NBS Source
I'm a manufacturer

"ground water control trench sheeting etc"

18,151 results found

Sort by:

Showing 1729-1764 of 1898

Sponsored
Host Helix Student Accomodation

Host Helix Student Accomodation

Polyroof Products Ltd

The Host Helix building, also known as the “Helter-Skelter,” was a unique and striking structure built in 2011 with stunning views of North London and Wembley Stadium. Over time, the building experienced general wear and tear and water began to enter the buildings’ complex structure.Polyroof Products were called in to consult with the clients and offer a seamless, encapsulated solution that could address the many unusual details associated with the building’s design.The SolutionA full survey of the roof terrace areas was conducted by the Polyroof Technical Services, after which a bespoke specification was produced for the works. The proposal document detailed a comprehensive set of recommendations for producing a seamless solution to encapsulate the problematic roof, therefore solving the issues that had arisen over the years due to its condition and age, as well as the issues associated with the original design of the pitched, curved roof.Polyroof SA Carrier Layer was then applied over the cement particle boards with Polyroof pre-formed GRP Drip Trims fixed to the external edge. For continuity and to create a uniform finish, the SA Carrier Layer was extended onto the main roof sections as a substrate for the Protec system.Any details requiring local reinforcement were treated with Protec Resin and 75mm wide Polymat 450. The curing process was allowed to take place. To accommodate structural expansion / contraction movements at appropriate details, 25mm disbondment tape was installed prior to local reinforcements.The first coat of Protec Resin and Polymat 450 was applied at a minimum coverage rate of 1.3 – 1.5Litres/m² (0.66 – 0.77m²/Litre) and was allowed to cure. To complete the system, a second coat of Protec Resin was applied at a minimum coverage rate of 0.5Litres/m² (2.0m²/Litre) and was allowed to cure.ComplexitySuch an iconic building in the local community, the client wanted to protect the original aspects of the building to the fullest extent, so the Protec system installed at the perimeter was color-matched to the original blue and grey colours. This was achieved by blending pigments until they matched the desired colors, in turn the pigment was then blended into the Protec resin before application. The survey revealed concerns about the original building designs from 2011 and the roof’s drainage system. Due to the roof’s pitch, rainwater was cascading down the curved slopes at high velocity and causing water to bounce into the building under the original capping.After many discussions between the main contractor and Polyroof, as well as the provider of the external cladding, it was agreed that the perimeter detail needed to be encapsulated with the new waterproofing system to prevent further water ingress. Fire-retardant cement particle boards were fixed to the internal and top faces of the external parapet walls, and the Polyroof SA Carrier Layer was applied over them with Polyroof pre-formed GRP Drip Trims fixed to the external edge.The Protec System was then applied to encapsulate the entire parapet detail, meaning its waterproof integrity would be covered under the Polyroof Guarantee. The curvature of the building added complexity to this process, and the contractor took great care in cutting the trims to size and fixing them to the external edge to ensure they followed the profile of the structure. Due to the building’s height, all the trims were face-fixed to prevent wind uplift.WorkmanshipIn order to improve drainage and prevent water from accumulating in hotspot areas of the roof, the contractors were instructed to install new internal curved gutter channels at the point where the roof and building met. These channels were designed to have a sufficient height and angle to effectively direct rainwater towards the outlets, preventing water from pooling on the roof. However, the installation process was made more complex due to the curved nature of the building’s architecture, which required careful measurement and customization of the gutter channels to fit the unique shape of the building.Additionally, the contractors had to consider the many joins of the gutters and how they would hold up to the elements over time as the building structure expands, contracts and moves. Extra steps were taken to ensure the gutters liquid membrane was properly sealed and secured to prevent leaks.The contractors were instructed to repair all protrusion and mansafe post details as necessary in order to allow the Protec System to be installed to a minimum height of 150mm, and to terminate it underneath a suitable weathering flange or jubilee clip. In addition, all right angles were to be reinforced with double taping. Any protrusions that were liable to significant movement was required to have disbondment i.e., bond break, tape applied to it to stop the external coating from stressing on expansion. Furthermore, all pipes were to be abraded, solvent wiped, and where necessary, primed in accordance with the Polyroof coatings manual. A flashing detail was also to be created with a weathering flange or seal.All outlets were inspected to ensure that they were functioning properly. Any outlets that were deemed unsuitable were replaced with new ones. The outlets were cleaned, prepared, and primed as necessary. The Protec system was then dressed into the outlets as far as was practical. The inspection and replacement of the outlets and the preparation of the Protec system helped to ensure that the drainage system functioned effectively.ConclusionThe refurbishment of the roof was completed within the client’s target timeframe and budget. Following a final inspection by Polyroof Technical Services, which highlighted quality workmanship of Tower Asphalt Ltd, the client received Polyroof’s trusted Accredited System Guarantee and now has the peace of mind the roof will be leak-free for decades to come.
Sponsored
Croft Gardens, Cambridge

Croft Gardens, Cambridge

Cellecta Ltd

Croft Gardens is a four building student accommodation at King’s College in Cambridge, achieving full Passivhaus Classic standards. With 12 rooms across three floors of three crescents and a villa, along with the Victorian Holmcroft building which provides a library, laundry room and common room area, Croft Gardens provides 84 homes for graduate students. Including graduate rooms, communal facilities, landscaping and external works, Croft Gardens will be carbon negative for the first 7-10 years of operation.Cellecta’s HEXATHERM XFLOOR 500 was specified by Feilden Clegg Bradley due to its high resistance to compression and closed cell structure that provides unrivalled resistance to water absorption, making them ideal for residential applications. These insulation boards are used under a concrete slab to comply with part L Building regulations.Gilbert-Ash was awarded this 650m² contract for this development at Barton Road.
Sponsored
Timber Yard, Birmingham

