NBS Source
I'm a manufacturer

"heavy duty tile flooring"

6,684 results found

Sort by:

Showing 1045-1080 of 1234

Sponsored
Coombe Wood School Gain Support from DYNAMIK and Basketball England

Coombe Wood School Gain Support from DYNAMIK and Basketball England

DYNAMIK Sports Flooring

Jonathan Wilden, Chief Executive Officer for Folio Education Trust, speaks about the successful collaboration between Basketball England and DYNAMIK: “Folio Education Trust is delighted to have worked closely with both DYNAMIK and Basketball England to provide an inspirational court for the children of Coombe Wood School and others in the local community. Together we look forward to increased participation and the opportunity to support children discovering and then reaching their personal best in basketball.” For this project DYNAMIK installed over 800m2 of their Premium Engineered Sports Oak, with line marking focused on 3 main sports, Basketball, Netball and Futsal.
Sponsored
Keeping warm from the floor upwards with Grant underfloor heating

Keeping warm from the floor upwards with Grant underfloor heating

Grant Engineering (UK) Ltd

A Grant Uflex MINI low profile underfloor heating system has been installed throughout the entire downstairs of a four-year-old property, providing the homeowners with complete comfort in the rooms they occupy the most frequently.
Sponsored
Stainless steel open mesh floor grating for Vista Apartments at Chelsea Bridge

Stainless steel open mesh floor grating for Vista Apartments at Chelsea Bridge

Lang+Fulton

The new Vista apartments occupy an enviable location, close to Chelsea Bridge and overlooking Battersea Park. As a high-end residential project, the landscaping was given a high priority.Lang+Fulton were approached by the architects to propose a suitable stainless steel grating for pedestrian use, which would ventilate the underground car park. A grating with a heel proof mesh of 55x11mm was recommended and was designed with support beams and anchor bolts. The stainless steel was pickled and polished. In addition, 31m2 of galvanized mild steel grating with 66x33mm mesh was supplied for an area which was inaccessible to the public.
Sponsored
Tamdeen Square Residential Towers

Tamdeen Square Residential Towers

Halspan Ltd

Suma International Manufacturing Company fabricated 773 fire doors for Tamdeen Square Residential Towers, which are situated in Kuwait City.The FD60 doorsets incorporated Halspan Optima door blanks.Tamdeen Square is a new urban development in the south of Kuwait City that will feature 74 retail stores, a hotel, and Tamdeen Square Residential Towers. Strategically located in Sabah Al Salem, the project location has access to two of Kuwait’s main highways – Fahaheel Express Highway and the Sixth Ring Road Expressway.The Tamdeen Square Residential Towers project features three 40 floor towers with luxury residential apartments featuring a swimming pool, gymnasium, multi-purpose communal spaces, and a car park containing 800 spaces. The three towers combined contain 256 sea-view luxury apartments and 7 car parking floors.The elegantly constructed apartments have been finished to the highest international standards, and as such, Suma International Manufacturing Company decided to incorporate Halspan Optima door cores in this project.The fire-rated doors feature wooden frames and are located in all of the main entrances, the staff entrances, and the entrance doors in every apartment per level, the doors feature a bamboo veneer face panel and the drivers’ entrances feature white paint.Halspan Optima is durability tested to severe duty and features Halspan’s unique 3-layer particle board and is suitable for veneer, laminate, or paint finishes.Photography courtesy of Suma International Manufacturing Company.
Sponsored
The Dairy, Tunbridge Wells

The Dairy, Tunbridge Wells

Cellecta Ltd

The Dairy is a retirement Living Plus development built in 2017 for people over the age of 70. Providing both one and two bedroom apartments, each apartment has a fully fitted kitchen, underfloor heating, fitted and tiled shower room with level access shower and a 24 hour emergency call system. Facilities include a hair and nail salon, lifts to all floors, club lounge, restaurant and a south facing courtyard garden. Transport links to surrounding towns and cities are available via rail and road. The railway station has trains running directly to Charing Cross and London Bridge which takes one hour.Cellecta’s Mojave S1-8 was specified by Lewis & Hickey due to it being a lightweight option for an acoustic composite floor build up. This system has a low energy use, reducing running costs and co2 emissions, which benefits the environment.McCarthy & Stone were awarded this 2,860m² contract to construct this development on St John’s Road in Royal Tunbridge Wells.
Sponsored
Chippenham Care Home

