NBS Source
I'm a manufacturer

"ground water control trench sheeting etc"

18,323 results found

Sort by:

Showing 1837-1872 of 1914

Sponsored
Edith Neville Primary School, Camden

Edith Neville Primary School, Camden

Anderson, GEC Ltd

The fit-out of a new primary school building in North-West London has featured the installation of half a dozen different configuration of high quality stainless steel work-surfaces within its teaching, staff and family areas, specified for their durability and visual appeal as well as the creation of hygienic, easy to clean and maintain facilities.The Edith Neville Primary School in Camden has been built by Orpington based Neilcott Construction for the London Borough of Camden with Hayhurst and Co. Architects leading the design team. Project Architect, Jamie Wakefield, commented: “I had seen GEC sinks on another project and we specified them as part of a full Stage 4 design for the Edith Neville Primary School, which has been built for the London Borough of Camden. Schools inevitably get some very heavy usage, but with stainless steel it is easy to clean the surfaces up and get them looking smart again and they’ll still look good in ten years’ time. The different GEC fabrications feature throughout the new school as classroom art sinks, tea-point countertops and in spaces such as the family centre. There is also one in the staff kitchenette and a special studio space. We’re very pleased with how they look and they are working well for the school.”The many and varied units supplied by G. E. C. Anderson include a total of 16 in varying sizes from 1440mm long x 600mm deep and up to 3073mm long x 650mm deep, all with flat surfaces for food preparation and stacking dishes, including ten units supplied with one full size sink and six with a full sink together with half sink, plus three with cut out for cooker hobs, while 300mm high splashbacks- again in stainless steel, help prevent water or waste material staining or damaging the walls. The tops also incorporate five different edge details for such purposes as preventing water run-off.Since its formation in 1962, GEC Anderson has built its reputation for the supply of top end stainless steel sinks and sanitaryware on a combination of innovative design, top quality materials and expert craftsmanship. In addition to the company’s Decimetric system of cabinets, sinks, drainers and other equipment - widely specified for sectors including health and catering – it is able to create custom engineered solutions to exactly fit any space or specification.
Sponsored
Sixmilewater Park | Anti-Slip Decking For Public Boardwalk

Sixmilewater Park | Anti-Slip Decking For Public Boardwalk

Gripsure (UK) Ltd

Sixmile Boardwalk is a wooden walkway located in Ballyclare, a town in County Antrim, Northern Ireland. The boardwalk stretches for over a mile through Sixmile Water Park, providing visitors with stunning views of the surrounding natural beauty. The boardwalk is an accessible and family-friendly attraction that allows visitors to explore the park’s wetlands and wildlife, including ducks, swans, and otters. It is a popular destination for walkers, joggers, and cyclists, as well as families and nature enthusiasts. The boardwalk also features several rest areas and interpretive signage, providing visitors with information about the park’s history and ecology.The second phase of the Antrim Boardwalk refurbishment project involved an extension and upgrade of the walkway, including the removal of existing slippery timber deck boards and replacing these with new anti-slip timber deck boards. For this, Gripsure’s non-slip Premier decking were carefully chosen for the new raised boardwalk and viewing platform area, installed by Martin Contracting Services Ltd.Primarily chosen for its safety benefits, Gripsure’s Premier profile achieves a PTV rating of 78 assuring a safe and comfortable walking surface for visitors, even in wet or damp conditions. Gripsure decking has been tried and tested on projects for over 15 years and is now trusted by many household names, such as Center Parcs and Samsung.In addition to the proven safety benefits, the Gripsure decking used at Sixmile Boardwalk is also extremely durable and long-lasting, making it a cost-effective choice for Antrim and Newtownabbey Borough Council. The decking requires minimal maintenance and is resistant to rot, decay, and insect damage, ensuring that it remains in excellent condition for years to come.Overall, the Gripsure non-slip decking used at Sixmile Boardwalk has been a great success, providing a safe and sustainable solution that enhances the park’s natural beauty and functionality. The decking has helped to increase visitor safety and comfort, and has helped to make Sixmile Water Park a more accessible and enjoyable destination for visitors of all ages and abilities.The Mayor of Antrim and Newtownabbey, Councillor Billy Webb, said: “These refurbishment works will bring more footfall to Antrim town centre and help us tackle the challenges of climate and environmental change by encouraging active travel whilst also proving a local business with the contract.”All media is courtesy of Martin Contracting Services. ©2022 Martin Contracting Services
Sponsored
Südanit 280 Alpha Hemihydrate | Mobile Screed Factory | Fast Floor Screed | 20,000 m2 apartments Dublin

Südanit 280 Alpha Hemihydrate | Mobile Screed Factory | Fast Floor Screed | 20,000 m2 apartments Dublin

SMET Building Products Ltd

We supplied our Südanit 280 Alpha Hemihydrate Binder to our Smet Supported Partner, Fast Floor Screed Ltd, who pump-applied their self-levelling, Südanit 280 Alpha Hemihydrate Screed in this amazing new apartment development for Cairn Home Plc in Dublin.The delivery, completed using their mobile screed factories, enabled Alpha Hemihydrate Screed flooring solution to be installed quickly and efficiently over the entire project over two sessions. The apartments are amazing looking: https://www.cairnhomes.com/new-homes/marianella/This CE marked, self-smoothing, self-levelling screed is the most technologically advanced floor screed available, complying with the performance requirements of EN 13813.Südanit 280 Alpha Hemihydrate Screed’s advanced composition means that it reacts with water quickly – providing consistent, reliable drying characteristics and considerably faster drying times – enabling follow-on trades to proceed without delay.The Fast Floor Screed Mobile Screed Factory – is a unique system. The lorry mounted rigs carry Sudanit 280 Alpha Hemihydrate binder, sand & aggregates and water in separate compartments. The automatic production process ensures materials are precisely weighed, fed to the mixing bin, and into the pump for easy, mess-free installation. Ensuring the Fast Floor Screed Mobile Screed Factory produces Sudanit 280 Alpha Hemihydrate floor screed to a consistently high quality. Have a look at Fast Floor Screed past projects.The floor is remarkably quick to walk-on – applied at 500m² per day and walkable within 6 hours and it’s particularly suitable for use with UFH, fully encapsulating pipes and services – increasing the performance of underfloor heating, maximising your insulation, and therefore improving your building’s U-Values performance.Check out more projects using this screed:https://www.smetbuildingproducts.com/projects/by-product/casea-sudanit-280-alpha-hemihydrate-binder/Whether your job is self-build, retro-fit, floor renovation, design, commercial or industrial venture – we have a floor compound suitable for you.Contact Smet Building Products Ltd for any advice regarding your substrate.Related DownloadsTDS CASEA Sudanit 280 BinderEPD – CASEA Calcium Sulphate Flowing ScreedTDS SMET_Tiling Onto Calcium Sulphate Floor Screed_System ITDS SMET_Tiling Onto Calcium Sulphate Floor Screed_System II
Sponsored
Hounslow House, London