Timber Yard, Birmingham

Cellecta Ltd

Timber Yard consists of two residential buildings made up of a collection of 379 modern apartments in Birmingham’s Southside district. The East Block features stylish one, two and three bedroom apartments, while the West Block includes a mix of studio, one and two bedroom apartments; both buildings surround a private courtyard garden. This development provides leisure facilities such as a gym, concierge services, a club lounge and screening lounge, and parking. The location is pedestrian friendly, with Birmingham New Street and Birmingham Moor Street walkable within 10 minutes.Cellecta HEXATHERM XFLOOR 250 was specified by Claridge Architects on this project for its high resistance to compression and closed cell structure that provides unrivalled resistance to water absorption, making them ideal for residential applications.Galliard Homes and Apsley House Capital were awarded this 7,500m² contract to construct this development.
Sponsored
Myatts Field North, Lambeth

Myatts Field North, Lambeth

Cellecta Ltd

Myatts Field North is a major regeneration project in the London borough of Lambeth, the development consists of 808 new homes, and 172 refurbished properties with 10 per cent fully accessible to wheelchairs. New streets, green spaces, play areas, landscaped park with two seven-a-side football pitches, multi-use games area and a play area, community centre, local store, commercial units, and an energy plant which provides reliable and efficient heating and hot water were also installed.Cellecta’s ScreedBoard 28 was specified by PRP Architects due to its ultimate single layer acoustic overlay treatment. It is frequently reviewed as the solution of choice for new build and refurbishment developments. Its high density and unique resilient layer provides an unrivalled acoustic performance.Regenter Ltd was awarded this 50,000m² contract to construct this regeneration in South London.
Sponsored
Education | Rainbow Nursery

Education | Rainbow Nursery

Venesta Washroom Systems Ltd

A functional, child-friendly washroom design featuring Genesis toilet cubicles was created for Rainbow Nurser. The nursery opted for Venesta’s Genesis toilet cubicles, a popular choice for early education settings due to it's versatility and many customisable features including low-level doors and curved partitions. The toilet cubicles were specified in High Pressure Laminate (HPL) making them ideal for nursery usage, allowing for easy cleaning and simple maintenance, meaning they really will stand the test of time.For cost savings and reduced installation times, our Vepps pre-plumbed panelling system was specified. In addition, low level vanity units were installed featuring semi-recessed basins. A favourite for our youngest customers as they don’t get the water from the basin on their clothes when washing hands. Read the full case study for more details.
Sponsored
Structural Repairs- Office Archway Restoration

Structural Repairs- Office Archway Restoration

Stonehealth Ltd

Structural Repairs’ office space was beautifully and seamlessly integrated into one of Windsor’s iconic train station arches. This newly built office space boasts from its impressive structural logistics and boldly featured decorative and themed memorabilia at many of its cozy corners.Via a combination of the fire grit machine, TORC system (seen in the images and videos), water by pressure and a DOFF system, the carbon accumulated in the brickwork was removed. These methods, especially the DOFF system, work with high-pressure stream and extremely high temperatures.Brick cleaning is an arduous and labor intensive process by which a brick masonry, also known as a layer of brick which has been laid on the wall’s outermost surface, is cleaned. Brick cleaning is required at various different stages of a building’s life, and with our arch, a cleaning was more than overdue to restore it back to its original condition!
Sponsored
D-marc - demarcation a Collective Protection Solution

D-marc - demarcation a Collective Protection Solution

Safety Fabrications Limited

D-marc 105TM demarcation system – a collective protection demarcation solution. The doctrine “prevention is better than cure” is one that rings true in so many instances. Common sense tells us that it much better to prevent a fall than it is to arrest the fall once it has occurred. The Working at Height Regulations (WAHR’s) 2005 reinforce this argument. Whilst in many instances it is not always practical to remove the risk of a fall; rainwater outlets will always require cleaning, rooftop plant will require regular maintenance etc.. there are a number of ways to protect the worker from the immediate hazard the fall presents. The simplest way and that which much closely echo’s the doctrine “prevention is better than cure” is to keep the worker away from the fall hazard. The most effective way of achieving this and that which is advocated by the WAHR’s is through the provision of a Collective Protection solution. A collective protection solution is one which will “collectively protect all those who access the area”. In a rooftop situation where the hazard is a fall from the roof edge, Collective protection can be achieved by raising the parapet or through the installation of a full perimeter guardrail. Alternatively the worker can be kept a safe distance from the roof edge through the installation of a demarcation system. –Health and Safety in Roofwork HSG 33 states that “where work is not done at the edge, demarcation barriers can be provided at a safe distance from the edge (usually at least 2 meters), e.g. work on an air conditioning unit in the middle of a roof.”.      An example of where The D-marc demarcation system has recently been specified and installed at Crown Woods College, Eltham to provide safe access to rooftop mounted plant. The client was looking for a solution that would;Provide a collective protection solutionNot penetrate the existing roof covering and therefore not compromise the roofs waterproofing or air-tightness.Be lightweight so as not to require an additional support structure.Provide easily identifiable access routes ensuring no exposure to fall hazardsBe low maintenance and ideally have good environmental credentials.  D-marc was able to meet all these criteria and has the additional benefit of giving the customer the piece of mind that whilst it does not rely upon any means of mechanical fixing to the roof structure, it is tested to withstand wind speeds in excess of 105 mph. Such testing is a requirement of BS6399-2 Code of Practice for Wind loads which states that all components that form a building are required to withstand a 1 in 50 year wind speed.   D-marc was used extensively on the project as part of the collective protection demarcation system to create clearly defined safe access routes across the roof to theplaces requiring regular maintenance work. Having created the safe routes to the places of work, the D-marc was then used to demarcate the safe working zones upon the roof top. To ensure a complete collective protection solution was provided in isolated areas where it was not possible to keep the worker away from the fall hazard a guardrail was used. The easy to install, non penetrating D-marc system creates a clearlydefined access route and a safe working zone for all those undertaking regular rooftop maintenance works.
Sponsored
Multipart Flushglaze And Three Wall Box Rooflights Provide Unrestricted Access To Terrace In Remodelled London Office

Multipart Flushglaze And Three Wall Box Rooflights Provide Unrestricted Access To Terrace In Remodelled London Office