Chippenham Care Home

Marley Ltd

Marley's Modern Interlocking Concrete Tiles within the shade of "Smooth Grey" were specified for the roofing of this new and wonderful extension of the Chippenham Care Home, which is opposite to Chippenham's newly built Golf Clubhouse. The Modern interlocking concrete tile is heavily chosen due to its slate-like appearance, ease of installation and due to it being a economical choice.
Sponsored
Tamesis 1

Tamesis 1

Steintec

A busy office building in Surrey with a granite paved entrance area subject to regular heavy traffic. Excellent aesthetics delivered despite the constraints of restricted budget, build-up depths and timescale.
Sponsored
Crystal Palace FC Training Ground

Crystal Palace FC Training Ground

GDL Air Systems Ltd

This multi-million-pound training facility at CPFC’s new-look academy includes a full-size indoor 3G training pitch.A state-of-the-art indoor training facility that will allow the football players to train in all weather conditions. GDL were approached to help with the ventilation requirements for the space. Six large rectangular recessed louvres were manufactured and installed to meet the demands of extracting the air from the indoor space generated by eight large fans each with a duty of 12900 m³/hr. 
Sponsored
Anti-terror glass balustrade, Birmingham UK

Anti-terror glass balustrade, Birmingham UK

Pure Vista Ltd

This is a BLASTguard glass balustrade installation by Miller Fabrications at the University Station in Birmingham. As a busy train station, a top-of-the-range balustrade was required to provide the highest quality of safety. More and more transport locations are upgrading their sites in order to improve the security of the public. This could be as a result of the new upcoming Protect Duty that is coming into force as a result of the terror attack at Manchester Arena in 2017. Pure Vista developed an anti-terror glass balustrade system with two variations. BLASTguard to withstand a bomb blast and BULLETguard that utilises bullet-proof glass. The BLASTguard balustrade system was designed in line with Pure Vista’s range in being a frameless system where the glass is only required to be held by the base shoe. A through-glass handrail can be added as required on many projects, such as this one. The glass can be at 1800mm high and still withstand the 3kN public area loading and achieve the blast testing. For this station development, the design team specified that a blast-proof system needed to be installed. Miller Fabrications took part in this large project and were the team who successfully installed BLASTguard, they stated that the installation was successful because the system is straightforward to install.  At University Station BLASTguard can be found of staircases around the main entrance. Within crowded spaces, anti-terror barriers can be used to protect different groups of people. By positioning the product on stairs and walkways, a blast will be more contained and therefore, the area becomes safer. If you would like to know more about Pure Vista’s anti-terror balustrade products, we run a CPD session on these products and how they can be used. As well as the key information on Martyn’s Law (protect duty), you’ll discover the fundamentals of Protect Duty, PALs, and the key information on anti-terror glass balustrade products. Learn about our commercial strength balustrade channels including the fire rated balustrade which can be used on installations over 11m high. The session will end with a Q&A where we can discuss your upcoming projects and ensure you leave this CPD with an increased knowledge of Martyn’s law and anti-terror glass balustrades. 
Sponsored
Emshield DFR-2 Seals Wide (100mm +), High Movement (+/- 50%), Fire Resistant (min 2hrs), Structural Deck & Floor Movement Joints at the Wood Wharf Development in London

Emshield DFR-2 Seals Wide (100mm +), High Movement (+/- 50%), Fire Resistant (min 2hrs), Structural Deck & Floor Movement Joints at the Wood Wharf Development in London

