NBS Source
I'm a manufacturer

"ground water control trench sheeting etc"

18,106 results found

Sort by:

Showing 1873-1894 of 1894

Sponsored
Servicecare Support Services - Coniston Wall Mounted Canopy

Servicecare Support Services - Coniston Wall Mounted Canopy

Able Canopies Ltd

Portakabin Ltd. were working on a project for Servicecare Support Services Ltd. to install a temporary canteen and locker room facility. They required the extra building space so they could continue to operate whilst adhering to social distancing measures throughout the COVID-19 pandemic.Alongside the temporary building, they were in need of a wall mounted canopy along the right elevation to provide weather protection above the main entrance to the building that leads to the corridor.Able Canopies have been working with Portakabin for a number of years, adding shade and shelter structures to their temporary buildings. Although our canopies are permanent structures, we have designed above ground planter pads and special wall brackets to enable us to install the canopies and take them down when they are on longer required.These adaptions have been designed for our Coniston Wall Mounted Canopy and have been successfully used for many years now. The staff at Portakabin therefore put the Coniston Wall Mounted Canopy forward to Servicecare Support Ltd. who were pleased with the design and specifications and were happy to go ahead with the installation.The final design was 10m in length with a 3m projection to cover the whole span of the temporary building and provide the weather protection required above the entrance.
Sponsored
Armourcoat creates exceptional acoustics at the Minster Building

Armourcoat creates exceptional acoustics at the Minster Building

Armourcoat Ltd

Armourcoat surface finishes have played a central role in the comprehensive refurbishment of the iconic Minster Building in the heart of London’s business district, applying over 600m2 of it's seamless Acoustic Plaster System to the ceilings.The interior design by architects BuckleyGrayYeoman for Ivanhoé Cambridge and its development/asset manager Greycoat Real Estate LLP, has created a major repositioning of the building built around the central eight storey atrium. The ground floor reception is approached by a 30 metre long boulevard from the new entrance on the corner of Mincing Lane and Great Tower Street. The original entrance has also been retained to Minster Court piazza.Designed to optimize the acoustics of interior spaces, the Armourcoat Acoustic Seamless Plaster system offers a clean and smooth mineral surface that can be applied seamlessly over large expanses to both flat and curved surfaces. Comprising of a special mineral wool composite panel that is bonded onto the substrate and finished with a seamless layer, the system offers an elegant marble based plaster finish while allowing sound energy to pass through the surface. The zero VOC system, which consists of over 70% recycled material, achieves class '0' fire rating and a class 'A' Noise Reduction Coefficient rating.Photography: Jonathan Banks
Sponsored
Contemporary outdoor living space looks incredible with new steel windows and doors

Contemporary outdoor living space looks incredible with new steel windows and doors

Clement Windows Group

Our client, One 17 Design, acted as Architects, Interior Designers and Project Managers for this superb project with involvement from inception through to completion. Their brief was to create a home office / garden room in the grounds of an existing detached home, which was done by extending the detached garage.The material palette for the garden room predominately featured oak and steel. Blackened oak cabinetry and steel fenestration provide a striking contrast against the natural oak frame and cladding. Clever detailing in the relationship between the oak frame and steel doors adds a contemporary twist. The bricks for the outside of the building were selected to match the brickwork of the existing bungalow. Bespoke Clement steel windows and doors from the W20 range were chosen for the project, including an interior door, fitted with reeded glass that leads to the bathroom. All handles were powder coated black to match the steel frames.The project won “Best amazing space” at the 2022 Northern Design Awards.Freddie Garside, Partner and Director at One 17 Design, said:“We and our client were delighted with the finished doors and screens. The narrow framed black steel doors complement the natural oak frame perfectly. Clement were very professional, efficient and responsive throughout the whole project.”Photography: Joe Cotterill
Sponsored
Historical merged with contemporary