Hounslow House, London

AG Paving and Building Products Ltd

Opened in April 2019 by the Mayor of London, Sadiq Khan, Hounslow House is the new greener-energy HQ of Hounslow Council in London.Building plans for the new purpose-built council offices included a rooftop communal area, and, impressed by what the team at AG could offer, it was agreed that AG’s TerraPave® premium granite flags perfectly fitted the requirement for a smooth granite finish flagstone, providing a more superior product than the original spec while also ensuring significant cost savings on the project.The 500m² area was given a beautiful aesthetic look through the use of our TerraPave® Rimini and Milano Ground (400x400x50mm) which was calibrated and laid on pedestals for speed of construction.Offering an attractive, cost-effective and practical alternative to traditional stone paving, TerraPave® is a favourite choice with architects and specifiers – and this is one project that proves why that’s the case.Dan Smith, AG Regional Sales Manager, said:“AG was able to provide better quality and a keener price on the products used. Furthermore, our team was also able to deliver both the experience and project know-how required to ensure the client received best value for money on the overall project.”
Sponsored
Sinclair Meadows – Zero Carbon Code 6 Housing

Sinclair Meadows – Zero Carbon Code 6 Housing

CDI Innovative Construction Materials Ltd

Providing 21 affordable homes in the first ‘carbon negative’ housing community of its kind in the UK. The initial concept began in 2009 with the aim of creating carbon negative housing. The project is ground breaking with a plan to lock away as much carbon as possible whilst generating excess energy from systems installed.Lewis Deck light weight steel/ screed composite floor system providing acoustic floors improving Building Regulations Part E standards by at least 8dB was installed in the apartments.This project achieved a Zero Carbon certification under the Code for Sustainable Homes and achieved Passiv Haus standards, but was not certified under this system. The performance was monitored by the Technology Strategy Board (TSB) as well as how the social tenants found the experience of living there given the lifestyle adjustments that were needed.The Lewis Deck was used as it achieved the enhanced acoustic and fire performance required in this project, especially given that this was a timber frame development. The elements of the building also had to achieve an A+ Green Guide to Specification rating from the BRE, this was achieved by using a liquid screed on top of the deck that contained a high recycled content.The project won a number of awards and was marketed as the UK's 1st "Carbon Negative" social housing scheme.
Sponsored
Clement EB24 steel windows and doors chosen for incredible country house

Clement EB24 steel windows and doors chosen for incredible country house

Clement Windows Group

Over a number of phases, Clement have manufactured and installed new steel windows and doors from our EB24 range for this magnificent house in the Berkshire countryside. The original home was built in 1905 and the current owners have beautifully refurbished the whole property including the gardens. They have cleverly added a contemporary twist, but have retained all of their home’s original charm. The new slim framed steel windows and doors have opened up the views from the house to the garden and let masses of light into the home. Two different glass types were chosen: leaded light glass for the new multi point locking steel windows and G+ glass for the steel doors, and the combination works perfectly together. The larger panes of glass in the steel doors allow natural light to flow throughout the ground floor. The client said: “Clement Windows Group are a fantastic company. They have worked at my property now for the last couple of years, as the work has been carried out in phases. Throughout the whole process I have been impressed with their professional service. We are really happy with the quality of all our new windows and doors and would not hesitate to use Clement again in the future.” 
Sponsored
Starfield Shopping Mall - Intercure 200, Interthane 870 - Infrastructure

Starfield Shopping Mall - Intercure 200, Interthane 870 - Infrastructure

International®, brand of AkzoNobel

Covering 460,000 square meters, the equivalent of around 70 soccer fields, Starfield in scenic Hanam, just east of Seoul, is one of the largest shopping malls in South Korea. Stepping inside the mall, shoppers are greeted with copious amounts of natural light coming in through the two glass roofs standing at 35 meters above the ground, built to deliver a relaxed and comfortable atmosphere. Our coatings are making sure that Starfield Hanam’s stunning roofs are looking great for the millions of shoppers that the giant mall is catering for.The owner specified a fast-curing primer to increase productivity in the workshop, followed by a high build polyurethane topcoat with a semi-gloss white surface.Intercure 200 was chosen to provide superior long term corrosion protection to the roofs’ steel. The zinc epoxy primer provides rapid cure even under low temperature conditions and is suitable for over-coating within 3 hours in most climatic conditions, speeding up production and throughput in fabrication shops.Semi-gloss and available in a wide range of colors, our Interthane 870 finish coat was used to deliver excellent cosmetics and extended recoatability, assisting in project flexibility.This two coat system boasts a very long global track record.
Sponsored
The London Stadium at Queen Elizabeth Park

The London Stadium at Queen Elizabeth Park

Knauf Insulation Ltd

ChallengeThe London Stadium (formerly Olympic Stadium) and home of Premier League football club West Ham United, required an insulation solution that would not only upgrade the thermal and acoustic performance of the HVAC and service pipe areas, but also one that could meet the overall environmental demands of the project.SolutionAfter a series of consultations with the main contractor, Knauf Insulation developed a bespoke, one product solution, which met all requirements and helped to reduce engineering costs and installation time.23,000m2 of Rocksilk® Soffit Linerboard Standard was installed in the different elevations of the stadium, from level two to the lower ground level of the West Stand.Manufactured with ECOSE® Technology, Rocksilk® Soffit Linerboard Standard is a laminate of a compression resistant, non-combustible Rock Mineral Wool slab with a variety of aesthetic finishes designed to provide a robust faced solution suitable for installation in semi-exposed environments such as stadiums like this.The project was completed before West Ham’s first competitive game at the London Stadium in August 2016."The insulation product knits together to prevent open joints, which helped us to maximise the thermal efficiency of the insulation."Kunal Vekaria, Project Manager at HLS Installations
Sponsored
GKD: A little closer to heaven