NCC – Emseal Movement Joints

Client: Canary Wharf Group Consultant: Adamson Associates Architects Main Contractor: Kilnbridge Construction Ltd Main Products Used: Emseal DFR-2 SystemsWood Wharf Development is certified as a BREEAM Outstanding rated, sustainable mixed-use development that covers a 23-acre site. It consists of 6 individually designed building structures that provide 2 million square feet of curated workspaces and offices, more than 3,500 new residential homes and 500,000 square feet of retail space. The site is being developed as a new 5G and Wi-Fi-6 enabled, London District to include more than 9 acres of interconnected riverside leisure space with boardwalks, squares, and parks to create an oasis of urban green space. The new multistory building structures were designed with 50mm wide structural expansion joints between floor slabs to accommodate the high levels of thermal movement anticipated, as well as the vibrations from traffic and other loadings. These joints also had to minimise any noise transmission through the floors and provide a minimum of 2-hours fire resistance, which is a key reason the consultants selected the Emshield DFR-2 System as it could easily meet all these stringent requirements. In fact the innovative Emshield DFR-2 System can accommodate more than 100% joint movement capability and is CE Marked to EN-1366-4 for up to 4 hrs fire resistance. This unique Emseal solution also has the advantages of not requiring any potentially damaging mechanical fixings into the structure, as it is easily bonded into the joint, with access only required from above. 
Sponsored
Morris Blitz Court

Morris Blitz Court

Bauder Ltd

Morris Blitz CourtBauder LiquiTEC cold applied liquid waterproofing systemSynopsisMorris Blitz Court is a residential housing estate in Hackney that has undergone an extensive amount of refurbishment works as part of the Decent Homes Programme. Included within the approved scheme was the renovation of all of the building’s balconies and walkways, as well as the transformation of the 1,000m2 concrete podium deck located above the car park into an aesthetically pleasing social space.Bauder Building BoardProject:Morris Blitz Court​Location:Hackney​Roof Area:1,400m²​Specifier:Mansell Construction Services​Approved Contractor:Armour Group​The specificationVarious waterproofing options were explored by the client, however, it was decided that the Bauder cold applied liquid systems would be the optimal solution given all the requirements.Project challengesOne of the major challenges for this project was the low door thresholds connecting to the podium deck, which couldn’t be raised, meaning that the build-up for the majority of the cold applied waterproofing and landscaping elements would need to be less than 100mm in height. Because of these restrictions the only drainage and protection board suitable within the system was Bauder’s Versicell 20, which is just 20mm in height but can withstand extremely high loading. The surface of the deck consists of three distinct finishes; permeable paving on the ground floor patios and walkways, artificial turf featuring fibreglass planters to serve as a communal garden and rubber mulch to create a play area for children.Balconies and communal walkways were waterproofed with Bauder’s cold applied reinforced waterproofing layer; which is extremely fast curing and can withstand foot traffic within an hour of being installed. Residents remained in situ throughout the installation so working hours were scheduled to accommodate for school hours. Despite the challenges encountered all works were completed on time and to budget. Products appliedBauder LiquiTEC SystemA cold applied liquid waterproofing system that offers the maximum versatility in roofing. The fast curing properties of the PMMA resin allow for exceptionally fast installation times.System installedBauder LiquiTEC cold applied liquid waterproofing system1 LiquiFINISHA PMMA based resin that requires a catalyst and is solvent, isocyanate and halogen free. The final coat, used to seal and bind the quartz wearing course in LiquiTEC Balcony, Walkway & Terrace Systems, and also to provide the desired colour to the finished waterproofing.2 LiquiPAVE RFA combination of LiquiPAVE R resin and LiquiPAVE F filler. It is a fast curing, cold applied liquid self-levelling waterproofing aggregate bond coat. When topped with quartz, is suitable to receive heavy duty foot traffic. 3 LiquiBALKONA fast curing waterproofing resin, for use on the main flat area of the LiquiTEC Reinforced Balcony, Walkway & Terrace system, beneath the LiquiPAVE RF Deck Floor Layer or other landscaping elements.AdvocacyHarsha Amin, Project Manager from Hackney Homes:“Bauder delivered a comprehensive waterproofing solution of the highest quality; providing expert technical support throughout the project. They have successfully transformed this housing estate in terms of appearance and functionality.”
Sponsored
Porous, all weather car park surface for large brewery

Porous, all weather car park surface for large brewery

Tarmac

A new 4,000m2 staff car park was required for this large brewery in Monmouthshire. Sustainable water management was a key priority for the client. As a result they had specified full infiltration porous construction that would allow rainwater to soak into the pavement, before being slowly released into the ground. This would help to reduce the rapid runoff which can cause local drainage systems to be overloaded after heavy rainfall.The new ULTIPOROUS surface provided a safe, all-weather parking area which would avoid surface water after heavy rainfall and formation of ice during the winter. It also met the client’s sustainability requirements by helping to manage rainwater at source and control its release into the surrounding environment.
Sponsored
Decorette Woonatelier - F. Ball delivers win-win for Decorette Woonatelier

