NBS Source
I'm a manufacturer

"ground water control trench sheeting etc"

18,091 results found

Sort by:

Showing 1621-1656 of 1892

Sponsored
Bream Street, Bow

Bream Street, Bow

Cellecta Ltd

Bream Street is a mixed-use development of seven buildings, including 202 modern 1, 2 and 3 bedroom apartments, retail, employment and leisure spaces. Overlooking the Queen Elizabeth Olympic Park, this development includes 30% affordable housing. The scheme consists of demolishing a post-war commercial building to deliver a series of buildings set around three shared gardens within walking distance to Hackney Wick Overground station.Cellecta’s ScreedBoard 20 was specified by Allford Hall Monaghan Morris due to it being the ideal overlay floorboard for acoustic applications. ScreedBoard 20 was laid upon the first floor over PIR to achieve U Values, as the build could not accept a wet screed due to weight restrictions upon the ground.L&Q were awarded this 5,500m² contract to construct this development in Fish Village within Bow.
Sponsored
Travelodge Hotel, Rhyl

Travelodge Hotel, Rhyl

Cellecta Ltd

This Hotel is a 73 bed seafront Travelodge Hotel that was developed as part of Denbighshire County Council’s Waterfront Regeneration programme for Rhyl. Constructed on the site of the East Parade car park near the former Sun Centre, the three-storey timber-framed hotel has a render finish. It includes four accessible rooms, a ground floor reception, a bar, a breakfast restaurant area, and an onsite car park. This is the first hotel at Rhyl Beach, the company’s 576th Travelodge, and the company’s 27th hotel in Wales.Cellecta DECKfon 26T was specified by Ion Developments due to it being the ideal acoustic overlay treatment to improve the performance of the original structural timber decked floor. The tongue and groove on the floorboard make it quick and easy to install, saving time and money.Wynne Construction was awarded this 1,400m² contract to construct this hotel in North Wales.
Sponsored
Fowey Hall Hotel, Cornwall

Fowey Hall Hotel, Cornwall

Cellecta Ltd

Fowey Hall is a hotel located within a mansion on 5 acres of grounds overlooking the Fowey Estuary. The hotel is a 5-minute walk from Fowey town centre and 8 miles from the Eden Project. The scheme comprises of a refurbishment, reconfiguration and extension of the existing four-star family hotel including rooftop extensions, this provides enhanced facilities including additional guestrooms, new creche and children's playroom, lounge area, and outdoor swimming pool with pavilion. Landscaping works, additional parking, and associated infrastructure. This project also includes associated infrastructure works and access roads.Cellecta’s HiDECK Structural 25 was specified by Jeremy Blake Architects due to it being a conductive structural floorboard and having outstanding acoustic and fire performance and low thermal resistance.Brady Construction Services was awarded this 320m² contract for this development in Cornwall.
Sponsored
Hale Wharf, London

Hale Wharf, London

Kawneer UK Ltd

Kawneer played its part in the impressive Hale Wharf regeneration project by supplying our AA®100 Curtain Wall System, known for its excellent thermal performance and flexibility of design choice. The system features on both the ground floor retail and communal entrances of the 21-Storey (Block A) and 15-Storey (Block B) Buildings. It also features our AA®190 TB Doors on Block B that excel in high-traffic environments due to its robust and welded construction. The one and two-bedroom apartments are also fitted with Kawneer’s AA®720 Casement and AA®720 Tilturn Windows and AA®3572 Lift/Slide Doors, giving residents access to their balconies and the far-reaching city views which help set this exceptional development apart.
Sponsored
Type G200 - Smoove

Type G200 - Smoove

Movawall Systems Ltd

Having outgrown their previous offices, Smoove – a company operating in the property sector (formerly ULS) – took the decision to take on three floors at Masters Court; a fully refurbished office building in the quaint town of Thame, Oxfordshire. They swiftly appointed HNB and Leap Architects to deliver an overhaul of the dated interior that would better suit the Smoove team.We were approached to deliver a glass moving wall capable of separating the ground floor kitchen and main open plan space when required. Our Type G200 system was chosen, which provides transfer of natural light when partition is closed while simultaneously stopping the transfer of noise.The minimalist manifestations applied to the glazed panels along with their black painted frames have been designed to match a number of fixed glass partitions within the space, offering a consistent design throughout.
Sponsored
Glasgow National Hockey Centre

Glasgow National Hockey Centre

Polytan Sports Surfaces (UK) Ltd.

The 20th Commonwealth Games were held in the Scottish city of Glasgow in the summer of 2014. Over 6,500 active participants from 70 nations competed in 17 disciplines. The Glasgow National Hockey Centre was constructed in Glasgow Green in order to provide a suitable setting for hockey players taking part in the competitions. Two pitches were fitted with the Poligras Mega CoolPlus complete synthetic turf system from Polytan, thus ensuring optimal training and playing conditions. The colour scheme is certainly eye-catching: the bright blue and bright green surfaces installed in the stadium match the colours of the stand. In contrast, the synthetic turf in the training ground consists of blue and purple areas. The unfilled Poligras Mega CoolPlus is particularly suitable for hockey as the compact and uniform structure of the turf does not distort the rolling behaviour of the ball, thus facilitating precise play.
Sponsored
Soundis Floating Floor at Channelsea House, Stratford, London

Soundis Floating Floor at Channelsea House, Stratford, London

Soundis

Soundis supplied 3,265m2 of a shallow floating floor treatment, laid over an existing concrete structural deck, at Channelsea House in Stratford for City Square.The areas included the Ground, 1st, 2nd, 3rd, 4th, and 5th Floors. Channelsea House is a former office block being converted to residential apartments, with a one bedroom flat being valued at the half a million pound mark. Located in Stratford, 1.3 miles away from the Olympic Stadium, Channelsea House is in a prime location for high quality accommodation.Soundis were required to provide a high specification shallow acoustic solution to achieve compliance with ‘Impact’ performance criteria when tested on site. The specification implemented by the Architect was 26mm Timber Floor Overlay Board, which was chosen to minimise construction height and to comply with Approved Document E Building Regulations.
Sponsored
Richmond Care Village, Evesham

Richmond Care Village, Evesham

Tobermore

The Challenge To install an attractive retaining wall solution that complements the beautiful landscaping. Richmond Care Village in Evesham comprises of a 60-bed care home for nursing and dementia care, 46 assisted living suites and 61 independent living apartments. The development is designed within the Richmond Care Villages model of luxury retirement accommodation and includes facilities such as a bar, restaurants, library, wellness spa with pool and gym all set in beautifully landscaped grounds. This luxury retirement village needed a retaining wall with considerable aesthetic appeal. The landscape design was carefully formulated to make a major commitment to the restoration and conservation of the landscape on the original Wood Norton estate. Groundworker R O’Donaghey was tasked with proposing a retention solution that could facilitate curves, corners, stepping down and railings. The project team had considered Gabion Baskets but decided that they would detract from the beautiful surrounding landscaping.
Sponsored
Holy Name Medical Centre ICU, USA

