NBS Source
I'm a manufacturer

"office"

3,755 results found

Sort by:

Showing 1225-1226 of 1226

Sponsored
City Hall, Sunderland

City Hall, Sunderland

Vebro Polymers

Client: Sunderland City CouncilLocation: Sunderland, UKSector: Mixed-Use FacilityYear: 2021Project Size: 3,500 m²System: vebro Classic TerrazzoA durable, attractive, impressive terrazzo flooring solution for the atrium, staircase, café, walkways and breakout spaces in the new City Hall development in Sunderland.FaulknerBrowns’s City Hall scheme provides a mix of private and public uses comprising two blocks, one five-storey and one six-storey tower, linked by a covered central walkway.Project backer Sunderland City Council is expected to move around 1,200 employees into the seven-storey building on the plot which, until recently, had laid dormant since the brewery’s demolition in 1999.Bringing together council staff from eight different offices around the city under one roof, the project is set to deliver net operational savings to the council of around £22 million over 25 years. The building will also include customer services areas, a fitness room, and an employment centre.The former Vaux Brewery site in Sunderland has been redeveloped as part of an ambitious £500m plan to deliver state-of-the-art commercial offices, residential, retail, leisure, hotel, and dining space.The brownfield site, which sits to the north-west of the city, is being developed in phases to bring a new mixed-use neighbourhood to the area. With the first phase that originally commenced in 2016 now complete, the second phase of the plan (Vaux 2) comprises the 17,775 square metre, £42 million City Hall, Sunderland.Vebro Polymers supplied its decorative epoxy terrazzo flooring system, vebro Classic Terrazzo, in two unique colour blends, RAL 3009 Red Oxide and RAL 7044 Silk Grey as part of the flooring package at the new Sunderland City Hall, which has been expertly project managed from prep through to finish by the team at MJF Group over a 4 month period.These terrazzo materials have also been used to create several pre-cast elements including the dining hall counter, central feature stairwell, and other items of furniture.vebro Classic Terrazzo is a highly decorative, but highly durable and long-lasting epoxy terrazzo flooring system. The material is installed as a slurry of wet components mixed with a blend of handpicked decorative marble aggregates onto the primed substrate.MJF Group is an established support services company providing specialist solutions to businesses nationwide.Since 2006 the company has built an enviable reputation in the commercial cleaning market, fuelling a later expansion into site services and specialist flooring alongside growth from local to national level.MJFs dedicated team of flooring experts are a group of highly skilled professionals who deliver a first-class service, ensuring all of their flooring solutions achieve outstanding results within an efficient and timely manner.MJF pride themselves on offering their clients extremely competitive prices, without ever compromising results.
Sponsored
Environment at the heart of Eden/A3 Bailey

Environment at the heart of Eden/A3 Bailey

Knauf UK

The 115,000 square feet, 12-storey office scheme Eden/A3 Bailey in Manchester is designed with the ambitious goal of becoming one of the most environmentally friendly offices in the UK.  This ambitious goal included one of the biggest green wall façades in Europe in accordance with Passivhaus principles. As such, it was imperative the products specified were both sustainable and high performing to meet the demands of the brief.The challenge would be to strike a balance between performance on site and sustainability in the long term. This meant suppliers who could demonstrate a commitment to sustainability within their supply chain were at an advantage. Combined with their quality and high-performance products, Knauf were chosen.Neil O’Toole, sub-contractor for Linear Projects elaborates: “Given the aim of the project, we needed to use specialist products. This combined with the familiarity we had with Knauf meant that they were specified for use within the building itself.”Rahul Vishwakarma, the architect for the project from Make Architects continues. “Knauf offered guidance not just on their own products but on overall wall build ups which assisted in making design decisions . Furthermore, we found that their sustainability credentials aligned with the project.”The specialist products used included Knauf Shaftwall. Designed to meet fire safety requirements and building codes, Shaftwall provides high levels of fire protection enhancing the level of safety within the building for occupants. Using Knauf Shaftwall also allows for greater space optimization, by allowing for the creation of fire-rated vertical shafts, including elevator or stairway enclosures and horizontal shafts for electrical and plumbing services. Ensuring centralized services within designated areas and freeing up space.What made Knauf Shaftwall really stand out for Rahul though was the versatility it offered. As he explains. “Knauf Shaftwall was perfect for use on this project because it can be adapted to different building designs and configurations. Giving us much greater flexibility in terms of the build-up and layout, thus allowing us to customize the system to meet the specific needs of the project. That it is durable and long-lasting was an additional benefit.”A range of Knauf High Performance Plasterboard was used to meet the acoustic requirements of the office space. Knauf Soundshield Plus and Performance Plus were used to ensure a quieter more comfortable working environment and to provide Knauf Performer wall types as partitions throughout the building.  Furthermore, Knauf boards contain Recycled Gypsum along with Natural and FGD gypsum to form a strong core and system performance.Knauf Encasement system with Fire Panel was used to meet the safety requirements for the building, by offering fire protection to encase the steel work throughout the building.Knauf Test Data was used to enable the boards to contribute to the holistic performance required. This was particularly attractive for the architects given the use of heat pumps throughout the building.Knauf Ready Mix Finish provided a sustainable addition to the products used. As not only did reduce the amount of water that needed to be introduced into the build, but it also reduced the amount of waste produced. This is because any unused product can be put back into the bucket and used for another project.Whilst these products assisted in the development of the Eden/A3 Bailey, there were challenges.Something that Neil elaborated on. “At the start there wasn’t a full design, which meant we had to be agile and smart with how we approached the build. We were having to adapt as we went along, something we were only able to do thanks to Knauf. Their familiarity with the systems we were using meant they gave us advice on the best way to put things together. And if we had any questions or needed help, they were always on hand to provide it.”Neil Shaw, Contractor at B&K expanded on these issues. “Initially, there were a few challenges regarding getting a fire system installed. We needed one that had fire test data to meet the requirements of the project and be compliant with regulations. We tested a few systems and eventually settled on Knauf Fire Panel as it was the system that best met our needs.”Throughout all these challenges, both Neils felt that Knauf were incredibly helpful and supportive.As Neil O’Toole explained. “I’ve known some of the team at Knauf for a long time. They were fantastic, they assisted with the design and provided site audits, ensuring that any questions we had were answered and any help we needed was provided.”Rahul agreed with the sentiment. “The project is quite a tricky one in terms of what we are hoping to achieve, but the team at Knauf are brilliant. It’s been really helpful being able to talk to the team at Knauf who are really knowledgeable about the field and are always quick to respond to any questions we’ve got.”The project is ongoing, but the signs are there that it will achieve its aim of being one of the most environmentally friendly building within the UK.

Showing 1225-1226 of 1226

Feedback