Decorette Woonatelier - F. Ball delivers win-win for Decorette Woonatelier

Ball, F and Co Ltd

Stopgap 600 Base deep section base compound and Styccobond F49 Hybrid PS adhesive were amongst products from F. Ball used to install floorcoverings in the new premises of the Echt franchise of the Dutch home deco retailer Decorette.Work was undertaken by Decorette Woonatelier Schuyt in Vught, as part of an arrangement that will in turn see Decorette Woonatelier Echt install floorcoverings at the Vught location when it is refurbished later in the year.After installers began by removing old ceramic tiles and mechanically preparing the subfloor to remove adhesive residues, floor levels needed to be raised by 11mm.To do this, flooring contractors applied Stopgap 600 Base deep section compound at a thickness of 7mm. The product is suitable for applications at thicknesses between 5–50mm prior to being capped with a suitable F. Ball smoothing compound. Its fast-drying properties meant that this could take place just three hours later, allowing flooring contractors to return the next day to install floorcoverings.Pressure sensitive adhesives from F. Ball were then used to install PVC planks in a herringbone formation in the 200m2 area. Floorcoverings were adhered using Styccobond F49 Hybrid PS temperature tolerant adhesive in the areas near the showroom’s floor-to-ceiling windows, which had the potential to cause solar gain and, consequently, extreme temperatures and temperature fluctuations – this can cause floorcoverings to expand and contract significantly, leading to unsightly tenting and gapping at the edge of vinyl floorcoverings over time. Styccobond F46 was used to install vinyl planks in other areas. The pressure sensitive acrylic adhesive provides a high bond strength that increases as it is trafficked, as well as strong initial tack, to reduce the likelihood of tiles or planks moving around while working.Raymond Schuijt, franchise owner and installer at Decorette Schuyt, said: “We love using F. Ball adhesives and smoothing underlayments as they are top quality and very easy to work with. The range is well thought out and contains solutions for every situation you can imagine. I can always count on their technical support if I have any queries too. They’re only ever a phone call away and will gladly undertake site assessments to advise on the required subfloor preparation and floorcovering installation processes.”
Sponsored
Bishop Challoner School (London)

Bishop Challoner School (London)

RHEINZINK GmbH & Co.KG Datteln – Office U.K.

Rheinzink Flat Lock Tile, prePatina Blue-Grey
Sponsored
Revive IT

Revive IT

Heckmondwike FB

Revive IT, based in Leeds, are an IT recycling and disposal company. The company underwent a full office refurbishment, with new carpets required as part of the development. Revive IT wanted carpet tiles that stood out, while also matching brand colours and providing durability. To match the company’s purple branding, Heckmondwike FB provided Array Purple, alongside Broadrib Purple accent tiles to create a distinct finish
Sponsored
Hexagon Entrance Matting at AberInnovation

Hexagon Entrance Matting at AberInnovation

INTRAsystems

Using hexagonal INTRAshape entrance matting tiles exclusive to INTRAsystems, Aberystwyth Innovation and Enterprise Campus (Aberinnovation) creates a striking first impression on visitors. Available in five tessellating shapes and a variety of sizes, INTRAshape entrance matting tiles offer endless creative possibilities. Compatible with our complete range of INTRAlux fibre inserts, their aluminium frames can also be anodised to suit your designs.
Sponsored
Tower 12 Spinningfields

Tower 12 Spinningfields

RYNO

Tower 12 takes its name from both the number of floors it spans and the fact it was the twelfth building in Spinningfields, Manchester.Due to the area being dominated by commercial developments, often inhabited by financial industry tenants, the Spinningfields area has been dubbed the “Canary Wharf of the North”. Located in the heart of this bustling district, Tower 12’s design offers a unique, holistic, and modern work environment.This vibrant area, furnishing both residents and office workers with entertainment, bars, and restaurants, also features and celebrates the local heritage with the Peoples History Museum located just across the river. This is mirrored with Tower 12 whose façade emanates the industrial heritage of the area but whose function retains modern refinement.Flexible Business Interiors created the terrace spaces on Tower 12 using the pedestal paving system, which is comprised of our specifically designed paving pedestals and porcelain tiles.The overall project design is enhanced by the seamless transitioning from indoor to outdoor spaces: achieved using Ryno’s simply adjusted RP-FR non-combustible paving pedestals.The porcelain tiles, in the shade Argento from the Quadro range, punctuated the space with their elegant, contemporary finish. This paving choice created a stain-resistant, slip-proof, and non-combustible surface ready to face the test of time. 
Sponsored
Royal Derby Hospital - F. Ball cuts waiting times at Royal Derby Hospital