Holy Name Medical Centre ICU, USA

Altro

Altro wall solutions support fight against COVID-19ChallengeNew Jersey’s Holy Name Medical Centre was at the forefront of the fight against COVID-19, coping with an alarmingly high rate of new COVID case admissions. It became clear that for Holy Name Medical Centre to continue providing its patients with crucial life-saving care, their existing Intensive Care Unit (ICU) space would need to undergo an essential update.Approach“Our ICU was built in the 1960s and was in need of an upgrade,” stated Melissa Candela, Holy Name Medical Centre’s Manager of Design and Construction. “Our experience at the epicentre of New Jersey’s outbreak triggered an action plan to transition the outdated space to a unit with the highest technology, safety, and design standards, in addition to strong functionality.” The design of the unit needed to prioritise interiors that could endure frequent cleaning and disinfecting routines while helping to create a design-oriented space with a patient focus.SolutionHoly Name Medical Centre selected Altro Whiterock White and the decorative Altro Whiterock wall designs throughout the ICU to create a high design, hygienic space for patient treatment. Altro Whiterock is a hygienic walls system, providing smooth impact-resistant surfaces and leaving dirt and bacteria nowhere to hide. This is especially practical in the case of Holy Name Medical Centre’s ICU, where thorough cleaning is vital in promoting the safety of patients and staff alike. Altro Whiterock wall designs can be used alongside Altro Whiterock White to create a less clinical feel in patient areas.Altro Whiterock wall designs give elegance to interior walls while providing the durability you expect from an Altro Whiterock wall sheet.
Sponsored
Investment bank project, Lockers

Investment bank project, Lockers

Boyco (UK) Ltd

Flagship project to supply and fit  ‘one-of-a-kind’ changing-room lockers for City headquarters as global bank invests in staff wellbeing.Boyco’s attention to detail, from design to installation, is delivering outstanding projects  for local clients... and prestigious brands. We enhanced our reputation for product quality, function and efficient installation on a flagship project to supply and fit bespoke changing-room lockers for a global bank HQ in central London.“We were very impressed with the  Boyco team. They kept to their  schedule and their site operatives  were able to overcome any issues,  and get the job done efficiently  and safely. Highly recommended.” Philip Kyriacou, Senior Project Manager, BW: Workplace Experts.Boyco were commissioned to supply and ft a bespoke locker system for the ‘wet and dry’ changing rooms – but not before going through a detailed process to understand the needs of the client and their employees.The solution was based around our two-compartment ‘Z’ locker system – an ingenious design that separates wet/dry or clean/dirty clothes, but provides long hanging space for both. Boyco’s renowned attention to detail covered everything from the locking mechanism to the hinges and foor plinths. But for this project, style was as important as function – and we liaised with the client and aluminium sheet suppliers to ensure a range of vibrant colours to create a welcoming environment for staff. Timescales were just as tight as the access for the central London location – but we delivered on time, in full.“At Boyco, it’s all about relationships and reputation, and we’re extremely proud to have been involved in this stunning project for such a prestigious client,” said Boyco managing director Damien Boyt.
Sponsored
English Spirit Distillery - F. Ball gets into the spirit at new distillery

English Spirit Distillery - F. Ball gets into the spirit at new distillery

Ball, F and Co Ltd

F. Ball products including Styccobond F48 PLUS fibre-reinforced high temperature grade vinyl adhesive, have helped transform a disused agricultural building into a new state-of-the-art distillery and visitor centre at Treggudick Manor, Cornwall.Flooring contractors installed a variety of floorcoverings, including vinyl sheet and tiles, wood and carpet tiles, throughout the 620m2 space at the English Spirit Distillery.The installation began by mechanically grinding the building’s recently installed power floated concrete screed to create a ‘key’ for subsequently applied subfloor preparation products. Stopgap F77 waterproof surface membrane was then applied to create a barrier to prevent excess subfloor moisture attacking adhesives and floorcoverings, potentially leading to floor failure.Following this, contractors primed the surface using Stopgap P141 primer, and once dry Stopgap 300 HD levelling compound was applied in the kitchen that serves the café. Elsewhere, Stopgap 1200 Pro high performance levelling compound was used to create a perfectly smooth base for floorcoverings.Styccobond F48 PLUS was chosen to install Altro Ensemble wood-effect Luxury Vinyl Tiles (LVTs) in the restaurant and shop, each comprising an area of approximately 100m2.In the kitchen, Altro Stronghold ‘Dolphin’ grey vinyl safety flooring was adhered with Styccobond F73 PLUS one-part, moisture-curing heavy-duty adhesive and in the offices, Styccobond F41 carpet tile tackifier created a permanently tacky film to hold Heckmondwike flint grey carpet tiles firmly in place when subject to normal foot traffic but enable them to be lifted and replaced should they become worn or damaged.
Sponsored
GT Yarmouth - Beattie passive - Retrofit

GT Yarmouth - Beattie passive - Retrofit

Intelligent Membranes

An old block of apartments in Gt. Yarmouth getting a low carbon Retrofit for a higher, cleaner living standard and reduced energy bills. Passive Purple has been used externally on this huge scale block of apartments. with no margin for error and tricky details throughout, a liquid applied airtight membrane was the only way going forward. The building was being insulated externally and getting a whole new façade from render to aluminium panels. With the residents still inhabiting the building this had to be done quickly and easily with maximum results. Being a liquid applied airtight membrane, any cracks, gaps, and service penetration leaks in the existing building fabric quickly became thing of the past. That and the hundreds of Panel brackets being installed to support the new façade going on, this Retrofit had multiple penetrations and tricky details. Making good of the building fabric and awkward brackets with a near on impenetrable adhesion, Passive Purple made fast work of this great conversion, impossible for any other method. Being in liquid state on application, Passive Purple can be applied onto most/any surface (See data sheets for more information) and will find its way into all the unseeable tiny gaps and cracks all buildings will undoubtably have. Like this old pebble dashed façade, any rough, uneven and awkward areas are no longer an issue, our products simply flow into these areas. We also have the fibre reinforced Passive Purple brush, used on this job to prepare the brackets by filling the larger gaps between that of the bracket and the existing wall and also the large penetrating bolts. A huge win and demonstration of the power of liquid products by Intelligent Membranes.
Sponsored
Crossrail Place

Crossrail Place

Radmat Building Products Ltd

Radmat Building Products has supplied the waterproofing roofing system for the Crossrail Place shopping development and roof garden in Canary Wharf. The system provides high performance waterproofing and thermal insulation – guaranteed for the lifetime of the structure – and has enabled the construction of an extensively planted living roof.• The 310m long roof arches 30m over the park and opens to allow natural irrigation• Highly insulating roofing materials help create a microclimate for the gardensRadmat Approved Contractor Prater delivered a 9,300m² roofing solution using PermaQuik PQ6100 Hot Melt Monolithic Waterproofing Membrane, EshaFlex 370 WS Root Barrier and ProTherm insulation.Construction access to the complex inverted timber roof was challenging, so Radmat’s products were chosen for their quick and flexible application and fast-sealing properties.PermaQuik is widely used beneath green roof installations where long-term weather tightness is a necessity, and it was chosen to support the extensive and densely planted gardens, which are the main feature of the Crossrail Place roof terrace.The PermaQuik membrane was followed by EshaFlex 370 WS Root Barrier, a reinforced bitumen membrane that is torch applied to the base sheet. It was selected because of its thermal efficiency and suitability for use with living roof systems. Partnered with ProTherm’s excellent insulation, the complex timber roof now boasts a waterproof system that is BBA Certified to last the lifetime of the building.The wooden structure evokes the ships that once sailed into West India Dock and provides a warm, natural counterpoint to the steel and glass towers of Canary Wharf.And with Radmat’s high performance products and lifetime guarantee, the green roof terrace at Crossrail Place will be a living oasis in the heart of London’s financial district for years to come.
Sponsored
Burger King Case Study - Brise Soleil & Canopies