Historical merged with contemporary

Guldmann Limited

The combination of old and new architecture provides unusual views and insights.This was certainly the case with the extension of the Batelease Farm owned by the Moody couple in the English county of Devon.The original Batelease Farm was built back in the 15th century and the building has been changed and extended over the centuries. Because the Batelease Farm is a Grade II listed building everything had to be approved by the responsible heritage officials.The modern extension to the old farmhouse creates a contrast between old and new and combines the two - quite literally. Because the goal wasn’t merely to create a new build - it also had to be accessible and enable barrier-free access between the old and new building.This will allow the client, a wheelchair user, to navigate between the buildings independently and to move between the centuries, so-to-speak.A glass structure connects the main house and the new build and covers two floors, including a lift. Barrier-free access has been created between the buildings on both the ground floor and the first floor. There is also an entrance and exit here, which enables the client to enter or leave the building independently at any time.A Guldmann GH1 ceiling hoist system is used in the client’s bedroom with the rail system integrated subtly into an exposed timber beam, so that the practical aid is almost invisible.
Sponsored
The Strand, Aldwych

The Strand, Aldwych

GreenBlue Urban Ltd

The Aldwych area, nestled in the heart of London, has undergone a remarkable transformation in recent years. Aldwych is rich and diverse, originally developed in the early 20th century as a grand thoroughfare, flanked by prestigious buildings and theatres. Over time, it evolved into a bustling commercial hub. However, changing urban needs and traffic management had begun to take a toll on its charm and functionality. “A Vision for Aldwych”LDA Design played a pivotal role in envisioning the revitalisation of Aldwych. Their work was grounded in the belief that urban spaces should be more than just thoroughfares; they should be vibrant, people-centric environments that promote sustainability and community engagement. Collaboration between LDA Design and Westminster Council, aimed to enhance the public realm by incorporating innovative urban design principles and environmentally friendly features, such as tree planting.The primary goal was transforming Aldwych into a welcoming and attractive pedestrian space. This involved expanding pavements reducing vehicular traffic and creating designated areas for social interaction. The existing London Plane trees that lined the Aldwych were seen as valuable assets the design aimed to celebrate and preserve these trees.Drawing inspiration from the Strand design, the project proposed unique street furniture. These pieces added aesthetic value and provide functionality, such as Wi-Fi hubs and charging points.
Sponsored
Junckers solid oak floor for award-winning school

Junckers solid oak floor for award-winning school

Junckers Ltd

Architects Dixon Jones specified 600m2 Junckers solid oak flooring for Marlborough Primary School, a multi award-winning building on a densely populated urban site in the Royal Borough of Kensington & Chelsea. The brief to create a primary school much larger than the original Victorian building on the existing site challenged Dixon Jones to design a school where teaching accommodation is arranged vertically around a series of cascading roof terraces. With nursery and reception classes on the ground, children progress upwards through the building the older they get, with the junior years arranged on the upper floors. The interior forms an equally dynamic environment for students and staff with teaching spaces arranged around communal halls and generous circulation areas. A large main hall and multi-use space, flooded with natural light from two central roof lights, features Junckers wide board oak flooring throughout, providing a natural, unifying backdrop. Junckers’ FSC and PEFC certified floors are a durable, long-lasting choice with low lifecycle costs. Made in solid wood, the floor can be sanded and refinished multiple times without losing its good looks or performance, ideal for a thriving community school. Main contractor: Mace; Joinery contractor: Swift Crafted; Photography: Paul Riddle. 
Sponsored
Houlton School

Houlton School

Michelmersh Brick Holdings PLC

In Rugby, 57 aerial masts and a radio station are the genesis for the beginning of a new town, centred around the recently finished Houlton School. The carefully considered design of the School by Van Heyningen & Haward (VHH), is the successful retrofit of a collection of historic, grade 2 listed radio station buildings. Its cost-effective evolution into a thriving, sustainable secondary school comes through the careful integration of the previous buildings and by choosing to use products that fitted soundly within the pre-existing vernacular.Adapting the original framework to today’s standards was a job that took years to come to fruition, careful application of steel frame and the restoration of the original brickwork has meant that the two main listed structures, Transmission Hall and Power Hall will become a place of learning for generations of students. Handmade clay bricks provided by Michelmersh were vital to the restoration of the project, where they were used to ensure the structures could be repaired and retained rather than rebuilt from the ground up.Throughout the project, various elements of the building's industrial past have been retained, with arched windows and high ceilings to ensure that the history of this nearly century-old building is revered, but not overpowering compared to its newly instated modern sensibilities.Houlton School recently won the Refurbishment Category at the BDA Brick Awards.
Sponsored
Durham University

