NBS Source
I'm a manufacturer

"school"

2,966 results found

Sort by:

Showing 73-108 of 1086

Sponsored
Wellington School

Wellington School

Westcountry Group

Versa tables aren’t just for dining! Wellington School were in need of a flexible, robust and multi-use dining furniture solution that could be used for a variety of activities throughout the school day. The furniture needed to stand up to years of daily use from over 1,300 students.Our Benchmark and ConverTables proved to be the perfect solution to meet their specific needs. The Benchmark table can be set up in under 10 seconds and provides a seating and tabling solution for up to 20 students, plus when it’s stored it takes up 44% less space than standard bulky stool tables! This combined with ConverTable’s ability to easily switch from bench seat to lecture-style table to dining table has created a truly winning, agile combination in the hall.The end result at Wellington is a multi-use hall suitable for a wide range of activities with durable, robust furniture that will last for many years.
Sponsored
Queensmead School, Middlesex

Queensmead School, Middlesex

urbanspec

Schools, colleges and campuses with an ever-increasing intake of students often outgrow the buildings originally designed for them. As a consequence, our education sites can consist of increasingly disparate faculty buildings extending far beyond a central hub. These are usually connected by a network of outdoor walkways that get crossed many times a day, in all weathers. Shelter for these walkways is a necessity but innovative designs can offer much more beside.Queensmead is an ambitious school that is committed to seeking the best for all its students. The forward-looking and dynamic co-educational academy to over 1,400 students aged 11-18 was recognised by the Department for Education for being in the top 5% nationally for student progress in 2016.Consisting of 15 detached buildings spread across a large site, access to buildings requires students and staff to cross a number of interconnected covered walkways on a daily basis. When these concrete covered walkways needed replacing, Queensmead sought a cost-effective alternative with the functionality to shelter the network of walkways and the scope to offer increased covered breakout space for the students to meet, eat and relax together. Particular care was required for heating pipes and cables that needed to be protected during the extensive demolition phase and incorporated in to the new design.“We’ve been delighted with the insightful but flexible design process and the speed and efficiency of each installation phase for this complex canopy project. The modern design, with integrated lighting, has re-invigorated our walkways and the additional sheltered breakout space has been a big hit with our students.”David Patterson, School Business Manager, Queensmead SchoolStreetspace came up with an over-arching solution that met the site plan requirements and the broad scope of the project, allowing considerable changes in length and width of the canopies, and a single-source approach which ensured both time and money were saved. The bespoke product has enabled the evolving project to be completed in phases, with the third and largest phase of the canopy completed over a 5 week period during the 2017 summer holiday.The TRITON canopies are installed with an opaque triple-wall polycarbonate roof system allowing good light transmission without the glare of clear versions. The curved canopy design exceeds the shelter provided by the demolished walkway covers and their extended reach, factored in the designs, has generated significant amounts of sheltered breakout space for Queensmead pupils. Working to time frames factoring in school holidays, disruption for staff and pupils has been kept to a minimum.By identifying the latent potential of their walkways and working closely with our expert designers at Streetspace, Queensmead upgraded their archaic network of concrete walkways with a modern design; bringing cohesion and unity across the site. The inclusion of recessed lights added welcome security and the extended canopy design not only provided improved shade and shelter but year round social space.
Sponsored
Burntwood School, London

Burntwood School, London

AluK (GB) Ltd

Allford Hall Monaghan Morris (AHMM) specified AluK curtain walling and window systems for the Burntwood School project, a series of new educational buildings which will serve up to 2000 pupils and over 200 staff. The scheme, developed by the architects AHMM working in close partnership with Lend Lease, Wandsworth Borough Council and Burntwood School, will see 85% of the school rebuilt.
Sponsored
Kingsmill SEN School Canopies