Glazing Vision Ltd

Barr Gazetas worked closely with BW: Workplace Experts and Glazing Vision on the remodelling of this contemporary yet classical office building which involved creating an accessible private terrace for staff and clients to enjoy the views of central London, as well as providing the 6th floor with natural daylight. Utilising a terrace in densely populated areas such as London is a great way to provide a building with more accessible space. Originally the 6th floor offered 2,821 sq ft of space, but with the addition of the terrace area, this increased to 3,790 sq ft.Not only does an accessible terrace supply you with extra room, but, in London, the presence of a roof terrace typically adds 12% to the value of a property, rising to as much as 25% in coveted Chelsea. Other benefits of access rooflights include improved natural ventilation, control of interior temperatures, and the result is also beneficial to the aesthetics of a building such as 6 Duke Street. Barr Gazetas chose Glazing Vision not only due to our vast experience in designing and manufacturing access rooflights, but also for our ‘start to finish’ service. All of our rooflights are designed and manufactured at our HQ in Diss, and we even offer an installation service via our sister company, Glazing Renovations, which provides our clients with peace of mind.Box rooflights are a great way to gain easy access to any roof terrace. Operated at the touch of a button, the user simply climbs the stairs whilst the rooflight is retracting into its open position and walks straight out onto the terrace. Our three wall box configuration is one of the most popular and can offer an almost seamless integration into the fabric of your building. On this particular project, the sliding section when open provides a clear opening of 1927mm on the left side when viewed from the outside and is glazed on the front and top with a built-in fall of 3 degrees, and mounted to walls at the rear and two sides. The rooflight also includes the optional extras of a proximity detector and a battery back up. The rooflight was crane lifted to the terrace so that installation could be carried out by Glazing Renovations.Our Multi-Part Walk On Rooflight has supplied the 6th floor with a large amount of natural daylight which is proven to boost vitamin D, help improve sleep, and can help boost focus. The rooflight also includes Enduro Shield glass protection which provides superior resistance against contamination caused by moisture, hard water, all types of dirt, lime scale, salt spray and pollution, and also helps protect against degradation, staining, corrosion and etching. Our standard glass specification on our Flushglaze Walk On Rooflight is designed to withstand regular foot traffic in domestic applications with uniform loadings of 1.5kN/m² and concentrated loadings of 2.0kN in accordance with EN 1991-1-1-1:2002.The two rooflights perfectly complement each other and work together to provide a vast amount of natural daylight whilst creating a visually impressive, accessible terrace area.“The Walk On Rooflight was key to providing as much light to the floor below as possible, and the box rooflight was a great feature to the terrace, providing easier access than a ‘hatch’ access product.” Pradumn Pamidighantam, Senior Architect, Barr Gazetas.
Sponsored
Royal College Strathclyde

Royal College Strathclyde

INTRAsystems

A Very Victorian Problem The Royal College Building is Category B listed. Designed by David Barclay, the 190s, gargantuan 4-storey Italianate college is a monument to Victorian architecture. It houses the University of Strathclyde's Principal and Vice-Chancellor's residence, alongside various university departments and independent businesses. As you'd expect, the entrance lobby is a grand affair and welcomes thousands of students, staff and visitors through its arched bays and up its curved marble staircase. But, with a Glasgow city-centre location and architecture pre-dating modern draught lobbies or revolving doors, Estates Services were losing a battle with the inclement weather. They needed to take control and prevent water from being traced into the building, making the subsequent tiled floor and marble steps slippery. A Custom ApproachThe University's Building Surveyor contacted INTRAsystems while exploring potential products in their ongoing experiments. After a follow-up call subsequent site visit, it was clear they had a design opportunity to create a unique Entrance Mat for a unique building. With its listed building status, the Entrance Matting system needed to be true to its heritage as a technical college of engineering - practically perfect and sympathetic to the building's aesthetics. Customised Chessboard Tiled Entrance MattingWe advised increasing the Entrance Mat from 4m2 to 10m2, the full width of the Polished red ashlar portico entrance bay and all the way to the marble staircase. However, extending the small matwell wasn't possible because of listed building constraints, so we suggested filling in the existing recessed matwell and installing a surface-mounted system with ramped edges. Fine Details But Heavy DutyWe custom-made 380 x 380mm INTRAshape tiles, with a black anodised finish and combined them with INTRAlux Elite Black 608 and Grey 606 inserts, to match the existing chessboard, monochrome flooring tiles perfectly. INTRAlux Elite has a high-density pile of coarse and fine polyamide fibres made from 100% Econyl (recycled plastics). They boast high moisture absorption (up to 5.4L/m2) and scraping abilities. The heavy-duty inserts also deliver durability, comfort and excellent sound absorption. This combined with the modular INTRAshape system, meets the multi-directional traffic requirement. A Perfect MatchProcurement partner and preferred contractor, Kirkton Flooring, managed the project with our support for layout and drawings, then Master Matting completed the install. First impressions were positive, and it's a marked improvement on earlier mitigation attempts. "It looks fab thanks, just exactly what I imagined it to be like. Thanks for all your assistance and patience on this one, much appreciated." Building Surveyor, Estates Services, University of StrathclydeMastering Entrance Matting with Expertise and InnovationINTRAsystems' specialist knowledge and proprietary products mean we can tackle any challenge of Entrance Matting. Whether you need a sensitive retrofit in a listed building or a contemporary new build system, we can match your Entrance Matting conundrum to enhance safety, design and first impressions.
Sponsored
The Patrick Geddes Centre