Durham University

Proteus Facades

A careful combination of A2 fire rated soffit panels, rainscreen cladding and mesh screens from Proteus Facades has helped band together the impressive new £42m Sciences Centre at Durham University. Based within the grounds of the Upper Mountjoy Campus, the new Mathematical Sciences and Computer Science building has been developed to create synergy between the two departments, which have been earmarked for significant growth within the Durham University Strategy – 2017-2027. The building features state-of-the-art teaching facilities and office space, including a specialist IT Lab with a designated server room, a 120-seat tiered lecture theatre and tutorial rooms. While a café and breakout spaces, as well as four enclosed courtyards make up the communal areas. Creating a bright space for students, staff and visitors to meet and relax, Proteus Facades manufactured striking 2.0mm Aluminium Proteus IP interlocking planks with a PPC Traffic White Matte (RAL 9016) finish for use on the façades of the four internal courtyards. GSS Architecture chose the Proteus IP aluminium PPC in Traffic White because it accentuates and reflects natural light creating an enhanced ambience in the teaching spaces that face onto the courtyards, whilst complementing the glass curtain walling system.
Sponsored
On the (B)RIGHT track...

On the (B)RIGHT track...

RENOLIT Cramlington Ltd

Gent Sint-Pieters railway stationCHALLENGE Gent Sint-Pieters, the main railway station in Ghent, is undergoing a spectacular metamorphosis today. The listed main building, constructed for the 1913 World Exhibition, has to remain untouched. Behind the old building however the platforms, waiting rooms and the central passengers corridor are being entirely refurbished. Architect Voncke’s objective was to create a pleasant atmospheric site with a 35,000 sqm open and attractive central hall, broadened and completely covered platforms and renovated rails. Functional, well-designed and above all spacious! As the 12 rail tracks had to stay on ground level, the passengers alley was excavated to a lower level under the railroad tracks. This necessitated permitting considerable daylight to enter the underlying levels.SOLUTION Transparent canopies, featuring large glass sections and translucent floors were all designed with this purpose in mind. To gain even more light the architect chose RENOLIT ALKORBRIGHT for waterproofing the platform canopies. The six long rectangular platform blocks, differing in height, are interconnected and make one large roof. The white highly reflective RENOLIT ALKORBRIGHT membrane on top of the construction reflects the daylight through the high side windows. A clever way to add extra day-light to the underlying areas. 
Sponsored
Uni of Reading Library, Berkshire

Uni of Reading Library, Berkshire

Sika Limited

A £40 million investment, 13 roof areas, eight different roof levels, and a steady stream of visiting students to keep happy throughout – the University of Reading (UoR) Library’s complete refurbishment was a large and challenging project spanning three years.Originally opened in 1964 and later extended in 1985, the library’s internal and external revamp was designed to increase space, improve facilities for individual study, provide better access and security across the building, and improve energy efficiency.In addition to a new-build Café extension, a new entrance canopy, a new ground-to-roof level lift and stair core extension – each featuring a new flat roof area – there were also 10 existing flat roof areas refurbished, coupled with the replacement of windows and re-cladding of the building’s exterior.Following a competitive tender based on an outline specification, Owlsworth Roofing, Sika Sarnafil single ply flat roofing specialists, impressed with the level of detail included in their quote and were awarded the contract by main contractor ISG.Roofing:Sika® Sarnafil G410-12 ELF.Sika® Sarnafi G410-12 EL.Sarnavap®-5000E SA.Sarnavap® HD SA.Primer 600.Sikatherm® PIR Insulation and Sarnacol®-2162.
Sponsored
Kameha Grand Hotel

Kameha Grand Hotel

Schöck Ltd

Winner of the MIPM 2010 award for Hotels and Tourism, which is presented for outstanding real state projects worldwide, the Kameha Grand was designed by architect Karl-Heinz Schommer Bonner. The unique elliptical section design did however make serious demands on the requirement for protection against thermal bridging. The architect discussed the issue with Schöck, the European specialists in thermal bridging solutions and it was agreed that a combination of three product variants would meet the requirement.The outer concrete arches on the roof and facade of the building cantilever 1.30 m on each side and this, combined with the subtle design of the facade, meant that it was not possible to use a standard thermal break solution. To minimise any thermal bridging problems along the two outer arcs an inventive solution had to be found by the Schöck design team. This was achieved by dividing the projecting element of the framework into a number of sections and using the appropriate Isokorb® T for the required forces. At the ground floor Isokorb® T type Q is used, with T type D being installed higher up the structure, followed by T type K on the top floor. Because of the arch profile, the Isokorb® T type D was cut and installed at 90 degrees and run under the curved edge of the roof emergency exits, providing F90 fire protection.
Sponsored
Flush Floor Access Hatch - SoFi Stadium, Inglewood, LA