GKD: A little closer to heaven

GKD - GEBR. KUFFERATH AG

Commissioned by 30 member states of the European Union, the European Organisation for the Exploitation of Meteorological Satellites (EUMETSAT) monitors the climate and weather. In light of climate change, the data it collects using complex satellite systems is becoming increasingly important. The growth of the organization associated with this is reflected in the continuous expansion of its HQ in Darmstadt. The construction of a new six-floor office building also includes a canteen for all employees working at the location. This canteen gets its unmistakable face from a lamella-style suspended ceiling made of golden PC-ALU 6010 aluminum mesh from GKD – GEBR. KUFFERATH AG.Modern weather forecasts today have little in common with traditional country weather lore. Satellites make it possible to monitor the climate and weather on a global scale. The data collected is then used to keep authorities, citizens and companies up-to-date with the latest developments at all times. In Europe, EUMETSAT monitors the atmosphere, oceans and earth’s surface around the clock and then transmits the data to the participating EU member states. Established in 1986, the organization opened its headquarters in Darmstadt in 1991. However, ever increasing requirements and staff numbers meant that the operation quickly outgrew its original space. A six-floor office building with 160 workplaces represents the final phase of a whole range of extensions and new buildings. Following a construction period of just 18 months, around 100 employees were able to move out of their temporary container offices and into the new building costing around €10 million, while a further 60 new employees are set to follow. The shape of the new building, designed by Pielok Marquardt Architects from Offenbach, is a mirror image of an existing building. Beside excellent energy efficiency and multifunctionality, the new building is characterized by transparency and modern design. Four office levels offer versatile space with transparent partition walls for any desired arrangement – whether open space, combination offices or classic cubicles.Functional division – exceptional aestheticsThe ground level comprises two separate functional units that can be accessed via separate entrances. Beside a control center for a new satellite program, this is also home to the campus kitchen with connected canteen for the workforce at the location, which has now grown to include around 600 employees. The kitchen has been designed to provide 410 meals a day and the canteen offers 250 seats. The mullion-transom facade also ensures that the room is flooded with light. Carefully chosen furnishings divide its area into various acoustically optimized zones. The white of the desks and chairs is picked up by strips in the glossy flooring and the cladding of the food counter, pillars and supports. In the central zone, bright red benches with high, sound-absorbing backrests offer a vibrant contrast. The color scheme is rounded off by the warm brown of the stone floor and the wooden acoustic cladding. However, the striking element in the room is the suspended ceiling, made from 400 square meters of golden aluminum mesh. Its 120 elements with a blade-type design mimic the appearance of sunshine in the canteen with their discreet shimmer. LED lighting strips further underline this impression. At the same time, the mesh conceals the ventilation technology with incoming air outlets on the element frames. As a result, the accessibility of the woven ceiling elements was among the key requirements for GKD. The planners opted for a particularly open mesh design in the form of the PC-ALU 6010 mesh with various warp and weft wire thicknesses. The function and aesthetics of the ceiling mesh thereby provide the desired high level of comfort in the canteen, while also making the room a unique feast for the eyes.
Sponsored
EDF Offices

EDF Offices

FAAC Entrance Solutions UK

Providing a secure and reliable office entranceEDF are one of the UKs largest energy providers, with their head office serving as the strategic hub that plays a pivotal role in its overall functioning and success. At FAAC Entrance Solutions, we understand just how vital a secure and reliable entrance is to such an important business. From the initial design working with Pick Everard, we reviewed the best entrance solution, to meet the clients brief and requirements.Project Year: 2023Product: FAAC A1400 Slider with pocket screen & TK35 profileProduct: RD100 Revolving DoorProduct: Magnetic mWing Pedestrian GatesProduct: FAAC Airslide Sliding DoorProject Background: The facilities team at EDF wanted to increase security with a safe and secure entrance that would suit their ground structure. They wanted a full entrance solution with a revolving door at the end of a bridge with a sheltered glass tunnel leading up to a pair of automatic sliding doors and security lanes. As part of the project, we worked closely with the contractor Imtech Inviron Ltd and all the project team, whilst meeting all challenges along the way, we aimed to create the perfect solution without disrupting the space and flow of the foyer whilst entering and exciting the building.Solution: One key item was enabling staff to be able to enter the entrance corridor through a revolving door, providing a sustainable and weathertight area out of the weather, then having a secondary entrance through a pair of automatic sliding doors, therefore providing an improved entrance with high protection against all weather conditions. To comply with Part M of buildings regulations, we provided our unique FAAC Airslide automatic sliding door system, to ensure accessibility for all.Once inside the building, we installed a bank of 3 security lanes, to control the access for authorised users only and preventing unauthorised personnel from entering the building.Revolving door: The RD100, a power-assisted door, elevates functionality for any office entrance with pedestrian traffic. This compact revolving door accommodates various pedestrian flows effortlessly and at their preferred pace. Manually activated, pedestrians push the door to start. Once the smart system activates, it guarantees smooth movement in both directions, reducing effort and power use, easing entry/exit, and reducing the carbon footprint.Sliding door: Our FAAC A1400 sliding door’s innovative “energy saving” feature empowers this system to discern transit direction, meticulously optimizing opening and closing times. This functionality effectively prevents unnecessary air dispersion, even amid cross traffic occurrences. The resulting product is environmentally conscious, reliable, secure, technologically advanced and notably, cost effective in the long term.Pedestrian Gates: The Magnetic mWing Pedestrian Gate system ensures swift visitor flow with quick opening times and preset travel features, ensuring high-security standards in both monitored and unmonitored areas. Engineered for durability and comes with a unique surface finish.AIRSLIDE Sliding Door: FAAC supplied and installed 1 of our unique AIRSLIDE automatic sliding doors, with an integrated air curtain. An air barrier protects the entrance area from the cold in winter and the heat in summer, without dispersion. This solution, designed for automatic entrances, allows the air to be kept inside the building, thereby helping to reduce energy consumption.The AIRSLIDE system combines the automatic opening and air curtain systems into a single unit, with obvious aesthetic and functional advantages. Its sleek design makes it easy to integrate into any architectural perspective.Check out more of our Energy Solutions.For more information or assistance with any project, please contact enquiries.esuk@faactechnologies.com where we can provide expert guidance and detailed documentation.
Sponsored
BAFTA Headquarters

