NBS Source
I'm a manufacturer

"duct"

1,189 results found

Sort by:

Showing 73-84 of 84

Sponsored
Old Woking Retirement Home - Ventilation and Screening Louvres

Old Woking Retirement Home - Ventilation and Screening Louvres

Maple Façades

A new project in Woking showcases the many benefits of Maple’s new Pluto louvred screening system.Designed to hide unsightly HVAC machinery on the roof of a new four-storey independent living development, the system is lighter and easier to install than traditional systems.   It’s perfect for the rooftop location. Seen from the ground, it’s a sleek bank of aluminium louvres – but the modular system also means that installation is safer, with time spent working at height kept to a minimum.  Maple’s Pluto system fixes easily to the building sub-frame using galvanised steel brackets, while an advanced sub-structure of posts, mullions and rails in high grade aluminium will provide hidden support for the 100mm louvre blades.  Despite a practical function of hiding equipment, pipes and ducting, the screening will not detract from the clean lines of the building, which are complemented by a bank of curved louvres (also supplied and installed by Maple) on the west elevation of the building.  The project is a collaboration between Maple, Willmott Dixon, HNW Architects and Woking Borough Council. When complete, the four-storey development will provide a mix of 48 one- and two-bed flats, which will provide independent (but supported) living.
Sponsored
Ventilated Nursery, Raised Steel Floor - Gothenburg, SE

Ventilated Nursery, Raised Steel Floor - Gothenburg, SE

Floor Levelling Systems Ltd

SubFloor flooring was used to help renovate, raise and ventilate a 700 m² floor into a Nursery near Gothenburg, Sweden.The Subfloor ventilation system was ideal for this nursery, as it allowed for multiple floor height adjustments and for ventilation installations under the floor. Associated floor ventilation material such as ducts, air distribution strips, fans, etc. was also provided. The negative pressure the ventilation generates under the floor creates a fresh and healthy indoor environment.This simple and elegant solution raised and levelled the floor to allow for installations and insulation. The joist and screw system allows for quick and easy assembly so that the floor can reach the desired height.Products:Steel Joist 45x30x3800 mmSubFloor Screw 100 mmInsulation Bearer 45 mmHeight Variation: 46 - 100 mmJoist separation: c/c 600 mmSystem Weight - c/c 600 mm: 2.06 kg/m²Materials:Steel, Z100 GalvFibre-reinforced polypropylenePoint Load Limit (50 x 50 mm): Between screws over joist - 7.08 kNOver screws over joist - 8.78 kN
Sponsored
Hospital Kitchen Extract Lining

Hospital Kitchen Extract Lining

Kompozit'All UK

application area: commercialuse type: extraction of cooking gases from kitchenproject scope: line brick extraction shaft to prevent grease build-upadded value: 25-year guarantee on liner, minimal downtime, easily fitted due to flexible materialBackgroundThis Hospital in Portsmouth has a busy commercial kitchen supplying restaurants and residents. Increasing reports of fumes from the greased-up brick extraction ducts have been a concern.A survey of the riser and plantroom was carried out to determine the most suitable solution. VentilFle-25 RKV for kitchen extracts was the preferred option due to the reduced access to the 30-meter brick riser.Statement of workThe shaft had been in use without a kitchen extract liner for the extraction of kitchen gases. This was a concern due to grease build-up, which can result in unpleasant odours within the building.VentilFlex-25 kitchen extract lining system was the chosen alternative lining method, with its jointless design, excellent heat resistance and fire rating, and crucially, an installation method that only required access at the top and the bottom of the riser.
Sponsored
Select Range Case Study