Burger King Case Study - Brise Soleil & Canopies

Twinfix Limited

Last year, fast food chain Burger King added forty-eight new restaurants to their rapidly growing portfolio. Twinfix were approached by Ideal Building Systems to design, manufacture & install canopies and Brise Soleils at three of the sites in Kent, Clacton-on-Sea and Swindon.With over 30 years’ experience the Twinfix Technical Team had no problems designing structures to suit the requirements and budget of the client.Twinfix’s expert team designed, manufactured, and installed a brise soleil which covered all four sides of the restaurant at the first site in Swindon and fabricated lean to mono-pitch canopies with squared posts and 3mm thick solid aluminium sheet for roof, complete with brise soleil for rear, sides and front at the restaurants in Kent and Clacton-on-Sea.The structures served two purposes, while providing shelter, they also enhanced the aesthetics of the restaurants and complemented the building’s exterior.Each canopy spans 35 square metres and the roof comprises of pressed aluminium roof at a reduced pitch to fit inside the 150 depths of our frame, concealed gutters and downpipes and prepared for soffits by another contractor. The roofs were powder coated in RAL 3020 Traffic Red and squared aluminium posts powder coated to RAL 9006 White Aluminium.The Brise Soleils are constructed from our 150 x75 rectangular hollow section and had to accommodate some wiring for lights that were installed later by another contractor. These are a striking addition to the building fascia.The design of the proposed future sites look set to follow the same format and we look forward to working with Ideal Building Systems on the upcoming projects.
Sponsored
Multipart Flushglaze Rooflights Provide Plenty Of Daylight Into This Stunning Home

Multipart Flushglaze Rooflights Provide Plenty Of Daylight Into This Stunning Home

Glazing Vision Ltd

The architect has created a connection with the outdoors in, utilising large fixed rooflights from Glazing Vision to bring daylight into the house and frame the surroundings.‘The most beautiful spot in the Netherlands’; that is the description of this country house in the marina ‘t Raboes according to the owners. Located on the Eemmeer, a place in the middle of nature, and away from the hustle and bustle of city life. The architect has created a connection with the outdoors in, utilising large fixed skylights from Glazing Vision to bring daylight into the house and frame the surroundings.Bringing in daylight with large minimalist skylights was a key requirement for the architect. The horizontal application of large glass surfaces demands a lot from the design and after many discussions, the architect was confident that Glazing Vision was the rooflight manufacturer that could implement what they had in mind.No framework in sight. Insulated glass with excellent insulation values. Glass that blends seamlessly into the architect’s design. A way to bring the outdoor feeling inside.Three multipart skylights have made this architectural vision become a reality.The back-to-back angles fit in very well with the rest of the modern contemporary interiors. To make it possible to darken the rooms, Glazing Vision has applied custom-made sun protection from Topshade.At the spot where the river Eem flows into the Eemmeer, architect De Kort van Schaik designed the country residence ‘t Raboes. The clients wanted to create a place where they could fully experience nature, but also withdraw from the hustle and bustle of the city.The house consists of three parts, connected by three covered terraces. Concrete walls and floors which blend seamlessly into the environment and large windows that frame the polder landscape.All energy on ‘t Raboes is generated locally. The solar cells on the roof of the marina building supply electricity. A heat pump that uses the surface water of the Eemmeer provides heating for the house and swimming pool.In the living areas, wood stoves have been used, all which use wood from their own grounds, providing readily available extra heating capacity.A beautiful contrast is created by the yellow epoxy bathroom furniture, designed by Sabine Marcelis. A piece of furniture consisting of a bath, wash bath and shower stands as a free-standing sculpture in the concrete bathroom. The skylight forms a completely frameless glass roof, which gives you the feeling of being outside even more.Sabine Marcelis states that she has designed her dream bathroom. The subtle rotation of the furniture gives you a fantastic view of the landscape from the bath.Taken aback by this stunning property, the architectural press has been impressed with all aspects of the design. De Volkskrant gives the Huis op ‘t Raboes five stars. “The Rotterdam architectural firm De Kort Van Schaik designed a house in which you live with the elements and at the same time are protected against them, thanks to a thick concrete coat.”
Sponsored
Denby Dale Passivhaus

Denby Dale Passivhaus

Knauf Insulation Ltd

CHALLENGEAn ambitious project, and one of the first certified PassivHaus homes in the UK - the Denby Dale PassivHaus in West Yorkshire, had to to use 90% less energy for space heating than the average UK dwelling – with a space heating need of only 15 kWh/m2/ year. The three-bedroom property is the first UK Passivhaus to be built in a traditional style using cavity wall construction and had to be built to a tight budget of £141,000.SOLUTION“We decided to go down the cavity wall path and arrived at the design for several reasons including: planning restrictions, thermal store, cost, and maybe most important of all, buildability,” explains Bill Butcher, Project Leader.Excellent performing insulation is obviously fundamental to Passivhaus construction and the Denby Dale house has 300mm Knauf Insulation DriTherm® Cavity Slab 32 in the walls, 500mm Knauf Insulation Loft Roll 44 in the roof void (both of which incorporate ECOSE® Technology) along with 225mm of high-performing Polyfoam® Floorboard Standard* insulation in the floor.“We’re fully filling the cavity with glass mineral wool insulation for the walls above ground, because it helps minimise air movement in the cavity and offers greater flexibility, fitting snugly around the ties, openings and imperfections of the masonry surface.” comments Bill Butcher.Economics, performance, availability, ease of fitting and reducing thermal bypass were all among the benefits of the Knauf Insulation products chosen.*No longer sold through Knauf Insulation.BENEFITSGlass Mineral Wool was specified over rigid insulation to ensure a tight thermal fit. Knauf Insulation DriTherm® Cavity Slabs are flexible enough to eliminate air gaps and prevent heat loss due to their inherent ability to knit together at joints between the slabs. If rigid insulation is used and fitted badly with too many gaps, air movement around and between the insulation boards is increased, which can drastically reduce its insulation value.Knauf Insulation DriTherm® Cavity Slabs are BBA Certified for all exposure zones and formally guaranteed for 50 years to prevent the transmission of liquid water from the outer masonry leaf to the inner masonry leaf.In addition to its thermal performance glass mineral wool also has other sustainable features. In manufacture it uses a high content of recycled glass bottles and requires less overall energy consumption than some alternative products, resulting in less carbon emissions. In addition, it can be recycled at the end of a building’s life and has zero GWP and zero ODP. ECOSE® Technology further extends these established green credentials as it is manufactured with 70% less energy than traditional binders and the products contain no dyes or added formaldehyde – providing the ideal solution to the eco-friendly house.
Sponsored
Residential Complex "Green Center"

Residential Complex "Green Center"

