NBS Source
I'm a manufacturer

"beverage making equipment"

6,559 results found

Sort by:

Showing 145-180 of 1095

Sponsored
Westfield Park - London

Westfield Park - London

DCM Surfaces

DCM Surfaces were contracted to install the surfacing at an “inclusive” play project at Westfield Park, Royal Borough of Kensington & Chelsea.DCM installed Rubber Mulch in various colours and depths around the play equipment on site.Different coloured mulch was used to create shapes and patterns within the park.
Sponsored
Tittensor First School, Staffordshire

Tittensor First School, Staffordshire

Broxap Ltd

Pupils at Tittensor First School love their new PE equipment.The school has invested in a Children’s Activ8 Outdoor Multi Gym, providing a total of eight fitness stations so pupils can enjoy a workout together.The Activ8 puts social inclusion at the heart of school outdoor fitness, attracting even the most reluctant pupils and helping everyone to understand that staying active is important for a long and healthy life.The Activ8 features a range of fun and easy to use outdoor gym equipment.At the centre is the Double Health Walker, which is a bit like an outdoor treadmill. Users march on the spot with their feet in the footboards and their hands on the handrail. This engages the core and gets the legs and lower body moving in a brisk aerobic workout to keep the heart, lungs and circulatory system healthy.Slalom Skiers, which encourage the body to move side to side for good stability and balance, are at either end of the Activ8 multi gym in an arrangement which enables pupils to encourage and motivate each other.The multi gym is completed with a double Waist Twister, wheelchair accessible Tai Chi Discs and a wheelchair accessible arm bike.The Waist Twister, as the name suggests, mobilises the waist and lower body which is complemented by the Tai Chi Discs and Arm Bike for the upper body.As part of our high quality installation service, our teams arranged for the disposal of old equipment and embedded grass mats around the new outdoor multi gym to protect the ground from heavy use.
Sponsored
Double action fire rated doors for Harrods, London

Double action fire rated doors for Harrods, London

Dortek Ltd

Arguably the most famous department store in the world, Harrods of Knightsbridge is a huge retail concern with over 5000 staff members working in over 70,000 square meters of retail space split into 300 plus departments over seven floors.When Harrods decided to redesign their staff food court they required double action doors that were aesthetically pleasing, had a high hygienic rating and were easy to use and they also needed a double action door with a 120 minute Fire Rating.SolutionDortek Installed Polyethylene doors that could be used as personnel doors. They also allow easy movement of trolleys and kitchen equipment between the three distinctive kitchen areas. Dortek also installed double-action 2-hour fire rated GRP doors into a 2530mm wide structural opening to enable staff to bring in large pieces of kitchen equipment when necessary.
Sponsored
Artisan building complex in Fitzrovia, London

Artisan building complex in Fitzrovia, London

Gira Giersiepen GmbH & Co KG

The renowned London project developer Dukelease has renovated six historical buildings in the centre of London, and transformed them into 13 luxurious apartments and penthouses. The apartments were equipped with state-of-the-art building technology – a Gira KNX system with the Gira HomeServer and touch sensors from the Gira E22 in aluminium switch range.
Sponsored
Blackheath Halls

Blackheath Halls

Anderson, GEC Ltd

The conclusion of a far-reaching and detailed refurbishment contract within the country’s oldest purpose-built cultural entertainment venue has included the installation of custom designed stainless steel units and worktop, supplied and installed by G.E.C Anderson for the food preparation area.  The project at the historic Blackheath Halls in Lee Road, South-East London, has been carried out by the equally long established Sykes and Son on behalf of the operating company, a wholly owned subsidiary of the Trinity Laban Conservatoire of Music and Dance. The scope of the work included the redevelopment of the Great Hall, bar and box office/foyer areas. With such construction work as electrical rewiring, plumbing and plastering completed, G.E.C Anderson’s project management team carried out a precise survey of the food preparation area, located to one at the North end of the main bar, in order for the design and fabrication process to commence. While many clients choose to make use of G.E.C Anderson’s standard ranges of sinks and other sanitaryware, the conservation considerations to the work within Blackheath Halls required a bespoke solution. The sector specialist manufacturer’s workshops duly produced a set of three base cabinets in stainless steel, and a single-piece L-shaped stainless steel work-surface with integral sink and splashbacks. Such custom made installations offer a pristine appearance that is ideal for such public facing applications, while helping establishments maintain an efficient cleaning regime essential in achieving the high standards of hygiene essential in commercial premises.   Hannah Benton, Operations Manager for Blackheath Halls whose responsibilities include the servery area, commented: “The refurbishment of the different areas of the venue – including the general building work, updating of plumbing and electrical services and installation of the new servery facilities, was completed to schedule for the reopening in November. All of the equipment matches the scope of the works effectively as well as hygiene requirements.”Since its formation in 1962, G.E.C Anderson has built its reputation for the supply of top end stainless steel sinks and sanitaryware on a combination of innovative design, top quality materials and expert craftsmanship. In addition to the company’s Decimetric system of cabinets, sinks, drainers and other equipment - widely specified for sectors including health and catering – it is able to create custom engineered solutions to exactly fit any space or specification.
Sponsored
Barrow Hall Primary School