Royal Derby Hospital - F. Ball cuts waiting times at Royal Derby Hospital

Ball, F and Co Ltd

F. Ball and Co. Ltd.’s newest high-performance water-mix smoothing underlayment, Stopgap 1500 AquaPro, has been used alongside the company’s Styccobond F46 pressure sensitive vinyl adhesive to provide a time-saving solution for installing floorcoverings in Derbyshire’s largest hospital.Derbyshire Flooring Contractors installed an eye-catching bespoke vinyl flooring design in the waiting area and connecting corridors of the children’s outpatient ward at Royal Derby Hospital, a total area of 800m2.The floors in the ward required refurbishing as the old floorcoverings had become worn. Work needed to be carried out in the evening, in stages, so that it would not interfere with the day-to-day running of the ward. Requiring a time-saving solution, contractors opted to use Stopgap 1500 AquaPro water-mix smoothing underlayment, avoiding the need to remove old adhesive residues.Stopgap 1500 AquaPro uses the latest technology to offer a water-mix smoothing underlayment that can be applied over old adhesive residues, including bitumen, carpet tile tackifiers and ceramic tile adhesives. In such applications, there is no need to prime beforehand, saving further time and expense. Fast-setting and fast-drying, it is walk-on hard in as little as 60 minutes after application and ready to receive floorcoverings from just four hours.Work began with the labour-intensive task of uplifting old floorcoverings. Stopgap 1500 AquaPro was then applied at a thickness of 3mm over the subfloors to create a perfectly smooth base for new floorcoverings.A bespoke two-tone design, resembling a river running through the children’s ward with ‘islands’ of colour either side, was created by cutting shapes from two different colours of Polyflor Classic Mystique PUR vinyl sheet flooring, with the pieces adhered using Styccobond F46 pressure sensitive adhesive.Styccobond F46 provides instant grab, preventing floorcoverings from sliding when placed, helping with the creation of designs and patterns. The adhesive is also formulated to minimise the incidence of trowel serrations showing through thin vinyl flooring potentially affecting the finished appearance of installations.Commenting on the project, Mark Grant, Managing Director at Derbyshire Flooring Contractors, said: “We like using F. Ball products – they’re really good quality and reliable. Also, their tech reps are always available, if needed, to provide advice on products to use and procedures to follow throughout a project, from start to finish, including keeping us up-to-date with the latest technology that can help us achieve optimum results efficiently. That’s how I found out about Stopgap 1500 AquaPro, which saved us a lot of time outside of normal working hours and enabled us to complete the work while the ward wasn’t in use, minimising disruption to services.”
Sponsored
Sir Colin Campbell Building (Nottingham)

Sir Colin Campbell Building (Nottingham)

RHEINZINK GmbH & Co.KG Datteln – Office U.K.

Rheinzink Zinc Facade with diamond shape flat lock tiles
Sponsored
Yarm School  (Yarm)

Yarm School (Yarm)

RHEINZINK GmbH & Co.KG Datteln – Office U.K.

Rheinzink Roofing and Cladding, Square Tiles, Blue Grey prePATINA
Sponsored
South Petherwin Primary School, Thermal Efficiency Upgrade

South Petherwin Primary School, Thermal Efficiency Upgrade

Garland UK

Over several years, multiple attempts had been made by Cornwall Council to repair the Stonewold tiles and recoat the gutter courses at South Petherwin Primary School, to stem the leaks that had continued to affect multiple classrooms across the site.Project management surveying firm, Kendall Kingscott, appointed Technical Manager Justyn Irons, to carry out a thorough condition survey to assess the roof build-up and isolate the source of the leaks. During the investigations, Justyn discovered that the main cause of ingress was caused by the wrong tile type being installed on the low-level pitch of the building. The gutters around the hall were too narrow and often blocked with debris, allowing ingress to flow back under the tiles into the building and directly into the classrooms below.
Sponsored
Key considerations when specifying ladders