Kingsmill SEN School Canopies

Twinfix Limited

Situated in the heart of the community of Driffield, Kingsmill School is a SEN school which caters for pupils aged 2-19 years. Situated across two sites, the main school site houses Early Years through to Key Stage 4. The school was completed in May 2017 and has been purpose built to meet the needs of its pupils. Alongside eleven new classrooms, the main site also has a new hydrotherapy pool, rebound room, sensory therapy room and sensory rooms.Students aged 16-19 are based at The Kings Mill Student Centre which is based at Driffield Secondary School approximately a mile away from the main site. This comprises three classrooms and a combined common room and food technology area.When the school decided to utilise its outdoor space to provide a safe environment for pupils to learn and play undercover, Twinfix were approached by Main Contractor Hobson Porter to design, manufacture & install four classroom canopies..The free-standing mono-pitch canopies all comprise our innovative Multi-Link-Panel Non-Fragile (NF) roofing system, glazed with 16mm multiwall polycarbonate. The roof is non-fragile in accordance with the HSE’s test for fragility ACR[M]001:2019, an important factor when installing canopies where children may try and access the roof. Each canopy has an aluminium frame, powder-coated to RAL 5015 sky blue to match the school’s building and logo. Other features Twinfix incorporated into the design of canopies are anti-climb guttering and post-protectors, which provided further elements of safety for the students.Being a one-stop shop for designing, manufacturing and installing such outdoor structures we are proud to offer a seamless service to any school or other education establishment looking for a canopy or walkway. We are really pleased that the staff at Kingsmill School are delighted with the latest additions to their school and we know they are planning to use it for all sorts of fun and healthy outdoor learning/playing experiences for their children.
Sponsored
Fairford School

Fairford School

Metrotile UK Ltd

Fairford School was refurbished in 2008 and required a roofing system that could offer unsurpassed durability complimenting the honey coloured brick walls.Metrotile’s .900mm Slate profile in Bronze was specified, as it is the only system that could meet all of the project’s demands. The school’s new Metrotile Slate roof delivered on all counts including performance, durability, low whole-life cost and aesthetics. As Fairford is situated in a rural setting, the aesthetics of the building’s roof needed to compliment the natural surroundings.
Sponsored
Hand Dryer Case Study (Secondary School) - Gladesmore Community School, Tottenham, London

Hand Dryer Case Study (Secondary School) - Gladesmore Community School, Tottenham, London

Dryflow

The challengeBoth male and female student washrooms were to be fully refurbished in the main building as they were tired looking and the busiest in a school with 1200+ students. The old hand dryers were loud and slow to dry the hands. The washrooms were opposite classrooms, so noise was an issue. New hand dryers needed to be energy efficient, cost effective, robust, reliable, attractive and with quick drying times.“They are quieter than the old hand dryers so neighbouring rooms have benefited. Since installation we feel they have encouraged more usage as a result, so contributing to improved hygiene by users in the premises.”Alexis O’Brien - Premises Manager, Gladesmore Community SchoolAbout Gladesmore Community SchoolGladesmore is an 11-16, mixed school with approximately 1,250 pupils. It is situated in the urban area of South Tottenham, adjacent to Markfield Park which backs onto the River Lea. It has repeatedly been judged to be an ‘Outstanding School’ in all aspects by Ofsted Inspectors.The solutionProviding a quick dry time yet Quiet Mark approved low noise volume, this vandal resistant hand dryer has 4 settings to maximise energy efficiency and minimise running costs.Model: Dryflow ViperDry time range: 15 - 20 secondsRated power: 600W - 2000W (4 settings available)Guarantee length: 3 yearsThe results“The hand dryers are robust while still looking attractive. They dry hands just as quick as a more expensive brand but at more than half the cost.The quick drying time has also helped to alleviate congestion at peak rush periods during break times.The ability to easily adjust the temperature and speed with no special tools is useful and can be done in under one minute.”Alexis O’Brien - Premises Manager, Gladesmore Community SchoolEstimated annual savings using new high-speed hand dryers compared to previous units+:Cost Savings: £196Electricity savings: 1,634 kW/hCarbon Savings: 882kg/CO2Estimated annual savings using new high-speed hand dryers compared to if paper towels were used+**:Cost Savings: £9,856Carbon Savings: 11,592kg/CO2(+Dryflow Viper running at its most energy efficient setting based on 12p per kW/h and 1kW = 0.54kg/CO2; **Based on 3 paper towels used per dry, 0.6p per paper towel, 22.5gms/CO2 per dry)
Sponsored
Brynseng School, Oslo, Norway