Barrow Hall Primary School

Boyco (UK) Ltd

Boyco worked with Ellis Williams Architects in Warrington to design the ultimate coat & bag storage solution for Barrow Hall Primary School, ensuring maximum storage for each pupil. The contract was awarded to Robertson Construction, and Boyco worked with Robertson's to supply & install the equipment smoothly within the given timescales, to ensure a seamless delivery of the project.
Sponsored
White Mint Honed Sandstone Staircase Project

White Mint Honed Sandstone Staircase Project

Stoneworld Oxfordshire Ltd

In this project Stoneworld have supplied and installed a totally bespoke sandstone staircase, created by cladding a poured concrete structure. Stoneworld create a digital template for each piece by using the latest portable scanning equipment onsite. This data is then used to waterjet individual pieces for the step treads and step risers. Read on to see the details of this project
Sponsored
Auchmuty High School

Auchmuty High School

Allgood Ltd

Designed by Fife Council Property Services, the newbuilding constructed at Auchmuty High School inGlenrothes, Scotland, sees the new development replacethe old high school with better learning facilities andadvanced learning equipment.Allgood provided Fife Council with a complete accesscontrol and ironmongery solution, which makes the majorityof the school keyless.Allgood Trio created an advanced access control package,containing proximity readers and access control handlesets, that provide traceable audit throughout the buildingand in addition to the ability to control access to variousareas. The package also included software which allowsthe deletion of a card if it is lost or stolen, providing a betteralternative to the expensive process of replacing lost keys.Allgood Trio also supplied and installed the automatic doorset solution, which satisfied Fife Council’s requirement forthe doors to automatically drive open and remain open inthe event of the fire alarm being activated, providing smokeventilation through the main central core area of the school.The solution also allowed staff to control the main entrancedoors and pupil entrances during specific times. (i.e.granting pupils access during school; start, finish and breaktimes and being locked outside these time periods).The whole package provided by Allgood Trio was deliveredon time and within the clients budget, including theinstallation of both access control and automatic doorsetsby Allgood Trio engineers.
Sponsored
Cardiff High School

Cardiff High School

Gerflor Flooring UK Limited

When Cardiff High school needed a high-quality multi-use sports flooring solution for their main hall, they chose international flooring specialist Gerflor to supply 700m2 of their world class Taraflex® Multi-Use vinyl sports floor. Gerflor also supplied an Isolsport underlay and their ubiquitous Taraflex® Bateco moveable protective covering which would ensure that the Taraflex® sports floor would remain protected during non-sporting activities.The contracting responsibility for the sports floor would be undertaken by Cardiff-based Floor Furnishings Limited. Nick Jefferies, Company Director, Floor Furnishings Ltd commented, “Gerflor’s Taraflex sports floor was extremely easy to lay. The Isolsport underlay also supplied by Gerflor, enabled us to lay the Taraflex Multi-Use directly over the existing concrete floor, this was a real benefit as the project was on a very tight schedule, due to the hall being required for exams.”The Taraflex® Multi-Use is a P1 category sports flooring, designed for both sport and non-sport use making it ideal for multi-purpose areas. Taraflex® Multi-Use protects users with excellent shock absorption and impact protection of 25% to 35%. Yet it’s tough enough to protect itself against non-sport demands often found in many education environments such as the movement of tables, chairs, and exercise equipment.
Sponsored
Höllentalanger Hut