Select Range Case Study

Excelsior Panelling Systems Ltd

Lloyds Pharmacy The Project – Lloyds PharmacyRefurbish existing washroom facilities at Lloyds Head Quarters. Work along side Swift Building Services to complete the project. Specification lead by Pinnegar Haywood Design.   The ChallengeProduce a range of Cubicles, Duct Panels and Vanity units to create an innovative, vibrant space. Solid surface on site jointing and polishing of oversized, bespoke Solid Surface Vanity tops. Manage installation from drawings to completion with a dedicated Contracts Manager.  Complete full, detailed survey & provide guidance on discussing feasibility at planning stage. The SolutionExcelsior Select Range in a kaleidoscopic array of colours has created a stimulating, revitalising washroom environment. A valiant use of colour conveyed onto the Vanity Unit completed the installation; Magma Range 100% recyclable Compact Density Fibreboard frame with 12mm Hanex Top to suit semi recessed bowl with a 250mm upstand and a 200mm downstand finished off with 20mm square edge access panels.  This Analogous colour scheme proves a break from the norm for washrooms and is testament to the Architect and the combined skills and expertise of Excelsior’s trusted team that resulted in such an accomplished finish. Combined skills and expertise of Excelsior’s trusted team that resulted in such an accomplished finish.
Sponsored
Howick Place, London

Howick Place, London

Sylan

Within London’s sought-after area of Victoria is situated the architecturally cutting edge commercial and residential development, Howick Place.This 143,000sq ft. of Grade A office space and 23 luxury apartments is a flagship development by joint developers Doughty Hanson & Co and Terrace Hill Group PLC. The building is modern, stylish and full of light due to its impressive floor to ceiling windows delivering a perfect working space for the luxury brands it has already attracted. Responsible for the impressive design were Rolfe Judd Architects. Not only did they want to create an exterior that that was visually stunning but also an interior that show modern design at its best.This inspirational working environment had to make an immediate impact with potential occupant’s right from the moment they step in to the expansive reception area to rinsing their hands in the washrooms. To help achieve this Rolfe Judd appointed Sylan to supply and install their modern and luxurious washroom products so the building represented the highest quality craftsmanship no matter where you are in the building.When discussing the importance of a quality washroom fit out project architect Andrew Wall said: “Our clients are becoming increasingly concerned with the quality of their washroom facilities. More and more people are cycling to work in the city and so we needed washroom and changing areas that met our client’s high standards”.Sylan's Real Wood Veneer toilet cubicles were specified for the washrooms. With 44mm Real Wood Veneer doors and totally invisible fixings, Sylan was the perfect choice for this project given that quality was such an important factor:“We were very impressed with the Sylan system. We needed a totally bespoke system and Sylan gave us just that. We needed flexibility from our cubicle choice so we could achieve the level of detail required for this project”.Being offset against contemporary Lime Stone Vanity Units, also supplied by Sylan, the cubicles gave the perfect contrast between the traditional and the modern.To further enhance this cutting edge design Glass Duct Panels were also installed in the washrooms. Being fully aware that accuracy and precision was critical to the build, Sylan ensured due care and attention was paid when installing all products but particularly when dealing with this delicate and intricate design element.Sylan Products Supplied:Real Wood Veneer Toilet CubiclesFlush frontedStrong and SecureInvisible fixing systemIdeal for where low impact interiors are neededAvailable in 11 Real Wood VeneersReal Wood Veneer Duct PanellingCo-ordinating panelling to cubiclesInfinite repetition of colourAvailable in 11 Real Wood VeneersQuartz VanityExtremely hard wearingClassic style that will last for years to comeAvailable in 9 coloursSupplied with or without cut outs
Sponsored
HANPAVE™