Key considerations when specifying ladders

Howe Green

Figures published by the Health and Safety Executive (HSE) in 2018 indicate that 26% of fatal injuries and 8% of non-fatal injuries are caused by a fall from height. The construction sector accounts for 18% of those accidents! Architects, specifiers and building contractors have a duty of care to ensure that when specifying ladders they give due consideration to a number of factors to help to minimise the risk of falls. Tony Stevens, Technical Estimator at Bilco UK, outlines some of the key factors to be considered when specifying ladders for accessing a roof area.
Sponsored
Unit 216, Cambridge Science Park

Unit 216, Cambridge Science Park

Kawneer UK Ltd

Kawneer’s aluminium AA®100 zone-drained curtain wall and thermally superior AA®720 entrance doors feature on all elevations of Unit 216 at the UK’s leading science park, while AA®190 TB severe-duty doors have been used on the main entrance. The unit was taken back to a concrete shell and rebuilt with a brick and glazed façade by main contractor Hutton Construction and is now the new home for Amgen, one of the world’s largest independent biotechnology companies.
Sponsored
New Product - Ecco Concertina Loft Ladder

New Product - Ecco Concertina Loft Ladder

Premier Loft Ladders Ltd

The Ecco concertina loft ladder features the very latest technology to achieve excellent thermal insulation and an airtight seal. The 4-point latching system ensures an airtight seal all the way around the hatch, while WDL tape provides an insulating seal between the hatch box and ceiling structure. Ideal for residential and light-duty commercial projects. The lightweight yet strong and durable aluminium loft ladder is easy to open and close. It is also suitable for smaller ceiling openings (as small as 800mm x 550mm).
Sponsored
Bowthorpe

Bowthorpe

Forterra Building Products

The ChallengeBowthorpe is a high-quality development of 174 new homes together with landscaped open space, community gardens and a children’s play area on an area of undeveloped land in Norwich.The development was inspired by nearby Bowthorpe Hall and explored the idea of an historic walled garden with homes built within its boundary.As part of the site’s high environmental standards, it was critical that existing features, such as important tree belts and hedges were retained while also accommodating a proposed network of cycle and walking routes.The SolutionForterra’s Breckland Reserve – a red, tumbled, wirecut brick – was used alongside flint on the ground floor of some of the homes to create detailed wall work that echoed Bowthorpe Hall.Traditional red tiled roof pitches sit above the wall and reference Bowthorpe Cottages. On top of the wall sit cedar shingle clad upper floors.Traditional terraces form most of the new homes, with flats provided alongside unique mews-style housing.The BenefitsThe building form, the materials selected, and the use of pattern and decoration, helped to create a visual connection to the local area.
Sponsored
Pietra Perla Reception

Pietra Perla Reception

Rock Unique

"Expanding boundaries, horizons, capturing space and transforming it into new, modern, and welcoming lines": it is with this leitmotiv that the Pietra Perla reception hall in Sannicandro di Bari welcomes its guests, accompanying them in an experience where exclusivity and elegance reign supreme.In this evocative and dreamlike setting, a pearl of the small town in the Apulia region, Atlas Concorde has contributed to furnishing some of the indoor and outdoor spaces of the facility with a contemporary style.The romantic entrance comes to life thanks to the combination of different formats and contrasting colours, where the earthy essence of stone and its rich details bring together the refined look of natural materials with the excellent technical performance of porcelain tiles.The beauty and practicality of the stone effect is repeated in the floors of the interior spaces, like halls and restaurants, where warm shades make the rooms welcoming and give them a clean, avant-garde design.Decorations inspired by simple geometries with metallic-effect inserts further enrich the furnishing project, covering the walls of the bathrooms in perfect harmony with the dark nuance of the concrete-effect floor for a unique compositional balance.
Sponsored
Ace Hotel

Ace Hotel

AATi (Antislip Antiwear Treads International)

The main entrance features AATi cast Nickel Bronze SN30/60 anti-slip stair nosings, this nosing profile is a perfect choice to cope with the heavy foot traffic coming in off the busy Shoreditch High Street.
Sponsored
Friendship House (London)

Friendship House (London)

RHEINZINK GmbH & Co.KG Datteln – Office U.K.

