the issues which started with an acoustic assessment and detailed acoustic report. And following a competitive tendering process, Hush Acoustics was appointed to complete the acoustic upgrade using its sound absorber panels.How absorption resolved the issueThe solution involved manufacturing and installing a series of Hush Absorber 50 panels which were strategically mounted on the walls of the learning pods. The Class A absorber panels are formulated using a 50mm thick acoustic foam which is hand finished in a high quality fabric applied on the face, edges and back – at Carr Lodge, the panels feature a green fabric to match the school’s aesthetics and contribute to the welcoming environment.Various sizes of panels were installed to fit the differing sized spaces within the school. Their positioning was dependent on the size and the layout of the learning pod for the year group. Some year group pods, for example, feature desks, so absorber panels have been installed to be continuous along the desk line, helping the children hear what is being said by teachers. In other desk-free learning pods, the panels were positioned on the walls – symmetrically where possible – to deliver an aesthetically pleasing and acoustically -effective result. Hush Absorber 50 panels work by absorbing soundwaves generated by speech and other sources in a way that hard surfaces such as plastered walls, wood and laminates do not. As a result, less sound is reflected back into the room, so the level of ambient noise is dramatically reduced to deliver a more acoustically comfortable environment that is far more conducive to learning.‘Huge difference’ to the learning environmentSarah Crampton, Principal at Carr Lodge Academy said: “Sound reverberation was causing us real problems and it meant that the learning pods – although fantastic in principle – simply didn’t serve the purpose for which they were intended.“The sound absorber panels have made a huge difference to the useability of our learning pods and provided a solution that did not require major, disruptive work. The quality of the solution provided by the Hush Acoustics team, and their service overall, has impressed everyone involved in this project.”
Sponsored
Inspirational interiors for award-winning stadium

Inspirational interiors for award-winning stadium

Altro

IssueSheffield Olympic Legacy Park Stadium was created after a collaboration of key institutions decided to deliver an Olympic legacy through the four themes of sport, community, environment and economy. The park has an ethos to achieve physical and mental health and wellbeing by providing world-class facilities for community sports, from grassroots up to elite levels.ApproachWith the need to provide inspirational interiors for aspiring Olympians, Alex Parojcic, Architect at Whittam Cox knew that a high-end design, complemented by technical performance and ease of maintenance was required for the new changing areas, showers and physiotherapy suite. “Ceramic tiles had originally been specified for the showers and changing rooms, but we switched to Altro Tegulis when we realised the installation would be quicker, give a fantastic look and feel to the areas,and provide the cleanliness and hygiene standards required for such busy areas.”Joe Richardson of Richardsons Cladding who completed the installation, added “Altro Tegulis was a quick and easy install which assisted with the contractor’s tight programme. If this had been done in the ceramic tiles it would have impacted the programme massively.”SolutionAltro Tegulis, partnered by Altro Aquarius were specified for the showers, providing safety from slips in shoes and barefoot. For the changing rooms, where traffic from football studs, sports shoe spikes and bumps/knocks from sports bags and equipment would be experienced, Altro Atlas 40 was specified. Altro Wood provided a less clinical finish in the physiotherapy suite.Altro Tegulis tile-effect wall panels offer the ideal alternative to traditional tiles for wet rooms, bathrooms, kitchens, and retail spaces. With a range of tile-effect patterns offering a grout-free alternative to tiles, Altro Tegulis offers a more familiar feeling than traditional wall panel sheets.Altro Atlas is well suited to areas where the risk of a slip is high, including heavy duty industrial use and sports changing rooms. Hard wearing, stable, and resistant to mechanical damage and chemicals, Altro Atlas 40 provides long term durability and slip resistance, and is easy to clean and maintain.Altro Aquarius is a specialist solution for combined wet and dry, shoe and barefoot areas. Keeps you safe with common contaminants such as shampoo and conditioner.Altro Wood is a general purpose 2mm wood-effect vinyl safety flooring available in a range of designs with different plank sizes.
Sponsored
Wythenshawe Hospital