Flush Floor Access Hatch - SoFi Stadium, Inglewood, LA

Surespan

Surespan designed and manufactured four access products for the SoFi Stadium in Inglewood, California The Project:HKS Architects were behind the architectural design of the stadium by creating an unrivalled sports and entertainment destination. The 5-billion-dollar stadium has created a diverse event space that offers an unparalleled experience from enjoying cocktails and food to immersive sporting events.The stadium offers a ground-breaking video experience that became the first venue to air live football on its roof. Furthermore, the centre-hung Samsung screen is the world’s first halo video board that is roughly 70,000 square-foot, dual-sided and is considered the most LEDs ever used in a sports and entertainment venue.The SoFi Stadium will be hosting several global events from the Super Bowl LVI 2022, 2026 FIFA World Cup and 2028 Summer Olympics opening and closing ceremonies.The Product:Surespan designed and manufactured four access products.  Two electrically operated, double leaf, flush floor hinged access covers to suit an overall frame size of 4267 x 1768mm.  Two electrically operated, double-leaf ceiling access panels to suit an overall frame size of 4267 x 1768mm. The lids have been designed to open downwards.
Sponsored
Tower Hamlets, London - Functional public space

Tower Hamlets, London - Functional public space

Townscape Products Ltd

Tower Hamlets, LondonFunctional public spaceStreet furniture | Street seating | VADForty-two Townscape Half Penny Bollards were used to create a functional public space in Tower Hamlets.Used as a community outdoor space, Oval Space is a multi-purpose venue with over 5,000 square feet of unobstructed statement space, in a unique London setting.The location is adjacent to the iconic Bethnal Green gasholders, Oval Space is used for all kinds of events from corporate functions to product launches and fashion shows through to small and large-scale stills, TV and film shoots.Half Penny Concrete Bollards are a below ground fix and are available in the following colours:Smooth Prestige Mixes:White PP09, Black PP32, Yorkstone PP02, Cloburn Red PP48 and Grey PP08 Exposed.Natural Aggregate Mixes:Natural Round, Ballidon, Mountsorrel, Criggion, Cleehill, Cloburn Red, Harvest Gold, Cornish, Red Aberdeen.See full product infoDownload the datasheetThe architectural team was led by Abhinav Kurup from London Borough of Tower Hamlets, while the Constructor was JB Riney.For more details of how we can help with your own public space requirements, please get in touch.
Sponsored
Whiteley Shopping Centre Redevelopment, Bayswater

