NBS Source
I'm a manufacturer

"wall light"

5,185 results found

Sort by:

Showing 1765-1774 of 1774

Sponsored
Llwnderw School

Llwnderw School

Marley Ltd

Western Red Cedar Shingles with FRT Exterior® Fire Retardant Treatment (AA Rating) provided the Welsh Primary School in Swansea with feature cladding to the curved external walls, in order to create what the architect described as a ‘cedar shell’.
Sponsored
The BoTree Hotel, London

The BoTree Hotel, London

Palco

Palco supplied single & double door Riser Doors for both front and back of house. Front of house are panels that have been specifically designed and tested to accept wall paper whilst still achieving a fire, smoke and acoustic certification.
Sponsored
Engine Manufacturing Facility for Jaguar Land Rover

Engine Manufacturing Facility for Jaguar Land Rover

Norwood Group Limited

PROJECT OVERVIEW Jaguar planned a £500m investment for their first in-house engine manufacturing facility. Opened by Her Majesty, it currently produces 400,000 Ingenium petrol and diesel engines a year. Norwood worked with Interserve to deliver this ground-breaking project to the highest standards. The overall project won the Regeneration award at the RICS Awards Grand Final.OUR SCOPE OF WORKThe main challenge was to provide a 120Min fire-rated demountable compartment wall at 11 meters high. Norwood teamed up with Interserve, developing our 200mm Mediline system, which was subjected to excessive laboratory testing to achieve the 120Min Fire Rated certification. In addition to solid partitions, Norwood supplied a 90Min fire-rated 9-meter high glazed partition wall which provided a viewing gallery from the grand reception onto the manufacturing floor.In addition to the fire-rated compartment walls, Norwood provided a self-supporting machine and QC enclosures. The enclosures had to give a clean environment to a GMP standard; therefore, they had their own mechanical equipment, which was all supported by the Norwood enclosure. This was delivered by designing and installing a bespoke PodSolve system which consisted of a hidden ceiling joist system that provided the structural support for the mechanical equipment.Norwood often returns to Jaguar Land Rover providing modifications without business interruption to the build as their product cycle changes.
Sponsored
How to improve learning in the classroom with whiteboard paint

How to improve learning in the classroom with whiteboard paint

ESCREO

Today, visual learning has been recognized as the easiest way the human mind can perceive information. The more technology is developing, the more people get drawn towards the screens. While tech devices have a definite advantage in providing a highly interactive way of introducing ideas, there are also some drawbacks that most people are very familiar with. Sometimes it’s just best to use a whiteboard wall instead. When we think of a classroom we usually imagine a narrow space with a teacher podium and a wall-hung writing board. The whole attention is drawn to the front centre of the room towards a confined writing space. The teacher-student conversation is a one-sided one where students often feel pressure and inability to respond when asked to step in front of the whole class. Who likes being tested before the judging eyes of a whole room of people, anyway? Teachers understood this problem and decided to take action. Driven by the idea to bring learning closer to students, teachers from the 125th Middle School in Sofia, Bulgaria have reimagined the typical classroom with the help of a product that ESCREO has developed especially with children in mind. The school added a clear dry-erase writing space to one of the side walls of a classroom. What happened after that turned their whole teaching system upside down.
Sponsored
Castlehill Private Housing Development, Belfast

Castlehill Private Housing Development, Belfast

AG Paving and Building Products Ltd

AG was delighted to continue our partnership with Braidwater Homes at one of the house builder’s most prestigious private housing development, Castlehill, located just off the Ballygowan Road in Belfast.Braidwater Group’s Chief Operating Officer, Ryan Boyle said:“AG’s paving and walling products which are aesthetically pleasing, tie in totally with Braidwater’s ‘living the dream’ aspirations. For the Castlehill development we had a number of requirements, which included ensuring that the landscaping tied in with the modern feel of this high-end development.” To this end, we utilised AG’s Vertica® and Diamond® retaining walls, where appropriate, together with AG’s River Stone 3’s set pavers in contrasting tones.”AG’s Regional Sales Manager, Barry Scott commented:“We have a really good relationship with the Braidwater Group and are currently involved in a number of their sites across Northern Ireland. The Castlehill contract was an important one for us and we have worked hard to ensure we live up to their high standards. As part of our commitment to Braidwater I personally make visits to their sites to ensure their team always have the products they need. Our personal service supported by speed and ease of delivery is something they appreciate. They also like the fact that by utilising our Anchor® Diamond® mortarless/pin-less segmental retaining wall system their team can work on in wet weather with no breaks in construction.”
Sponsored
BTR Towers, Erie Basin, Salford Quays, Manchester

BTR Towers, Erie Basin, Salford Quays, Manchester

Kawneer UK Ltd

Architectural glazing systems by Kawneer were specified for their “robustness and quality” for two linked 16-storey apartment blocks on the last plot to be developed in one of Britain’s fastest-growing property hot spots - the £37 million BTR (Build To Rent) towers at Erie Basin in Salford Quays, Manchester, a stone’s throw from MediaCityUK.Kawneer’s AA®100 curtain walling features as strip curtain wall to copper-coloured rainscreen areas of the towers at Erie Basin. In addition, AA®110 curtain walling features on link bridges and as floor-to-ceiling screens facing the water. While the AA®100 system uses 50mm sightlines, the AA®110 system uses 65mm but both in this case were zone-drained. They are complemented by AA®541 open-out casement window inserts and AA®720 ultra thermally-efficient entrance doors.The Kawneer systems were installed over eight months by a team of up to 35 from approved specialist sub-contractor FK Group for main contractor GRAHAM and client Glenbrook, the privately-owned property development and investment company, who acquired the site from the Peel Group.The prominent dockside development is GRAHAM’s second project with Glenbrook, with work also underway on another £27 million BTR project in Ellesmere Street, Castlefield, Manchester, which also features Kawneer systems.
Sponsored
Lidl Distribution Centre

