NBS Source
I'm a manufacturer

"ground water control trench sheeting etc"

18,148 results found

Sort by:

Showing 1801-1836 of 1898

Sponsored
New Fencing at Elland Road, home of Leeds United Football Club

New Fencing at Elland Road, home of Leeds United Football Club

Lang+Fulton

49ers Enterprises Ltd, the corporate venture capital arm of The San Francisco 49ers focused on sport, has acquired full ownership of Leeds United Football Club with a commitment to bring fresh leadership, management and investment.Recent improvements at the Club have included a steel louvred fence.Lang+Fulton supplied an Italia-100 steel louvred fence to screen the parking area for coaches at the Club. Italia-100 provides a high level of security with anti-climb properties and 100% visual screening. The fencing stretches to 111 linear metres behind the West stand of the stadium.Each RHS post was double-holed to allow for the installation to be stepped along the entire length of the fence run to accommodate the gently rising ground. Access for the coaches was provided through an extra wide 7450mm double leaf gate.The specification for the fencing and gates was for a height of 2500mm. This was achieved by seamlessly stacking an extension panel on top of the standard 1975mm panel with a flat bar frame on either side.The panels posts and gates were hot-dip galvanized and polyester powder coated Grey (RAL7016) for a durable, long lasting finish.
Sponsored
x+why

x+why

Radii

Flexible workspace providers x+why’s new 33,000 sq ft location at 100 Embankment aims to provide “an impressive space from which to grow and thrive” for start-ups and established businesses across Manchester.Radii, working through our northern contracting office, joined John Robertson Architects and ADT Workplace in May 2023. Working across Ground, Mezz and 1st and 2nd Floors of the space, Radii’s popular single glazed Linear 25 (Rw 39 dB) and Linear 30 (Rw 41 dB) partitions and Hogan single and double pivoting doors (Rw 47 dB) were used for glazed fronts for a variety of different size meeting spaces and offices. Many of these were installed with our popular ‘Rio’ banding.Ei30 single glazed fire rated screens, complete with timber door frame junctions, provide exit route protection.The finished space also benefits from some of the 11 Ei60 FireTec double door sets installed across all eight levels of the building during the original base build Cat A fit out in 2020.
Sponsored
Chelwood

Chelwood

Michelmersh Brick Holdings PLC

Chelwood House by Napier Clarke is a clean, modern building in Chesham Bois, Amersham. It was built to replace an existing suburban house and is located within an area of special character meaning it was vital to seamlessly blend into the local area.Napier Clarke elected to use local brick and charred timber to ensure the house’s materials were able to sit visually well within the immediate area. Chelwood’s impressive size (5 bedrooms, 5 bathrooms, living space, snug, kitchen/ dining, play area, garage, utility room and an attic yoga room) and modern visual leanings were expected to be a challenge for local planning authorities. However, the building’s sympathetic materials and centrepiece vaulted roofs were inspired by the local area and the proposals were accepted.Chelwood introduces a cantilevered brick upper floor to its design which contrasts the simple design of the ground floor. Internally, the same materials used in its external spaces are repeated, creating a series of truly dynamic focal points.Chelwood uses legacy Michelmersh products in its production and recently won the Individual Housing Award in the 2022 BDA Brick Awards.
Sponsored
Old Woking Retirement Home - Ventilation and Screening Louvres

Old Woking Retirement Home - Ventilation and Screening Louvres

Maple Façades

A new project in Woking showcases the many benefits of Maple’s new Pluto louvred screening system.Designed to hide unsightly HVAC machinery on the roof of a new four-storey independent living development, the system is lighter and easier to install than traditional systems.   It’s perfect for the rooftop location. Seen from the ground, it’s a sleek bank of aluminium louvres – but the modular system also means that installation is safer, with time spent working at height kept to a minimum.  Maple’s Pluto system fixes easily to the building sub-frame using galvanised steel brackets, while an advanced sub-structure of posts, mullions and rails in high grade aluminium will provide hidden support for the 100mm louvre blades.  Despite a practical function of hiding equipment, pipes and ducting, the screening will not detract from the clean lines of the building, which are complemented by a bank of curved louvres (also supplied and installed by Maple) on the west elevation of the building.  The project is a collaboration between Maple, Willmott Dixon, HNW Architects and Woking Borough Council. When complete, the four-storey development will provide a mix of 48 one- and two-bed flats, which will provide independent (but supported) living.
Sponsored
BB93 Solution for Teeside University

BB93 Solution for Teeside University

CMS Danskin Acoustics

Sound-absorbing ‘trees’ installed at Teesside University LibraryTeesside University’s Middlesbrough campus has benefited from over £270 million of investment in recent years, including a £6 million refurbishment programme for the university library. The library’s first floor was the second phase of the refurbishment, opened on 7 October 2016, and includes a unique and visually striking installation of CMS Danskin’s SuperPhon panels, designed to represent two trees.The ChallengeThe original building was constructed in 1997 and incorporated some sound absorbent materials; the refurbishment had to inject new life into the interior whilst also enhancing the library’s acoustic performance. The open-plan layout, which can have up to 450 students using it at any one time, presented a particular challenge for controlling the build-up and spread of sound.Class A absorbent rafts and baffles were recommended by Apex Acoustics to act as noise barriers as well as provide sound absorption, and control the spread of sound throughout the space. The space was zoned for noisier and quieter activities and acoustic consultants Apex Acoustics undertook full modelling to determine the optimum arrangement of rafts and baffles.The SolutionCPMG Architects, who were tasked with the refurbishment, worked to integrate the recommended Class A absorbent rafts into the library’s interior scheme, which used a contemporary palette of materials and a focused colour strategy. Two identical ‘trees’ were created at either side of the library’s first floor, using CMS Danskin’s SuperPhon Acoustic panels to represent the foliage.Circular panels of varying sizes and different shades of green were suspended from the ceiling and arranged around two structural concrete columns, to look like abstract trees. The panels were bespoke and CPMG Architects was able to specify the material used to cover them, and the colours. Some of the panels had to be made and supplied in two halves, and constructed on-site, due to their size. The ‘trees’ also had contemporary lights suspended from the panels, to represent hanging fruit.The ResultThe two sound-absorbing ‘trees’ represent a visually striking and unique use of CMS Danskin’s SuperPhon panels.Richard Thorpe of CPMG Architects said: “We went for the SuperPhon panels because of what we could do with them – the bespoke service gave us scope to play around with the design and come up with something quirky and interesting. We were able to create an attractive design feature which had a very practical purpose – to reduce reverberation in the refurbished library.”The project was completed at the end of September 2016 and the refurbished floor is now open to students.
Sponsored
Aviation Hangar Heating - Boscombe Down