Whiteley Shopping Centre Redevelopment, Bayswater

URSA UK LTD

Leading insulation manufacturer, URSA, has been selected as the specifier of choice at the redevelopment of historic London building, The Whiteley. The former Whiteley's shopping centre in London's Bayswater is the setting for one of the most impressive property redevelopments in Europe, in a £1 billion project to convert the century-old shopping arcade into a high luxury residential, hotel, restaurant and retail complex covering more than 90,000 square metres. In one of the company’s largest single project specifications to date, contractors Laing O’Rourke and architects, Foster and Partners, have opted for over 5,000 square metres of URSA’s glass wool insulation. Ian Claydon, Technical Manager for URSA UK, commented: “This is undoubtedly one of the largest building projects in Europe and so being part of that is incredibly exciting. “We have worked closely with the scheme architects to ensure that they have the best possible specification for their project and that is undoubtedly URSA’s glass wool insulation, our premium insulation product. “Glass mineral wool is the most efficient and user-friendly thermal and acoustic insulation material, both environmentally and from a cost-effective point of view. It is suitable for use throughout a structure, providing the most efficient insulation solution available on the market today.” Ian added: “We’ll continue to work closely with both the contractor and architect to ensure products are delivered to site in line with the construction team’s needs. This is a long-term project and vast on every scale; we will continue to partner with distributor, Encon Insulation in Maidstone, who have been instrumental in this specification.” The 110-year-old historic shopping center has been closed for two years after a prolonged decline following the opening of the famous giant Westfield London shopping center nearby in 2008. The former shopping arcade, in one of the most influential areas of the City of London, at the northern end of Queensway and about 5 minutes' walk from Kensington Gardens, has become London's most fashionable development with the commencement of the building development behind the retained and refurbished Queensway and Porchester Gardens frontages. The development includes 139 one to five-bedroom luxury flats and townhouses, with a starting price rumored to be in the region of £1.5 million, complete with spa, pool and exclusive communal workspace. 20 luxury shops and restaurants and 110 hotel rooms in the UK landing of the Six Senses luxury hotel/spa chain. The project, which involves construction and engineering firm Laing O'Rourke and famed London contractors Lyons & Annoot, is based on an architectural project designed by Norman Foster's architectural practice, Foster and Partners. Mark Guest, Regional Sales Manager for URSA UK commented: “Talking through the initial enquiry from Lyons & Annoot, the client was impressed by our quick response and ability to provide swift technical reassurance with an open approach. Being able to supply products immediately by working with the Encon network enabled URSA to cut delays associated with Covid, that were previously thought inevitable and costly”. The redevelopment will retain the essence of the building, which at its opening in 1911 was the height of luxury at the time, with a theatre and even a rooftop golf course before being listed in 1970 and converted into a shopping centre in 1989. The works will respect the iconic façade, central courtyard and dome of the old building which will be restored as well as the majestic and historic interior staircase, which will form the centerpiece of the hotel's ground floor. URSA's state-of-the-art insulation materials are being used in the refurbishment work. The contractors have already used URSA CAVITY BATT 32 glass wool slab treated with water-repellent additives and glass mineral wool for first-class thermal and acoustic insulation. With a fit-out contract of around £111 million, the 139 luxury homes will occupy a unique space of almost 28,000 square metres and are expected to be completed in 2023.  
Sponsored
Distribution centre 2.0 becomes sustainable with living walls and roof gardens at Schiphol Trade Park

Distribution centre 2.0 becomes sustainable with living walls and roof gardens at Schiphol Trade Park

Mobilane

For the new distribution centre at Schiphol Trade Park along the A4, living walls have been realised with MobiPanel, the living wall system from Mobilane. With a total surface spanning 750 m2, the facades of the new distribution centre is greened with the latest generation vertical green from Mobilane.Sustainable and innovative distribution centreA lot of attention has been paid to the appearance of the new distribution centre. With the design of Dedato Architecten, sustainability has not only been taken into account on the inside, but also sustainability at the outside of the building has been taken into consideration by including nature-inclusitivity. Dick Venneman, architect and owner of Dedato Architecten tells: “It is a building with its own characteristic appearance, a landmark from the highway. The building is in its materials friendly and accessible. The different surfaces in the facade gives it a human approach. The living walls and the vertically placed solar panels tells something about the sustainability of the building and plays a role in the preservation of biodiversity in the area”. In addition, the MobiPanel living walls makes the environment more sustainable and improves air quality. The installation of the living walls was carried out by Mobicare in collaboration with Zoontjens Boomprojecten. In addition to the living walls, Zoontjens also installed two large roof gardens with various trees, shrubs and 2,600 MobiRoof ECO sedum cassettes totalling 650 square metres.Distribution centre 2.0 Schiphol Trade ParkThe building spans 30.000 m2 of which 3000 m2 is available for offices. Under the distribution centre, there is a car park spanning 7500 m2 with space for 270 cars. The construction of the new distribution centre began in 2020 and is delivered by Dijkham Bouw BV. “From the environment, wellbeing and to prevent a paved environment, for the design it has been chosen to implement living walls, green roofs and ground level. We are very satisfied about this procedure. The execution is very good, the communication was good”, according to Marcel Smeets – Coordinator at Dijkham Bouw BV. The distribution centre was developed by Minerva Development. Minerva Development is an independent developer with years of experience in the development and realisation of business premises. “Since Schiphol Trade Park has set the goal of becoming one the most sustainable logistics centre, as developers we were very happy to take on the challenge. Next to all other facilities such as solar panels, we have opted for a lot of greenery in the design. Not only on the facades, but also in the surroundings of the building and on the roof. We are very happy with the end result and proud of the fact that because of the living walls, this is by far the most beautiful DC in the area. We are very curious about what the result will be over a few months when everything is in bloom”, Bob Lukassen – Minerva Development.Latest generation vertical greenFor greening the distribution, it was chosen for the new living wall system MobiPanel from Mobilane. MobiPanel is an innovative, sustainable and lightweight system for living walls. It is a modular and circular system consisting of omega profiles and pregrown plant cassettes (40 x 40 cm), provided with an automatic irrigation and drainage system. The plants in the cassettes receive water through capillary action. MobiPanel can be installed on flat or curved walls and is suitable for different types of walls, including certain types of sandwich panels. For the facades of the new distribution centre, sandwich panels from Cladding Point have been used. “With Mobilane, as a global expert with many years of experience, we can continue to lead the way in innovation and sustainability. Cladding Point and Mobilane are ready for the future together”, Frank Janssen – Managing Director at Cladding Point. Cladding Point’s Design+ Carrier sandwich panels contribute to the highest BREEAM category.Client: Minerva DevelopmentArchitect: Dedato ArchitectenConstruction period: 2021Installation: Mobicare
Sponsored
Dorset House, Bournemouth University, Poole