BAFTA Headquarters

3v Architectural Hardware Ltd

Architect/Designer: BenedettiLocation: London Project OverviewFront of house refurbishment including developing bespoke signage and hardware to meet the client and architect’s requirements. ServiceFull hardware scheduling service. Bespoke signage & ironmongery. Project Details 3v worked alongside Benedetti architects to provide a full interior hardware package for the beautiful refurbishment of the British Academy of Film & Television Arts headquarters at 195 Piccadilly. This project included development of bespoke signage panels and hardware designed to complement the overall design aesthetic for the refurbishment of this Grade II listed building.The Expansion includes new top floor by raising & restoring two large Victorian rooflight structures & decorative plasterwork considered ‘lost’ for 40 years, from the original 1883 Royal Institute of Painters in Water Colours Gallery, built in ‘opposition’ to the Royal Academy across the road.Facilities include: doubled capacity, two cinema theatres, banqueting hall, multipurpose event and exhibition spaces, members’ bars/restaurant/club, roof terraces, judging/meeting rooms and offices.
Sponsored
Three Bridges Station

Three Bridges Station

A J Wells & Sons

AJ Wells designed, manufactured and installed just over 1000m2 of vitreous enamel wall cladding with a metal ceiling to modernise the public areas of Three Bridges Station and provide easy access to hidden electrical and telecommunication services.The metal soffit was designed and installed to act as both a water management system and create an aesthetically pleasing ceiling in the subway and platform access areas. The ceiling also incorporated inspection hatches so that the underside of the rail bridges could be inspected periodically by the relevant parties.AJ Wells carried out the installation work under extremely challenging conditions as Three Bridges station is open 24 hours a day throughout the year. As a result the majority of works could only be carried out during the evening and in the early hours of the morning when customer traffic flow was at a minimum.AJ Wells worked closely with the other trades on the project in order to ensure that all interfaces achieved their required purpose.KEY FEATURES:• Vitreous Enamel Cladding system• PM13 ceilingA.J WELLS SERVICES:• Design• Manufacture• Installation
Sponsored
Ridgeway Views, Mill Hill

Ridgeway Views, Mill Hill

Cellecta Ltd

Ridgeway Views is a collection of 490 flats set within 47 acres overlooking fields of Totteridge Valley. These energy-efficient homes offer village life coupled with city living. The development includes a gym, bar, parking, charging points, landscaped gardens, fitness trail, concierge, café, car club and play area. The National Institute for Medical Research was originally designed in 1934 by Maxwell Ayrton, with the buildings all being named after pioneering researchers from the institute (Dodson & Wolff House), with the main cruciform named as Ayrton House. This building has been recreated with a green copper-roofed centre, village pond, 3 storey workspace and restaurant.Cellecta’s HEXATHERM XPERi was specified by Julian de Metz of dMFK working with Hawkins\Brown & RMA Architects due to its closed cell structure that provides unrivalled resistance to water absorption and high compressive strength, making them ideal for external basement lining applications.Barratt Homes was supplied 112,500m² of Cellecta products to develop these flats in the Mill Hill conservation area.
Sponsored
Butlins - Bognor Regis

Butlins - Bognor Regis

DCM Surfaces

DCM Surfaces installs synthetic surfacing at Butlins new pool complex in Bognor Regis.The project, which took two years to complete, accommodates almost 1,000 guests and has unique seaside and fairground-themed rides, a wave pool and a special area for toddlers.Kier was the successful bidder for the contract. Following a rigorous selection process based on quality, cost and Health and Safety, selected DCM Surfaces to install synthetic surfacing for three main areas around the complex.DCM Surfaces was in a unique position to deliver all elements of synthetic surfacing, which included the installation of an Artificial Grass safety surface, Resin Bound Gravel pathway, and Rubber Mulch, which was used to fill several tree pits. A core requirement of the installation was that each surface would be permeable, allowing water to drain through and ensure that it could be used all year round.A Rubber Shockpad was installed beneath the Artificial Grass to give children a soft, impact-absorbing layer to run and play with.The installation, completed on March 19, covered an area of over 1000 sqm.
Sponsored
Walls can purify the air with ESCREO Clean Air

Walls can purify the air with ESCREO Clean Air

ESCREO

For almost a decade, ESCREO whiteboard paints have been helping companies transform their workplaces, making them more creative, organised and open to collaboration. Creativity and innovation are embedded in the DNA of the company and its team from the very beginning. Thanks to this, they manage to find a solution to a problem that negatively affects our productivity and well-being, namely poor air quality. This is how ESCREO Clean Air was born - the latest addition to ESCREO's carbon neutral portfolio of functional paints. ESCREO Clean Air is an interior air purifying paint, which reduces air pollution by more than 90.1%. One of the magic components is an enhanced mineral which attracts and neutralises harmful pollutants, incl. VOCs, odours, air chemicals and CO2. The non-toxic environmentally friendly water-based formula is a great collaboration between modern technology and a clever "problem-solving" approach, through which ESCREO can help commercial building owners use hitherto passive areas such as walls to further purify the air indoors, making the premises more attractive to current and future users.
Sponsored
Horne Terrace

Horne Terrace

Forterra Building Products

The ChallengeA former industrial area along the south bank of the Union Canal in Merchiston, Edinburgh required transformation with the expected outcome of becoming one of the places to live in the city centre. A housing development was to provide a stylish addition to the already thriving growing community.The development consists of 11 stylish, one, two and three-bedroom apartments. The apartments feature high quality engineered flooring, bespoke kitchens, designer bathrooms and fitted wardrobes, and each has a terrace or balcony enjoying open views over the canal.It was important that the building materials used were sympathetic to the local sandstone buildings.The SolutionThe original intention had been to use extruded bricks for the project, however, it was decided instead to use Forterra’s buff, stock thrown, Belgravia Gault Blend from its Ecostock range. A total of 55,000 bricks were used in the construction of Horne Terrace.The BenefitsBelgravia Gault Blend complemented beautifully the sandstone aesthetic of the buildings in the locality, while at the same time delivering great technical specification of low water absorption and low embodied carbon.
Sponsored
DORSET HOUSE, BOURNEMOUTH UNIVERSITY, POOLE

DORSET HOUSE, BOURNEMOUTH UNIVERSITY, POOLE

IKO Ireland

Dorset House sits at the heart of Talbot Campus, where most of the undergraduate and postgraduate courses are delivered at Bournemouth University. It is home to the Doctoral College, providing important support to its postgraduate research community with a range of high-tech laboratory equipment, as well as the Business School’s Professional Engagement Suite.Sustainability is a top priority for Bournemouth University. In fact, the University is ranked 21st in the world and 6th in the UK for its contribution to UN Sustainable Goal 13: Climate Action for The Times Higher Education Impact Rankings 2023. As well as opening new eco-friendly buildings, Bournemouth University is carrying out major refurbishment works across its campuses, investing in a range of low or zero-carbon technologies to help minimise water and energy use.As part of this refurbishment, Dorset House was to undergo a significant transformation to help enhance the entrance area and make better use of the space. Bluestone Design & Construction Ltd was tasked with upgrading the building’s flat roofing system, in association with IKO, and the build-up include the installation of a new 80kWp solar PV system.
Sponsored
Metal Roof and Gutter Coating - Well Lane, Wolverhampton