Höllentalanger Hut

Schöck Ltd

The Höllentalanger, at 1387m, short of halfway during the initial ascent from Germany's highest mountain, the Zugspitze, is a 'hut' millions of climbers have found shelter since 1893. Despite modernisation over the years however, the building had to be closed in autumn 2013.A replacement building was needed – and quickly too. Stephan Zehl, an architect from Munich, won the tender with his three-level, stepped building design. It has pent roof borders, which protects against avalanche risk from the eastern side; and meets all necessary current standards in providing dining facilities, equipment rooms, drying and shoe rooms and comfortable accommodation to sleep 100 people.During autumn and winter, all paths to the Höllentalanger are closed-off, as the Alpine climate makes it impossible to work for eight months of the year. Even in good weather, there are only walking tracks to the Höllentalanger, with no road access at all – so everything had to be flown in by helicopter. Rapid assembly and efficient transport costs were therefore critical to the budget and a combination of timber and pre-cast element walls were the chosen method of construction. Core-insulated prefabricated element walls were supplied for the ground level building. Due to the extreme temperature fluctuations, the concrete is subjected to pretty extreme expansion and contraction conditions. To counter this and to combat thermal bridging, it was important to install Schöck Thermoankers.
Sponsored
For better performance in educational labs

For better performance in educational labs

BROEN-LAB

A modern laboratory for educational use needs to perform every day. Students and researchers work under tight time constraints and must deliver high quality results. There is not much room for downtime if equipment fails or an incident happens. BROEN-LAB offers flexible laboratory solutions and emergency shower systems that work reliably for year after year.
Sponsored
Lewes Cycle Hub

Lewes Cycle Hub

Cyclepods Ltd

Lewes Cycle Hub was a full turnkey project for Cyclepods. We were involved in every step of the process from designing the initial Hub concept to carry out installation and fully equipping the Cycle Hub with state-of-the-art facilities such as access-control, CCTV, gas-assisted two-tier racks and bike pump and repair stand.
Sponsored
St Johns School, Ealing

St Johns School, Ealing

Redlynch Leisure Installations Ltd

We completed this large redevelopment of this school’s playground in Ealing, West London, over the summer holidays. The teachers were looking for two separate zones for older and younger children, with the junior zone to feature challenging, stimulating equipment .The Lappset Motoric Track acted as a perfect centrepiece for the area, being able to entertain large numbers of users for busy break and lunch times. The 6 tower structure features interlinked climbing nets, rope bridges, fireman’s pole, a large slide, climbing panels, and much more, giving hours of endless fun. A space net climbing frame is positioned adjacent to the track, providing additional climbing and challenge for older aged children.The younger age zone is comprised of an exciting multiplay structure, natural themed trim trail, and two crawl tunnels under earth mounds.The equipment was constructed from glue laminate timber and green panelling, to blend in with the treelined surroundings of the play area. For the surfacing elements of the works, artificial grass was selected, to compliment the natural aesthetic. 
Sponsored
BMI Regional Installs Specialist Aviation Industry Floor Finish

BMI Regional Installs Specialist Aviation Industry Floor Finish

Flowcrete – a brand of Tremco CPG UK Ltd

The commercial airline’s hangar at Aberdeen International Airport was in need of a new floor coating, as the old surface was showing signs of age and wear. The epoxy coating Flowcoat SK was chosen to create a seamless floor that would be able to maintain an unblemished, impervious and easy to clean finish despite the movement of planes, exposure to Skydrol hydraulic fluid and heavy onsite equipment.
Sponsored
Metalseal metal roof coating installation

Metalseal metal roof coating installation

Liquasil Ltd

Metalseal 20 was specified as part of an industrial unit refurbishment project. Metalseal is the only BBA Approved metal roof coating on the market and the only one to come with a Latent Defects Insurance Guarantee. This is a single coat application, in this case, using brush and roller to avoid the risk of over-spray which can occur when using airless spray equipment.
Sponsored
MEDITE® TRICOYA® EXTREME stands up to the elements of the Lake District

MEDITE® TRICOYA® EXTREME stands up to the elements of the Lake District

MEDITE SMARTPLY

In order to protect budding hikers, climbers and visitors to the area, Coniston Mountain Rescue has been patrolling the territory for over 70 years. Pivotal to their job is the ability to store lifesaving equipment, such as stretchers, warm clothes and ropes, in the mountainous region, which is why they have constructed their iconic blue boxes throughout the region,with MEDITE® TRICOYA® EXTREME.
Sponsored
Horsham Cycle Hub