Dorset House, Bournemouth University, Poole

IKO UK

BriefDorset House sits at the heart of Talbot Campus, where most of the undergraduate and postgraduate courses are delivered at Bournemouth University. It is home to the Doctoral College, providing important support to its postgraduate research community with a range of high-tech laboratory equipment, as well as the Business School’s Professional Engagement Suite.Sustainability is a top priority for Bournemouth University. In fact, the University is ranked 21st in the world and 6th in the UK for its contribution to UN Sustainable Goal 13: Climate Action for The Times Higher Education Impact Rankings 2023. As well as opening new eco-friendly buildings, Bournemouth University is carrying out major refurbishment works across its campuses, investing in a range of low or zero-carbon technologies to help minimise water and energy use.As part of this refurbishment, Dorset House was to undergo a significant transformation to help enhance the entrance area and make better use of the space. Bluestone Design & Construction Ltd was tasked with upgrading the building’s flat roofing system, in association with IKO, and the build-up include the installation of a new 80kWp solar PV system.ChallengesThere were several challenges to overcome during the project, but as the team had recently completed similar works on the nearby Poole House on campus, they could apply their extensive learnings to ensure the refurbishment of Dorset House ran seamlessly. As the project was on a busy campus, it was important that it was carried out during the holidays to avoid significant disruption to students and staff. There was, however, a short period during term-time that required more coordination, to ensure appropriate access while making sure the project ran on time.Another challenge was ensuring the material deliveries arrived on time, to minimise site storage issues and meet workforce scheduling requirements. The team managed this effectively, by ordering the materials via construction product distributor, SIG, which were then delivered as required from the local SIG depot. This meant Bluestone Design & Construction could meet programme deadlines, without needing to store materials long-term on-site.SolutionThe installation process at Dorset House involved a standard hybrid built-up roofing (BUR) system, using both self-adhesive and torch-on membranes suitable for the substrates of the project. Choosing products with a 25-year guarantee was important to the team, as the installation included solar electricity panels (also known as PV), that would need to provide reliable power output over the system’s lifespan.Bluestone Design & Construction followed a thorough process to ensure the roof area was suitable for the PV installation, following the necessary remedial works and new roof overlay. Once the systems were in place, all works were reviewed to ensure they met the specifications of an IKO technical engineer and requirements of IKO’s guarantee, without any issues. The team also worked to all the necessary health and safety standards throughout the project.Bluestone Design & Construction and IKO worked together to ensure that the Dorset House project was carried out within the programme requirements – finishing ahead of schedule, in September 2023. It was essential that the building was ready on-time and within budget, ahead of the installation of the new PV system, to ensure maximum availability for the 2024 period. With Bournemouth University’s ambitious sustainability targets in mind, the Bluestone Design & Construction team wanted the system to be fully operational as soon as possible. As the main contractor and roofing installer, Bluestone Design & Construction was able to have more control over the project and ensure the roofing segment ran smoothly as part of the wider picture.The University was extremely pleased with the installation and execution of the project. Now with its improvements made, Dorset House is another success story in the University’s plan to futureproof its campuses for many years to come.
Sponsored
Solina observation tower and gondola station