Metal Roof and Gutter Coating - Well Lane, Wolverhampton

Liquasil Ltd

Liquasil's BBA Approved Metalseal 20 roof coating and Gutterseal system were specified for use on the Airspace Trampoline Park in Wolverhampton. The whole roof was pressure washed and a historical cut-edge corrosion treatment was removed before application; the cut-edges were treated with our SWT Corrosion Primer, with additional reinforcement to the mid-laps through the installation of Liquasil's optional HP Butyl Tape.The whole roof was then coated with Metalseal 20 in Goosewing Grey at a filmweight of c. 300 microns to provide a protective, aesthetically pleasing finish.The gutters were cleaned out and dried before being primed with our SWT Corrosion Primer. Once touch-dry, the joints could then be sealed using our Non-Sag Sealer and a single coat of Liquasil One was applied to the entire gutter. Liquasil One can be immediately applied over the top of Non-Sag Sealer, meaning no time is wasted waiting for it to cure before the works can continue.The end result was a revitalised metal roof with a protective, water-resistant coating that is guaranteed for 20 years.
Sponsored
The Avenue

The Avenue

SELO

This exemplary development inserts 76 new homes into a conservation area in a historic market town and preserves a lime-tree avenue and a listed water tower, creating a beautiful setting for popular homes. In addition to large detached houses, it includes affordable family houses and smaller homes for the over-55 market. Saffron Walden is one of England's most beautiful market towns and the design of 'The Avenue' uses this existing context to brilliant effect.In this development Arrive and Enigma were used. Arriva stands out as an exceptionally versatile doorset featuring an outward-opening action. When positioned in front of the concealed flush side, the door gracefully swings open towards you, adding to its user-friendly and adaptable design.Enigma Pocket Doors are recognised space savers and allow the occupiers to use the full footprint of the rooms where they are installed. A conventional door will need a radius of around three feet to open which means around 10 square foot of space needs to be kept free for the door to function. This is all space that could be used for something else.
Sponsored
Themed playground in Athens, Greece

Themed playground in Athens, Greece

Redlynch Leisure Installations Ltd

Nestled in the natural beauty of northern Athens, “Adventure Farm Forest” is an inspiring outdoor playground that beckons families from all corners to come together and have fun!Themed playground in Athens, GreeceDesigned with a harmonious blend between nature's wonderland and creative play activities, it will surely excite imaginations while thrilling your little adventurers. Its centerpiece attraction – Polka - draws many children seeking thrills amidst elastic tiles covering its entire area. For younger kids, there are multiple interactive games such as Mole's Wood adventure or Little House for infants plus several benches for tired parents waiting nearby. A refreshing marble fountain supplies cool water under sunny Grecian skies topped off by a cozy municipal coffee shop only steps away when you need refueling after long hours of family bonding moments within this special place - truly a one-of-a-kind spot in Greece!The project was executed by our local channel partner Intec S.A. in 2012.
Sponsored
Amgen, Cambridge

Amgen, Cambridge

Rapid Ramp Limited

REQUIREMENT: The planned site improvements included relocating the loading bay and installing compliant access steps to the post room.ADDITIONAL INFORMATION: CAD and technical drawings were designed in-house and based on site measurements taken.END RESULT:We installed the modular access steps within a few hours. Once the installation was complete, the system was instantly usable. This allowed the post room to open within a quick turnaround time.The access steps are fully compliant with documents M & K of the building regulations.FEATURES INCLUDED: Infill Handrail - this product prevents users from climbing or falling through gaps.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of each step. Additionally, it helps users distinguish any level changes.Trombone Ends - these are added to the ends to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.Continuous Handrail - this handrail system ensures users always have support to hold onto.
Sponsored
Knowle C of E Primary School phase 2 washroom revamp

Knowle C of E Primary School phase 2 washroom revamp

KWC DVS Limited

Knowle C of E Primary School in Solihull has undergone phase two of their major washroom refurbishment. Phase two of the refurbishment included additional washbasins, taps and final installations such as lighting and flooring. As one of the chosen washroom manufacturers in the final phase, Franke Water Systems provided:·        1 x SOLX1800T Miranit washtrough ·        3 x F3SV1001 self-closing tapsThe washtrough and taps were provided to complete the final phase of the project. Maintaining a high standard of hygiene is a key element to consider when specifying school washrooms. Franke’s composite washtroughs and basins are seamlessly moulded in Miranit, an advanced resin and granite composite with a gelcoat, providing a non-porous, robust and hygienic finish. Miranit is several times stronger than ceramic, highly impact-resistant and virtually shatter-proof, making it ideal for busy school washroom environments. Also provided were three F3 self-closing taps, the F3S range of taps combine functionality, robustness, and maintenance-friendly design which is ideal for highly frequented school washrooms.  
Sponsored
Soundis Raised Floor System & Underfloor Heating Boards at Holland Park, Kensington, London

Soundis Raised Floor System & Underfloor Heating Boards at Holland Park, Kensington, London

Soundis

Holland Park Villas has set a new benchmark for quality in the super-prime central London residential development market. Unparalleled interior finishes combined with exceptional landscapes to show what a truly world-class team can deliver.On arrival, an impressive 30 year old Acer Palmatum tree takes centre stage. Granite paving, hornbeam trees, ornamental planting and a water wall further add to this sense of elegance and quality.This level of quality and attention to detail continues to areas not easily seen by the new tenants. Around 13,200 m2 of Soundis High density dry screed panels able to span between joists were installed by our installation partner UK Acoustic Systems as a raised access floor system. Chosen primarily for the ease of maintenance and future extensions of the underfloor network, the system is also an integral part of the underfloor heating system.Not only does this system demonstrate its practical heating properties, but the new apartments will also benefit from the pleasant acoustic characteristics provided from the floor system.
Sponsored
Crossrail Place, Canary Wharf