Aviation Hangar Heating - Boscombe Down

Powrmatic Ltd

OverviewA successful installation of 40 x Powrmatic SRP U Tubes at a hangar facility in Boscombe. With the system design by Powrmatic, ABS, a leading HVAC and installation company, was entrusted with this significant installation project. The installation aimed to provide efficient heating performance, reduce energy costs, and improve the overall comfort and functionality of the hangar.Project BackgroundThe Weighbridge Hangar Building 499 at MOD Boscombe Down operated by QinetiQ required a new heating system due to the life-expired existing system. The hangar required a powerful heating system that would operate efficiently during the cold winter months while reducing energy costs. A new Powrmatic SRP U-tube herringbone radiant heating system was produced in line with the design intent of WYG on their tender documents. J & B Hopkins secured the M & E contract and employed the services of ABS Ltd to undertake the installation of the radiant heating system. ABS Ltd, formed in 1978, offers a full range of professional services including the installation and maintenance of both radiant and warm air heating systems to both commercial and industrial properties throughout the UK.SolutionThe MOD hangar facility, situated on an exposed location, at Boscombe Down required a robust heating solution to withstand the cold winter months. 40 Powrmatic SRP radiant U Tube PVU50 Hi/Low heaters each rated at 50kW on a herringbone system layout with ducted fresh air onto each burner to comply with fire safety standards were installed by ABS Ltd. To maximize efficiency, the heaters mounted at an impressive height of 23 meters in line with Powrmatic’s design drawings were arranged in 8 lines of 5, with 3 heaters connected to one fan and 2 heaters connected to another fan. The heating system incorporated Powrmatic MC200 controllers and black bulb sensors for precise temperature control across the hangar.ResultThe final stage of the installation was completed by J & B Hopkins, arranging for the necessary gas and electrical distribution services to the radiant heaters and discharge fans. The 40 Powrmatic SRP radiant U Tubes installed by ABS Ltd effectively heated the facility, providing a comfortable and conducive environment for the workforce during the winter season. Additionally, the new heating system reduced energy costs and eliminated the need for multiple exhausts on the rooftop hence retaining the aesthetic design principles of the hangar. The commissioning was successfully carried out when all services were completed, providing a satisfied client with a capable heating installation within the hangar, for the exposed site location.
Sponsored
Emberton Park Caravan Site Choose Decimetric

Emberton Park Caravan Site Choose Decimetric

Anderson, GEC Ltd

Refurbishment of a campsite services facility at a popular country park provided an unusual testing ground for part of a new stainless steel kitchen furniture range developed for the professional catering sector. But after a full season’s camping at Emberton Country Park, the double bowl sinktop from GEC Anderson’s new Decimetric® range has met all expectations and is set for a long service life.Emberton Country Park, near Milton Keynes, was developed from disused gravel workings and is today an attractive parkland setting of 200 acres. It caters for a variety of uses and includes 58 pitches for tents and touring caravans, rally fields, lake and river fishing, a conservation area, children’s play areas, a shop and washroom/toilet facilities.As part of a major refurbishment of the services block for campers in the touring field, Milton Keynes Council’s Construction Services Department refitted the washroom where campers wash their crockery and cooking utensils. After another supplier was unable to deliver a suitable sinktop within the council’s timeframe, Robert Gritton, Project Manager for Milton Keynes Council, shopped around for a cost effective alternative – and became one of the first customers to order from the Decimetric® range. “GEC Anderson was able to custom make the sinktop in a very short time, and everyone has been very pleased with it. I’m very glad that the other make was not available,” he says. “The other big advantage of the Decimetric® product is that its 100mm modular size increments permit specification of the largest possible unit to fit a space, without the premium of a true bespoke installation.”The Decimetric® sinktop is extremely durable, but requires minimal maintenance. Park Manager David MacCarter says: “It’s really solid, well made and it will never wear out. The cleaners just give it a wipe over every day: it’s easy to keep clean and it looks great.”The 1,700 x 600mm sinktop of commercial grade stainless steel has a water-retaining 40mm lipped edge at the front and sides, and an 85mm sloping upstand at the back. The bowls are 400 x 400 x 250mm and positioned 100mm apart, centrally along the length of the sinktop. Both have 38mm outlets and two 30mm diameter tapholes at 200mm centres behind each bowl. The sinktop stands on square section stainless steel legs with adjustable feet. A solid stainless steel shelf is fitted under the sinktop. The new Decimetric® range from GEC Anderson offers a flexible and comprehensive selection of sinks, surfaces, support frames, cabinets and shelving. The range was developed mainly for the professional catering market, but its versatility, good looks and low maintenance requirements make it an excellent choice for applications requiring hard-wearing and hygienic surfaces. Decimetric® units are easy to specify and are offered in sizes from 500-3,000mm, with 100mm sizing increments (100mm = 1 decimetre). The modular approach makes for economy and short delivery times. Founded in England in 1962, GEC Anderson has pioneered the development of made-to-measure stainless steel products. Today, the company’s range includes bowls, worktops, cabinets, shelving and sanitaryware for use in domestic, commercial and specialist environments. All products are manufactured to ISO 9001 and backed by a comprehensive support service from planning and product specification to installation and maintenance.
Sponsored
Rhondda Heritage Park

Rhondda Heritage Park

Polyroof Products Ltd

The Rhondda Heritage Park is a renowned tourist destination in South Wales, offering a glimpse into the coal mining community that thrived in the area for over 130 years until the early 1980s. Every year, thousands of visitors take a guided tour led by former colliery workers to experience the life of coal miners.The Heritage Park takes great pride in its appearance and the local heritage it represents. However, the aging asphalt roof terraces that covered the old mine shafts had been leaking constantly, damaging the visual appeal of the visitor site.The ChallengeThe Polyroof technical team was called in to help with the waterproofing and refurbishment of the two roof terraces, measuring over 1100m², that protected the underground mining attraction. After conducting a thorough survey of the roof terrace areas, a customized specification was prepared. This specification included a comprehensive set of recommendations for addressing the issues that had caused the aged and worn condition of the terrace areas over the years. To support the proposal, additional information was provided to the client to demonstrate how a liquid system could seamlessly encase and waterproof the terraces while maintaining an aesthetically pleasing solution that was true to the authenticity of the site.Satisfied that the solution proposed would provide the long-term peace of mind they were looking for, the Heritage Park awarded the contract to RM Polymers Ltd.Before starting the work, any areas affected by fungal growth or moss were treated with Polykill Anti-Fungal Wash to eliminate all spores. Any holes in the asphalt were smoothed out or removed, and levelled using Polyroof Structural Repair Mortar. All large cracks and voids were cleaned and repaired using the same mortar.PVC protrusions were removed and surfaces were cleaned with acetone. Any damaged, loose, or unsound concrete or brickwork was removed and repaired using Polyroof Structural Repair Mortar. All repairs were allowed to cure and dry before priming.The SolutionOne of the main features of the tourist attraction is the mining carts that were used to transport coal around the mine tunnels during its operation. Similar to train tracks, the mining cart tracks are fixed into the ground using metal bolts and fixings which over time had become a weak point for water ingress. Concrete and sandstone had been used as a “quick fix” to prevent rainwater entering the mine shaft below but a long-term solution was now needed. The cement and sandstone was carefully chiselled from the rails, exposing the original metal tracks which were then lifted and abraded back to their original condition. Whilst lifted, the underlying surface was made good before the application of the Protec System. Railway sleepers were then laid on a sacrificial layer on top of the waterproof membrane, upon which the tracks and mining carts were re-instated.As the terraces are constantly trafficked by the general public, the client was clear that an anti-slip finish would be required on any walkway areas.Following the application of the Protec System, Polyfinish and Quartz Sand Anti-Slip was applied to all walkway areas, to provide slip resistance and surface protection. A 50mm margin around the perimeters of the terrace was masked off to provide a neat termination of the anti-slip finish. Ensure masking tape was removed whilst resin was still wet. Then a third coat of Protec Resin was applied at a minimum coverage rate of 0.5Litres/m² (2.0m²/Litre) and whilst wet, clean dried quartz sand (0.7 – 12mm) was broadcast at an approximate coverage rate of 4.0kg/m². Once cured, the loose sand was removed.WorkmanshipThe engine houses along the tour experience featured vast amounts of intricate details and unique items and structures, such as “Bertie and Trefor” – the names given by the mine owner to the mine head stock wheels. This presented an exceptional challenge, particularly in regards to the difficulty of working on the intricate details of the degraded mastic asphalt upstands and decking.As a result of many years of weathering and gravity, the vertical sections of asphalt on the raised terraced roof had slumped and rippled, leading to stress cracks and ultimately water ingress. To overcome this ugly problem, the asphalt was stripped from these vertical sections back to the concrete and removed from site in accordance with the Health and Safety policies in place. The contractor then installed new 18mm OSB3 to these areas to create a flat substrate for the Protec System. The incorporation of Polyroof pre-formed GRP Drip trims at the bottom of the OSB3 ensured the timber would not be exposed to any rain water in the future as well as provide a neat, edge detail.To keep the overall aesthetic feel of the site, the application of the liquid waterproofing system at wall abutments was critical. This, combined with the undulating nature of the stone and brickwork meant that the contractor would not be able to install a cover flashing or termination bar. Instead, the contractor carefully dressed the system onto the wall to the standard minimum 150mm upstand height and into a chase.The edging was then finished with a mortar to provide a neat and clean weatherproof finish, in-keeping with the traditional methods of the site at the time of its construction.The roof terraces that cover the old mining areas also act as the main walkways to the Heritage Centre’s tour routes. Therefore, one of the main challenges of the project was the complex planning of the works to ensure that the site continued to operate so not to financially impact the heritage park. It was imperative that works were complete within an 8-week period with 17,500 visitors booked in for their annual Santa’s Grotto Experience Tour beginning in early December.The application speed of the catalyst cured Protec System, combined with communication between the contractor and the site to ensure unobtrusive installation, meant the centre stayed open and the tours running with minimum disruption.The benefits of using a fast-curing liquid waterproofing solution were also vital due to the ever-changing micro-climate in the Welsh valleys. On any single day, the weather would serve up anything from bright sunshine to windy, rainy conditions. Therefore, the fast-curing Protec System, combined with the flexibility of the installation team, who gave up weekends when required, ensured the project was finished on schedule. The works were completed to an extremely high standard with full encapsulation of the roof terrace areas and without a single detail being left exposed to the elements.ConclusionThe unique aspects of this project certainly kept the team on their toes. But they were determined to complete the project on time.The team worked tirelessly, even giving up their weekends to ensure that the project was completed on schedule. Despite the harsh Welsh weather, they pushed on and were determined to make sure that Santa could visit the children of the Welsh Valleys. It was a challenging project but the team’s hard work and dedication paid off.Finally, the project was completed and the results were astounding. The roof terraces are now fully waterproofed and refurbished, and the visual appearance of the visitor site was greatly improved. It was a project that was both memorable and rewarding to all those involved.
Sponsored
University of Brighton, Bioscience Building

