NBS Source
I'm a manufacturer

"sika"

638 results found

Sort by:

Showing 73-76 of 76

Sponsored
SIKALASTIC® RAPID PROTECTS WALKWAYS FROM RAIN ON STATION PARADE

SIKALASTIC® RAPID PROTECTS WALKWAYS FROM RAIN ON STATION PARADE

Sika Liquid Plastics

All apartments are accessed at the rear of the building via stairs and walkways and the existing asphalt walkway surfaces had blistered, causing various leaks and creating a trip hazard for residents. There was an urgent requirement to carry out the walkway refurbishment while the building remained fully occupied and with minimal disruption for occupants. The building’s flat roof had also reached the end of its service life, requiring a refurbishment to protect the apartments from water ingress.
Sponsored
Dry Installs Case Study, Manhattan Loft Project, London

Dry Installs Case Study, Manhattan Loft Project, London

The Solid Wood Flooring Company

In Manhattan Loft gardens, they have a dry install system and are going to use the recommended system from Sika, then fit the floor fully bonded with our SW890 adhesive. Installation and site visits are part of our service. With large residential tower developments, there will normally be slabs for each floor. These will take at least two years to dry out completely. This means that unless the slabs have a DPM applied there will always be a chance of moisture affecting whatever is laid on the floor be it a cradle system or dry install underfloor heating system.
Sponsored
West Kirby Railway Station

West Kirby Railway Station

Whitesales Rooflights

West Kirby railway station’s 1930s platform canopy was long overdue refurbishment. Whitesales were brought in by Briggs Amasco, Network Rail’s roofing contractor, to design, manufacture and install a series of non-fragile rooflights for the 900sq m replacement roof. After our initial roof survey, we specified bespoke polycarbonate Em-Vault continuous barrel vault rooflights. They’re compatible with the chosen Sika Liquid Plastics roofing system and have light transmission of up to 88%. The standard mill finish frame would keep costs low and blend with the canopy's concrete finish.
Sponsored
DOWNER RAINSCREEN FRAMING USED EXTENSIVELY FOR THE BROXBOURNE SCHOOL

DOWNER RAINSCREEN FRAMING USED EXTENSIVELY FOR THE BROXBOURNE SCHOOL

Architectural Panel Solutions

Downer our original helping hand, aluminium rainscreen framing system, helps lead the way for this exemplary education sector project.In the words of leading education sector architects – Bond Bryan, The Broxbourne School is a beacon for excellence for modern education.Architectural Panel Solution's Downer rainscreen framing system - DCS031 was used extensively for this ambitious projects as you can see from the supporting suite of images.A vibrant and contemporary aesthetic was achieved thanks to the complementing, highly durable Swisspearl fibre cement facade panels – Vintago (Colours: VI 061, VI 091) fixed with Sika adhesive onto Swisspearl’s Sigma8 mechanical secret fixing system, and our original Downer DCS031 framing.Architectural Panel Solutions was extremely proud to have won an award for this project in last year’s Facade Awards, thanks to an excellent collaboration with SD Samuels (Special Projects) Ltd, Bond Bryan Architects, ArchitecturePLB, Mid Group Ltd LtdFind out more on our website and check out the photography on the architects’ and installers websites too.https://bondbryan.co.uk/project/the-broxbourne-school/https://www.sdsamuels.co.uk/broxbourne-school/https://downerframing.com/downer-framing-used-extensively-for-the-broxbourne-school

Showing 73-76 of 76

Feedback