HANPAVE™

Hahn Plastics Ltd

CHALLENGEIlam Park was a popular tourist destination in the Peak District with a parking problem. The main car park is paved with asphalt but their sloped overflow car park suffered from rutted, unsafe and uneven surfaces due to poor drainage and puddling. More asphalt would create water runoff and drainage problems elsewhere so a permanent and durable permeable paving solution was required.SOLUTIONHanpaveTM was chosen as it’s a freedraining system that’s tested to bear almost any vehicle. There are no more problems with rutting or uneven surfaces. It’s also highly durable, weather-resistant and made from 100% recycled plastic. When installed on a properly engineered permeable base (no pipes or ducting required!), it can be in-filled with gravel or grass for an attractive, stable base that becomes virtually invisible to the average user.CONCLUSIONHanpaveTM was installed in 2019. We called in on a very wet day in November 2022 and the HanpaveTM grids were in excellent condition. Surfaces were even, rutting was gone and, even in torrential rain, puddling could only be found in areas paved with asphalt – not HanpaveTM. Despite some extremely hot summers, Hanpave’s unique expansion absorbing design and professional installation have given Ilam Park an effective, longlasting and attractive solution to their overflow parking problems.
Sponsored
Dudley Leisure Centre

Dudley Leisure Centre

Excelsior Panelling Systems Ltd

The Project A new Leisure Centre at Dudley is part of a multi-million-pound Leisure Centre program and regeneration of the area. The new facility will include a 25metre swimming pool, teaching pool, four-court sports hall, gym, exercise studios, soft play area, and caféDudley Council has committed £17.4 million to the project in the heart of the town centre. Working in partnership with Alliance Leisure, through the UK Leisure Framework, the council will create a vibrant modern hub for residents and workers to enjoy a range of physical activities.The ChallengePropose a system suitable for a wet, high humidity environment including Cubicles, Ducts, Vanities, Lockers & Benches. Ensure the material used and the system proposed is suitable for a high traffic environment. Changing cubicle divisions to have increased height at the rear of the cubicle to prevent users standing on the bench and peering over. Fully framed cubicles to be free standing & self-supporting, positioned in centre of the changing area. Create a locker area suitable for use by wheelchair users. The SolutionSolid Grade Laminate was used throughout the scheme. 12mm core boards, self-supporting, highly durable and impervious to water penetration.Hydroline system installed as a fully framed island constructed cubicle with profiled division panels at 2400mm.
Sponsored
Yorkswood Primary School

Yorkswood Primary School

Excelsior Panelling Systems Ltd

The Project Yorkswood Primary School forms part of Solihull’s Regeneration Project, investing in the area through the creation of new schools, housing, parks, village centres, and local enterprise.The £5.7m new school will replace the current outdated buildings as part of the £60m scheme in place to improve every single primary school in the North Solihull Regeneration Area benefitting the learning of over 4,000 children. The ChallengeThe Architects vision for the washrooms was to create a vibrant, innovative space with multi coloured cubicles working in harmony throughout the colour pallet. The challenge for us was to ensure full usage of the core material was utilized throughout the scheme to ensure optimal yield and competitive pricing.Construction took place alongside the existing occupied school buildings, and therefore keeping the school operational and safeguarding the pupils and staff was an important factor for this project. The SolutionRepeating the pallet throughout the washroom areas ensured as much of the core material as possible was utilised.Harlequin Mariner & Harlequin Peardrop Cubicles and Duct panelling were used through the scheme. Solid Grade Laminate is the perfect choice of material for the Education Sector offering extremely high levels of durability.SpecificationProduct Range: Harlequin MarinerDoors: 20mm Laminate Faced Compact Density FibreboardPilaster: 12mm Compact SGL, Polyrey Érable Nordique E028Partition: 12mm Compact SGL, Polyrey Érable Nordique E028Ironmongery: SBAAAvailable Finishes:These Systems Are Available In The Following Finishes:• High Pressure Laminate• High Gloss Laminate
Sponsored
Lloyds Pharmacy