University of Brighton, Bioscience Building

Ash & Lacy

The 8,500m2 Biosciences building is clad in silver anodised ACM panels generally 1.3m high and up to 6.4m long that work together to wrap around the complex elevations. Each individual panel purpose-made and pre-curved at Ash & Lacy’s West Bromwich site, to fit around and match the windows on the building. The protruding raked capping details were also manufactured in the same material, in order to provide a fully cohesive design. Original concept architects, Llewelyn Davies Yeang, specified 3,500m2 Ash & Lacy Facade for the extensive new build, to give the building an innovative and hi-tech finish, reflecting the standards of the department itself.The design of the seven-storey building responds to the constraints of a steeply sloping site divided by a service road creating staggered floor levels, interesting external spaces and a flowing façade. The science block also features a sedum green roof fitted with solar panels for the heating of domestic water contributing to the very good BREEAM rating it has secured.
Sponsored
James Watt Dock

James Watt Dock

Forterra Building Products

James Watt Dock is a development of 137 new-build one- and two-bedroomed flats for social rent. The homes, built over five blocks, will offer residents magnificent views over the historic dock and the River Clyde. Residents will also benefit from parking, amenity units, and a landscaped public space.PROJECT INFOThe site is a brownfield waterfront site adjacent to the Grade A listed Sugar Sheds, which are a unique example of Scotland’s Victorian industrial architecture. The sheds became the design driver, aiding the architects in establishing mass, orientation, position and material.Farmstead Antique, from Forterra’s Butterley range, with its tumbled and distressed multi patches, was selected for its similarity to the bricks used in the Sugar Sheds. It allowed the design of the new development to relate to the historic building while delivering a modern, clean-cut façade.With a water absorbency of only 7%, the brick also offered the high technical performance required owing to the development’s location on the Firth of the Clyde, a robust marine environment.
Sponsored
Coca-Cola Enterprises, Wakefield

Coca-Cola Enterprises, Wakefield

Rapid Ramp Limited

REQUIREMENT: Able-bodied access to the cabin. ADDITIONAL INFORMATION: We quoted and produced technical and CAD drawings, with reference to the finished floor height measurement supplied by the modular building company.END RESULT:Our expert installers fitted a step system as shown. FEATURES INCLUDED: Mesh Platform - self-draining mesh allows water to pass through rather than collect on the surface.Trombone Ends - these are added to the ends of a step system to prevent clothes catching.Telescopic Legs - these can be adjusted to accommodate different threshold heights.Standard Continuous Handrail - this handrail system ensures users always have support to hold onto.Standard Colour Black - ramps are powder-coated black, to create a durable finish that is tougher than conventional paint.THE COMPLETE RAMP PACKAGE:An all-inclusive, stress-free option which we managed in-house.This package includes a site survey (if applicable), quotation, CAD and technical drawing, supply, and installation. 
Sponsored
Aintree University Hospital

Aintree University Hospital

Roché Systems Ltd

THE PROJECTRoché were asked with helping refurbish the Critical Care Unit at Aintree University Hospital by providing a suitable shading solution for their critically ill patients who rarely get chance to leave the ward. The project was part of a £35 million development and marked the completion of the project.THE CHALLENGEThe key design concern for the awnings was ease of use as well as keeping the area aesthetically pleasing for patients and visitors.THE SOLUTIONThe Markilux Syncra Uno Flex freestanding awning frame was installed outside the Trust’s Critical Care Unit. This particular solution is used in cases where fixing options are limited with boxes at the base to stabilise the frame. Larger bases were specially designed to create weighted flower boxes for a unique outdoor effect. The Markilux 6000 full cassette awning was then secured onto the frame keeping the fabric completely enclosed when retracted. Grey fabric was chosen to suit the modern aesthetic of the building with the added benefit of UV protection and water resistance.
Sponsored
Ocean's Park

Ocean's Park

Lorient

Opened in 1977, Ocean Park is a marine mammal park, oceanarium, animal theme park and amusement park situated in Wong Chuk Hang and Nam Long Shan in the Southern District of Hong Kong.In 2005 they embarked on a HK$5.5 billion development plan that saw it expand to over 80 attractions and rides, and steadily grow visitor numbers, making it the world's 13th most visited theme park, and one of the largest theme parks in Asia.Due to open in 2019, the Hong Kong Ocean Park Marriott Hotel is being built at a cost of $639m. In addition to 471 rooms, the five-star hotel will include a 16m high aquarium in the lobby, lagoons, a ballroom and a rooftop garden. As well as facilities for families attending the park, it will also be equipped to host meetings and conventions. The hotel and water park are part of a plan to transform Ocean Park into an international resort.Lorient supplied DS acoustic, smoke and fire door seal and LVH44 air transfer grilles to the Ocean's Park theme park in Hong Kong.
Sponsored
Absorb-R GypLine Visible Acoustic Spray Plaster Channel 4 Studies