Lidl Distribution Centre

Fixfast Ltd

The construction of Lidl's largest Regional Distribution Centre (RDC) in both Great Britain and globally has brought 125,000m2 of class B8 storage to the new 58 acre facility - located just outside London on the M1. A new distribution hub servicing more than 150 Lidl stores in London and the surrounding counties, this RDC is the first to feature automation, bringing over 1,200 jobs to the Luton and Dunstable area. ChallengeFull envelope construction provider FK Construction were contracted to construct the building envelope, cladding the building with Kingspan KS1000MR composite wall panels, fixed back to ultra heavy steel. SolutionBeing a secret fix panel, the fasteners needed to fasten through 100mm of insulated panel to fix back securely to the framing. Fixfast supplied in the region of 500,000 DF25-SSA4-HT fasteners for the construction of the external walls and internal coldstore applications, being able to self--drill through steel up to 25mm thick. Hex headed, available with washers for roof, rooflight or wall applications - and in A4/316 grade stainless steel for maximum corrosion resistance: these fasteners are the solution for fixing into ultra heavy steel.(images courtesy of FK Group)"FK have forged a close working relationship with Fixfast over many years and in partnership successfully delivered a number of high-profile schemes"Alistair Bolton - Construction Procurement Director at FK Group
Sponsored
Bright modern spaces created in quick timeframe with Altro Ensemble

Bright modern spaces created in quick timeframe with Altro Ensemble

Altro

IssueA rental property in Stourport-on-Severn needed a quick refurbishment, allowing the landlord to turn the property around for tenants who were keen to move in. The main areas to be refurbished were the kitchen and bathroom, both of which needed to be fully re-fitted, providing a fresh, clean home for the new residents. ApproachThe landlord had previously worked with Altro products and needed quick to install products, which would provide ease of installation, durability, and ease of cleaning. “We had received information about a new product, Altro Walls ShowerKit, and were keen to try it out. The house needed a quick turnaround as our tenants were waiting to move in. The installer was also keen to have products that were easy to manoeuvre, carry up and down stairs, and resulted in less waste” said S.Birch, Landlord.SolutionAltro Ensemble luxury vinyl tile in colour Pewter Concrete was selected for the kitchen, providing a luxury feel together with comfort underfoot and impact sound reduction.Altro Walls ShowerKit in colour Cool Mineral and Stacked Metro design was selected for the bathroom, partnered with Altro Wood adhesive-free in colour Post Oak. The combination of an Altro floor and wall results in an easy-to-maintain and safe space, giving the bathroom a homely aesthetic, with ease of cleaning and our Altro one in a million slip-resistance reassurance.
Sponsored
Mid Cheshire Hospitals NHS Foundation Trust

Mid Cheshire Hospitals NHS Foundation Trust

CONTOUR HEATING PRODUCTS LIMITED

The refurbishment of children's wards at Leighton Hospital by the Estates Management Team at Mid Cheshire Hospitals aimed to alleviate the distress often associated with hospital visits for young patients. Recognizing the anxiety induced by unfamiliar surroundings, the team prioritized transforming clinical spaces into welcoming environments conducive to children's wellbeing and recovery.Employing an innovative approach, large format prints of wildlife in forest and jungle settings adorned the walls behind beds, accompanied by soft natural colours on walls, panels, and fixtures. The use of RAL Green 6019 on the DeepClean LST radiator guards contributed to the soothing ambiance, seamlessly blending with the floor covering and complementing the blue panelling behind the wall-mounted washbasins. This thoughtful design choice aimed to create a calming and tranquil atmosphere for children during their recuperation.Furthermore, the choice of RAL White 9003 for the guards in the ward corridors maintained a clean and hygienic environment. The DeepClean guards, featuring a patented drop-down front panel for easy access and a BioCote anti-microbial coating, played a crucial role in upholding hygiene standards in critical care areas.To further enhance the natural theme, Contour supplied a column casing finished in RAL Brown 1019, harmonizing with the jungle and forest-inspired décor. This comprehensive refurbishment initiative demonstrates a commitment to not only aesthetics but also the holistic wellbeing of young patients undergoing treatment at Leighton Hospital.
Sponsored
Whitby Hospital

Whitby Hospital

Gerflor Flooring UK Limited

When the local community hospital in Whitby, Yorkshire commissioned a complete re-development and refurbishment of the existing location and buildings, the flooring and finishing throughout the site would need to be of the very highest standards. International flooring specialist Gerflor would supply over 7000m2 of high-quality flooring, together with a selection of Gradus handrails and corner guards for this Procure 22 project.The redevelopment of Whitby Hospital by the team at Medical Architecture has created a modern health and social care hub which supports the integrated delivery of primary care, secondary care, and community services.Louise Drew, Senior Architect, Medical Architecture said, “We chose to specify Gerflor for their outstanding world class flooring products and were pleased that they could also assist us with the wall protection surface needs for the healthcare facility. It was refreshing to know that we could work with both businesses for this iconic refurbishment. We specified the Gradus wall protection solutions, thanks to the innovative products that would enhance the building interiors”.Andy Gordon, Gerflor Key Account Manager, Healthcare North commented, “There was approx. 7000m2 of Gerflor products specified to all areas of the building, along with a number of Gradus Wall Protection solutions for the corridors, clinical areas, stairways, wet areas, toilets, together with storage rooms and X-Ray areas. Overall, it was a significant project that would require innovative solutions.”

Showing 1765-1774 of 1774

Feedback