Crossrail Place, Canary Wharf

Allgood Ltd

Situated in the north dock of the West India Quay,Canary Wharf’s Crossrail Place is a unique architecturaltriumph that houses a train station,retail space and apublic garden.Designed by Foster & Partners and constructed byCanary Wharf Contractors, the £500 million project’sdistinctive 300 metre timber latice roof has lead to thebuilding being likened to a ship moored in thedocks.Beneath it’s eye-catching facade lies Canary Wharf’sCrossrail station. Scheduled to open in 2018, it is one ofseven new underground stations built to facilitate theCrossrail project. With a 256 metre long station box, it isalso one of the largest facilities on the Crossrail network.Allgood began work on the project in early 2015, withthe task of providing an ironmongery package to matchthe high quality theme of the building.With a 25 year guarantee on all products, the Modricrange was selected for the steel doors in order toprovide a durable product that also formed a uniformappearance for the door.With the public nature of the building, security was ofparamount importance. The steel door package enabledaccess from public to private areas and thereforerequired higher security measures. Allgood installedhigh security solenoid redlocks that enable electronicsynchronisation with access control.
Sponsored
Hafan Y Coed Mental Health Unit

Hafan Y Coed Mental Health Unit

CLD Physical Security Systems

When a new mental health unit planned to provide a safe and secure environment for their patients and staff, CLD Fencing Systems and a Littlewood Fencing were asked to design, manufacture and supply the perfect solution for this project.Hafan Y Coed (Haven of Trees) Mental Health Unit at the University Hospital Llandough opened the doors of their £ 88 million facility back in 2016 offering patients a modern, therapeutic and recovery-focused unit.Powell Dobson and Laing O’Rouke designed and constructed the detailed mental health unit, and in order to match the level of safety of the building, their hospital security fencing needed to encourage privacy and security throughout.The BriefSecurity of patients and staff was paramount when understanding the brief for the new perimeter fence line and security access control. The following requirements were set out to maintain their security needs:Create a safe and secure environment for staff and patients by implementing high security perimeter fencing.Feature anti-climb, anti-cut and anti-ligature properties for both fencing and gate solutions.Provide privacy screens for specific areas of the unit to promote recovery.Manufacture 18 gate solutions for easy access for staff through the entire site.
Sponsored
Battersea Power Station

Battersea Power Station

CDM Stravitec

Nearly forty years after the lights were switched off at Battersea Power Station, a decommissioned Grade II listed coal-fired power station, located on the south bank of the River Thames, this much loved London landmark recently re-opened to the public following a transformational eight-year restorationApple Inc. will be leasing approximately 500,000 sq ft. across 6 floors of the central Boiler House and plans to move all of its 1,400 London employees to the new venue. This will make Apple by far the largest tenant at Battersea Power Station.221m² of Stravifloor Channel, a resilient high-performance floating floor based on floor channels containing steel springs as resilient supports was installed to decouple the acoustically critical listening, screening and control room spaces at Battersea Power Station.The added insulation material between the channels contributes to the acoustic optimization of the spaces by preventing the so-called standing wave effect to take place within the air void.During the installation of the acoustic floating floor, careful attention was paid to the many service penetrations as improper installation would most certainly lead to rigid connection which in turn affect the system’s performance.
Sponsored
Manchester City Etihad Training Complex

Manchester City Etihad Training Complex

CLD Physical Security Systems

“We are building a structure for the future, not just a team of all-stars” announced Sheikh Mansour in 2008 with reference to Manchester City Football Club.Six years and £200m later, Mansour’s vision has been realised in the Etihad Training Complex; an 80-acre site where over 450 players train each week. The site, home to 17 football pitches and a 7,000-seat stadium for reserve matches, is an epitome of innovation and state-of-the-art design that CLD is proud to have contributed to.The BriefCreating a world class training complex presents a number of key requirements when it comes to the external, internal fencing systems and physical access control.An external perimeter to LPS 1775 SR1Swing gates with guaranteed delay of at least 3 minutes against attackFast operation cycle main gates to prevent tailgatingPitch separation that allows clear viewAbility to stop balls leaving the training area up to 6m in heightMust compliment the Manchester City brandMUGA fencing that can withstand impact from Professional PlayersFull Operation and Maintanence Schedules ProducedCAD Design and ‘as-built drawings’ of all systems used on the project
Sponsored
Reinforced Concrete Restoration - Omni Centre Car Park, Scotland

Reinforced Concrete Restoration - Omni Centre Car Park, Scotland

C-Probe Systems

Challenge: C-Probe's LoCem® +chase® anode mortar has been installed at the Omni Shopping Centre Car Park in Edinburgh, Scotland to 4 levels of underground car parking as part of a comprehensive corrosion management strategy. Overtime the popular car park had succumbed to structural damage and corrosion caused by the ingress of chlorides from de-icing salts from above.Solution: This system comprised of 42 ICCP zones and 7 additional monitoring zones forlevels protected using surface-applied corrosion inhibitors. In addition to this, some 6000 C-Puck galvanic anodes were used to protect newly repaired areas to 2 levels. All the anodes and monitoring could be controlled and data accessed remotely throughoutthe car park with AchillesICP and AchillesIES, helping to extend its service life for 100+ years.Outcome: This ESG compliant approach meant there was no need for demolition or extensive reconstruction using new materials, helping to reduce waste and harmful emissions. Reconstruction was also a near-impossible strategy due to underground facility and electric tram on land, meaning something non-invasive like cathodic protection was essentialto minimise social disruption. 
Sponsored
Safe aluminium ramps

Safe aluminium ramps

Elefant Gratings T/A PcP Gratings Ltd

Lambertsson is one of Scandinavia’s largest rental companies and service providers in construction and industrial solutions. Lambertsson erects cranes and elevators for construction projects, among other activities. Shorter building times, better control over costs and smoother processes are therefore critical and beneficial to the project owners.ChallengeLambertsson has been erecting and dismantling elevators for more than a decade using wooden planks or plywood for building the elevator ramps. This method of building ramps is time consuming and resource demanding. Lambertsson needed a simple ramp solution that would make the project planning time more predictable and less time consuming when erecting the elevators. Lambertsson needed a ramp that could handle the same weight as the elevator, equivalent to a capacity of 2.1 tonnes, and without exceeding 1.3 metres from the position .SolutionIn order to meet the criteria of Lambertsson, PcP Scaffolding developed a custom solution based on the PcP OPTIMO® grating series, which is the safest choice for applications in construction, where workers are on the job. To customise a simple solution, PcP built a ramp that is able to lift the same capacity as the elevators, up to 2.1 tonnes, with a span of 80 cm. The ramp is made of aluminium decks and is very light to install.
Sponsored
Glasgow Royal Infirmary University Tower for NHS