Rheinzink Zinc Double Standing Seam & Zinc Flat Lock Tiles
Sponsored
Beaconsfield Eleven

Beaconsfield Eleven

Marley Ltd

Marley's Acme Double Camber Clay Plain Tile in Burnt Flame has been used by EAB Homes and Developments Ltd on their award-winning development in Beaconsfield, Buckinghamshire. EAB Homes is a boutique developer, building exceptional, high-end residential properties. They specialise in the design, development and construction of bespoke family homes for buyers who appreciate the very best, and that's why they chose to use Marley roof tiles on their Buckinghamshire development.
Sponsored
Llys Cadwyn Commercial Building (Pontypridd)

Llys Cadwyn Commercial Building (Pontypridd)

RHEINZINK GmbH & Co.KG Datteln – Office U.K.

Rheinzink Zinc Roofing and Cladding. Square Tile System prePatina Blue-Grey
Sponsored
The Cloud House, Howards Farm (Ormskirk)

The Cloud House, Howards Farm (Ormskirk)

RHEINZINK GmbH & Co.KG Datteln – Office U.K.

Rheinzink Zinc Roofing and Facades Flat Lock Tiles(prePatina Blue-Grey)
Sponsored
Rochdale Riverside Cinema - Acoustic Floating Floors

Rochdale Riverside Cinema - Acoustic Floating Floors

Total Vibration Solutions Limited t/a TVS Group

As part of the Rochdale Riverside new development, the TVS Group was approached to assist in the construction of a new 6-screen Reel Cinema to ensure that Reel’s acoustic requirements for the space were met, as well as ensuring that adjacent businesses would not be adversely affected.
Sponsored
Meadowbank Sports Centre

Meadowbank Sports Centre

Junckers Ltd

Meadowbank Sports Centre has been the home of elite sport in Edinburgh since the 1930s. The historic Meadowbank stadium was built for the 1970 Commonwealth Games, which it also hosted for a second time in 1986. For nearly 50 years the centre was open to both elite athletes and the local community before it closed in 2017. Designed to high standards of sustainability by Holmes Miller Architects, the new centre is part of a wider regeneration of the surrounding area in accordance with the City of Edinburgh Council’s long-term plan to cut carbon emissions and at the same time improve the health and wellbeing of the local community. Providing access to state-of-the-art sport and physical activity on their doorstep, the new centre is first and foremost a community sports facility. There is an outdoor athletics track with a 500-seat capacity stand and inside facilities include two multi-sports halls with fixed and moveable spectator seating, two squash courts, a gym floor and fitness studios all fitted with Junckers’ solid hardwood flooring. The two multi-sport halls are fitted with Junckers 22mm Maple Champion flooring providing a durable and long-lasting floor that will easily withstand high levels of usage. Installed over Junckers UnoBat 45 subfloor system, the floor offers a safe and high-performing surface with excellent shock absorption and ball bounce, fully conforming to EN 14904 class A4. Installed by Junckers’ Approved Contractor Courtcraft, the floor has a 25-year warranty which includes a regular maintenance programme to keep the floor in optimal condition. The larger sports hall houses a large-capacity retractable seating unit which can be rolled out onto the sports floor when needed and stored away when not in use. With extensive technical expertise in this area, Junckers will advise on how to strengthen the sprung batten system to allow for heavy loads whilst leaving the sprung quality of the floor unaffected. A sealed solid hardwood flooring surface is very resistant to the type of wear and tear which may occur with retractable seating systems. Seating wheels will not mark or indent the Junckers floor whereas vinyl and other synthetic floors are often impossible to use because the wheels cause permanent tracking marks and scuffs. In addition, Courtcraft installed Junckers’ SylvaSquash flooring in two squash courts, a high-performance solid beech floor left unfinished to ensure high grip-levels; and Maple Champion in the two fitness studios. Junckers’ 22mm oak flooring was also supplied for standing-only plinths the gym area, fitted by GL Floors. A sporting and social hub for Edinburgh, Meadowbank Sports Centre offer participation and accessibility at the heart of the centre, bringing physical, mental, and social benefits to the local community and beyond for generations to come. The project was a collaboration between The City of Edinburgh Council, Edinburgh Leisure and sportscotland.
Sponsored
Little Corkhill Farm - F. Ball enables quick getaway