Lloyds Pharmacy

Excelsior Panelling Systems Ltd

The Project Refurbish existing washroom facilities at Lloyds Head Quarters.Work along side Swift Building Services to complete the project.Specification lead by Pinnegar Haywood Design.   The ChallengeProduce a range of Cubicles, Duct Panels and Vanity units to create an innovative, vibrant space.Solid surface on site jointing and polishing of oversized, bespoke Solid Surface Vanity tops.Manage installation from drawings to completion with a dedicated Contracts Manager. Complete full, detailed survey & provide guidance on discussing feasibility at planning stage. The SolutionExcelsior Select Range in a kaleidoscopic array of colours has created a stimulating, revitalising washroom environment. A valiant use of colour conveyed onto the Vanity Unit completed the installation; Magma Range 100% recyclable Compact Density Fibreboard frame with 12mm Hanex Top to suit semi recessed bowl with a 250mm upstand and a 200mm downstand finished off with 20mm square edge access panels. This Analogous colour scheme proves a break from the norm for washrooms and is testament to the Architect and the combined skills and expertise of Excelsior’s trusted team that resulted in such an accomplished finish.combined skills and expertise of Excelsior’s trusted team that resulted in such an accomplished finish.SpecificationProduct Range: Select 20mm HPL 1960mmDoors: 20mm High Pressure Gloss Laminate (Multiple Colours)Pilaster: 20mm High Pressure Laminate G059 Gris OragePartition: 12mm Solid Grade Laminate G059 Gris OrageThese Systems Are Available In The Following Finishes:Natural Wood VeneerHigh Pressure LaminateHigh Gloss LaminateIronmongery: Aluminium
Sponsored
Persimmon Homes: Sycamore Rise

Persimmon Homes: Sycamore Rise

Prolectric

IntroductionPersimmon needed an efficient lighting solution for their private estate project, Sycamore Rise. Persimmon faced challenges related to expensive power connections, the cost of ducting/cabling, and the need for a rapid lighting solution in a private estate managed by a management company due to roadways not being adopted by the council.Challenge Persimmon Homes encountered several challenges in providing efficient lighting for Sycamore Rise: Expensive Power Connections: Traditional main power connections were costly due to a DNO connection being required. Private Estate Management: Sycamore Rise, a private estate, was not adopted by the council, requiring management by a private company, adding complexity to the project. Tight Deadline: A rapid turnaround was crucial as the project had to be handed over to buyers within a tight deadline.SolutionAfter a site visit, we developed a full lighting design and proposal, ensuring the new site lighting would meet British lighting standards. We installed 40 AE3 solar street lights with steel columns across approximately 175 plots on the estate. The AE3 units were chosen for their ability to provide lighting without the need for trenching, cabling or mains power. The AE3 solar street lights are proven to operate reliably and efficiently throughout the UK winter, from dusk until dawn, thanks to their specially developed smart light controller. The Sycamore Rise project resulted in significant benefits for Persimmon Homes. Zero Maintenance and Carbon Footprint: Sycamore Rise now benefits from zero maintenance and zero carbon emitting solar lighting, eliminating the need for mains power. This has reduced the estate’s carbon footprint and will lead to long-term energy cost savings. Operational Efficiency: The AE3 solar street lights provided instant light to residents with minimal disturbance to the estate, meeting the tight deadline set by Persimmon Homes. 
Sponsored
Aviation Hangar Heating - Boscombe Down