The Patrick Geddes Centre

Allgood Ltd

Located in the painstakingly conserved 16th century Riddle’s Court in Edinburgh’s Old Town, the Patrick Geddes Centre is aworld-class centre for learning. Steeped in history, culture andarchitectural wonder, it reopened as a community, conferenceand events space following a £6m restoration in 2017.Allgood was selected by conservation specialist architectsLDN to deliver an ironmongery solution that would providemodern facilities within the picturesque Category A-listedmerchant’s house, without compromising the integrity of theoriginal building.Prestigious heritage hardware brand Frank Allart was chosen,and an antique brass finish was applied to blend in with thehistoric areas of the venue. Throughout the modern quarters,the high-performance and ultra-durable Modric stainless steelrange was used.Bespoke hinges and door closers were developed to matchthe different manufacturers’ ironmongery, while Certifireapproved Alite door closers and Allgood’s integrated securitypackage including secure access controls, intercom andvideo entry systems were employed to deliver a high-qualityfinish.
Sponsored
Hong Kong-Zhuhai-Macau Bridge

Hong Kong-Zhuhai-Macau Bridge

Advanced

The $18.8 billion Hong Kong–Zhuhai–Macau Bridge, the longest open-sea fixed link on earth, is now protected by fire panels from from global industry leader, Advanced.A network of 31 Advanced ExGo gas extinguishant control panels were installed as part of the active fire protection protocol for one of South East Asia’s most ambitious infrastructure projects. The Advanced network protects the artificial island gateway in Hong Kong that serves as an entry and exit point for the new 34-mile bridge-tunnel hybrid system, used by over a 15 million people a year.The ExGo panels were selected to protect critical server rooms in 10 different structures on the purpose-built island, including police and fire stations ,as well as customs and administrative buildings. Each extinguishing system was designed, installed, configured and commissioned by Peak Trade International Limited, with every ExGo panel connected to at least one remote status indicator unit.
Sponsored
GEORGE REDGRAVE DBCP

GEORGE REDGRAVE DBCP

Aeromix Flowing Insulation

ASE STUDY PROJECT NAME: DERBYSHIRE HOUSE RENOVATION PRODUCT SUPPLIED AEROMIX SUPPLIED AND INSTALLED BY: CLOCKWORK SCREED INITIAL BRIEF: Garage to a one bed bungalow conversion. Aeromix was chosen for this project thanks to its many benefits of offering warmth, smoothness of finish and speed of install. The floor needed to be strong and warm so by using Aeromix with its thermal properties the finish was amazing. 175mm Aeromix was poured directly over compacted hard core topped with 65mm C20 liquid screed . The builder who completed this project AA BUILDERS DERBY said “The product is amazing and the finish is amazing, I would recommend it to anybody and everybody” Building control, GEORGE REDGRAVE DBCP He was very impressed with the flooring and commented “what a nice finish. , this is the way forward” Aeromix provided the ideal solution for the insulation on this project, compared to the normal concrete floor and other traditional methods, the speed of pumping the insulation coupled with the high thermal properties has contributed in saving the customer both time and money. 
Sponsored
British Museum - Egyptian Gallery

British Museum - Egyptian Gallery

Lonsdale Patent Glazing & Rooflights

The Egyptian Gallery was the first of many projects at the Museum to benefit from a replacement duo-pitch rooflight using Lonsdale’s ThermGard Roof Light System.After having procured roof lanterns of varying quality and with disappointing results from different manufacturers, the Client was determined to establish a design that met their very high criteria for thermal performance and protection of the priceless exhibits from damaging UV light. Whilst wanting the benefits of modern aluminium systems, there was a requirement for a ‘heritage’ appearance so that any replacement roof lanterns mirrored the original timber construction. High performance solar control glass was also specified to reduce harmful UV light to the exhibits below. Solar protection was further enhanced by the fitting of external shading blinds to the overhead glazing which produce the slightly ‘eerie’ affect that can be seen in this image. Such was the success of this initial project, the Client has held Lonsdale as the benchmark by which other roof light manufacturers are measured and we repay this loyalty by ensuring a first class job every time.
Sponsored
Drumhierny Woodland Holiday Lodges

Drumhierny Woodland Holiday Lodges

PARTEL

Nestled in Ireland’s Hidden Heartlands, over-looking the Shannon Blueway and River Shannon, Drumhierny is a unique development of high-end holiday lodges situated in a 100 acre woodland estate. This multi-unit project, consists of sixteen lodges, in four distinct architectural styles, each nestled within their own private area of woodland. The lodges have been designed, manufactured, and constructed to achieve an A-rated Building Energy Rating (BER). To help achieve a thermally efficient building envelope a number of products from Partel have been used.The buildings were constructed using an offsite fabricated Light Gauge Steel (LGS) frame. As part of the frame construction a number of Partel’s low carbon building envelope solutions were used. This included EXOPERM MONO 150, a high performing breather membrane, IZOPERM PLUS, a phA Class Passive House Certified vapour control layer; and CONEXO MULTISEAL, a phA Class Passive House Certified airtight tape.
Sponsored
Double Leaf Roof Hatch - National Oilwell Varco

Double Leaf Roof Hatch - National Oilwell Varco

Surespan

IntroductionFollowing consultations with our design team, Surespan designed and manufactured a large double roof hatch for the National Oilwell Varco Dunfermline factory in Scotland.Products suppliedWe supplied;Surespan designed and manufactured bespoke double leaf hatches, measuring 4 metres by 4.3 metres. These hatches enable an external crane to lift the manifold units through the roof.With the use of a key, these hatches are controlled by a small PLC that electrically operates the Hatches in an automated sequence.Features:The bespoke double leaf hatches were specially designed to stay open utilising strut locking to withstand the wind condition they specified with the design team.The projectThe NOV Dunfermline factory experienced difficulties building tall manifold assemblies due to the restricted height of the building. Following a consultation with our experienced design team, they were able to design a solution to solve the issue.The outcome: NOV were able to continue its operation in the existing factory without having to hire temporary premises.
Sponsored
West Yorkshire Police HQ – UK – Rutland TS.9205 & TS.11204