Brynseng School, Oslo, Norway

Rockfon

Rockfon Samson is ideal for high activity level areas and is installed in the corridor ceilings at Brynseng School.
Sponsored
Access control for Tonbridge School

Access control for Tonbridge School

Jacksons Fencing

Located in Kent, Tonbridge School is a prestigious independent institution celebrated for its rich history and academic excellence. The school administration, consistently proactive in safeguarding its students and staff, recognised the need to upgrade security and access control within the campus. To bring this vision to life, they turned to Jacksons Fencing, a trusted name in security and fencing solutions, who have been working with the school for over five years.
Sponsored
Nishkam School West London

Nishkam School West London

Westcountry Group

Nishkam School required a complete end-to-end supply, delivery and installation of fixed and loose furniture in their stunning new-build West London school which spanned three floors and two wings. As part of this large fit-out, our mother company Westcountry Group supplied nearly 2,500 furniture items across the school, including a number of Benchmark dining tables in the large school halls.The Benchmark tables make a great addition to the halls and have provided Nishkam with a space-efficient and very flexible folding dining furniture solution. Co-ordinating colours compliment the acoustic panels which have created a fun and modern look for the lucky students.
Sponsored
Ivydale Primary School, Southwark

Ivydale Primary School, Southwark

Cellecta Ltd

Ivydale Primary School is an expansion of the campus. Combating increasing demand for primary schools within the UK, it introduced a two-storey cross-laminated timber framed building on a second site nearby; this includes an amphitheatre. This extension has doubled the school’s capacity to accommodate key stage two children in a four-form entry primary school. Taking inspiration from the children’s illustration ‘The Fox in the Forest’ by Julia Woolf, this development won a regional RIBA London Award in 2018. Southwark Borough Council ensured the remodelled building was energy efficient, applying the London Plan’s energy hierarchy: ‘Be Lean, Be Clean, Be Green’.Cellecta’s HEXATHERM XCHiP was specified by Hawkins\Brown due to its high-performance thermal insulation with a P5 moisture-resistant tongue and groove chipboard to produce a high compressive strength, interlocking floorboard.Galliford Try was supplied 1,000m² of Cellecta products to develop this school in Southwark.
Sponsored
Latymer Upper School

Latymer Upper School

Concept Cubicle Systems

Latymer Upper School is a long-standing independent public school in Hammersmith, Central London. We updated their tired existing washrooms to a modern standard. Read the full case study here.
Sponsored
Kings Heath Boys School

Kings Heath Boys School

NBB Outdoors

Kings Heath Boys is a boys' community school located in Kings Heath, south Birmingham. The school had recently contacted NBB in need of a shelter, and together they came to the decision that a bespoke Free Standing Winterbourne Shelter would be best for the job. The structure measures 9000mm in length, and 2550mm in height, and was completed in the colour White RAL9003 to fit in with the existing area.Installation works commenced keeping any disruption to the school to a minimum and we are thrilled with the Walkway.
Sponsored
Montserrat Convent school

Montserrat Convent school

Saint-Gobain Ecophon

Col.legi Montserrat in Barcelona is one of the most innovative schools in Spain. The school has departed from the traditional system of silence and listening to explanations and encouraging discussions. The means? Acoustic quality and low frequency absorption.
Sponsored
Bow School, Tower Hamlets, London

Bow School, Tower Hamlets, London

Siniat

Bow School is a £30m campus in Tower Hamlets - an area with one of the fastest growing school populations in the country. Located close to the Blackwall Tunnel, the site suffered from air and noise pollution. It was also subject to a 20% budget cut at a late stage in the design phase. The new school campus accommodates 1,600 pupils in a state of the art building which includes rooftop sports pitches, a fitness studio, theatre, dining pavilion, open classrooms and areas of open circulation
Sponsored
Boxgrove Primary School