Schöck Ltd

Schöck in the "Green Center". New Residential Complex in Linz.In the Upper Austrian capital city Linz, a new urban district known as the "Green Center” is being created. It will provide about 800 apartments. In this context, the Schöck Isokorb® T is a substantial component.Seven non-profit real estate developers are building a new heart for the city on an area of 87,000 m² in its geographical center – the largest urban development project in Linz for decades. As of 2016, a total of 800 apartments will have been erected and in accordance with the socio-demographic development, 50 assisted living housing units and a kindergarten – all on the site of the former freight railway station.In this complex we wanted to create "a sea of green, stretching from private gardens, terraces, loggias and balconies up to the roof tops, " explained the city officials. This is also where its name comes from.14,000 m² of parklandAll objects are being built with net zero-energy efficient features. Solar collectors are being installed on many roofs to provide hot water. As part of the thermal insulation, Schöck’s Isokorb® T thermally separates elements while forming part of the structure. It is being used here on a massive scale in different variants. Around 1,700 units were installed in five different building complexes. The versatile range of Schöck Isokorb® T structural thermal breaks allowed the planners great scope for design and energy efficient solutions, since they not only offer thermal separation and additional fire protection but also freedom of interface access (e.g. balcony to living space). In addition to Isokorb® T, Schöck Dorn (shear reinforcement, heavy-duty dowel), Schöck Bole® (punching shear reinforcement) and the Sound Protection System Schöck Tronsole® (for stairwells) were used in many installations.A total of 89 apartments with 75 balconies will be built whereby the ground floor apartments each have their own small garden. The roof surfaces are all planted. The living areas of balconies that extend outwards have an L-profile. The resulting visual plant staircase on the sunny facades creates the impression of a hanging garden for the residents and neighbors. This has a relatively striking effect and yet this version of gradation and the enclosed balustrades provides a certain degree of privacy for the inhabitants. To achieve the desired level of green, balconies are to have two flower boxes each (1.5m in length) that will be tended to by the residents. The three-meter deep balconies are thermally separated with Schöck Isokorb® T elements.Arcades thermally separated"We have done everything that is technically expedient to save energy. The Isokorb® T has been installed in the terraces and arcades" (Karrer). A solar system was installed on the roof. "All the green diminishes the specified high construction density," says the architect. Gradated terraces ensure that even in the courtyards there’s good light. The buildings were handed over in the summer of 2014.
Sponsored
Four Seasons Hotel - Regupol® 4515 Multi (REGUPOL sonus multi)

Four Seasons Hotel - Regupol® 4515 Multi (REGUPOL sonus multi)

CMS Danskin Acoustics

The ChallengeThe extensively refurbished Four Seasons Hotel London at Park Lane required an acoustic underlay solution to effectively control impact sound with the marbled tiled floors of its guest bathrooms. Due to the prestigious nature of the hotel, superior impact sound attenuation needed to be achieved to exceed Part E requirements.Furthermore, having undergone a vast refurbishment programme the Four Seasons Hotel London now accommodates eight floors of guest rooms, so as well as attenuation of impact sound between floors it was necessary for the acoustic treatment to be easy to handle and install.The SolutionThe extensively refurbished Four Seasons Hotel London at Park Lane required an acoustic underlay solution to effectively control impact sound with the marbled tiled floors of its guest bathrooms. Due to the prestigious nature of the hotel, superior impact sound attenuation needed to be achieved to exceed Part E requirements.Furthermore, having undergone a vast refurbishment programme the Four Seasons Hotel London now accommodates eight floors of guest rooms, so as well as attenuation of impact sound between floors it was necessary for the acoustic treatment to be easy to handle and install.The ResultAchieving high levels of impact sound attenuation with a tiled floor finish, Regupol® 4515 Multi (REGUPOL sonus multi) exceeds the minimum requirement of 62dB or less specified by Part E regulations.Russell Coleman, senior project manager, Beck Interiors, commented: “As one of the finest examples of a world class hotel we needed complete peace of mind that the acoustic flooring solution we applied in the guest bathrooms provided more than effective impact sound isolation, especially with the marble floor finish. The technical support that we received from CMS Acoustics in order to specify Regupol® 4515 Multi (REGUPOL sonus multi) was excellent, with a member of the technical team taking the time to visit the site.”
Sponsored
Oval Village, London

Oval Village, London

FLOCONTROL LTD

A modern and green Mixed-Use project where people can live, work, shop, and play.  Oval Village is a major regeneration project in the South of London. It will include modern apartments, many new work opportunities, and aim to re-green the area resulting in better biodiversity.The first phase includes the apartment blocks Phoenix Court, Juniper Gardens and The Pinnacle offering modern homes with one-, two- and three-bedroom apartments. Between the buildings, landscaped gardens will offer room for relaxation and some of the buildings also provide access to private roof terraces. Residents will have a magnificent view over the Kia Oval cricket stadium and London’s iconic skyline. The project includes many sustainable initiatives such as attenuation rainwater tanks and recycled rainwater irrigation of green areas. A site-wide district heating network connected to solar panels and a super modern ventilation system shall secure low energy use whilst providing optimal indoor climate control. The space saving FloSet® Compact valve set is installed on each apartment’s FCU to handle heating and cooling duties. The FloSet® Compact was chosen as it is the smallest FCU valve set in the market for pressure independent automatic balancing and flow control. Each FloSet® Compact includes a FlowCon By-Pass Mini with only a 40 mm center distance, a FlowCon Venturi Metering Station, and a FlowCon PICV. The valve set is fitted directly over the FCU drip tray. The valve set offers 5 different operation modes. These include normal operation, back flushing, forward flushing, coil isolation/system flush and full isolation. The FlowCon PICV insert solution provides flexibility in all project stages from selection, setting and commissioning to servicing. All-together a compact and smart solution providing optimal indoor comfort, reduced energy consumption and a better building CO2 footprint.
Sponsored
vXtream Data Centre

vXtream Data Centre

Meesons A I Ltd

Headquartered in London, vXtream is a leading Private Cloud Managed Service Provider that has 7 global data centre locations. Having built up 2 years’ experience, vXtream services are relied upon by international companies, businesses of all sizes, and creative professionals. In order to protect their vast clientele’s data and hardware, a multi-layered security approach has been put in place featuring 24/7 on-site security, high-definition CCTV cameras, and biometric security approved by the NPSA (National Protective Security Authority). ChallengeDue to the ISO27001 certification that vXtream holds, they are committed to continuous improvement and risk management; therefore, a further layer of security was identified as needed for their data hall. This further layer of security had the challenge of preventing tailgating into the data hall to ensure access could be controlled and monitored. The solution would also need to integrate with vXtream new biometric system to enable fingerprint recognition entry. As well as this, the space within the data hall needed to be preserved so that further expansion could happen in the future with the data centre’s planned growth.  Solution To gather a good understanding of what vXtream challenges were, Meesons visited the site to gather a good perspective. With this, the FPJ140 2S Security Portal was proposed as a suitable solution. Since this product offers a high level of security, it helped overcome the risk of tailgating with the 2-zone pressure mat that provides a second level of verification, ensuring only one person is present in the portal at once. On top of anti-tailgating, the FPJ140 2S pressure mat is also capable of detecting hardware being removed from the secure zone. ResultsWith the FPJ140 2S Security Portal in place at vXtream, it proves as an effective security solution that prevents tailgating. It has created a secure line to the data hall and works well with the access control system that the data centre uses. With stainless steel cladding, we helped vXtream achieve a premium look that complements the surrounding environment. 
Sponsored
Allington Sluice Lock Gate, River Medway, Kent