Glasgow Royal Infirmary University Tower for NHS

Norwood Group Limited

PROJECT OVERVIEWAs part of an extensive refurbishment scheme to modernise and transform Glasgow Royal Infirmary University Tower, Norwood were specified by architects Armitage Associates in partnership with main contractors Balfour Beatty Scottish and Southern Ltd. NHS Greater Glasgow and Clyde commissioned the £12.5 million project to significantly improve efficiency within the University Tower. SCOPE OF WORK The transformation included creation of the new state-of-the-art laboratory, as well as a plant room and an impressive glazed vertical ‘eyebrow’, which was installed on the north elevation to enable hospital staff spectacular views of the city within dedicated break-out zones. We were involved from an early stage in the design process and successfully developed a unique internal wall lining system which allowed the interior of the building to be upgraded whilst reflecting the features of the building exterior. From the outset Norwood understood the Royal Infirmary’s need to work within exceptional project and budget control whilst utilising a new bespoke system for the client. The system’s intelligent functionality was developed and manufactured specifically for the University Tower and as such perfectly demonstrates the capabilities and adaptability of our partitions. We also provided our steel door sets.
Sponsored
Oval Village

Oval Village

RYNO

Oval Village in Lambeth is a project that comprises affordable residential apartments, with office and commercial space, retail and leisure facilities, and parking.The site is part of a large-scale redevelopment of the former Oval Gasworks site, offering 598 apartments with balconies and terraces for which we designed and developed the paving support system.The balconies used the TerraSmart Pedestal Paving System, which is straightforward to install, powerful and fully non-combustible, with the paving laid safely on our RP-FR, millimetre-perfect adjustable paving support pedestals, with edge spring clips around the edges to ensure uniform spacing for an aesthetically perfect finish.The terraces, with a commanding view of the city at the top of the building, feature a hybrid system starting with the TerraSmart Rail Paving System – super-strong thanks to its overlapping lattice framework – to form the ramps, which transition seamlessly into the TerraSmart Pedestal Paving System for the rest of the area.Throughout the project, we worked closely with Formation Architects, HTA Architects, Building Control, NHBC and Berkeley Group to design the most relevant systems for the project. Fenland Flat Roofing installed the systems for the balconies, while those for the terraces were installed by NAO Landscapes.
Sponsored
University of Bedford Luton Campus

University of Bedford Luton Campus

LSA Projects Ltd

Architect: Moses Cameron WilliamsInstaller: Willmott DixonProduct: Gustafs Linear RibThe new Library at the Luton campus of the University of Bedfordshire which opened in June 2016 was designed by Moses Cameron Williams Architects (of Cambridge) and project managed and installed by Willmott Dixon.The University has been around for over 100 years and teaches in a wide range of subject areas as well as conducting award winning research across health, energy and technology, and social policy topics.The library is spread over 7 floors including silent study rooms, group work and meeting spaces, computer labs and presentation facilities and a café as well as miles of bookshelves. Gustafs and LSA Projects supplied over 8,000 linear metres of ribs to the project for both wall and ceiling application covering around 450m2.Over 3,000 individual 28mm deep ribs in natural Oak veneer have been used to clad the impressive open atrium and cafe area as well as throughout the library isles and study spaces. 12mm gaps between ribs give the entire installation depth, texture, and warmth as well as impressive acoustic control; perfect for a busy university library!
Sponsored
Durlum Polylam at UMG London

Durlum Polylam at UMG London

LSA Projects Ltd

Universal Music Group – 4 Pancras Square, London
Architect: Aros
Installer: BOK Construction Ltd
Product:  Durlum PolylamIn the summer of 2018 Universal Music Group joins the likes of Google and Louis Vuitton inside the commercial floors of Eric Parry Architects’ Pancras Square 9 building development in Kings Cross, London. UMG’s 1,000 strong workforce occupy the entirety of the buildings 10 floors and 174,570 sq ft of floorspace.LSA Projects Ltd supplied 1,532 Durlum Polylam baffles (roughly 1000m2) to the project in 4 different lengths and custom timber effect finishes: natural oak, light stained oak, medium stained oak, and light grey stained oak. The baffles are installed independently at varying pitches and offset linear spacings to encourage visual flow through the space and elegant incorporation of linear lighting.By using metal baffles rather than a solid or wrapped timber product the architect and client were able to achieve the effect of a linear timber ceiling on a more dramatic scale than would be possible with natural wood. The baffles are also finished with micro perforations to the vertical sides and are filled with mineral wool for additional acoustic control.
Sponsored
Scarman House: Modern Comfort and Style Revamped!

Scarman House: Modern Comfort and Style Revamped!

Towelrads

Nestled at the heart of the University of Warwick campus, Scarman House is a 210-bed hotel accommodation and conference facility. This versatile establishment provides not only comfortable lodgings but also top-notch conference facilities, well-equipped meeting rooms, and enticing on-site dining options.In the summer of 2023, the hotel underwent a three-floor refurbishment project. Towelrads, in collaboration with the architect firm Baker Hicks, was instrumental in identifying optimal heating solutions for both Electric Towel Rails and Radiators. The client’s vision was to maintain a modern yet contemporary aesthetic in the individual rooms.We take pride in crafting a bespoke solution by designing, specifying, and supplying our Pisa Chrome Electrical Towel Rails for the bathrooms. These towel rails are equipped with Smart Thermostatic Elements, enabling occupants to have complete control over time and temperature settings, ensuring a comfortable stay.For the radiators, we selected a range of Vertical and Horizontal Windsor Column Radiators. This option added a touch of modernity blended with a hint of retro charm to the rooms, all while delivering exceptionally high heat outputs.Throughout this project, the collaborative partnership proved essential in navigating and meeting the challenging project timelines, ensuring its successful and timely completion.
Sponsored
Protecting the Fabric of the Building: New Avenue Case Study