Boxgrove Primary School

Westcountry Group

Boxgrove’s multi-use hall was the perfect candidate for the Versa Wall Pocket system. They struggled daily with seating their students in a tight timeframe and only had a very limited area to store their dining furniture.Our teams installed two quadruple and one triple Wall Pocket systems in the hall, complete in the school’s brand colours. The school can now store over 17 metres of tables and benching in under 60cms on the wall – that’s seating for up to 80 students!Boxgrove now has a flexible system that is seriously space-efficient! The school has the ability to store all their dining furniture on three pockets mounted on the wall, which take up minimum space.The staff and students are delighted with the Wall Pockets and how they’ve freed up more space in their hall for other activities. In the words of the Premises Manager, Duane Hall: “We are extremely pleased with the Wall Pocket system as it is quick and easy to use. It has created more space in the dining hall and looks very stylish and modern.”
Sponsored
Benenden School, Cranbrook

Benenden School, Cranbrook

Stone Cladding Systems

Architect: Guy Hollaway Architects Main Contractor: Buxton Building Contractors Installer: Colorminium Stone: Jura Beige Guy Hollaway Architects designed the competition-winning scheme for the new concert hall at Benenden School near Cranbrook in Kent. The project, completed in 2021, delivered a new combined concert hall; school hall and music department. The new school hall has a capacity of 750. The Concert Hall includes a 150 seat recital hall and digital media suites. This development, the largest in the school’s history, achieves the combination of brick and natural stone, in the form of Aztec Rainscreen with stunning success. The honed Jura Limestone angled soffits give the windows a superiority as well as realising more light into the building. Areas of the large panel 1200x450mm rainscreen achieve a modern look on this prestigious development.
Sponsored
Camestone School, Bedford

Camestone School, Bedford

Broxap Street Furniture

Pupils at Camestone School in Bedford have a broad experience of sport and physical activities thanks to the installation of a new Sunshine Gym.After initially ordering five stations that can be used by up to nine pupils at any one time, the school ordered another four pieces of equipment to accommodate a further seven students.The outdoor gym area is used on a regular basis by upper Key Stage 2 and lower Key Stage 2 pupils and a rota is in place to ensure every child has access to the equipment.Initially the primary school used part of its PE and Sport Premium to fund a Children’s Double Slalom Skier; Double Strength Challenger; Horse Rider; Tai Chi Discs; and Double Health Walker.Twelve months on and the outdoor gym was such a success it was extended to include another Children’s Double Health Walker; Rower; Waist Twister and an Arm & Pedal Bike.Rubber mulch surfacing defines the Sunshine Gym area within the school grounds.As part of its commitment to supporting healthy lifestyles for children, parents and staff, the school also offers active travel infrastructure.It boosted its cycle parking provision in 2021 with the addition of a Wardale standard shelter and two-hoop Senior Sheffield Cycle Rack from our parent company Broxap Street Furniture.This complements the school’s two existing New Sheffield Shelters which together accommodate parking for up to 20 bikes.
Sponsored
Wolverhampton Girls' High School

Wolverhampton Girls' High School

Sto Ltd

StoVentec Glass rainscreen cladding was specified for a new two-storey science block which has been built at Wolverhampton Girl’s High School, following its successful use on the school’s new sixth-form building, completed in 2018.
Sponsored
Judge Business School

Judge Business School

InterLace

Cambridge Judge Business School was founded on the Grade II Old Addenbrooke’s Hospital site originally constructed in the mid-eighteenth century, in the historic centre of Cambridge. This new Centre reflects the evolving culture of the University through the changing requirements for learning environments.InterLace designed, manufactured and installed electric and hand-operated roller blinds to provide user controlled and automated shading in teaching and lecture spaces.
Sponsored
New Hall School, Chelmsford, Essex

New Hall School, Chelmsford, Essex

urbanspec

New Hall School is the only independent Roman Catholic school in the Diocese and one of the largest and also the oldest of its kind in the country.With a requirement for significant areas of new external covered space for play, break-out, student activities and dining; New Hall School were looking for a canopy provider that could demonstrate the level of bespoke design and construction capability to deliver on this. Although the canopy projects had been in the pipeline for a few years, the pandemic made the need for covered, well-ventilated space a requirement to enable the safe and orderly return of students to school in September 2020.An ORION Triple Barrel Vault Canopy provides 660 m² of cover for the Prep Playground creating a genuinely multi-use area for teaching, play and events. The architectural PVC membrane translucency provides diffused natural lighting and the tall centreline creates a spacious feel to the area. The Triple Barrel Vault design ensures that the maximum height of the canopy structure is reduced in keeping with the historic school buildings. Integrated rainwater systems enable maintenance access and the timber post cladding soften the appearance of the structural steelwork.. Rubber crumb surfacing throughout the canopy area provides a safe, clean and visually attractive area for the younger students.The second ORION Tensile Membrane Canopy alongside New Hall School’s Walkfares Performing Arts Centre is also a triple barrel vault design. At 42 m width and 22 m in length the canopy covers over 920 m² with the entire area surfaced in synthetic turf. Together these canopies create the largest sheltered performance and recreational areas in the School.
Sponsored
Merstham Park School