Allington Sluice Lock Gate, River Medway, Kent

Saint-Gobain Weber

A £2.7million Environment Agency project to renovate an ageing river sluice facility on the River Medway in Kent, has required the technical attributes of webercem five star repair concrete and the high-build properties of webercem HB30 mortar. The structural sluice repairs are now complete with new gates and operating systems installed, bringing the sluice performance up to standard. Reflecting the substantial improvement in the river water quality over recent years, a new fish and elver pass has been created to enable fish to travel further upstream in the clean waters. This has enhanced the habitat in upper sections of the Medway, whilst allowing migratory and freshwater fish free passage. Constructed in 1937 the Allington Sluice lock gate is the last on the River Medway before it becomes tidal. Although the sluice is not listed, the Environment Agency took a keen interest in the repair of the structure due to its location adjacent to the Museum of Kent. Areas of failed surface concrete that had spalled, due to 70 years of weathering, were repaired sympathetically to match the existing finishes. These areas were cleaned back to sound material with all loose material removed. The major repair areas required shuttering before pouring in the flowing recasting concrete. webercem five star repair concrete is a pre-blended cementitious material that conforms with BS EN 1504 : 3 as an R4 mortar and also with the Highways Agency specification BD 27/86. It contains non-reactive aggregates and low alkali content. This is a shrinkage-compensated, high-strength flowing repair concrete specifically designed for permanent structural repairs that delivers a compressive strength of 65N/mm² after 28 days.Additional smaller damaged areas of the sluice structure have been improved with webercem HB30 repair mortar which is ideal for façade repairs where high compressive strength is not required. webercem HB30 is an acrylic-polymer modified, high-build façade repair mortar that complies with BS EN 1504 : 3 as an R3 mortar. Damaged areas were cut away and any steel re-enforcement was cleaned and coated with webercem keycoat prior to the application of the webercem HB30. This product has a unique shrinkage compensation system that ensures long-term dimensional stability. webercem HB30 is easy to apply with low permeability to water, carbon dioxide and chlorides.Main contractor Jackson Civil Engineering of Maidstone, Kent, carried out the sluice gate works while Structural Renovations Ltd of Slough, Berkshire, carried out the concrete repairs in the overall reconstruction, renovation and modification programme of the main structure. The project was designed by Atkins for the Environment Agency, who also undertook site supervision during the renovation procedure. In addition to the repairs and fish pass, a new wheelchair access has been formed allowing cross river access at this point on the Medway.
Sponsored
Queens House - Profipress and Viega Smartpress

Queens House - Profipress and Viega Smartpress

VIEGA LTD

Viega has supplied its cold applied Profipress and Sanpress Inox press connection systems to the latest refurbishment of the 17th century Queen’s House in Greenwich.Queen’s House, a Grade I listed building and scheduled ancient monument, was originally built between 1616 and 1635 and is the last surviving section of the palace of Greenwich. Queen’s House is now part of the Royal Museums Greenwich and is home to a large collection of important paintings, drawings and sculptures. Over the last few years the 400-year-old building has undergone a program of vital maintenance.The scheduled ancient monument protection is granted to sites of national architectural importance and makes it a criminal offence to damage the monument in question. The importance of the building meant that during the maintenance work the materials and methods used had to be carefully considered. For example, no hot works of any kind were permitted on-site so traditional soldering or brazing of pipework was not an option.Mechanical and electrical maintenance specialist Red100 was selected to carry out the work as the latest in a number of contracts to work on the building. The renewal of the pipework systems included the heating and chilled water systems, for both of which the supply comes off a header pipe from a plant room located in another building. The contract also included work on the greywater system.As a result of the restrictions on hot works, press connection technology was the chosen methodology for the pipe installation. Viega’s Profipress system was selected for use on the copper heating and water pipework while the stainless steel greywater pipe was connected with Sanpress Inox fittings.Stephen Phillips, Director at Red100 said: “We were familiar with press connection technology, having employed it on a number of similar projects. We had been recommended the Viega systems and were impressed by what we saw when we visited Viega’s production facilities in Germany.”Paul Burkett, Technical Sales Manager at Viega commented: “After discussing the requirements with Stephen at Red100 we were confident that the Viega products fitted their needs exactly. Also the range of different press connection options offered by Viega meant that there were suitable products available as the scope of the work expanded.”Due to the historical significance and protected status of the building as well as the priceless nature of the artwork housed within the Queen’s House, the security of the connections was paramount. Any water leaking from incomplete or inadvertently unpressed joints had to be avoided due to damage it would cause. The SC-Contur feature designed into products from across the Viega range, including Profipress and Sanpress Inox, ensure that any missed connections are reliably identified during testing. This avoids expensive and potentially damaging failures once the project is complete.Stephen Phillips concluded: “We were delighted with the performance of the products. The installation on Queen’s House went very smoothly and as a result we have subsequently used the Viega systems on other projects."
Sponsored
Protect the building aesthetic with coated hand-formed bricks

Protect the building aesthetic with coated hand-formed bricks

Vandersanden Brick

Over time bricks can discolour and lose their lustre because of the impact of wet weather, air pollution or efflorescence. The result can have a detrimental effect on a building’s visual aesthetic, compromising the architect’s design vision and reducing the value of the property for the owner. Brick manufacturer, Vandersanden is the first company to develop a viable, large scale coating solution to provide superior protection against efflorescence as well as secondary protection against the effects of pollution.Vandersanden’s automated coating formulation makes facing bricks water-repellent and resistant to the effects of air pollution and efflorescence, ensuring façades remain beautiful and untarnished throughout their lifetime. This innovative and environmentally sustainable process which also makes it easier to clean the brick, if dirt or damage does occur, has now been fully rolled out across the entire Vandersanden hand-formed brick range available to UK specifiers.Vandersanden worked with Belgian University, KU Leuven, to develop the solution which treats bricks with a special coating after the firing process. The process penetrates to a depth from 5mm to 15mm whilst retaining the original colour of the brick.The liquids contain no harmful substances or chemicals that can damage the brick or the environment and is automatically applied at Vandersanden’s manufacturing facilities in Belgium and The Netherlands.A coated brick has exactly the same pore structure as a non-coated brick and the number of pores and their size remain the same. However, as the walls of the pores are covered with a water-repellent layer, the water droplets are no longer attracted to the walls and will not be absorbed. As the pores remain open, the bricks also retain their resistance to frost.Applying the coating during the production process, eliminates the need to coat the bricks with an applicator once they have been installed, which is a highly specialised and expensive process. It also reduces the often laborious and costly task of prepping the facade for a coating and the regular maintenance required.“Creating beautiful facades that will stand the test of time remains crucial for Vandersanden,” says Jean-Pierre Wuytack, CEO at Vandersanden. "Thanks to our commitment to innovation in product design and manufacturing, we can ensure a lifetime of colour-safe brick performance for architects and their clients. We are proud of our coated solution which demonstrates how Vandersanden is the natural partner for architects who care passionately about creating the very best, most long-lasting aesthetic for their buildings.”Vandersanden coated bricks come with a 25-year guarantee and the company has worked hard to ensure these bricks can be delivered at the same cost as non-coated bricks.Vandersanden produces a vast array of high-quality bricks in different finishes and colours, ranging from reds and browns, to greys, creams and buffs that will inspire and enable the design and construction of beautiful buildings.To find out more, register for our RIBA approved CPD #2 "How to avoid brick stains and efflorescence" here CPD – Continuing Professional Development | Vandersanden
Sponsored
Transport Hub, Porth