Horsham Cycle Hub

Cyclepods Ltd

This Cycle Hub at Horsham Station is the third Hub that Cyclepods have installed for Southern Rail as part of their Cycle Provision Scheme. The Hub has 130 bike spaces using the Easylift+ two-tier storage system and is fully equipped with CCTV, Bike Pump & Repair Stand, Motion Sensor Lighting and Secure Access Control System and push release exit.
Sponsored
How to Simplify Maintenance with an Electric Lifting Winch

How to Simplify Maintenance with an Electric Lifting Winch

Penny Hydraulics Ltd

Precautions required to prevent falls from height can be costly and disruptive to operations. Where a ladder is not appropriate, scaffold towers, scissor lifts, and warehouse cherry pickers, are commonly used to safely perform cleaning and maintenance at height. Lighting for instance, is essential to every business and is one of the most frequently accessed suspended assets, using powered access equipment.
Sponsored
Protecting a primary school from water damage by providing a leak detection system

Protecting a primary school from water damage by providing a leak detection system

Andel Ltd

After a prestigious school near Birmingham suffered extensive damage when a leak went unchecked, we installed our award-winning leak detection system to prevent future devastationA tiny leak left to escalate at St George’s in Edgbaston ruined thousands of pounds of property and equipment and left the school without a properly functioning IT department. Leaks within buildings are very common and if not monitored can cause extensive damage, disruption and loss. So, once the school was back on its feet, we were delighted to work with their insurer, Hettle Andrews, to make sure the property was protected against future flooding. St George’s School, EdgbastonSt George’s School is a fully co-educational independent day school for children from ages three to 18 in Edgbaston, near Birmingham. Established as a charitable trust, the school opened in September 1999 as Birmingham’s first independent school to offer a complete education for boys and girls from kindergarten through to the sixth form.We worked with their insurance broker, Hettle Andrews, who facilitated the project. Hettle Andrews works primarily with schools, universities, colleges and charities. In the winter of 2021, the boiler in the room above the IT department of the school began to leak. The school was closed for the holiday period so no one went on-site and the leak went undetected. On return to the school in the New Year, staff discovered the leak which by that point had caused extensive damage.  The leak had not only destroyed the ceiling and light fittings but the whole IT department below including computers, carpets, plug points and furniture. The challengeNo warning: this was the first time anything like this had happened. There were no warning systems in place, nor were there any preventative measures. Extensive damage: the full ceiling had to be replaced, along with expensive light fittings, computers and IT equipment.Inconvenience: it resulted in substantial inconvenience and downtime for the department which in turn affected its daily function within the school.Disruption: the IT department had to be relocated elsewhere in the building, along with any remaining functioning equipment. Time-consuming process: while the damages were being claimed on insurance, the room was cleared and de-humidifiers installed to try and remove any remaining moisture.The solution;Andel Floodline®Andel's unique, award-winning water, oil and gas leak detection and monitoring solution. We are one of the global market leaders in leak detection systems and we knew our Floodline® solution would be a perfect fit. It is a true hybrid that can report to a single integrated control panel – unlike some other systems that require different alarm panels for different types of leak detection.Floodline® covers all possible leak detection requirements, from single-zone to multi-zone and distance measuring systems, with the capability to protect the largest of buildings, both old and new. Floodline® systems allow additional zones, sensors and upgrades to be added easily and cost-effectively so it is future-proof. So, we installed Floodline® SVCP – 2-Valve Control and Floodline® 1-Zone Leak Detection System. This means the school is now able to: Easily monitor all the Floodline® leak detection sensors installedEasily monitor the display LEDs which provide clear alarm information and system status for both leak detection and system faultHave peace of mind knowing the solenoid valve control panel will immediately close two solenoid valves in the event of a leak, ensuring the water source is stopped, preventing any damageBe alerted quickly as there is an audible alarm with a mute functionBe alerted when away from the property as output relays connect to a GSM communicator which sends out an SMS.The result;Bespoke solution: we were delighted to be able to come up with a tailored solution for St George’s School. Early warning: the boiler room at St George’s Edgbaston is now equipped with a bespoke leak detection system that will give early warning should there be any escaping water detected.Confidence: the client feels relieved and more confident now that our leak detection systems have been installed. Peace of mind: knowing they will no longer have to worry about leaks especially when there is no one on-site. Futureproofed: the school knows their chances of this occurring again and their building and equipment being unprotected have now drastically dropped. Community: as schools are the hubs of most communities, the last thing we want is for their day to day operations disrupted by escaping water, something which can be detected early and solutions provided easily. We are proud to have been involved in this project alongside Hettle Andrews and hope to work with more of their clients in future to provide proactive solutions.What the customer said;“We are relieved and more confident now that our leak detection systems have been installed. It has given us peace of mind, knowing we no longer have to worry about any leaks going undetected and resulting in catastrophic damage. The chances of this occurring again, meaning our building and equipment is unprotected, have now drastically dropped. We are really happy with the services and products provided by Andel and would happily recommend them.”Patrick Ryan, Maintenance Manager, St George’s School
Sponsored
Sterillo Out The Washroom