Absorb-R GypLine Visible Acoustic Spray Plaster Channel 4 Studies

Soundis

New HQ in Leeds...The national broadcaster first announced it would be opening a new HQ in Leeds in 2019. Almost two years on, around 200 members of staff are beginning to settle into their new home at the Majestic in Leeds city centre.Soundis were contracted to supply & install approximately 2,050 sq m2 of seamless acoustic spray plaster to the industrial style ceilings.Our client opted for the rough texture Absorb-R GypLine VisibleAcoustic Spray Plaster System 35mm thick. We installed the plaster to the surface following the contours of the profiled metal deck, providing a Class A Sound Absorption.The carbon-neutral Absorb-R GypLine visible acoustic spray is a high-quality and environmentally friendly acoustic spray that absorbs unwanted noise and can be used in a wide range of environments.The Absorb-R GypLine visible is a combination of recycled paper, wood adhesive, water and professional installation work. The tubular structure of the cellulosic fibres enables effective reverberation absorption.
Sponsored
Soundis Absorb-R Gypline Visible Acoustic Spray Plaster at Jodrell Bank Centre for Astrophysics

Soundis Absorb-R Gypline Visible Acoustic Spray Plaster at Jodrell Bank Centre for Astrophysics

Soundis

The Jodrell Bank Centre for Astrophysics is the astronomical research centre of The University of Manchester. The centre is a world leader in radio astronomy-related research and technology development.Rough textured spray plaster...Our brief was to create a moon like surface ceiling that not only looked realistic, but most importantly to absorb sound and background noise from within the centre.We installed the Absorb-R Gypline Visible Acoustic Spray Plaster to the surface following the contours of the profiled metal deck, providing a Class A Sound Absorption.Absorb-R Gypline Visible Acoustic Spray Plasteris an extremely flexible seamless sound absorption system. The carbon-neutral Absorb-R GypLine visible acoustic spray is a high-quality and environmentally friendly acoustic spray that absorbs unwanted noise and can be used in a wide range of environments.The Absorb-R GypLine visible is a combination of recycled paper, wood adhesive, water and professional installation work. The tubular structure of the cellulosic fibres enables effective reverberation absorption.
Sponsored
Fibre reinforced concrete for container terminal

Fibre reinforced concrete for container terminal

Tarmac

This major expansion of the deep-water container terminal at Liverpool docks would significantly increase the footprint and capacity of the site. The site handles the world’s largest container ships and connects road, rail and canal networks directly to the heart of the UK mainland. As part of this project, external concrete surfacing was needed that would deliver long term resistance to the high volumes of HGV traffic using the terminal. After discussions with the contractor, the solution proposed was Tarmac’s TOPFORCE fibre reinforced concrete with a combination of synthetic macro and micro fibres. TOPFORCE can eliminate the need for some traditional steel reinforcement, making it quicker and easier to place. It offers excellent longterm durability making it ideal for commercial and industrial sites used by HGV traffic. This solution would deliver a saving in both labour and material costs and avoid the budget impact of the rising cost of steel. As well as improving the durability and structural performance, the use of macro fibres also improved sustainability significantly by reducing embodied carbon compared to traditional steel reinforcement. 
Sponsored
How to prevent flooding. Northampton Service Station and Lorry Park, UK.

How to prevent flooding. Northampton Service Station and Lorry Park, UK.

ULMA Architectural Solutions

We have improved the drainage system at this lorry park and service station in this town to the north of London.  The problem was that the drainage system installed in the area did not have sufficient capacity to drain the rainwater, leading to dangerous accumulations of water on the road surface.Service stations and lorry parks have a constant flow of vehicles. There are also some areas where HGVs turn, making it necessary to guarantee the safety of the installation of the channels in order to prevent breakages and accidents.Good advice on your drainage system avoids problems and gives you peace of mind.In these cases, it is essential to have a consultancy service that, taking into account all the necessary parameters (location, rainfall, surface slope, weight to be borne by the grating (load type) and length of the drainage line), defines the model best suited to the site.In this project, 250 ml of Civil-F polymer concrete channels, model F150K, were installed for load type F900. And it has a grating secured at 8 points. It is important for you to know this.
Sponsored
Greg's Place, University of York

Greg's Place, University of York

Tobermore

TGP Help Mark New Era with Manhattan Plank Paving at Greg’s PlaceTGP Landscape Architects Ltd was assigned the task of designing the landscape at Greg’s Place, a vibrant outdoor community space which at the University of York, replacing the previous dilapidated Vanbrugh Piazza. Helping TGP to mark a new era for the University, Tobermore supplied the landscape architect with modern Manhattan plank paving and Granite Step Units which were used to create a unique, striking hard landscape.Greg’s Place was named in honour of Greg Dyke, a highly respected journalist, broadcaster, and chairman of The Football Association, who was additionally Chancellor at the University for 11 years.Andrew Gardener, Director at TGP, explained how the company won the opportunity to be involved in the refurbishment scheme: “The original site (Vanbrugh Piazza) was designed in the 1960’s and had gone unused for years, having never been updated. We took part in a competition being run by the University of York to come up with a design for a multi-functional space that students could use. We won the competition and presented a proposal to Greg Dyke and the Student Union, taking their opinions on board and the students ‘a year in the life’ concept that reflected the events taking place throughout the year for students – festivals, Christmas markets, graduations, etc.”TGP’s design concept had to meet a variety of requirements. Andrew noted: “The strong central axis of the site, which runs North / South from Vanbrugh College, was further enhanced by extending it out into the lake and placing a large timber and galvanised steel feature seating window on it. The space itself needed to be flexible enough for multi-purpose use and needed to work on a North / South and East / West axis.“Greg Dyke wanted a large screen installed for the communal screening of sports and movies on the College building to the West of the site. Timber, circular seating and a raised grass terrace were included to create multiple viewing directions within the site.”Andrew explained the selection of materials for the landscape at Greg’s Place:“For the hard landscaping, we knew that paving needed to be a versatile, cost effective, hard-wearing solution for the scheme.”ANDREW GARDENER, DIRECTOR AT TGP LANDSCAPE ARCHITECTS LTDTobermore paving products were an obvious choice for TGP and Andrew was particularly impressed with Tobermore’s Premium Collection’s Manhattan plank paving system: “I liked the large format size; the mixed size units and the variety of colours available with the product are impressive and it is always good to see paving that is different to the standard often seen in public spaces.”Manhattan was ideal for creating a contemporary look at Greg’s Place as it is manufactured with a sparkling granite aggregate surface layer, reflecting the aesthetics of natural granite that is popular in European cities.TGP specified the product in Silver and Mid Grey, forming a subtle colour pattern. The landscape architect selected Tobermore’s Granite Step Unit as a stepping solution, which was a wonderful, modern accompaniment to Manhattan as Granite Step Units are manufactured with a similar granite aggregate surface finish.Andrew commented on the results of Greg’s Place:“We are delighted with the finished look of the scheme and the University is pleased that students, staff and visitors are making use of the area in a way they never did before.ANDREW GARDENER, DIRECTOR AT TGP LANDSCAPE ARCHITECTS LTD“We are very happy with the products supplied by Tobermore as they have given a great contemporary feel to the space.“We plan to use Tobermore products again for forthcoming projects.” 
Sponsored
Case Study - Proteus Pro-Felt® - High Street, Polegate