Little Corkhill Farm - F. Ball enables quick getaway

Ball, F and Co Ltd

F. Ball and Co. Ltd.’s newest high-performance water-mix smoothing underlayment, Stopgap 1500 AquaPro, and Styccobond F48 PLUS temperature tolerant fibre-reinforced adhesive have enabled a fast-track LVT installation as part of barn conversions to create three holiday cottages in rural Nottinghamshire.Flooring contractors installed floorcoverings in bedrooms, open-plan living and dining areas and corridors of three previously disused farm buildings of varying size, a total area of over 200m2.Work began by sanding down the new concrete bases, which had been installed as part of the renovation of the properties, by mechanically preparing them, removing any laitance, contamination, dust and debris, to leave a solid, sound, micro textured surface to receive floor preparation products.A moisture test was undertaken by one of F. Ball’s technical representatives to ensure that the building’s subfloors were dry enough to receive floorcoverings. Surfaces were then primed using Stopgap P131 general-purpose primer to promote the application characteristics of subsequently applied subfloor preparation products.Stopgap 1500 AquaPro was applied to create a perfectly smooth base for floorcoverings. Fast-setting and fast-drying, it is walk-on hard in as little as 60 minutes after application and ready to receive floorcoverings from just four hours. The product uses the latest technology to offer a water-mix smoothing underlayment that can be applied over old adhesive residues, including bitumen, carpet tile tackifiers and ceramic tile adhesives. As it is moisture resistant, it can be applied to damp subfloors prior to the application of a waterproof surface membrane.Flooring contractors then used Styccobond F48 PLUS to adhere 7-inch wood-effect vinyl planks in each of the three cottages. The temperature tolerant adhesive holds floorcoverings in place when subject to high temperatures, which may be an issue as a result of solar gain caused by large patio doors. This can cause tenting and gapping at the edges of vinyl floorcoverings as a result of repeated expansion and contraction over time. Fibres in the adhesive also provide high initial grab, a benefit when installing LVTs.Commenting on the project, Anthony Holmewood, fitter at Forester Flooring, said: “Using Stopgap 1500 AquaPro meant that we could complete the work in less than a week. We opted for Styccobond F48 PLUS to install LVTs mainly because we like the adhesive, but also for the reason that floorcoverings are exposed to direct sunlight in some areas.”
Sponsored
Loveden Beck, Lincolnshire

Loveden Beck, Lincolnshire

Wienerberger Ltd

Wienerberger’s New Rivius slate appearance roof tiles used in stunning project in Lincolnshire.
Sponsored
70 ST MARY AXE - Metal ceilings, Luminous ceilings, BREEAM

70 ST MARY AXE - Metal ceilings, Luminous ceilings, BREEAM

Lindner Group

60-70 St Mary Axe is an office building designed by London-based architectural firm Foggo Associates with retail space on the ground floor. It is located in thearchitecturally ultra-modern financial district of the City of London in close proximity to the iconic 30 St Mary Axe, also known as "The Gherkin," whose facade was realized byLindner. Also, the new building is nicknamed: "The Can of Ham" in its semi-elliptical shape reminiscent of the packaging of English canned ham. The 360° view through the vaulted, all-glass façade offers a great view of the city of London. The BREEAM Excellent building offers 28,000 m² of office space, spread over 21 floors and designedto meet a wide variety of needs.Lindner Interiors contributed to the construction with interior fit-out products. These include the suspended ceilings for the "A" category office rooms on the 3rd, 9th and 12th floors, and the luminous ceilings at the reception and in all elevator anterooms.The Lindner fire grid ceiling system LMD-B 100 with linear grid arrangement was installed on two floors, while on the third floor, light strip modules were chosen instead.These complete the appearance of the iconic building in an impressive way. If required, LMD-B 100 partitions can be attached to the Lindner ceiling system so that the office space can be individually divided. With its radiant fire grids and trapezoidal ceiling tiles, the system is perfect for the sweeping silhouette of the 60-70 St Mary Axe building.Completed Works:F0 Metal ceilingLMD-B - Post cap ceilingsLuminous ceiling/luminous canopyLuminous ceilingsCertification systemBREEAM

Showing 1045-1080 of 1234

Feedback