Sterillo Out The Washroom

Heat Outdoors & Handy Dryers

Sterillo Hand Dryer and Sterillo UNO have understandably been flying out of our warehouse in recent months. Our washroom sterilisation equipment was primarily being used in just the one room, but thanks to Sterillo UNO – a complete air sanitisation unit without a hand dryer, we have seen customers finding other purposes and locations for them to be used.
Sponsored
Children’s Clinic Erlangen

Children’s Clinic Erlangen

Record U.K. Limited

The children’s’ clinic at the University Hospital of Erlangen treats pre-mature and newborn babies, children and teens of all ages. To ensure optimal care, depending on the medical condition and age, it has various departments and clinics staffed by experienced paediatricians, equipped with modern diagnostic and therapeutic tools and techniques. They work closely with highly qualified nurses, physiotherapists and educators for the health of its young patients.
Sponsored
Oxford Biochemistry – Phase Two

Oxford Biochemistry – Phase Two

Sika Limited

With an acclaimed biochemistry building constructed in 2008, the University of Oxford appointed main contractor, Laing O’Rourke, to build the £73m phase two expansion of the facility.The institution required extra space for the faculty and the new building would house very specialised equipment.With respect to a partnership agreement with the University of Oxford spanning 20 years, it was important for Laing O’Rourke to select the right partner for the project.
Sponsored
University of Bristol

University of Bristol

Advanced

The University of Bristol has upgraded its emergency lighting with a further 10 LuxIntelligent emergency lighting panels from Advanced. The new equipment was installed alongside 21 existing LuxIntelligent panels linked to around 4,500 light fittings, to ensure ongoing compliance with the BS 5266-1 code of practice for the emergency lighting of premises.The LuxIntelligent panels were fitted across a range of university buildings, including seven halls of residences, using existing cabling. The ease with which LuxIntelligent can be used to replace outdated emergency lighting on existing sites allowed significant time and cost savings to be achieved.In total, 31 LuxIntelligent emergency lighting panels from Advanced now protect numerous buildings across the University of Bristol, linked to a wide variety of LED luminaires from the LuxIntelligent range, to protect buildings with very different lighting requirements. They include downlighters, spotlights, exit signs and bulkhead lighting that complement equipment already installed in the historic Victoria Rooms and the Wills Hall halls of residence, as well as operating theatres and abattoirs in the veterinary college campus.
Sponsored
Specialist hygienic door design for Cambridge Biomedical Campus (CBC)

Specialist hygienic door design for Cambridge Biomedical Campus (CBC)

Dortek Ltd

Cambridge Biomedical Campus. (CBC) created a vibrant and groundbreaking health care community at the forefront of science and medicine.Dortek’s brief was to supply and installation of doors to a very specific programme, across primarily 3 floors.Our Dortek doors were installed within the BRF rooms, laboratories, holding room, procedure rooms, CL3 labs, equipment store, changing rooms, and circulation routes. The type of doors we installed were GRP hinged and sliding in stainless steel frames, many with integrated privacy panels.SolutionThe particular project requirements that made our doors suitable was the durability, acoustic performance, non organic door quality of our SS frame which ensures suitability to this environment. The SS frame had previously been used at Francis Crick Institute also. We fulfilled the clients expectations by meeting the specification and programme, and working closely with planners to interface with other trades. There was some complexity about the project as most doors are very large for equipment access and some have acoustic requirements, also to include is there are a lot of doors in a concentrated area.
Sponsored
INOVYN Height Safety Day