Case Study - Proteus Pro-Felt® - High Street, Polegate

Proteus Waterproofing

Comprising of nine shops and several residential flats, properties 29-47 High Street Polegate required a full roof refurbishment after complaints of water ingress into the residential buildings. Proteus Waterproofing conducted a thorough survey which revealed that the existing roof build up, made up of a timber deck and 2-layer felt, had been previously repaired but was now at the end of its serviceable life.Being a residential building with a combustible deck, protecting individual properties from internal fire spread was a key consideration. Compartment walls were identified allowing Proteus Waterproofing to provide a solution that would meet regulatory guidance relating to the junction of compartment walls and roofs in Approved Document B whilst meeting the needs of the client.Proteus Waterproofing specified their robust reinforced bitumen membrane range of Proteus Pro-Felt®, including a bespoke hybrid insulation approach, where instead of a full replacement consisting of entirely non-combustible insulation, a scheme was designed to meet the requirements above and either side of the compartment walls, offering the client the most cost-effective solution possible that would also mitigate any unnecessary increase of weight loading elsewhere on the roof.High Performance WaterproofingThe waterproofing and existing deck were stripped back and re- decked with 18mm plywood. When removing the existing waterproofing, our approved contractor, carefully recorded the exact location of the party walls as no drawings of the upper story flats were available.Proteus Pro-Felt® SA AVCL was used as a vapour control layer to allow for the application of the hybrid combination of 150mm Proteus Pro-Therm PIR insulation and 150mm Proteus Pro-Therm Mineral Wool insulation. A thermal calculation was undertaken to ensure that the final result met the requirements of Part L of the National Building Regulations. These were both adhered with Proteus Pro-Bond Foaming Adhesive. Proteus Pro-Felt® SA Underlay Plain was laid and finished with Proteus Pro-Felt® Ultima Plus Fireguard Mineral Capsheet, providing the client with a fully waterproofed Part B and Part L compliant roof, guaranteed for 20 years.Proteus Waterproofing worked closely with the Proteus Approved Contractor, to ensure the project was delivered to a high standard.Health & SafetyWhen working on occupied buildings, safety is always of utmost importance, as well as keeping disruptions to a minimum. The Proteus Pro-Felt® range have been tested to the highest European Classification of BROOF(t4), making it the ideal system to use on all buildings, as the risks to residents, property and members of the public are greatly reduced. All Proteus Waterproofing specifications promote fire safe installation methods conforming to the industry lead Safe2Torch guidelines. Proteus also have a range of cold liquid applied membranes which are also BROOF(t4) certified.Long Term PerformanceProteus Pro-Felt® offers high-performance bituminous membrane systems, tested to perform in extreme temperatures and weather conditions, while offering clients a robust and cost-effective waterproofing solution. Proteus Pro-Felt® Ultima Plus range retains its high polymer performance. Its class leading, high quality modified bitumen content allows this flexible membrane to move with the building and ensure long term durability and performance with third party BBA accreditation and guarantees available up to 30 years.
Sponsored
False Fire Alarms Continue to Cost the UK

False Fire Alarms Continue to Cost the UK

Safety Technology International Ltd

False fire alarm numbers continue to rise post-pandemic causing major issues for the economy by wasting vital time and resources.The latest Home Office figures from year ending September 2022 reveal fire and rescue services attended 238,885 fire false alarms, the largest total of false fire alarms in over a decade, an increase of 10% compared with the previous year.With an 18% increase from the previous year for malicious false fire alarms, 6,473 false alarms were determined, the number still rising post-COVID.False fire alarms continue to be the largest proportion of incidents attended at 38% and so it is increasingly important to minimise false alarms to ensure both the safety of individuals and the efficient use of emergency services.A teenager was arrested in Aberdeen after setting off fire alarms more than a dozen times, which police investigated as ‘deliberate and malicious’. Firefighters attended calls and wasted time and resources, meaning they could not respond to real emergency calls.False alarms are costly and disruptive, amounting to around £1 billion a year for the UK they often require emergency responders to mobilise and respond to a non-existent emergency, wasting resources and time.False fire alarms can be costly for building owners with fines introduced for repeated false alarms from emergency services, as they may have to attend multiple times, causing a drain on resources that could be better used elsewhere.They can also cause panic and confusion, particularly if they occur frequently, making it harder for people to take the necessary steps to evacuate safely in the event of a real fire. Frequent false alarms can lead to complacency among building occupants, who may not take real fire alarms seriously, potentially putting themselves and others at risk.Firefighters attended false alarms a considerable number of times at Basset Lodge, an independent living facility for many elderly and disabled people. False fire alarms are not only disruptive for staff and residents, but also pose a risk to their safety, and place additional strain on fire and rescue services. These repeated false alarms can lead to complacency in the public, lowering the sense of urgency in real evacuations.Protective covers can help to control the number of accidental and malicious fire alarms, but there are many ways in which you can reduce false alarms, for example regularly checking and testing equipment to ensure it is not faulty is one approach to preventing unnecessary risk for the fire department and public from false alarms.As the original call point cover manufacturer, Safety Technology International manufacture tough covers have been specifically designed to help deter false fire alarms and to prevent malicious or accidental activation of manual call points. The strong, durable construction of our polycarbonate call point protectors means they can withstand the toughest knocks, whilst offering lasting protection against false fire alarms. With various models available in a range of sizes and colours, and multi-language or custom text options, we have covers suitable for most applications or devices. Sounder models help to deter malicious activations with an audible alarm that draws immediate attention to the area. Waterproof models also allow for outside application, protecting devices and manual call points against the ingress of dust or water.
Sponsored
Co-Operative, Birtley

Co-Operative, Birtley

Berry Systems

Berry Systems supply and installed safety barriers and balustrading to protect loading bays, warehouse racking, pedestrian walkways and the plant.The new Co-Operative Composite Distribution Centre in Birtley covers 25,600 sq metres (276,000 sq ft) and supplies a vast range of products from 3,500 lines to 262 Co-Operative stores in the North of England.Activity in the centre is extremely busy with hundreds of vehicle movements daily facilitated by 500+ members of staff. We won the contract to supply and install all the safety barriers, balustrades, loading bay barriers and racking protectors inside the warehouse, as well as the vehicle perimeter barriers and ramp barriers externally.All the products, with the exception of the galvanised spring steel barriers, were painted in high visibility yellow. The spring steel barriers are designed to absorb  impacts from HGVs and forklift trucks while retaining their own integrity and ongoing effectiveness. The Co-Op were determined to ensure their new development was as environmentally friendly as possible. Waste oil helps provide heating and the lighting system is solar controlled to eliminate wastage. It ensures a variable level of interior lighting to automatically complement exterior levels.
Sponsored
AUTOMATIC SYSTEMS INSTALLS NEW FIRSTLANE AND ACCESSLANE INTO HOUSING ASSOCIATION PROJECT

AUTOMATIC SYSTEMS INSTALLS NEW FIRSTLANE AND ACCESSLANE INTO HOUSING ASSOCIATION PROJECT

Automatic Systems UK & Ireland

Automatic Systems was asked by Aspex UK Limited to work with them on a project they had won at the head office of Riverside Group.Riverside is a group of complementary businesses driven by a clear social purpose, with a charitable housing association at its core.Established over 90 years ago, they have grown to become a major provider of affordable housing, care and support services in England and Scotland, with almost 56,000 homes in management. Operating at scale and across 160 local authorities, their vision is to transform the lives of the 90,000+ people they house and revitalise the neighbourhoods in which they live.RiversideGroup approached Aspex as a result of Covid to help secure and control the access of their head quarter building.SOLUTIONWith the help of Automatic Systems Aspex came up with a solution that fulfilled their criteria. This included the installation of the newly launched Firstlane and AccessLane.WORK TIMEFRAMEHaving worked with Aspex on a number of previous projects Automatic Systems were the preferred supplier when the contract was won in December 2020. Works took a week to complete as allocated in February this year.FUTURE WORKAutomatic Systems looks forward to working with Aspex on future projects.
Sponsored
Geschwender Lockers at Sky Lagoon Iceland