West Yorkshire Police HQ – UK – Rutland TS.9205 & TS.11204

Rutland

Project DetailProject: West yorkshire Police HQLocation: Wakefield, UKProduct: TS 9205 and TS 11204 Cam Action closersProject DescriptionNormanton Police Head Quarters work closely with high security locksmiths and Ironmongery Suppliers ensuring safety and compliance for humanity.Complete door sets and door closers were installed to the 25 Million pound facility accommodating operational teams, response teams and CID, as well as providing a 35 cell custody suite and office accommodation for staff.Rutland were pleased to supply the high efficiency TS 9000 range of door closers and the TS 11204 Cam Action range that meet and exceed the standards for assisting doors to meet the Equalities Act and BS 8300.Chosen because of the long guarantees and high efficiency these ranges of closers are made for easier to open and better control.When you need door closers that help not hinder contact ourselves or one of our team.
Sponsored
Soundis Absorb-R Gypline aw at Bristol University

Soundis Absorb-R Gypline aw at Bristol University

Soundis

Like every other institute of learning, the University of Bristol has to provide world class educational facilities, but also find new revenue streams. One such area is the provision of commercial conference space. This of course brings an extra pressure in the quality of the space provided to fee paying delegates.The atmosphere of the large open atrium was dependent on controlling the level of reverberation, without compromising on the architectural finish.Working closely with the Main Contractors Site Team, Architect and Client, we were involved in the specification for the new Atrium Feature Wall, along with all complex detailing, including expansion joints, louvres and display cabinets.Working closely with Vinci Construction, to carry out the Absorb-R GypLine αw Acoustic Plaster treatment to the Atrium Feature Wall at the University.Soundis Absorb-R GypLine αw system was installed to give a very desirable natural white stippled effect, combined with a highly absorbent functional wall spanning the length and height of the building, rising a full 5 floors.
Sponsored
A Highland Home

A Highland Home

SuperFoil Insulation

A 200 sqm, highly energy-efficient new build project in a remote location in the Highlands of Scotland. Built using sustainable materials, and with the timber frame sourced locally and wood fibre insulation used alongside SuperFOIL Insulation throughout. Powered throughout the year using solar PV and battery storage.Looking to increase the thermal resistance of the building envelope in order to reduce energy usage. With the building using an air source heat pump and underfloor heating, they wanted to make sure that any heat loss was minimised and it was vital that they chose the correct insulation for the walls and roof.Solution: SuperFOIL SF19+ is a multifoil product with a total of 11 layers, made of wadding, aluminium coated PET layers and Foil Laminated Outer Layers. At only 40mm thick and providing an R-value of 2.14 when used in a roof, SF19 can be used on its own or in combination with other types of insulation. A fully flexible product that provides a vapour control layer as well as acting as a radiant barrier.
Sponsored
Chester Zoo sensor taps

Chester Zoo sensor taps

Ecoprod Technique

Ranked as the best zoo in Europe, and the third best zoo in the world, Chester Zoo, in Cheshire, UK, has long-been considered a pioneering attraction that many other zoos aspire to. With over 1.8 million visitors a year, the Zoo has specified CONTI+ sensor taps for its visitor washrooms as part of a number of water-saving initiatives .In 2018, the Zoo started a refurbishment project of its washroom facilities, choosing the CONTI+ Ultra sensor taps for all their washbasins. Ecoprod– a Conti+ distribution partner and supplier of environmental washroom solutions was the link that enabled this project to happen, through a consultation process.“Working with the Mechanical Services Supervisor at Chester Zoo has been very straightforward as his hands on experience and knowledge of this sector is comprehensive. We provided a few products to install in both ladies and gents washrooms for a trial period to get feedback from staff and other stakeholders. The Ultra tap was quite quickly considered by all to be the preferred choice and was therefore specified going forwards for all washroom refurbishment works”Marcus Rose, Sales Manager Ecoprod.Ultra is one of the most innovative sensor tap solutions from CONTI+. It works particularly well for leisure spaces and attractions as it can be powered by battery, turbine or solar, avoiding the need for electricity in the tap area. The battery lasts for up to four years, meaning maintenance is minimal and, when it is time to change the battery this can be done quickly and easily through an access point on the top of the product avoiding labour intensive access into vanity units.From an environmental and cost-saving perspective, the Ultra ticks all the boxes. Great design, with sophisticated sensor function, water saving can reach an impressive 70% compared with a more traditional tap. And in attractions, with a high volume of users, the touch free system provides a more hygienic way to wash hands, reducing the spread of germs and ensuring each user has a clean tap to use.Of course, as a Swiss-designed and assembled product, manufactured in the Conti+ facilities in Switzerland, Chester Zoo can rest assured that the Ultra taps are built to last and will work first time, every time.
Sponsored
Gloucester Business Park

Gloucester Business Park

Excelsior Panelling Systems Ltd

The Project Gloucester Business Park, Plot 1420, takes the form of three buildings grouped around a landscape courtyard, the buildings are split into six self-contained units which are sub-divided floor by floor.  Gloucestershire is excellent for transport links & the parks modern and flexible working environment also provides sufficient parking for all employees and visitors Plot 1420 won Kier Central Site of the Quarter for Jan – March 2015. The site scored 100% when externally audited by the BSI for Quality and Environmental Performance.The ChallengeManufacture, deliver and install premium quality system befitting the development and the client’s requirements.Offer complimentary system for use in the shower areas &produce Solid Surface troughs to bespoke lengths, exceeding 3000mm. The SolutionExcelsior Flush 44 Full Height system provides a sleek flush fronted façade delivering the upmost in quality, design and privacy. Complimentary Mariner Cubicles finished in matching laminate installed in the wet areas. 12mm Solid Grade Laminate is recommended for shower enclosures the core material is manufactured with phenolic resins which ensures the self-supporting panels are impervious to water penetration and will stand the test of time against water/moisture ingressAll Cubicles and Vanities are finished in Oak Classic High-Pressure Laminate along with a Corian Vanity Top in Designer White. All working to complement each other and deliver a harmonious natural colour scheme generating a tranquil & calming atmosphereNick Flexen-Cook at Kier Construction has said – “Plot 1420 was delivered by the best, highest performing team that I have ever been privileged to be a part of. The tenant is rightly delighted with their facility which exceeds their expectations.”SpecificationProduct Range: MarinerDoors: 12mm Compact SGL Sonae Oak Classic M3817Pilaster: 12mm Compact SGL Sonae Oak Classic M3817Partition: 12mm Compact SGL Sonae Oak Classic M3817Ironmongery: Stainless SteelClient:GoodmanContractor:KierArchitect:Frank Shaw Associates LtdLocation:Gloucestershire
Sponsored
Playground in Sweden with a maritime theme