Merstham Park School

Fixfast Ltd

Merstham Park secondary school for 11-16 year olds, prior to 2022, consisted of temporary cabins in the grounds of nearby Chart Wood School. With the construction of a brand new, state-of-the-art low carbon secondary school, the educational facility underlines their motto of 'igniting a passion for learning' - seen in the high quality classrooms providing an education and leisure space (including a dance studio and all weather sports pitch) for 900 students. Challenge178 modules were craned into location within a 6 week period - meaning less time on-site, less hassle, and faster install; avoiding extra disruption and delays to site works. Award winning roofing and cladding contractor Marksman Roofing + Cladding was contracted for the cladding of the building - including the sports hall, (the only building constructed on-site), to fix the stunning Rockpanel Chameleon exterior that blends in with the surrounding environment - futureproofing the look of the school for years to come. SolutionFor this project, Fixfast were able to assist Marksman with lacquered DrillFast fasteners - with low profile heads to blend in with the cladding, these fasteners are available for light or heavy steel. Alongside these, Fixfast also provided SureFast 6.1mm diameter concrete screws, and a range of other fixings including wood screws and DF12-W wing drillers. "We have a strong working relationship with Fixfast, this was strengthened again whilst working on Merstham Park. Fixfast offered technical support throughout the project, whilst also maintaining exceptional customer service with prompt deliveries"Marksman Roofing + Cladding(image courtesy of McAvoy)
Sponsored
University of Birmingham School, Birmingham

University of Birmingham School, Birmingham

Technal

The University of Birmingham School was the first academy free secondary school to be assigned to a particular university. This is a new model of education, bringing together the best of university research and teaching best practice in secondary education. Technal aluminium windows were specified for this project in a 210mm high module to achieve the required available air flow and light transmission. Aluminium Commercial Doors were specified to achieve robustness and increased thermal insulation. Aluminium Curtain Walling was also used to deliver more natural light into the project without sacrificing weather performance, thermal insulation and ease of fabrication. 
Sponsored
Parmiter's School | Washroom Refurbishment

Parmiter's School | Washroom Refurbishment

Brookhouse

The ChallengeParmiter’s School needed five of their washroom blocks refurbished and work was initially planned to take place during term time for two of the quieter rooms and Summer for the other ones.The main objective for the school was to increase the amount of cubicles in all the washrooms to accommodate their increased student numbers.The SolutionBrookhouse, having created a strict methodology for term-time work, was able to refurbish both the Sixth Form Washroom and Gym toilets during term time with minimal disruption.The washrooms were designed utilising the spaces effectively to obtain the maximum amount of full-height enclosed cubicles which increased capacity by over 30% for each room.Superbly stylish, practical and highly durable, these solid grade laminate cubicles were the exact finish that Parmiter’s School were hoping for. We Provided:Full Height Washroom Cubicles and IPSSolid Grade Laminate (SGL)Contrasting Colour Doors and PanelsAutomatic Infrared Taps & Soap DispensersHygienic Hand-DryersModern Solid Surface TroughStructural SteelDrainage Groundworks
Sponsored
Widewell Primary School, Plymouth

Widewell Primary School, Plymouth

NBB Outdoors

Widewell primary school welcome all and believe everyone matters. Their vision as a school is that it is a place of excellence and innovation, where children’s skills, knowledge and values can grow.NBB were recently contacted by the school, in need of a shelter to extend a classroom and create an outdoor learning area for use in the spring and summer months.After working closely with the school and surveying the site, it was decided upon that our Winterbourne Freestanding Shelter would be the best option to suit the environment. The finished project measures H2600 x L4000 x W4000mm and is powder coated in Umbra Grey RAL 7022 to complement the surroundings.They also chose to add on some 100% recycled plastic picket fencing to act as a perimeter for the learning area. The fencing is completely maintenance free, will never rot, crack, or splinter and will last up to 5 times longer than any timber alternative!
Sponsored
Higham Lane School