Transport Hub, Porth

Cellecta Ltd

Porth Transport Hub is an integrated bus and rail interchange part of the Porth Regeneration Strategy located at the existing railway station. The hub is modern and attractive at the heart of the Town Centre, providing seamless travel across bus and rail. The development saw demolition of three buildings to include electric vehicle charging points, a taxi rank, cycle stores and several upgrades across the local Active Travel network.Cellecta’s HEXATHERM XFLOOR 300 was specified by Redstart due to its high resistance to compression and closed cell structure that provides unrivalled resistance to water absorption, making them ideal for a multitude of domestic, commercial, and educational applications.Encon Construction in partnership with Rhondda Cynon Taf Council was awarded this 530m² contract for this development in Porth.
Sponsored
LPG for hotels, restaurants & pubs

LPG for hotels, restaurants & pubs

Calor Gas Ltd

If your hospitality establishment is off grid, here at Calor you can benefit from our versatile LPG heating solutions which translate into both fuel and CO2 savings when compared with oil, keeping your customers happy with hot water and piping hot food. Follow the link to read through the case study with one of our clients, Nash Manor House. ''The oil tank has rusted and started leaking and I was concerned about the impact that this might have on the environment. I also didn’t like the fact that oil was a target for thieves – so I wanted a fuel that could not be easily stolen. On paper LPG appeared to be more expensive than oil, but in practice that has not been the case.''
Sponsored
Green facade covers like an envelope

Green facade covers like an envelope

RENOLIT Cramlington Ltd

Roof and facade cover... CHALLENGE For the design of a youth centre a Belgian architect wanted to have a fully homogeneous and waterproof cover for the roof and the facade. This envelope technique needed to be combined with a more ecological and aesthetically pleasing green wall design. SOLUTION For the waterproofing of the roof surface a standard RENOLIT ALKORPLAN roofing membrane was used. For the facades the architects opted for a RENOLIT ALKORSOLAR fixing system as the base to attach the final greenwall system. As the roof and the wall covering (waterproofing) are the same material there were no jointing issues. The whole building has been covered with RENOLIT ALKORPLAN roofing membrane. The facade details were similarly accomplished as standard roof details and RENOLIT ALKORSOLAR profiles were used to fix the rain water pipes from the roof.
Sponsored
217 Bath Road, Slough

217 Bath Road, Slough

Sylan

217 Bath Road is an 80,000 sq. ft contemporary office space based in Slough. 217 Bath Road has under gone a huge refurbishment now offering a striking reception and full height atrium, flexible office floors and an onsite café.Sylan Products Supplied:High Pressure Laminate Toilet CubiclesFlush frontedStylish and elegantInvisible fixing systemFull height cubicleAvailable Fronts onlyAvailable in over 30 laminate coloursNo hefty price tagSGL Z Lockers on Cantilever BenchMade from water resistant Solid Grade LaminateHardwearingMultiple locker configurations Available in over 30 colours, you can match to your cubicles
Sponsored
FasTop RS69 polyurethane cement used for Bangladesh food production plant

FasTop RS69 polyurethane cement used for Bangladesh food production plant

Sherwin-Williams

  ​​​​​​​The FasTop RS69 polyurethane cement system was used for this ongoing Bangladesh food production plant project to deliver a heavy duty hygienic floor. Sherwin-Williams FasTop Multi RS69 product used in this system delivered a thickness of 6 mm overall and 9 mm in selected areas under machines where the floor would be subjected to boiling water. The initial area totalled 3500 sqm, and then further areas were done as the applicator worked through the factory. The project was the first time Quality Floors Bangladesh Ltd. team had taken advantage of the FasTop technology which featured extreme application conditions, including temperatures of 34-36oC, day and night, and also air humidity up to 100%.
Sponsored
Tormarton Village Hall

Tormarton Village Hall

Gerflor Flooring UK Limited

When the idyllic village of Tormarton nestled in the Cotswolds wanted to transform the main room in their village hall, the committee responsible for organising and specifying a replacement floor would choose Taraflex® Multi-Use from international flooring specialist Gerflor.Tormarton has a population of about 350 people from a wide variety of backgrounds. At the centre of village life is the parish hall which provides a blank canvass for a raft of local community activities.Stewart Waters, Chair of the Tormarton Parish Council commented, “We specified Gerflor Taraflex® Multi-Use indoor sports surface as it would cater for a variety of needs. The new Taraflex® sports vinyl floor is much easier to maintain and clean and so much brighter than the old, dated tiles.”Commenting on the project Chris Pursey, Gerflor Area Sales Specification Manager, Southwest & Channel Islands said,” The existing subfloor consisted of old vinyl tiles, which although were well bonded to the substrate, presented a health and safety risk if removed due to possible presence of asbestos.” Chris Pursey added, “For this reason, we specified that the installation should ideally be over an Isolsport membrane, which left the tiles undisturbed and also enabled the installation to be done quickly with minimal floor preparation.”Stewart Waters ended by saying, “We have had lots of positive comments and all parties are really pleased with the refurbishment. We would definitely choose Gerflor flooring again.”Taraflex® sports flooring has been fitted at every Olympic Games since 1976. Approved by many National and International governing bodies as a world class sports surface, it is also widely installed within the education, community, leisure, health, and fitness sectors.
Sponsored
SOLUTIONS | THUMS Island: Grissom Waterfall Rehab

SOLUTIONS | THUMS Island: Grissom Waterfall Rehab

Five Star Products

Date of Project: August - September 2014Project Owner: Occidental PetroleumProject Contractor: Hugh Roberts ConstructionMarket/Environment: Oil ProductionSubstrate: Gunite from the 1960sProduct Used: Five Star Structural Concrete V/0®Project Size: 500+ PailsProject DetailsIn 1965, four artificial islands were built in San Pedro Bay off the coast of Long Island to conceal oil pumping stations. In the year 2000, Occidental Petroleum purchased the islands, known as THUMS Islands or Astronaut Islands, and operations. The islands contain significant landscaping, a waterfall, and tall structures concealing the drilling rigs, including one known as The Condo and often mistaken for "a ritz hotel" by those on land. Island Grissom is the closest to land and contains more sculptured screens than the other islands.The ChallengeOver the years, wind and water have taken their toll on the concrete structures around the island, causing a great deal of deterioration. A few obstacles to overcome were:The depth of repair (Tapcons were driven into the substrate for added reinforcement in the deeper areas of repair)Direct sun/heatHeight of repair was as high as 100 feetLimitations on water saturation for presoak and wet cure.Deliveries had to be scheduled precisely as all products had to be shuttled over to the island via ferry.Five Star® SolutionChosen for this demanding repair project was Five Star Structural Concrete® W/O because of its rapid-setting properties and ability to be used on vertical and overhead surfaces. Moisture-sensitive coatings could also be applied in 8 to 24 hours, speeding up repair time.This high-strength, permanent concrete repair material allowed the workers to make repairs quickly and efficiently, using only one product for thin and thick placement.
Sponsored
New Brabantia headquarters has a sustainable eye-catcher with living green walls