INOVYN Height Safety Day

MSA Safety (Latchways) – Fall Protection

MSA Safety’s recent Height Safety Day gave nearly 100 workers at INOVYN’s Runcorn site a first-hand look at how the global safety equipment manufacturer is innovating in fall protection and brought them up to speed on the latest regulations. The information day took place at the INOVYN site in Runcorn, owned by INEOS Group, a global manufacturer of petrochemicals, specialty chemicals and oil products.
Sponsored
PUWER regulations in a nutshell

PUWER regulations in a nutshell

Penny Hydraulics Ltd

Health and safety regulations can seem complicated and confusing to even the most experienced employers, and PUWER is no exception.If you’ve ever wondered how PUWER regulations affect your business, read our full guide today, where you’ll find out exactly what you need to do to ensure your workforce abides by the work equipment regulations and satisfies health and safety laws.
Sponsored
Duoflex hot melt structural waterproofing system for new hospital

Duoflex hot melt structural waterproofing system for new hospital

Soprema UK

A brand new hospital in Middlesex will deliver efficient and much improved care to it’s patients. The hospital includes new wards, an extension on one of its existing wings as well as the relocation of its existing energy centre. With so much investment in the new hospital including state-of-the-art equipment, the roof design needed to be robust, provide security and require minimal maintenance throughout its lifetime.
Sponsored
Stafford College - Sauna & Steam

Stafford College - Sauna & Steam

Sauna360 Ltd

Helo completed a custom designed steam room and sauna for Stafford training college. The health suite is part of the training facilities which include spa therapies. Both rooms feature unique Helo equipment and design systems to provide an environment which is attractive and comfortable.The final health suite finishes have the look of a luxury hotel but have been delivered within a strict budget and timeframe.
Sponsored
Omicron Service & Training Centre

Omicron Service & Training Centre

Excelsior Panelling Systems Ltd

The ProjectNew Build, State of the Art facility offering full-scale test equipment to create a realistic, complete test setting – ideal for training.  The facility is intended to offer a range of professional courses for technical staff from electrical utilities, industrial plants, equipment manufacturers and service companies. Space Invader architects designed the high-quality refurbishment and specified Excelsior to manufacture and deliver the washroom package.  The ChallengeThe washrooms form part of a £2 million build for Omicron. The building itself in its design and quality is at an extremely high standard.  All the latest technology from fittings, desks to equipment have been considered and the washrooms needed to equal this standard. The Architects vision was to create Superloo facility affording the user complete privacy and comfort which is what is expected in modern buildings.  The Solution Excelsior Flush 30 Full Height Cubicles provided complete privacy for the user and a flush frontage complete with aluminium rebated edge detail to the doors and pilasters enhance the cubicle system and protect the meeting styles.Vibrancy has been created throughout the building’s interior and exterior on this project and white cubicles with a vibrant pop of yellow on the cistern panelling created just the right finish.Built by Pave Aways, the building was handed over to a very happy client in September 2017.Flush 30 Cubicle (Floor to Ceiling)SpecificationProduct Range: Flush 30 HPLDoors: HPL Bonded onto 28mm MR Core, Blanc Megeve B070, rebated HPL/ABS edge detail.Pilaster: HPL Bonded onto 28mm MR Core, Blanc Megeve B070, rebated HPL/ABS edge detail.Partition: HPL Bonded on 18mm MR Core, Blanc Megeve B070 with matching HPL/ABS edge detail.Ironmongery: Stainless Steel
Sponsored
22 Bishopsgate, London - 60+ storeys of EuroPipe

22 Bishopsgate, London - 60+ storeys of EuroPipe

BLÜCHER UK Ltd

The second tallest building in the United Kingdom, and tenth largest building in the world is home to an impressive amount of BLÜCHER EuroPipe! All 62 floors are equipped with stainless steel drainage, from RWP, SVP and food vacuum systems to interceptor foul drainage and disconnecting traps for rainwater.The project spanned over two years, and it was a no brainer that our lightweight, adaptable and push fit system was chosen as the sole supplier.
Sponsored
Bespoke locker solutions for emergency services