Higham Lane School

Paxton Access Ltd

Net2 Provides Well-Rounded Access Control Solution for Secondary SchoolHigham Lane School is a high-performing comprehensive academy for students aged 11-18 based in Nuneaton, Warwickshire, UK. It is part of the Central England Academy Trust (CEAT), and has over 1,400 students.RequirementThe Facilities Management team at Higham Lane School needed a system that would help them manage doors across the campus, and the specific access rights of individual members of staff and visitors. Additionally, as part of the community academy’s safeguarding plan, they require a full audit trail of who enters and leaves the site, or accesses specific doors to ensure the safety of students and people working on campus.Along with their access control requirements, the school wanted a video door entry system and to integrate the security system with their existing CCTV cameras and a fire alarm system.
Sponsored
Badminton School, Bristol

Badminton School, Bristol

DYNAMIK Sports Flooring

A historical reputation for excellence in academia and sport, Badminton School enhanced and maintained this reputation with a new sports hall. Clare Elsley, Assistant Director of Sports at the school, and former England International Netball player, insisted that the performance of the floor enabled the school to use the facility for multi-sport. The DYNAMIK sprung system provides high levels of shock absorption and comfort which benefits teaching staff and students alike. This system replicates that of a DYNAMIK sprung wooden floor, however has all the benefits of having a synthetic playing surface which keeps future maintenance to a minimum.
Sponsored
Cavendish School

Cavendish School

Gerflor Flooring UK Limited

Cavendish School in Hemel Hempstead, a Specialist Sports school, were having a new purpose built Sports Hall constructed during their summer break. Gerflor’s Taraflex Sport M Plus flooring was their preferred option as it provides their users with a safe, technically advanced sports floo
Sponsored
Poole High School, Dorset

Poole High School, Dorset

NBB Outdoors

Poole high School is located in the heart of the sunny Dorset seaside town. A large school, they pride themselves on their successful pastoral system, reflecting the value they place upon the individual.Having worked with Poole High several times over the past decade, we were delighted to be approached once again to provide two bespoke, freestanding and wall attached shelters, to further extend their dining hall facilities into available space around the building. The finished project takes the form of a 22m x 10m Winterbourne Freestanding Shelter with a mixture of sub-surface and surface mounted posts, and 8m x 3m Winterbourne Wall Attached Shelter. Guttering and downpipes were also included so rain doesn’t cascade over the end of the shelter during rainy spells. To complement the school aesthetic and previous installations, Poole High School opted to have their new shelter galvanised and epoxy powder coated in Squirrel Grey RAL 7000. This surface treatment means the structure will be guaranteed to last 25 years, serving the school for many years to come. The roof is made from UV stabilised 16mm polycarbonate, to give a light and airy feel.Mark Sheldon, Estate Manager at Poole High School said: “After 3 previous successful shelter installations from NBB Outdoors, they were first choice for us when, towards the end of the 21-22 academic year, we explored the possibility of expanding our dining hall space by erecting a large canopy structure by the north entrance/exit, as well as a queue shelter by the west entrance/exit. NBB have been on hand to help and guide us through every step from initial quote to installation, and obligingly installed both structures during the summer holiday, causing as little disruption to school operations as possible and ensuring our new dining space is ready to go in time for our students to return. The school is delighted with the high standard of workmanship, as we’ve come to expect, and are sure our students will enjoy the space for many, many years to come!”.
Sponsored
Oaklands Infant School, Berkshire

Oaklands Infant School, Berkshire

NBB Outdoors

Oaklands Infant School needed an old wall-attached canopy removed from their school and replaced with a new shelter to provide cover over an entrance. They contacted NBB and it was agreed that a bespoke freestanding Branksome shelter would be the best fit for the space. After dismantling the old shelter, the new one, measuring L9000mm x D5600mm x H2990mm was built with guttering on one side to discharge rainwater onto the school roof. The shelter was treated with Triplex anti-corrosion multi-layer powder coating to ISO 12944 in Blue RAL 5002, guaranteeing the shelter for 25 years.
Sponsored
Monkerton Community Primary School

