NBS Source
List your products

This case study is no longer available

Horsham Cycle Hub

by Cyclepods Ltd

  Favourite

This Cycle Hub at Horsham Station is the third Hub that Cyclepods have installed for Southern Rail as part of their Cycle Provision Scheme. The Hub has 130 bike spaces using the Easylift+ two-tier storage system and is fully equipped with CCTV, Bike Pump & Repair Stand, Motion Sensor Lighting and Secure Access Control System and push release exit.

Read more

No featured products in this case study

Contact Cyclepods Ltd by clicking the button below to find out which products were used in this case study.