Geschwender Lockers at Sky Lagoon Iceland

LSA Projects Ltd

Client: Pursuit CollectionInstaller: Geschwender GmbhProduct: Bespoke Cubicle Solution from GeschwenderOpened in 2021 Sky Lagoon in Kársnes Harbour, Kópavogur near Reykjavik in Iceland is a Geothermal Spa experience from luxury hospitality and attractions provider Pursuit. Pursuit Collection manage world-class attractions across the glove with facilities including wildlife safaris in National Parks and a growing collection of ‘FlyOver’ flight experiences in the United States, Canada, and Iceland.Sky Lagoon is a wellness retreat featuring their seven-step ritual experience including traditional sauna and steam room as well as the unique oceanfront geothermal infinity lagoon with unobstructed views of the ocean landscape.Geschwender supplied and installed a series of Bespoke Lockers and Changing Rooms to the spa. Sky Lagoon has both public and private changing facilities depending on the ritual package chosen each being carefully designed and installed by Geschwender in matching faux Oak laminates to reflect the natural ethos of the space. Lockers and private changing spaces are controlled using contactless electronic locking systems which are perfectly integrated into Geschwender fittings.
Sponsored
HANOVER STREET

HANOVER STREET

Metalline Architectural Fabrications

Sandwiched between a retail unit and some 2000 square feet of office space, the seven storey shuttered façade reflects the historical military tailors that used to occupy this part of London. Their tailoring techniques, forms of embroidery and bronze detailed shop fronts were an inspiration for the architects Squire and Partners, whose detailed design of the bronze panelled façade, included glimpses of deep red in the shutter reveals with 45mm diameter punched holes intended to replicate the stripes on a Sergeants uniform. Fabricated on a CNC turret punch press using high grade J57S UP aluminium, the exterior featured hook on Unity rainscreen panels finished in bronze anodised and aluminium infills in a red polyester powder coating. The balcony detail was enhanced with impressive folding shutter doors designed to offer, security, shading, ventilation and noise control from the streets below. The outer skin to the shutters was finished in bronze anodised to match the exterior panels. They also featured a regency gold anodised finish to the side plates and a red polyester powder coating to the interior screen that when folded added to the aesthetic design of the building.
Sponsored
Adare Manor Padel Courts

Adare Manor Padel Courts

LSA Projects Ltd

Architect: Healy PartnersInstaller: John Paul ConstructionProduct: Gustafs Linear Ribs and Gustafs Panel SystemClose to 400m2 of Gustafs Linear Ribs and Gustafs Panel System in natural Walnut veneer were used to clad the walls and ceiling beams of the Padel Courts in the new leisure facilities at the Adare Manor in early 2020.The new Padel courts are a facility unique to the activity centre at Adare Manor. Padel is a hybrid sport between tennis and squash, traditionally played with 4 players and suitable for the whole family. Part of the larger expansion and restoration project the Padel Club also houses studio space for yoga as well as gym and swimming facilities, sauna and steam room.Gustafs Ribs were installed to the upper walls within the court area, 34mm deep ribs with 38mm gaps were used for 50% open area achieving class A for acoustic absorption, perfect for controlling sound levels in the sports hall.In addition to the ribs 171m2 of Gustafs Panel System was used to clad the steel ceiling beams in complimentary Walnut veneer. Specialist Gustafs capax profiles were used for their signature invisible fixing.
Sponsored
Bespoke Double Leaf Hatch - Kielder Observatory, England

Bespoke Double Leaf Hatch - Kielder Observatory, England

Surespan

IntroductionSurespan design and manufactured two sets of bespoke double leaf hatch doors for the Kielder Observatory located in England’s largest forest in Northumberland. Products suppliedWe supplied;Surespan designed and manufactured two sets of bespoke double leaf hatch doors for the roof and the front of the Observatory’s two rotating turrets – one to house a 20” Pulsar manual telescope and the other for a small Mead 14” telescope. Features:These hatches are electrically operated and have been specially designed to open in a specific sequence using remote control via 24v dc actuators.The projectAs part of the Kielder Art and Architecture program, Charles Barclay Architects designed Kielder Observatory for the Forestry Commission.The all-timber observatory was constructed from Douglas fir with larch cladding, the pier-like building has rotating turrets that house two permanent telescopes and an observation deck. The turrets can be rotated through 360 degrees.The observatory generates its energy using a wind turbine and photovoltaic panels and includes a composting toilet.The observatory has received 2009 awards from the RIBA and The Civic Trust and featured in the inaugural World Architecture Festival.
Sponsored
InterContinental, The O2 – London – Rutland TS.9205 & TS.11204

InterContinental, The O2 – London – Rutland TS.9205 & TS.11204

Rutland

Project DetailProject: Intercontinental – O2 – HotelLocation: London, UKProduct: TS.9000 range of architectural closers Project DescriptionThe purpose built new InterContinental® London – The O2 features a dedicated riverside conference centre with separate entrance away from the main hotel lobby allowing for complete privatisation of bespoke events for exclusive use hire. The Luxury hotel with a globally recognised brand.With 453 luxury bedroom suites, 5 Restaurants and Bars, 20 meeting rooms, and a complete fitness centre it was important that the door controls not only work well but were guaranteed for many years. Both the TS 9205 and the TS 11204 Cam Action door closers were used extensively on the O2 Hotel as the importance of frictionless customer care and ease of operation was paramount.A Door Closer is a small element of building design, which makes an enormous difference to its operation.You can check out their web site here or visit at 1 Waterview Drive, Greenwich Peninsula, London, the O2, SE10 0TW.For all your Door Closer requirements e: sales@www.rutlanduk.co.uk or t: 01246 261 491
Sponsored
Absorb-R GypLine αw Acoustic Plaster Lambeth Town Hall

Absorb-R GypLine αw Acoustic Plaster Lambeth Town Hall

Soundis

Lambeth Town Hall, a Grade II listed building designed by the well-known architects Septimus Warwick and Austen Hall, was opened on 29 April 1908 by the then Prince and Princess of Wales, subsequently King George V and Queen Mary and is a fine example of the Edwardian Baroque style of civic architecture.The remit for the New Town Hall was to provide a more peaceful working environment where council workers were not disturbed by noise levels and reverberation issues. As an example, where poor sound absorption and poor reverberation control is not resolved, staff members often experience problems with concentration, fatigue and headaches so practical work is always disturbed instead of being a pleasant working space.Soundis supplied and installed a Monolithic Absorb-R GypLine αw to the existing soffits and ceilings to create a Semi-Textured Finish to soffits and a Semi-Smooth Finish to public spaces and council meeting rooms.Morgan Sindall have monitored progress with pre-completion quality results and on site satisfaction reports which indicate that exceeded the expectations of all involved with this project. Morgan Sindall also highlighted and rewarded Soundis for Health & safety performance throughout the contract.
Sponsored
Surespan provide access to space - Kielder Observatory