Bespoke locker solutions for emergency services

LinkLockers

Case Study for West Yorkshire PoliceStaff lockers and equipment storage forthe emergency services is an importantaspect of keeping working environmentsclean and safe, whilst ensuring ease ofaccess for quick turnaround times.When items to be stored in lockers have a very specificpurpose a bespoke solution is often required. We are ideally placed to supply expertly designed installation’s which meet truly unique requirements.
Sponsored
Burdett Road - Canary Wharf

Burdett Road - Canary Wharf

DCM Surfaces

DCM Surfaces were delighted to install Wetpour onto the Rooftop Terrace at Burdett Road in Canary Wharf.The affordable housing project, which rises from 7 to 11 stories, included the development of 56 residential units, amenity space, cycle parking, and a play area on the roof terrace.Four colours of Wetpour was used to create a variety of graphics at various depths around the play equipment area.
Sponsored
Institute of Oncology and Radiology

Institute of Oncology and Radiology

Knauf Ceiling Solutions Limited

Pushing Forward WellbeingThe Belgrade-based Institute of Oncology and Radiology symbolises hope in the fight against cancer. It sets a new standard with state-of-the-art equipment and a room concept designed for patients first, pushing forward wellbeing as a constitutive element of patients' recovery.With the support of our ceiling experts in Serbia, Knauf Ceiling Solutions provided 1,200sqm of acoustic solutions for the clinic building with a strong focus on hygiene requirements.
Sponsored
Retractable Roof Access Ladder and Hatch - Case Study

Retractable Roof Access Ladder and Hatch - Case Study

Premier Loft Ladders Ltd

Premier Loft Ladders were contacted by a specialist food processing plant to replace a damaged retractable roof access ladder. As this presented the only means of access for maintenance of roof top equipment, it was important that the replacement access ladder was strong, durable and easy to operate. The Supreme with flat roof access hatch provided the perfect solution. Please follow the link below to learn more about this high-specification project...
Sponsored
Warm tones and clean lines for bathroom with Altro Walls ShowerKit

Warm tones and clean lines for bathroom with Altro Walls ShowerKit

Altro

IssueA 15-year-old bathroom in a housing development was looking tired and dated and the owner wanted to refresh the area with minimal disruption in a quick timescale. The bathroom had three walls of ceramic tiles, and a sink splashback, which were in good condition but were unfashionable and required high levels of maintenance to remove limescale and mould.The property, a first floor flat, had easy access but no lift, so equipment, materials and any waste needed to be carried up and down the stairs.Approach“We wanted to replace the ceramic tiles, without having to re-plaster the bathroom walls which would mean a complete renovation and redecoration project,” said Helen Green, the owner. “We live in an area with hard water and limescale is a real problem so a wall that is easy to keep clean would be ideal.”SolutionAfter liaising with Altro customer services, the new Altro Walls ShowerKit was recommended as being the ideal solution as the wall panels can be installed over existing ceramic tiles and provides ease of maintenance for residents. There is also no requirement for construction materials or heavy equipment as Altro Walls ShowerKit is lighter to transport than ceramic tiles.
Sponsored
Type Glide - Student Loans Company

Type Glide - Student Loans Company

London Wall Design Ltd

Student Loans Company (SLC) are a non-profit making government-owned organisation that administers loans and grants to students in colleges and universities in the UK. Since 2008, one of SLC’s main offices has been located in the North Eastern town of Darlington at The Memphis Building.What was once part of a wool factory is now a leading open plan workspace for hundreds of staff. Over the last fifteen years, the interior has undergone a number of major changes to accommodate the SLC team’s ever changing needs – including the design, manufacture and installation of multiple Glide moving panel systems we delivered in 2021.SLC wanted to implement a solution that would allow them to re-configure the large, open plan and create smaller more private areas for staff when required. All panels are top-hung, meaning there is no obtrusive floor track. Despite this, each individual panel can be locked in to position thanks a foot-operated compression bolt.Half of the panels are equipped with a drywipe surface which allows for extra writing space during team meetings, presentations, brainstorming sessions and more.The other half of the panels feature PET polyester, which incorporates custom cut-out shapes in a variety of colours. In addition to providing a uniquely textured finish, the PET panels offer protection from noise distraction thanks to the material being sound absorbent.The aluminium panel frames – which have been painted to match the PET finishes on show – ensure durability, increasing the system’s lifespan.

Showing 145-180 of 1095

Feedback