Protecting the Fabric of the Building: New Avenue Case Study

illbruck – a brand of Tremco CPG UK Ltd

In the construction industry, contractors move at lightning speed to source the best products at the right price for their projects, all with the goal of ensuring client satisfaction and meeting tight deadlines. Renowned for our leading sealing, bonding, and insulation solutions, a selection of illbruck products were chosen through our extensive distribution network for the New Avenue project in Oakwood, London.The ProjectErected in an affluent neighbourhood within the London Borough of Enfield, New Avenue is an idyllic development boasting the peace and tranquillity of suburban life, whilst being only a stone’s throw from the hustle and bustle of Central London.Due to consist of over 400 mixed-type homes, ranging from apartments, maisonettes, as well as houses, this eight-year development will also include a community and energy centre, in addition to a new nursery. The SolutionDuring phase two of the new housing scheme, illbruck’s expertise were called upon to provide a vapour control layer for the Reinforced Concrete (RC) frame element of the project. This was to restrict warm, moist air from the interior of the finished structure from entering the fabric of the building. For the 11-storey block of flats, Central Essex Interiors required a solution at a competitive rate from a manufacturer with a good supply chain, due to the extensive size of the project.As a brand of CPG UK, illbruck has been recognised for over 70 years across the UK, Europe, and around the globe for supplying high performing solutions that meet the stringent requirements of the construction industry. Catering to a wide range of installation environments for both interiors and exteriors, from major building schemes to home improvements, our solutions can be tailormade to you or your client’s specification.The ApplicationProcured through one of our distribution partners, AC Fixings Ltd, illbruck ME003 Vapour Barrier was stapled into the party walls of the construction to achieve adequate vapour control. 500 rolls of this innovative 3-ply solution were required to protect the fabric of the building and its insulation, by providing a vapour and airtight seal. This in effect will help to improve the overall energy efficiency of the New Avenue apartment block, due to the product’s high-grade granules, which means that the SD value (resistance to vapour diffusion) is not lowered. The flexible and tear-resistant nature of this product boasts ease of application due to its lightweight properties, and is compatible with a number of illbruck’s intelligent window membranes and adhesives.Following the installation of ME003, illbruck’s ME315 Total Protection Tape was used to provide a high performance air and weather tight seal. This special tape is suitable for a wide variety of applications, and achieves a permanent bond to all illbruck indoor and outdoor building protection membranes. This fully compatible solution is highly UV and moisture resistant, quick and easy to install, and can be used within partially open facades. ME315 is also certified to EMICODE EC1 due to its low emission production, contributing to the energy efficient properties of ME003 to provide a total green solution for New Avenue.Scott Hurry, Area Sales Manager for illbruck, commented: “It has been a pleasure to work with our valued customer, AC Fixings, who in turn have supplied Central Essex Interiors with two of our leading products from our sealing and vapour control range.“illbruck was chosen due to being a highly recognised name within the marketplace, and we have been able to work with the Client to supply the products at a competitive rate and turn the project around quickly. The installation is due to span over a course of seven months with completion scheduled for late 2023.“When working with illbruck, however, you will receive more than just products. Behind our brand is a team of experts beholding a wealth of knowledge and industry experience, all of whom are well versed in applying the technique of illbruck’s innovative, high-quality products into the complexities of today’s construction environments. “As a customer of illbruck, you will receive technical support as and when is required, in addition to our suite of training, which encompasses everything from CPD seminars for architects, application tutorials for contractors and installers, as well as trade mornings for distributors.”
Sponsored
Kalwall Translucent Cladding - Metea Valley High School

Kalwall Translucent Cladding - Metea Valley High School

Kalwall

From the beginning, architects DLR Group designed Metea Valley High School in Aurora, Illinois, to light up education, both literally and figuratively. The sprawling campus with room for 3,000 students is broken down into a handful of more intimate, human-scale learning spaces, called “think tanks”, where interaction with faculty is encouraged. Two interior courtyards, open to the sky, offer fresh air during free periods. Shaped a bit like a bow tie, Metea combines three concepts – mind, in the midsection, and body and soul on either end – to offer students a truly 21st century school experience.Lighting up Metea in the literal sense comes largely from the extensive use of Kalwall translucent curtain wall throughout the school. Upon coming through the school’s main entrance, visitors are struck by the cheerful, airy, daylighted lobby. Controlled daylight also pours into the school’s innermost areas, traditionally a structure’s darkest, from the courtyards. Kalwall introduces daylight into the vast commons area that serves as the students’ lunchroom. In the gymnasium, Kalwall’s shadowless, glare-free light enhances ball handling in team events; sunlight does not glance off the shiny court surface. The diffuse-light-transmitting panels also prevent glare off computer screens, easing eyestrain. And in a dramatic demonstration of Kalwall’s superb flexibility, the design includes occasional, narrow, horizontal runs of clear glass – some serving as clerestories – adding visual interest as well as clear views to the outside.At 464,000 square feet, Metea could have been an energy-consumption nightmare, adding significantly to its $125 million total project cost. But innovations such as demand control ventilation, energy recovery wheels, and high efficiency boilers will save Indian Prairie School District 204, the state’s fifth largest, thousands of utility dollars every year and pay for themselves in just a few years. In fact, the building’s design is targeted to be 19 percent more efficient than ASHRAE 90.1 requires. Because translucent Kalwall admits so much controlled daylight, the school’s exterior light harvesting system, which monitors indoor light levels, can actually turn off electric lights in public spaces automatically when they are not needed. The harvesting system alone is expected to save the district over £16,000 a year in operational costs with a payback of under seven years.Illinois can get very cold in the winter and quite toasty in the summer. Highly insulating Kalwall helps there, too, keeping temperature extremes outside and lessening the need for and cost of heating and cooling. During the manufacturing process, standard 2-3/4” and optional 4” Kalwall sandwich panels can be infilled with various densities of specialized, translucent insulation. Architects and designers can achieve a thermal insulation value of up to R-20 (0.05 Btu/hr/ft²/F).At Metea Valley High School, DLR Group chose to include Verti-kal™, a unique design variation on the standard shoji or square grid layouts of Kalwall Translucent Systems. The panels incorporate internal, continuous supports to provide a vertical emphasis. As with all Kalwall translucent systems, Verti-kal distributes diffused daylight throughout the school, even on cloudy days, drastically reducing the amount of artificial lighting required and eliminating shadows and glare as well as stark contrasts of light and shade. Verti-Kal can be supplied in panels up to 5 ft. (1.5 m) wide and up to 12 ft. (3.6 m) high, minimizing the number of joints. The unique format creates an entirely different look while still utilizing the most highly insulating, diffuse-light-transmitting, structural composite technology.Any school system must concern itself with maintenance costs, and Kalwall excels there as well. The panels are vandal-resistant and self cleaning; dirt simply washes off with each rainfall. After dark, the diffuse, translucent properties of Kalwall contain interior lighting and prevent direct-beam light pollution. Instead, the exterior surface of the building simply glows beautifully, boosting Metea Valley High School’s aesthetics and welcoming both students and the surrounding community to a true masterpiece of daylighting.Photography: James Steinkamp

Showing 1837-1872 of 1914

Feedback