Playground in Sweden with a maritime theme

Redlynch Leisure Installations Ltd

In Marstrand City Park, you will find the playground 'Kraken' featuring products from Lappset's popular Flora and Finno series. The playground is a themed and inclusive play area that has quickly become a natural meeting point for both residents and tourists.A playground with a maritime theme has dropped anchorMarstrand is one of the most popular summer destinations on the Swedish west coast, surrounded by hundreds of islands and islets with smooth cliffs and a lively coastal life. On September 13th, a new playground was inaugurated in the heart of the city, featuring products from Lappset's popular Flora and Finno series. One of the products was a large and impressive Flora tower and ship, custom-designed to fit the environment and the playground's name, which the children had participated in creating.A close collaborationThe playground design was done in close collaboration between the customer, the local salesperson, and the design team at Lappset.The municipality of Marstrand desired an interesting and inviting product connected to the area and the environment.The proposed theme was one related to the sea and ships, fitting the coastal town of Marstrand.For instance, a sign with fish unique to Marstrand was created. Even the windows with muntins on the product are a detail inspired by the many historical buildings in the surroundings.The name 'Kraken' won the naming competitionWhen the playground needed a name, Marstrand municipality, together with Lappset, organized a naming competition where children were invited to suggest names.To inspire the children, Lappset also sponsored a prize for the individual or individuals who came up with the winning suggestion. The name that received the most votes was KRAKEN.The Kraken is often described as a sea monster, as large as an island, pulling ships into the depths. Fascinating, just like a playground should be.The ship was christened with water-filled balloonsBefore a ship embarks on its maiden voyage, it is christened by breaking a champagne bottle against the side of the boat.This time, children used water-filled balloons for the naming ceremony of the play boat.There were many joyful laughs as the balloons were thrown and burst against the playship.In conjunction with the inauguration, a sign for the park, crafted by a local carpenter, was also unveiled.
Sponsored
Windsor Girls School

Windsor Girls School

3v Architectural Hardware Ltd

Edgingtons Architects were appointed by the Royal Borough of Windsor and Maidenhead to design and deliver a new build sixth form building for Windsor Girls School. The external detailing of the brickwork takes inspiration from a mature oak tree that sits in close proximity to the building, ground floor representing the tree trunk and first floor the texture of the branches and leaves. Internally the building follows a simple layout with a neutral palette of cream, grey and light wood finishes.The ironmongery brief was to specify a simple, robust and affordable ironmongery scheme that would stand up to the typical heavy use of an education setting while ensuring the products were chosen to ensure a long life span. The scheme centres around our Vieler 522 safety lever handle and matching straight pull handle finished in stainless steel. We also supplied all door signage including stainless steel and black door discs denoting room numbers. The simple shape and finish of the ironmongery compliments the project aesthetics beautifully, creating the perfect educational space.Photography: Neil Kenyon
Sponsored
Dartington CofE Primary School - Tarnhow Mono Wall Mounted Canopies

Dartington CofE Primary School - Tarnhow Mono Wall Mounted Canopies

Able Canopies Ltd

Dartington C of E Primary School in Totnes, Devon were in the process of having a new £7 million school built. The new development consisted of 12 classrooms and a variety of contemporary facilities which 315 primary school pupils and 30 Early Years children would benefit from.As part of the design of the new school, the architect was keen to introduce a free-flow from the outside to the inside. It was also important to them that they create an outside space that could be used throughout the school year.The only way to achieve the level of cover required, would have been to install a number of wall mounted canopies adjacent to the school’s classrooms.It was therefore agreed that 130 metres of timber canopies would be installed around the school, wrapping around the building providing almost uninterrupted cover throughout. This included using our standard Tarnhow timber canopies and adding bespoke qualities to them such as a 90° ‘hip’ (external corner) and a 45° ‘valley’ (internal corner) to the buildings’ entrance and variations in the post heights due to the uneven ground height.
Sponsored
Darcliffe Homes provide a sustainable solution with Brett's Alpha Flow permeable paving, complement the rural backdrop of their prestigious development.

Darcliffe Homes provide a sustainable solution with Brett's Alpha Flow permeable paving, complement the rural backdrop of their prestigious development.

Brett Landscaping

Brett Landscaping, a leading provider of innovative landscaping solutions, partnered with Darcliffe Homes on the Stoneham Park housebuilding project in Reading. Stoneham Park is a prestigious development perfectly located on the Western edge of Reading, offering residents unparalleled access to both urban conveniences and scenic countryside. With beautifully landscaped grounds and a variety of residential options, Stoneham Park aimed to provide a desirable living environment. Brett Landscaping’s role in the project was to supply permeable paving, specifically their Alpha Flow range in Autumn Gold and Brindle colours, along with Chaucer paving slabs in Buff and High Kerb in Autumn Gold to complement the paving. The Stoneham Park project commenced in November 2022 and is scheduled for completion in December 2023. The development encompasses a diverse selection of 1 & 2 bedroom apartments, as well as 2, 3, 4, or 5 bedroom houses, catering to a wide range of potential residents. The project aimed to create a harmonious blend of urban and rural elements, with a picturesque backdrop of open fields, views of Sulham Woods, and convenient access to Reading’s amenities.
Sponsored
Islington Square