Wythenshawe Hospital

Inpro

ClientManchester University NHS Foundation Trust (MFT) Market SectorHealthcare The Project BriefWythenshawe Hospital is a major acute teaching hospital part of the Manchester University NHS Foundation Trust (MFT). Its area of specialisms includes cardiology and cardiothoracic surgery, heart and lung transplants as well as cancer and breast care services and supports patients from across the North West and beyond.During the upgrade of the Emergency Department (E.D) the team decided on both protection and preventative measures to ensure only the highest of standards were adhered to which were in line with the Hospital’s renowned reputation. The SolutionIntastop Ltd was chosen to supply and fit a range of protective products designed specifically to integrate seamlessly with the hospital aesthetics.They included Bed Head Protection, Hand Rails, Sanparrel® Wall Sheet and Corner Guards from the Inpro product range in addition to Intastop’s innovative I-Gienic Smooth Hygienic Sheet and Rigid Frame Guards. Impact protection sheet along with the other products installed at Wythenshawe Hospital boast a plethora of benefits including high impact resistance, Class ‘O’ Fire Rated; tested to BS476 Parts 6 & 7 and available in a variety of colours. Additional Benefits of Impact Protection SheetEnsures staff and patient safety in the event of a fire by maintaining fire integrity of the surface.Protects against localised damage.Maintains a clean, safe environmentAchieves colour contrast for critical surfaces to assist with visually impaired staff and patientsWhat the client saysMarcus Ashurst, project manager for the emergency department said“With a collaborative approach from the inception of the project through to completion, the Trust was mindful that the new emergency department operating 24 hours a day would require careful thought and consideration with regards to the finishes selected. With leading healthcare architects IBI plans were drafted with full engagement with the clinical teams to develop an extremely well-considered and effective design – fit for purpose.Working with Interserve, the principal supply chain partner appointed to construct the new development, Intastop were nominated to supply and install a fully comprehensive system of door and wall protection that would not only withstand and protect the built environment, but also enhance the aesthetics of the environment. The holistic approach taken and end result was indeed most satisfactory.”
Sponsored
First printed house with KEUCO IXMO fittings and accessories

First printed house with KEUCO IXMO fittings and accessories

KEUCO

The result of the first project of this type is a house with an organic, soft design - the furnishings minimalistic, high-quality and modern. The house consists of triple-shelled walls that are filled with insulating mass. With the help of a giant 3D printer, the concrete mass was applied layer by layer. And within only a few months, a single-family house with 160 m² of living space was created.Nothing was to be missing from the house with its furnishings; the aim was to emphasise the high-quality and special style of the building. The concrete layers were to remain visible inside and out - reduced, clean and yet expressive in its style. This claim runs consistently through all rooms of the house. The bathrooms are equipped with KEUCO IXMO fittings in the shower and on the bathtub. The minimalistic fitting elements blend into the futuristic image, restrained yet strong in design. The shiny chrome finish, reflect a brilliant contrast to the dark tiles in the shower.Aligning with the principle of the house "without corners and edges", round cover plates were chosen for the fittings.  The accessories at the washbasin and WC also fulfil the credo of the design concept: EDITION 400 with its round form language is filigree and the accessories are high-quality eye-catchers. They enhance the bathroom with their understatement.What once started as a pilot project could influence building in the future and also offer installation and plumbing companies with completely new challenges.The materials and fittings of the bathrooms were chosen to match the special wall texture. "Without corners and edges", the EDITION 400 accessories from KEUCO perfectly fit to the motto, as does the KEUCO IXMO bath mixer with round cover plates.In addition to numerous accessories for the toilet and washbasin area, the EDITION 400 range also includes many hooks and towel rails. The accessories are very filigree in design and nicely round-off the bathroom design in a discrete and elegant way.  The IXMO fittings in the shower are not only outstanding in terms of design, but also from a technical point of view: the water quantity and temperature are regulated via the single-lever mixer. The shower holder integrates a diverter, where you can choose between a large overhead shower and a hand shower. Two in one: The KEUCO free-standing accessory for the toilet area is the flexible solution for a toilet paper holder and toilet brush set. Thanks to the large base plate, it is particularly stable.  
Sponsored
Wetguard Modular protection at Wood Boutique Hotel, Austria

Wetguard Modular protection at Wood Boutique Hotel, Austria

SIGA Cover AG

In this wooden building in the center of Vienna, the walls, ceilings and floors are made from solid wood(CLT). The construction protection covering and sealing for the individual elements were achieved with the SIGA products Wetguard and Rissan.

Showing 2017-2052 of 2191

Feedback