New Brabantia headquarters has a sustainable eye-catcher with living green walls

Mobilane

The new headquarters of interior design brand Brabantia in Valkenswaard was recently completed. Several green living walls have been installed in the office, contributing to the company’s sustainable image. The entire office was built according to the BREEAM standard, designed by Gert Jan Kruijning of AA Architects. The vertical greenery in the building was installed by Ten Brinke Interieurbeplanting.Sustainable DesignBrabantia’s new head office was built climate-neutral according to BREEAM standards. The building’s skeleton is made entirely of wood. The green walls in the office bring in the more natural look and also provide many benefits such as oxygen production and an improved indoor climate.Thomas Deenen, Commercial Director Brabantia Benelux & DACH: ‘Implementing vertical greenery in the design was an idea of the architect, following Brabantia’s requirements. The requirements were; lots of green, sustainable, pleasant atmosphere and a natural transition from outside to inside. The green living walls are a real eye-catcher, a real image-defining part of the interior. The vertical green looks very nice, gives a warm and natural feeling and a fresh smell’.Innovative and sustainable green wall systemThe green walls were installed by Mobilane dealer Ten brinke Interieurbeplanting using the LivePanel Indoor system. LivePanel Indoor is an innovative and sustainable system in the field of vertical greenery. It is suitable for installation against new and existing walls. It is possible to water the green walls manually, automatically or by means of a tank. For the walls at Brabantia, automatic watering was the option chosen.A century of quality and designBrabantia started out in 1919 as Van Elderen & Co in Aalst, producing milk churns, jugs, sieves and funnels. Over the years, Brabantia has grown into a global interior design brand, known for its smart and stylish household products.Client: BrabantiaArchitect: AA ArchitectenConstruction period: 2022Installation: Mobicare
Sponsored
Blackfordby St Margaret’s Primary School

Blackfordby St Margaret’s Primary School

Polyroof Products Ltd

The building that would be the St Margaret’s Primary School, officially opened by Robert Leitch the local parish vicar in 1889 provided education to children up to fourteen. The school underwent many changes in structure throughout its over 100-year existence continuing to provide the high level of teaching it always held. In 2012 it underwent a further change in the form of a huge modernisation project that would extend the school and allow more students to be taken. Unfortunately, leaks were reported on the older parts of the building and despite localised repairs were not ultimately solving the problem.After reports of leaks it was imperative that the roofs in question were inspected to find where the issues were originating, in action to this a site survey was undertaken. The survey highlighted the original build-up consisted of an asphalt on a timber deck, this original system was in a aged condition. It was also shown that standing water and vegetarian had developed on the roof. In order to protect the building from further leaking it was determined that the roof would benefit greatly from the installation of a high-performance waterproofing system.Along with waterproofing improvements, there would also be improvements made to the falls which would reduce the amount of standing water present on the roof.Waterproofing would not be the only recommendation; the roof was also to receive a full thermal upgrade which would further provide the benefit of increase fuel bills and less energy consumption for the school.Taking into consideration all these points, the Polyroof Technical team began creating a bespoke specification that would provide the details needed to make these recommendations a reality. The Polyroof Approved contractor Thomas Cassie & Sons was specifically chosen to undertake this project due to their experience in liquid roofing systems. With a specification and approved contractor ready the project could officially commence.
Sponsored
Waterproofing the London School of Economics

Waterproofing the London School of Economics

Newton Waterproofing Systems

In April 2016, the world-renowned London School of Economics announced that Grafton Architects were to design their next major project. The Marshall Building at 44 Lincoln’s Inn Fields, built by Mace Group, includes an extensive two-storey, mixed-use basement that will house plant areas, squash courts, changing facilities and a sports hall, covering a total of over 2,250m2 of floorspace and presenting quite the project for Newton Specialist Contractor Cast Contracting Ltd (CCL).Newton Specialist Contractor CCL were appointed to design, supply and install the waterproofing by principal contractor Mace Group in late 2019.To provide a completely dry, guaranteed solution on such a high profile project, CCL recommended the Newton CDM System.Otherwise known as Type C waterproofing, the CDM System is the safest and most reliable form of waterproofing.Prior to installation, CCL applied Newton 906 Lime Inhibitor to the new slab to prevent free lime from the concrete from affecting the drainage membranes. The Type A liquid waterproofing membrane Newton 103-S was also applied internally to many of the concrete surfaces as a barrier to water.With preparations complete, over 2,250m2 of Newton 520 eco membrane was installed to the floor and over 570m2 of Newton 508 membrane installed to the walls to create the Newton CDM System. A drainage system of Newton Basedrain channels also directs any water captured by the membranes to the point of discharge, and the whole system was sealed with Newton OverTape.Despite requiring dedicated delivery slots, and working to an extremely tight program of work, CCL were praised on the quality and speed of their installation, which was completed well within the time limit.The Newton recycling service was also a great success, recycling 115 kg of HDPE waste and therefore preventing over 132 kg of CO2 emissions.
Sponsored
V7-300- University of Lincoln- NATIONAL CENTRE FOR FOOD MANUFACTURING

V7-300- University of Lincoln- NATIONAL CENTRE FOR FOOD MANUFACTURING

Velair Group Ltd

CLIENT The National Centre for Food Manufacturing at University of Lincoln leads the way for food industry innovation for businesses and employees.PROJECTProcurement of a hand dryer suitable to use within food manufacturing areas. It must be hygienic, dry hands quickly, make minimal noise and limit the creation of slip hazzards.SOLUTION- V7-300Over 300 jets of strategically placed air remove water from both sides of hands simultaniously without needing continuous hand movement. The Veltia V7-300 hand dryer uses patented technology to stop water from your hands ending up on the floor surface. This range uses Microban technology - an antibacterial protection impregnated at the manufacturing stage (that doesn’t wear out) which inhibits the growth and transference of microbes and harmful bacteria. There is also a ZeroSmell feature that neutralises bad odours. If that wasn’t enough, the V7 boasts of low noise and low energy use, too.The National Centre for Food Manufacturing (NCFM) is dedicated to helping food industry employees advance their careers. They understand the demands of working in this fast moving, dynamic industry. V7-300 hand dryers were fitted into NCFM factory areas two years ago, and the units continue to be easy to clean, quiet and perform their task very well. The hand dryer gives a very good first impression to our visitors as they pass through our hand washing systems. Alongside an extensive academic offering the NCFM is also committed to spurring innovation within the sector. An important role of the NCFM is to help food companies see what good looks like within the food industry.“The V7-300 continues to hit the high standards we set out for training and education work.”
Sponsored
Embracing Passive House Design: Enhancing Efficiency with Automatic Doors