Aviation Hangar Heating - Boscombe Down

Powrmatic Ltd

OverviewA successful installation of 40 x Powrmatic SRP U Tubes at a hangar facility in Boscombe. With the system design by Powrmatic, ABS, a leading HVAC and installation company, was entrusted with this significant installation project. The installation aimed to provide efficient heating performance, reduce energy costs, and improve the overall comfort and functionality of the hangar.Project BackgroundThe Weighbridge Hangar Building 499 at MOD Boscombe Down operated by QinetiQ required a new heating system due to the life-expired existing system. The hangar required a powerful heating system that would operate efficiently during the cold winter months while reducing energy costs. A new Powrmatic SRP U-tube herringbone radiant heating system was produced in line with the design intent of WYG on their tender documents. J & B Hopkins secured the M & E contract and employed the services of ABS Ltd to undertake the installation of the radiant heating system. ABS Ltd, formed in 1978, offers a full range of professional services including the installation and maintenance of both radiant and warm air heating systems to both commercial and industrial properties throughout the UK.SolutionThe MOD hangar facility, situated on an exposed location, at Boscombe Down required a robust heating solution to withstand the cold winter months. 40 Powrmatic SRP radiant U Tube PVU50 Hi/Low heaters each rated at 50kW on a herringbone system layout with ducted fresh air onto each burner to comply with fire safety standards were installed by ABS Ltd. To maximize efficiency, the heaters mounted at an impressive height of 23 meters in line with Powrmatic’s design drawings were arranged in 8 lines of 5, with 3 heaters connected to one fan and 2 heaters connected to another fan. The heating system incorporated Powrmatic MC200 controllers and black bulb sensors for precise temperature control across the hangar.ResultThe final stage of the installation was completed by J & B Hopkins, arranging for the necessary gas and electrical distribution services to the radiant heaters and discharge fans. The 40 Powrmatic SRP radiant U Tubes installed by ABS Ltd effectively heated the facility, providing a comfortable and conducive environment for the workforce during the winter season. Additionally, the new heating system reduced energy costs and eliminated the need for multiple exhausts on the rooftop hence retaining the aesthetic design principles of the hangar. The commissioning was successfully carried out when all services were completed, providing a satisfied client with a capable heating installation within the hangar, for the exposed site location.
Sponsored
ABG blueroof, Podium Deck Stormwater Attenuation, Middlewood Locks, Salford, UK

ABG blueroof, Podium Deck Stormwater Attenuation, Middlewood Locks, Salford, UK

ABG

Located at the first locks of the Manchester, Bolton & Bury Canal, the second phase of the £1bn Middlewood Locks development in Salford delivers 546 apartments across 4 new buildings with private podium gardens. Phase 2 of the development is part of the wider mixed-use scheme to regenerate 25 hectares of brownfield land with new apartments, office space, a hotel, bars, restaurants, car parking and a gym.The large catchment area of the development discharges to the newly renovated balancing basins that service the confluence of adjacent canals and the River Irwell. An extensive podium drainage landscaping design was required to meet the site’s strict discharge limits and reduce the impact of surface water run-off to less than that of the pre-developed brownfield land.The ABG blueroof storm water attenuation system specified for the scheme covers over 9,500 m2 and restricts rainfall outflows to below the 16 l/s discharge limit on Plot G of the site and within the 20 l/s limit for Plot H. The system incorporates 27 ABG restrictor chambers above rainwater outlets which are configured to restrict outflow rates to within the discharge consents.The system is designed to attenuate a 1-in-100 storm event (data extrapolated from the local FEH 2013 flood report), plus 30% allowance for the effects of climate change. The geocomposite drainage and attenuation layers and network of restrictor chambers serve to filter surface water run-off pollutants to treatment train stage one of the SuDS process, meaning no other filtration measures are required. The top of the chambers are designed to sit flush with the porous resin paving surface, and different configurations and thicknesses of drainage composites were used to achieve the correct height of system to match the different surface levels. The ABG Deckdrain geocomposite layer provides multi-directional flow capacity to efficiently channel rainwater to the nearest restrictor chamber outlet whilst the integral geotextile filter helps to prevent the cuspated drainage core from becoming blocked.The choice of hard and soft landscaping materials specified for the development are of a very high standard and the inclusion of large areas of green spaces and substantial planting creates valuable new private gardens and amenity spaces for the area.The attenuation system configuration was designed and supplied by ABG and installed over a 6 month period by ABG Installs. As part of the storm water attenuation system design, a new restrictor chamber diffuser was developed to fit directly onto the downpipes of the apartment buildings. The attenuation voids were modified to allow for cable ducting to pass through them and a method was also developed to provide structural drainage beneath the concrete footings of the stone planter walls.

Showing 73-84 of 84

Feedback