Solina observation tower and gondola station

Pilkington United Kingdom Limited

Project: Solina observation tower and gondola stationClient: PKL and PFR GroupsThe Prime Minister of Poland, Mateusz Morawiecki, hailed the opening of a new observation tower and gondola lift in the Bieszczady Mountains as an investment that will strengthen the magnetism of Solina, a major tourist hotspot.At the opening, Morawiecki remarked how Solina is a beautiful place where nature is untouched by the human hand*. The picturesque holiday destination in South East Poland is famous for its forest-covered peaks and vast open water, home to the largest artificial lake in the country.These surroundings make Solina equally as popular with birds as it is for tourists. The area is home to 130 species of birds, including eagles, hawks, sparrowhawks, smews, black terns and songbirds; while also being located on a main migratory route.Protecting Solina’s bird population was therefore a top priority for the two groups behind the tourist attraction, the PKL Group (Polish Cableways), which provide sustainable mountain tourism services, and the PFR Group (The Polish Development Fund), a state-owned financial group which invests in sustainable social development, who paid close attention to the needs of bird species throughout the design and construction phases.They turned to specialist glass for the gondola station and the observation tower to help protect its feathered neighbours.Glass designed to protect birdsPilkington AviSafe™, an innovative glass designed to protect birds, was specified for the project’s glazing. Its unique patterned UV enhanced coating disrupts the reflection on the glass, helping birds to see a clear barrier.Jason Eggerton, UK specifications manager at Pilkington United Kingdom Limited, part of the NSG Group, explained: “Experts distinguish three effects leading to birds colliding with glass.“The mirror effect is where birds mistake the glass’ reflection as reality. Corners of buildings or narrow passageways can also lead to collisions as they allow birds to see the habitat on the other side of the building. Thirdly, the fly-through effect is where birds may also not see the transparent barrier and aim to fly into a building to a perching spot, such as within an atrium.“The gondola station and observation tower are surrounded by forests making bird collisions due to reflections of the trees a particular risk. Ultimately Pilkington AviSafe™ disrupts these reflections making the glass more visible”The coating is designed on the principle that birds see in a different light range to people, making Pilkington AviSafe™ glass more visible to birds while remaining aesthetically appealing on the exterior surface. From the inside however, it’s barely visible to the human eye.It was used in the large, modern glass facades of the gondola station in combination with Pilkington Suncool™ 70/35 and Pilkington Optilam™ glass, which ensures effective thermal insulation, solar control and safety.The Pilkington AviSafe™ glass was manufactured at the Merseyside manufacturing site of Pilkington United Kingdom Limited, part of the NSG Group, in St Helens.Jason Eggerton continued: “Making buildings truly sustainable goes beyond emissions and energy efficiency. Architects and specifiers increasingly need to consider how their projects impact local wildlife too.“Pilkington AviSafe™ has clear value amidst nature reserves, forests and mountains in Solina. But many of the world’s major cities are located on bird migratory paths, where tall, glazed buildings can increase the chance of collisions.“We’re proud to support a project of such high prestige and economic significance in Poland, and to play our part helping Solina’s tourism industry to maintain its minimal impact on nature and local wildlife.”
Sponsored
EWI for two high-rise residential towers

EWI for two high-rise residential towers

Sto Ltd

Located in Tower Hamlets, Gayton House and Sleaford House are managed by housing association Poplar HARCA. Following amendments to Building Regulations, which banned the use of combustible materials in external walls of high-rise buildings above 18m, StoTherm Mineral K was specified to replace the existing EWI system.BBA-certified, StoTherm Mineral K comprises mineral fibre insulation boards and the system is classified with an A2-s1, d0 reaction to fire in accordance with BS EN 13501-1.Working on behalf of Westminster Building Company, Square 1 Architectural Solutions was responsible for removing the existing EWI and installing the StoTherm Mineral K system onto four elevations on each 23-storey block. The non-combustible mineral fibre insulation boards were secured to the existing concrete substrate using adhesive and mechanical fixings, and without the need for additional expansion joints.A StoLevell Duo Plus reinforcing coat embedded with Sto-Glass Fibre Mesh was then applied to the face of the insulation boards. This was followed by the application of 1.5mm stippled StoSilco, a silicone resin render that provides high levels of water repellence to protect the walls from weathering.
Sponsored
Warm tones and clean lines for bathroom with Altro Walls ShowerKit