Surespan provide access to space - Kielder Observatory

Surespan

Kielder Observatory Surespan designed and manufactured two sets of bespoke double leaf hatch doors for the Kielder Observatory located in England’s largest forest in Northumberland.  The ProjectAs part of the Kielder Art and Architecture program, Charles Barclay Architects designed Kielder Observatory for the Forestry Commission. The all-timber observatory was constructed from Douglas fir with larch cladding, the pier-like building has rotating turrets that house two permanent telescopes and an observation deck. The turrets can be rotated through 360 degrees.The observatory generates its energy using a wind turbine and photovoltaic panels and includes a composting toilet. The observatory has received 2009 awards from the RIBA and The Civic Trust and featured in the inaugural World Architecture Festival.  The ProductSurespan design and manufactured two sets of bespoke double leaf hatch doors for the roof and the front of the Observatory’s two rotating turrets – one to house a 20” Pulsar manual telescope and the other for a small Mead 14” telescope.  FeaturesThese hatches are electrically operated and have been specially designed to open in a specific sequence using remote control via 24v dc actuators.      
Sponsored
Canterbury's Art Museum & Library, The Beaney Institute, Canterbury

Canterbury's Art Museum & Library, The Beaney Institute, Canterbury

Tarmac

Background:Canterbury’s Art Museum and library, The Beaney Instituteis a Grade II Listed, Victorian building dating back to 1900.The Institute was granted £11.6m by the Heritage LotteryGrant to conserve, repair and restore the existing buildingplus create an extension that would double the size of theInstitute in order to provide better facilities to the museum,art gallery and library.The Solution:Limelite plaster from the Heritage range was used torestore and protect the internal walls throughoutthe Institute. Limelite Renovating Plaster was appliedto control and minimise dampness that can occur inolder properties. High Impact Finishing Plaster was thenapplied, creating a BBA approved plaster system allowingthe walls to breathe while protecting them from damage,maintaining a heritage-style appearance.The Outcome:The Limelite plaster system was the perfect solutionfor The Beaney Institute. Important pieces of art andmuseum artefacts are protected from condensationand salt transfer from the walls.This modern solution works sympathetically with thefabric of the building providing the aesthetic finishexpected of a building of its character whilst also beingdurable enough to withstand the high footfall of thevisiting public.
Sponsored
Marischal Square

Marischal Square

Bauder Ltd

Marischal Square Bauder Bakor Hot Melt structural waterproofingSynopsisMarischal square is a mixed use complex in the centre of Aberdeen based on the site of the former council headquarters building, St. Nicholas House. In 2011 Muse Developments undertook a £107m redevelopment of the site creating space for two new office buildings, seven restaurants and café bars, a 126-room hotel, a modern civic space and a new public space area in between the new buildings.Bauder Building BoardProject:Marischal SquareLocation:AberdeenRoof Area:5,400m²Client:Muse Development & Morgan SindallApproved Contractor:Briggs AmascoThe specificationWith large parts of the new roofing areas being accessible terraces and areas which will experience a significant amount of foot traffic, the Bauder hot melt structural system was a natural choice. The system was combined with hard and soft landscaping to provide the different aspects of the various terraces, stairways, podium decks and rooftops.The Bauder Hot Melt structural waterproofing system is ideally suited as a waterproofing system beneath paved or ballasted surfacing, car parks, podiums, plazas, green roofs and substructures.Project challengesA key challenge for this project was the fact that Muse Developments and Morgan Sindall, who were working jointly on the development, were looking for a single source waterproofing. Bauder proved to be the perfect fit, covering and delivering all elements of the waterproofing systems.The resultApproved contractor Briggs Amasco carried out the works on the 5,400m² of the separate roof areas, whilst expert Bauder site technicians carried out a total of 26 site visits over the duration of the project to ensure the quality of the installations. Following a final inspection, Bauder was able to issue a 20 year product and workmanship guarantee on the project.System installed1 BauderPLANT E 42Green torch-on root-resistant capping sheet.2 790-11Hot melt rubberised bitumen asphalt with a percentage of post-consumer recycled materials that infills and fully bonds to all minor deviations in the deck.3 DeckPrimed concrete.
Sponsored
That hard-working industrial look

That hard-working industrial look

Powdertech (Corby) Ltd

Project OverviewThe Percy Gee Building, at Leicester University, is named after a former benefactor and chairman of the former college. Over the last 2-3 years the building has undergone an exciting £13.1 million transformation and expansion. This is a multi-purpose facility, home to the Students’ Union, a venue for informal learning and a centre for refreshment and eating.PLEASE NOTE: BETTER IMAGES WILL BE POSTED WHEN WE CAN ACCESS TO THE BUILDING WHICH IS CURRENTLY CLOSED DUE TO COVID-19. THESE PHOTOS WERE TAKEN THROUGH A GLASS WINDOW. That hard-working industrial lookA main hub of the building will be ‘Campus Kitchen’ a new food court which will provide a range of varied cuisines for staff, students and visitors This is an interior occupied by Millennials and Gen Z and the décor needed to reflect their styles and trends. By using Amron Welltec “wave” or “corrugated” profiled aluminium sheet on an interior wall something new and unexpected was injected into the kitchen space. To take this ‘jolt away from the norm’ still further the designers envisaged not shiny metal, but the appearance of weathered and rusted metal – an industrial ‘vibe’ perhaps hinting at determination and hard work.Powdertech Collections includes a range of finishes which replicate patination/rust on metal, giving a ‘Corten’ appearance but with no rusty residue which could mark clothing and other surfaces. The client chose ‘Firebox’ from the Evolution/Rust collection. This gives a very natural ‘rusted’ look with no two panels looking the same. Powdertech applied Firebox to 80 m2 of material which line the walls and over-counter area of the Campus Kitchen.BenefitsEvolution™ Rust finishes can be used internally and also externally. There is no residue, and no run-off or staining from rainwater.The striking designs are achieved through using polyester resin systems, and a bit of magic!The finish can be cleaned like any other powder coating – minimal maintenance.We are passionate about colour and always keep up with latest trends in shade and texture of finishes.The Evolution range has up to a 25-year guarantee for gloss, colour and adhesion.Conforms to ISO 12206 and Qualicoat specifications.
Sponsored
Durlum Polylam at The Sands

Durlum Polylam at The Sands

LSA Projects Ltd

The Sands - Durham WaterfrontArchitect: Ryder Architecture LtdInstaller: Pennine ContractsProduct: Durlum Polylam BafflesLSA Projects supplied over 300 linear metres of Durlum Polylam baffles to the new facility The Sands on Durham Waterfront in the city centre. The new riverside development was intended to move the County Council headquarters into the city centre for improved public transport connections for staff and other visitors.In 2022 the building applied for change of use planning to convert the landmark building into additional learning spaces for Durham University Business School. The change of use allows the department of the Russell Group university to move straight into the ready-made facility after delays with their original plans for a different site.The £50m facility has space for the 2,300 students and members of staff at the business school across the 1.4 hectare site. In addition to traditional learning spaces the building has modern working space for staff and academics and hopes to attract leading businesses to work with the university and graduates.Durlum Polylam baffles were used for the feature ceiling in the main event space. The ceiling is made up of 320mm deep 100mm wide baffles in concentric squares with the outer square measuring an impressive 20 metres across. Polylam pieces were finished in a Dur-Graphic faux Cherry veneer print and mounted in 9 double-row rings with alternating strip lighting and integrated ventilation systems.Polylam from Durlum is a versatile ceiling system made up of vertical baffles available in a range of sizes up to 100mm wide by 800mm deep. Pieces can be installed using suspension grid systems available from Durlum in a variety of ways including independent mounting and group mounting with regular spacing and options for demount-ability.Baffles are made from either galvanised sheet steel or aluminium and finished in a choice of RAL colour powdercoating as a standard with options for gloss and metallic finishes as well as Dur-Graphic and Duroplan printed designs. Acoustic perforations can also be applied to the baffles as well as incorporating Dur-Sonic acoustic mineral wool filling to the inside of the hollow baffle lengths.
Sponsored
Leeds Beckett University