Embracing Passive House Design: Enhancing Efficiency with Automatic Doors

FAAC Entrance Solutions UK

As concerns about environmental sustainability continue to escalate, the concept of Passive House (Passivhaus) design has emerged as a game-changer in creating energy-efficient buildings.This innovative approach focuses on maximizing a structure’s energy efficiency while maintaining optimal comfort for its occupants. One key element that can complement and enhance Passive House principles is the incorporation of automatic doors.Understanding Passive House DesignPassive House design revolves around stringent energy efficiency standards. It employs various techniques to minimize energy consumption, such as superior insulation, airtight construction, high-performance windows, and heat recovery ventilation. These elements work harmoniously to create a building that requires minimal energy for heating or cooling, leading to significant reductions in carbon emissions and energy costs.The Role of Automatic Doors in Passive HouseAutomatic doors might not seem like an obvious addition to Passive House design, but their integration can significantly contribute to its efficiency goals. Here’s how:Controlled Air Exchange:Passive House principles emphasise airtightness to prevent energy loss. Automatic doors, equipped with sensors and precise control mechanisms, can efficiently regulate the airflow, allowing for controlled ventilation while minimising the loss of heated or cooled air. This feature ensures that the building maintains its airtightness while providing necessary air circulation.Energy Conservation:By automating the opening and closing of doors, energy loss due to unnecessary drafts or human error is minimised. The doors swiftly close after use, reducing the transfer of heat or cold air between different zones within the building. This helps in maintaining the indoor temperature, contributing to the overall energy efficiency of the structure.Accessibility and Comfort:In addition to energy efficiency, automatic doors significantly enhance accessibility, ensuring ease of entry and exit for all individuals. The seamless operation of these doors adds convenience and comfort to occupants while aligning with the core principles of Passive House design.From revolving doors to sliding doors, we have just he solution for your energy saving needs. We help our clients save energy because we know how important it is to cultivate a sustainable future and reduce environmental impact, while simultaneously promoting cost-effective and efficient solutions for their individual needs. Find our new energy saving FAAC sliding doors here solutions here, and energy saving data here.ConclusionPassive House design has revolutionised the way we approach building construction, emphasising sustainability and energy efficiency. The incorporation of automatic doors complements these principles by enhancing airtightness, energy conservation, and overall occupant comfort.In the pursuit of creating eco-friendly and energy-efficient buildings, integrating automated systems like doors not only aligns with Passive House standards but also sets a new benchmark for sustainable architecture. These technological advancements not only serve functional purposes but also play a pivotal role in reducing environmental impact while prioritising the well-being of the building’s occupants.Check out more of our Energy Solutions.For more information or assistance with any project, please contact enquiries.esuk@faactechnologies.com where we can provide expert guidance and detailed documentation.
Sponsored
Bitumen Case Study: Whitburn Partnership Centre

Bitumen Case Study: Whitburn Partnership Centre

Bauder Ltd

Whitburn Partnership Centre was designed by Project Architects, Matthew Fair, Neil Forrester and Jamie Bateman at Smith Scott Mullan Associates for West Lothian Council. The design of the contemporary £4M building restores the historic Whitburn Burgh Hall original façade as it is one of the towns most renowned buildings and incorporates a new-build two-storey extension.Located in the centre of Whitburn, this building is a community hub that embraces the West Lothian Council’s model of bringing together services that benefit local communities whilst delivering financial efficiencies through the decrease of council buildings. This building facilitates a library, community halls, museum and customer information service office, making it an important community resource. Project:Whitburn Partnership CentreProject type:New buildLocation:West Lothian, Scotland,Waterproofing:Bauder Total Roof System (BTRS)Roof size: 525m2Energy generated from PV array: 10.35kWp Specifier: Smith Scott Mullan AssociatesMain Contractor: Maxi ConstructionApproved contractor: ProCladd (Scotland) LimitedSolar PV installer: Intelligent Electrical SolutionsThe specificationTo support the West Lothian Council's sustainability objectives of achieving high energy efficiency, it was our responsibility to specify a waterproofing system and provide a solution for natural energy generation. The bituminous Bauder Total Roof System (BTRS) was chosen for this project as it features membranes that can withstand impact and tearing, as well as thermal insulation that met the required U-value of 0.15 W/m²K. This waterproofing system is verified by the BBA and offers a service life in excess of 35 years.The BauderSOLAR system was also specified, as it incorporates photovoltaic arrays for natural energy generation. The photovoltaic mounting system is attached to the roof without penetration of waterproofing or the deck, safeguarding the integrity of the waterproofing to fulfil its full-service life.Project challengesThe Architect’s design incorporated unusually high parapet upstands, which posed a challenge for installers. Area technical manager for Bauder, Christopher Langton, attended design meetings with the Architects and Main Contractor to discuss the best solution for installation. A mutual agreement was made for the underlayer to be mechanically fixed to prevent any slippage of the capping sheet membrane. Due to the height of the upstand, non-combustible insulation BauderROCK was incorporated into the design at these details.The installation of BauderSOLAR F uses prefabricated bituminous BauderK5K membrane sleeves to slip over the mounting plates and welded into position, anchoring the plates to the surface of the Bauder waterproofing system. Approved BauderSOLAR installers, Intelligent Electrical Solutions, installed the BauderSOLAR system, collaborating with ProCladd, approved contractor for the waterproofing installation, and other trades during the roof installation.There is a junction where the flat roof meets the original slate roof of the adjacent building, this detail fell under the torch free zone that hot air welding techniques are used to install the membranes within these areas.The resultInstallation of the Bauder waterproofing system may only be carried out by trained and certified operatives approved by Bauder. A project pre-start meeting was held by Bauder site technician, Duncan Hastings, and area technical manager, Christopher Langton inviting the Site Manager from Procladd and their Bauder badged operatives. During this meeting, they discussed the installation of the project, and identified the areas that required torch-free and torch-safe detailing. They also discussed how the project was going to be delivered in co-ordination with other trades working on the site at the same time, for example cladding and lead that was installed atop the waterproofing upstand details.Weekly site-inspections were carried out by Bauder site technician, Duncan Hastings during the project. Visiting the site frequently meant that Duncan could provide consistent support to the installers and answer any questions they may have had directly. It also meant that the quality of the roof installation was being monitored regularly to ensure it would be to a high standard, achieving the comprehensive guarantee.The approach taken to deliver this project on time and to budget was through meticulous planning and working to tight time frames. The organisation of the delivery of Bauder products to site had to be in line with the schedule to ensure that the site was ready to receive a delivery. With the project located in the busy centre of Whitburn next to a cross junction with traffic lights. This meant that timed delivery of products to site was required in addition to prebooked off-loading by pump truck and tail lift or by telehandler.Health, safety and environment was managed during the planning, design and installation of this project by advising that all installers follow the advice shown in the “Responsible Specification Checklist” produced by the National Federation of Roofing Contractors.In accordance with the Workplace (Health, Safety and Welfare) Regulations 1992, roof edge protection in the form of scaffolding was installed during installation. The project’s perimeters were surrounded by Heras fencing to isolate the construction site from the public. All scaffolds that were on the elevation next to the public had toe boarding and safety mesh where required.As standard, there was a one-hour Firewatch after the Bauder membranes have been installed using a gas torch. This was carried out by Procladd operatives each day when they were working on the project to ensure the welfare of the workforce, and the safety of other trades and that of the building. The 19kg gas cylinders were used on this project as they are easily transportable on the roof area. At the end of each working day, the cylinders were stored in a locked and designated gas storage unit on site.System installedBauder Total Roof System (BTRS)1 BauderK5KElastomeric bitumen torch-on capping sheet in charcoal grey. This product features a spunbond polyester reinforcement to allow the finished product to cope with structural movement without fracture, and a mineral finish to provide protection against UV degradation.2 BauderTEC KSA DUOA self-adhesive, elastomer bitumen underlayer. This product features distinctive technology for lap sealing.3 BauderPIR FA-TE flatboard insulationA rigid polyurethane foam board faced on both sides with aluminium foil.4 BauderTHERM DS 1 DUOA self-adhesive, elastomer bitumen air & vapour control layer.

Showing 1621-1656 of 1892

Feedback