Warm tones and clean lines for bathroom with Altro Walls ShowerKit

Altro

IssueA 15-year-old bathroom in a housing development was looking tired and dated and the owner wanted to refresh the area with minimal disruption in a quick timescale. The bathroom had three walls of ceramic tiles, and a sink splashback, which were in good condition but were unfashionable and required high levels of maintenance to remove limescale and mould.The property, a first floor flat, had easy access but no lift, so equipment, materials and any waste needed to be carried up and down the stairs.Approach“We wanted to replace the ceramic tiles, without having to re-plaster the bathroom walls which would mean a complete renovation and redecoration project,” said Helen Green, the owner. “We live in an area with hard water and limescale is a real problem so a wall that is easy to keep clean would be ideal.”SolutionAfter liaising with Altro customer services, the new Altro Walls ShowerKit was recommended as being the ideal solution as the wall panels can be installed over existing ceramic tiles and provides ease of maintenance for residents. There is also no requirement for construction materials or heavy equipment as Altro Walls ShowerKit is lighter to transport than ceramic tiles.
Sponsored
Cannon Park Student Accommodation

Cannon Park Student Accommodation

Biotecture Limited

Cannon Park Shopping Centre in Coventry has undergone a significant transformation. Led by MPR, the redevelopment project includes refurbishment of the existing shopping centre, construction of a new 780-bed student residence, and the addition of a new 400-space multi-storey car park. Biotecture was brought on board to incorporate living walls into the development.In 2021, Biotecture installed a 690 square metre green wall on the multi-storey car park as part of the project’s first phase. We then continued to collaborate with the project’s architects, Urban Innovations, and landscape architects, Parkhood, on phase 2; 9 living walls on the student accommodation phase. The vertical greening was an important part of the scheme, helping to help soften the development, improve air quality, contribute to biodiversity net gain.The living walls are integrated into the building fabric. We worked closely with the design team to ensure that the living walls not only aligned with the desired aesthetics but also met the technical requirements.We used our BioPanel system which uses Grodan® as the growing medium. Grodan is dimensionally stable, chemically inert, and water retentive resulting in healthier and longer-lasting plants.
Sponsored
MEGAgrip Safety Railing Installation On The River Thames

MEGAgrip Safety Railing Installation On The River Thames

Pure Vista Ltd

A safety railing on the River Thames. London’s longest pier, Royal Wharf includes a 162m² viewing platform for unparalleled views along the River Thames, now surrounded by a glass balustrade safety railing. Like many river-side locations, the view is spectacular and is preserved for the enjoyment of those walking by. The glass balustrade keeps the views in tact while also providing a safety barrier and windbreak along the length of the pier. The Royal Wharf Pier opened in 2019, after a refurbishment, and now provides quick transport to and from central London by water taxi. The use of MEGAgrip keeps the view of the River Thames while providing the necessary safety feature on the pier. MEGAgrip is Pure Vista’s answer to a heavy-duty and fully adjustable balustrade system. The internal glass clamps allow for easy alignment of the glass within the channel, making this one of the most easily adjustable systems available. MEGAgrip is ideal to be used as a public space barrier in busy locations such as transport hubs or venues. A benefit to this product is that it can be upgraded, with the use of a converter kit, to become bomb-resistant. For this project, MEGAgrip provides the most suitable safety railing on the River Thames.
Sponsored
Kings Cross Residential Acoustic Flooring System

Kings Cross Residential Acoustic Flooring System

Access Floors Distribution

Capella Development, Handyside, Kings Cross LondonDeveloper: ArgentMain contractor: Laing O’Rourke Architects: Chapman TaylorSub Contractor: InstaGroup120 newly built residential apartments received InstaCoustic's 'dry' cradle & batten system combining under floor heating & topped with Knauf GifaFloor FHB25.Original plans were to install a T&G chipboard to finish the acoustic floor system, however it was determined that there were deflection risks around the proposed large format tile finish.As a result, the chipboard was replaced by the high density, gypsum fibreboard Knauf GifaFloor FHB25. This resulted in:Quicker install & less use water than a wet screed systemImproved acoustic performanceImproved fire performanceImproved thermal efficiency resulting in reduced energy costs for the end userHigher loading performance, creating a solid substrate for the finish to be applied directly toReduction in overall embodied carbon & installation of a product that offers a high recycled contentLifetime guarantee of the buildingClick the link below to read the full case studyhttps://www.instacoustic.co.uk/case-study/kings-cross-london-n1c/

Showing 1873-1894 of 1894

Feedback