Leeds Beckett University

Ecoprod Technique

Louise Lyttle – Campus Service Supervisor"I am the campus supervisor in charge of all the cleaning in the University. The waterless urinals were installed in the food court last September as part of the University’s Green Impact initiative.They were installed while I was on holiday. When I came back everyone was gushing about these waterless urinals but I was very sceptical. I thought there was no way that they would work, that they would stink and so on, but they’ve been absolutely amazing.I’m a massive convert – if I had my way they’d be installed all over the campus."No more odour"I can’t believe how fantastic they are and that they work so well without needing any running water. They always look clean, they always smell clean and they’re 100% easier to clean because there’s no water going into them."Much easier to clean"Cleaning them is so much easier than cleaning traditional urinals, and more efficient too. I can’t believe how long the cleaning fluid lasts for. I thought we’d go through bottles and bottles of it but we don’t.With traditional urinals you often have a constant trickle of water through them which means you can get lots of problems with limescale and other marks which can be really difficult to clean off. You don’t have any of these problems with the waterless urinals. They’re much easier to clean and, importantly, they always look clean too."No more blockages or flooding"We used to get a lot of blockages in traditional urinals on campus and they can cause all kinds of problems but we haven’t had any of that with the waterless urinals.The traditional urinals run on battery sensors that regulate the flush. From time to time the battery runs out and if the guys don’t spot that on their check then they don’t flush at all for a few days which causes huge problems with odour. It’s not an issue at all with the waterless urinals.Similarly, we used to get overflows and floods caused by blockages in the traditional flushing urinals. These can be hugely damaging. If they happen over a weekend then you can come in on Monday and find that you’ve got a ceiling down on the floor below. Again, the waterless urinals remove this problem completely."Smells lovely and looks clean"I’m converted. If it was up to me we’d have them all over the campus. It’s such a big difference – if you go in the gents now it alway smells lovely and looks so clean.We have an external cleaning company that does most of the cleaning on campus. When we first installed the waterless urinals we put one of our own cleaners in to clean them, our team leader trained her on the correct method and then trained the external cleaners. They all picked it up straight away. They’ve had no problems with it and they never get mixed up.The feedback from the cleaners is really positive. They find the waterless urinals much easier to clean. You just spray them and wipe round – no more scrubbing or rinsing."Positive feedback from students"We’ve put a sign up explaining to the students what the waterless urinals are about. A few found it strange at first but the only comments we get are about how great it is that the urinals don’t smell like they used to."Great service from Ecoprod"Dealing with Ecoprod is great. The pods need replacing every few months. I raise a purchase order and as soon as Ed sees it he sends out the order and it’s here the next day.It’s fantastic service. I know within two days of placing the order that I’ll have the replacements so I never need to worry. The service from Ecoprod is really good."
Sponsored
Britmet Lightweight Roofing: Slate 2000 and BritFrame in Social Housing Case Study

Britmet Lightweight Roofing: Slate 2000 and BritFrame in Social Housing Case Study

Britmet Lightweight Roofing

This case study highlights the successful implementation of Britmet’s flat-to-pitch conversion system, BritFrame, and lightweight metal roof tile, Slate 2000. The project, carried out by Jennings Roofing encompassed a total area of 500 square meters and aimed to improve the infrastructure of the existing roof. This case study examines the benefits, challenges, and outcomes of utilising Slate 2000. This case study highlights the successful implementation of Britmet's Slate 2000 roofing system and Britframe structural solution in a social housing project. The client, a new customer of Britmet, discovered the systems at the UK Construction Week (UKCW) exhibition. Impressed by the innovative design and features, the client expressed interest in utilising Britframe for a flat-to-pitch conversion project in their social housing development. The client is a housing association responsible for managing and maintaining a portfolio of social housing properties. They were seeking an effective solution to address various issues with one of their buildings, including an ageing roof with multiple repairs, inadequate insulation, and inefficient rainwater management. The objective was to enhance the building's aesthetics, improve water tightness, increase energy efficiency, and minimize future maintenance requirements. The initial meeting between the client and Britmet took place at the UKCW exhibition, where the client became acquainted with Britframe, a lightweight and versatile structural solution. Intrigued by its potential, the client arranged for an on-site visit to further assess the feasibility of utilising the Britframe and Slate 2000 roofing system for their project.Slate 2000 is a durable and aesthetically pleasing lightweight roofing material that offers long-term performance and weather resistance. It's stylish design and robust properties make it an ideal choice for enhancing the visual appeal and durability of roofs and cladding. During the initial site visit, Britmet's team evaluated the existing roof condition, rainwater management system, and insulation levels. After careful assessment, they provided the client with a budget price estimate for the proposed project. The estimate included the cost of materials, labour, and necessary ancillary items. To streamline the project, the client signed a Project Assist agreement with Britmet. This allowed Britmet to obtain planning drawings and submit the necessary applications on behalf of the client. Additionally, Britmet provided structural calculations, design drawings, and rainwater calculations to ensure compliance with regulatory standards and best practices. The main objective of the project was to convert the existing flat roof to a pitched roof using Britframe and install Britmet's Slate 2000 roofing system. This conversion offered numerous advantages, including improved water tightness, increased insulation, and resolved rainwater management issues. Notably, the internal gutters, which had caused maintenance problems, were relocated externally as part of the new design.Beyond functionality, the new roofing system and structural solution significantly enhanced the building's aesthetic appeal. The modern design of Britframe, combined with the stylish appearance of Slate 2000, seamlessly integrated the property with its surroundings. The improved visual aesthetics added value to the social housing development. One of the key benefits of choosing Britmet's Slate 2000 and Britframe was the assurance of minimal maintenance requirements. Unlike the previous roof covering, which had undergone numerous repairs and reached the end of its life, the new system was designed to be durable and long-lasting. This eliminated the need for ongoing maintenance and reduced future costs for the housing association.Through the adoption of Britmet's Slate 2000 roofing system and Britframe structural solution, the social housing project achieved its objectives of enhanced aesthetics, improved water tightness, increased insulation, and efficient rainwater management. The collaboration between the client and Britmet, from the initial meeting at UKCW to the successful implementation of the project, demonstrated the value of innovative roofing and structural solutions in the social housing sector.
Sponsored
Hounslow House, London

Hounslow House, London

AG Paving and Building Products Ltd

Opened in April 2019 by the Mayor of London, Sadiq Khan, Hounslow House is the new greener-energy HQ of Hounslow Council in London.Building plans for the new purpose-built council offices included a rooftop communal area, and, impressed by what the team at AG could offer, it was agreed that AG’s TerraPave® premium granite flags perfectly fitted the requirement for a smooth granite finish flagstone, providing a more superior product than the original spec while also ensuring significant cost savings on the project.The 500m² area was given a beautiful aesthetic look through the use of our TerraPave® Rimini and Milano Ground (400x400x50mm) which was calibrated and laid on pedestals for speed of construction.Offering an attractive, cost-effective and practical alternative to traditional stone paving, TerraPave® is a favourite choice with architects and specifiers – and this is one project that proves why that’s the case.Dan Smith, AG Regional Sales Manager, said:“AG was able to provide better quality and a keener price on the products used. Furthermore, our team was also able to deliver both the experience and project know-how required to ensure the client received best value for money on the overall project.”

Showing 1801-1836 of 1898

Feedback