Islington Square

EH Smith Architectural Solutions

This breathtaking development is characterised by three statement residential buildings and a brand new public realm offering 170,000 sq. ft. of quality retail, dining, lifestyle and leisure options, including luxury health club and a cinema. The principal building is an internal conversion of a magnificent Edwardian masterpiece with the façade and entire external structure retained and refurbished, whilst another hybrid building preserves the Edwardian exterior structure at ground level with new-build framing on upper levels. Completely the Square is an all-new contemporary design, which is anticipated to become one of Islington’s most iconic buildings.CZWG Architects have taken the former Royal Mail sorting office under its wing and presented a forward-thinking vision of London living rarely attained in modern designs.EH Smith worked with CZWG to select and supply the bold mauve coloured rainscreen from our Partners Agrob Buchtal and worked with the specialist cladding contractors, Openwood and Commercial Roofing, to provide the bespoke engineered support system with our partners Systea.
Sponsored
London Luton Airport

London Luton Airport

Broxap Ltd

Travel to London Luton Airport (LLA) is being made easier, faster and greener with the development of the DART people mover.And the final journey between shuttle stop and airport terminal is via a covered walkway designed, manufactured and installed by Broxap.The walkway complements a series of canopies we created for the airport in 2019 as part of a bus and coach station upgrade.Together the DART (Direct-Air-Rail-Transit) system and bus services are designed to encourage more people to leave their cars behind when flying from LLA as well as offer sustainable travel options to employees.The 150-metre bespoke walkway guiding passengers to the terminal from the DART station is based on Broxap’s flagship ‘Newcastle’ design.The freestanding walkway features clear multi-wall polycarbonate cladding and is an essential element in the passenger journey, forming the final connection between ground transportation and the boarding of aircraft.A bespoke Hartcliffe Cantilever Shelter has also been made for the DART building to form a covered entrance area.Testing of the shuttle system is now underway with an announcement on its opening due in early 2023.
Sponsored
Op-Deck to the Curly House

Op-Deck to the Curly House

CDI Innovative Construction Materials Ltd

Initial project meetings first started in early 2008, the clients owned a small cottage on the site which had been extended several times during the 80’s and had permission to make further adaptations. The mixture of building standards meant that their home was extremely drafty and very energy inefficient. The site itself is particularly exposed. The design which achieved planning permission was a crescent form which steps and slides into the slopes on the site. The crescent formation is in direct response to solar orientation.The brief was to design a building which would accommodate the family for many years into the future, the planned occupancy would be for 5 adults. Additionally, the home will be used for large family occasions. A requirement was set for a minimum 16 seated spaces to be available for dining during these family occasions.Op-Deck was added into the scheme very early into the design process as the way of creating the highly insulated structural floor as the house was being designed under Passivhaus standards. The overall U-value of the property is 0.1w/m2K as standard. The system was installed on the lower and ground floors and also the roof.
Sponsored
Bowthorpe

Bowthorpe

Forterra Building Products

The ChallengeBowthorpe is a high-quality development of 174 new homes together with landscaped open space, community gardens and a children’s play area on an area of undeveloped land in Norwich.The development was inspired by nearby Bowthorpe Hall and explored the idea of an historic walled garden with homes built within its boundary.As part of the site’s high environmental standards, it was critical that existing features, such as important tree belts and hedges were retained while also accommodating a proposed network of cycle and walking routes.The SolutionForterra’s Breckland Reserve – a red, tumbled, wirecut brick – was used alongside flint on the ground floor of some of the homes to create detailed wall work that echoed Bowthorpe Hall.Traditional red tiled roof pitches sit above the wall and reference Bowthorpe Cottages. On top of the wall sit cedar shingle clad upper floors.Traditional terraces form most of the new homes, with flats provided alongside unique mews-style housing.The BenefitsThe building form, the materials selected, and the use of pattern and decoration, helped to create a visual connection to the local area.
Sponsored
POSIglaze Privacy Glass Balcony Installation

POSIglaze Privacy Glass Balcony Installation

Pure Vista Ltd

Privacy glass on a balcony is becoming a more frequent request. This installation by AC Fabrications in Cornwall on a domestic property perfectly displays how a glass privacy screen can be used. The partially frosted glass increases privacy for those on the balcony, people at ground level will not be able to see them. The non-frosted section allows the residents to enjoy their view from the privacy of their balcony. Taller glass on one side extends the privacy even more, and also will act as a windbreak. Frameless glass balustrade is often used as a windbreak on balconies, the solid pane of glass protecting those on the balcony. The installer has used POSIglaze base fit Silver brushed channel. Designed to provide the greatest possible adjustment opportunities, this system enables each panel to be perfectly aligned during, or even after, installation. POSIglaze is the perfect choice for residential to light commercial installations where up to 1.5kN frameless glass balustrade is required. This innovative patented and market leading screw-clamp technology locks glass panels into position effortlessly, with four immobilising fasteners per meter of channel. 
Sponsored
Santander Unity Place MK

Santander Unity Place MK

Planet

Working through our Midlands contracting office, Planet provided smoke sealed extended height PURE20XL glazing to floors 2 to 7 of the building’s internal atrium. 6.7m high Schueco Jansen Viss screens were placed on ground level, while PURE20XL was also utilised along with rebated 1.5 leaf IsoPro doors (Rw 36 dB).Extended 3.3m LOFT100 screens (Rw 47 dB) with back-painted glass above transom level were placed in the 300-capacity auditorium with double IsoPro doors. Finally, banded LOFT20 partitions and matching IsoTec acoustic doors (Rw 38 dB) and double glazed LOFT54 (Rw 45 dB) with IsoPro doors were installed for the client’s meeting rooms and phone booths respectively.The Unity Place development is a great example of a people-first workplace design that hopes to be a catalyst for the regular return to the office for many of Santander’s staff. The building is set to achieve a BREEAM Excellent rating for sustainable performance, aided by Planet’s EPD documentation for our LOFT and IsoPro solutions.
Sponsored
Hunter Street

Hunter Street

Forterra Building Products

The Challenge Hunter Street, Chester, is a new development of 77 student residential flats set over six floors, with ancillary and communal facilities, landscaping and car park. Located just within Chester’s city walls, in a redevelopment area, the site is in a prominent position next to the ring road. It is also next to a former Odeon cinema constructed in the 1930s, which has recently been renovated and extended to become the city’s thriving new arts centre, Storyhouse. The Solution It was important that the student accommodation reflect its surrounding environment and so cues for its design were taken from Storyhouse. The brick selected for the project was County Multi Smooth, which is a red, smooth textured, high quality facing brick that complements the modern aesthetic of the copper rainscreen cladding and through coat render used alongside. Extruded brick detailing was included to create a playful relationship with the recessed brick detailing of Storyhouse. The Benefits The use of County Multi Smooth served to connect the structure with the existing masonry buildings adjacent to it, helping to ground it in its environment.
Sponsored
Mandarin Oriental Hotel, Hyde Park

Mandarin Oriental Hotel, Hyde Park

Roché Systems Ltd

THE PROJECTAs part of it’s recent £100 million pound renovation, Roché Awnings were tasked with providing a shading solution which was in keeping with the hotels iconic features, whilst covering the width of their ground floor terrace. The terrace being the location for the hotel’s east smoking terrace, central loggia door entrance and private outdoor dining area.THE SOLUTIONThe challenge was to choose an awning which blended in with the style of the Edwardian building. Originally designed to incorporate the Markilux 730 drop arm awnings, we advised the hotel to choose the Markilux 3300 awnings due to it’s unique design. The awnings were mounted to the buildings stone facade and sit inconspicuously below the hotel’s balustrade. The helped the awning merge beautifully into the architecture of the building.Roché coupled Markilux 3300 full cassette patio awnings to achieve widths of close to 10 and 13 metres, along with a smaller width of close to 3 metres. The awning was installed green fabric, traffic white cassette and uniform awning projection. The positioning provided full protection for the open terrace area.
Sponsored
HMRC REGIONAL HUB

HMRC REGIONAL HUB

Metalline Architectural Fabrications

The new HMRC regional hub at the Arena Central complex in Birmingham has provided over 240,000 sqft of grade A commercial space over its ground and 13 upper floors. The building features an external envelope of geometric glass and aluminium facades that create an iconic feature to this area of central Birmingham. Working closely with the façade contractor NACWL, specialist architectural metal fabricator Metalline have manufactured and supplied over 9000 m2 of aluminium Unity Rainscreen Panels from their recently extended facility in Cannock. Delivery which commenced in September was completed within 10 weeks. The specification also included over 5000 m2 of Ultima Insulated Spandrel panels along with soffits, column casings and transition panels. The detailed design of the building’s façade demanded a uniformity of colours which was achieved using a single ingot of J57S Up aluminium. The Ultima Insulated Spandrel Panels were finished in a black polyester powder coating. The individual Unity rainscreen panels were supplied in a two – tone specialist 1934 and 1953 Unatex silver anodised finish.
Sponsored
The Anchorage Gateway, Salford Quays

The Anchorage Gateway, Salford Quays

URSA UK LTD

The Anchorage Gateway in Salford Quays is a new multi-storey building in the centre of Salford. The main wing is 29 storeys high whilst the lower tower tops out at 19 storeys. The ground floor contains almost 400m2 of commercial space and the upper floors contain 290 residential units and 800m2 of amenity space.The building is reputed to be one of the highest brick clad buildings in Europe, Kinlan Brickwork being specialist sub-contractor.Domis Construction is the main contractor on this scheme. URSA UK Ltd was chosen as the preferred insulation manufacturer. We supplied over 11,500m2 of 100mm URSAPAN BLACK - a unique glass mineral wool rainscreen cladding insulation slab;·      Euroclass A1 fire rating (non-combustible).·      Thermal conductivity of 0.035 W/mK.·      BBA Certified. Kate Fox, Area Sales Manager for the Midlands stated, ‘Following the success of this initial partnership URSA are now the preferred supplier of rainscreen insulation and our products have been used on Fifty5ive Queen Street in Salford with others in the pipeline including Derwent Street’.
Sponsored
Soundis Dry Screed Acoustic Flooring with Chip Board Overlay and XPS Insulation at Premier Inn, Penrith

Soundis Dry Screed Acoustic Flooring with Chip Board Overlay and XPS Insulation at Premier Inn, Penrith

Soundis

As part of Soundis’ ongoing work supplying high-quality acoustic flooring at various Premier Inn’s around the UK, we were brought on to provide acoustic flooring to their Penrith site, one of Premier Inn’s many new sites across the UK.Due to it’s service and close proximity to the Lake District, this hotel has become extremely popular in just a short period of time.Just like a number of our other Premier Inn projects, we supplied an acoustic flooring system to the 1st and 2nd floors. This superb system provides excellent levels of soundproofing while being used in a shallow floor build up.We also supplied XPS Insulation on the ground floor with a 22mm T&G chipboard overlay, maximising durability for the increased footfall.The system we supplied reduced the overall noise within the hotel, allowing Premier Inn to fulfill it’s promise of a good night’s sleep. This installation carried out by UK Acoustic Systems proved to be a great success, reducing the noise levels within the building and helped ensure the most comfortable stay possible for guests.
Sponsored
WoodBlocX Seating - Walsall Council Gallery Square

WoodBlocX Seating - Walsall Council Gallery Square

WoodBlocX Ltd

Walsall Council is undertaking a major redevelopment plan to re-imagine parts of the town. Gallery Square, the home of the area’s brand new art gallery, is the first space to be updated under the plans. WoodBlocX Landscaping was commissioned by Acadis UK to supply the street furniture for this part of the project.Gallery Square is a large open space, the designers have used colour in the form of a series of large squares, of differing sizes, painted on the floor to create interest from the ground up. The design and layout of street furniture aims to provide plenty of space within the square for visitors to the gallery and the wider public to use, it also allows for adequate social distancing as and when required.For this project we took the proposed design and recreated it using our versatile modular system. Our team is able to take the technical detail from drawings and create full and detailed design proposals using our bespoke software. Once the plans were finalised, we supplied a series of large seating solutions that were installed by the contractors in March 2021.

Showing 1729-1764 of 1898

Feedback