Monkerton Community Primary School

Westcountry Group

When opening a brand-new school, you need that wow factor. Having worked with the Cornerstone Academy Trust for many years, Westcountry Group were delighted to be chosen to supply a complete furniture solution for the new Monkerton Community Primary School.Our expert team worked with the school to install a comprehensive range of robust education furniture for multiple classrooms and office spaces. Our popular space-saving Benchmarks tables were also chosen as they had previously been selected for other trust schools and had been found to be very popular with staff and students.The Benchmark tables offer a space-efficient dining solution ensuring the school has more space and time for other activities throughout the day – as well as taking up half the storage spaceof other folding dining table systems.“We know with Westcountry you always get quality products and great customer care. Their product range often offers something different to the norm, for example, the amazing Benchmarkdining tables. They are robust, aesthetically well-designed and very compact when stored away. We would highly recommend Westcountry Group.” Mr Graham Newbery, Trust Business Manager
Sponsored
Style Offers Expert Partitioning Advice to School - Wolvercote Primary School

Style Offers Expert Partitioning Advice to School - Wolvercote Primary School

Style - Moveable Partition Specialists

Wolvercote Primary School, Oxfordshire, first contracted Style to install a folding wall in a classroom in 2015. This proved so useful that when the need arose again, the teaching staff insisted on the same product. Working with architect SixPC and contractor Wensley Group, Style’s team recommended the same Stylefold 120 folding wall but, with an endfold configuration rather than centrefold arrangement, giving added space when the wall is not in use. Boasting an impressive 46dB Rw acoustic rating, the partition enables the school to run adjacent classes either side, or quickly open the room up into one large space.
Sponsored
Riverside Primary School by Architype

Riverside Primary School by Architype

Junckers Ltd

JUNCKERS FLOORING FOR SCOTLAND’S FIRST PASSIVHAUS PRIMARY SCHOOL Designed by Architype who acted both as Architect and Passivhaus Designer, Riverside Primary School in Perth & Kinross is the first in Scotland to be built to the Passivhaus standard. Built to support healthy and innovative learning and at the same time minimise energy consumption and emissions, the building is estimated to reduce the school’s energy costs by around 70%. The new building provides better thermal comfort and ventilation with lower emissions and operational costs. All materials were carefully chosen for their performance and ability to create a warm, natural environment. Natural, non-toxic materials including Junckers’ flooring, create a high-quality finish that also enhances wellbeing for students and staff. Often specified for Passivhaus buildings, Junckers solid hardwood floors carry the Danish Indoor Climate Label, certifying there are no chemical substances that will adversely affect indoor air quality. Installed in the school’s large multi-purpose, multi-activity hall, Junckers SylvaSport Beech flooring has a perfectly smooth surface which cannot harbour dust or mites. The natural properties inherent in wood also helps to minimise static from electrical equipment. Beech is a light-coloured timber species which helps to maximise natural light levels by reflecting light into the hall, reducing the need for artificial lighting. In contrast to a dark surface which holds heat and consequently reflects it back into the room, a pale-coloured floor will not contribute to overheating, reducing the energy demand on air cooling systems. As public buildings, schools are expected to experience decades or even centuries of use. Specifying materials with a proven long lifespan not only means lower life cycle costs, it can also contribute substantially to lower embodied carbon emissions. A Junckers floor can be expected to last well over the 60+ year design life standard. Made in solid wood, it can be sanded and refinished up to ten times without loss of performance. With 12- year intervals between sandings, it is arguably one of the longest lasting flooring options available and will comfortably exceed the industry standard. Riverside Primary School is not only the first of its kind, it serves as an important reference project for all new schools being built in Scotland. The Learning Investment Programme (LEIP), established by the Scottish Futures Trust (SFT), who work with public and private sectors to finance infrastructure projects, incentivises reductions in energy consumption and emissions for newly built schools, as well as improving indoor air quality for students and teachers. Project Architect Sam Boyle noted: “We specified Junckers flooring systems at Riverside Primary School due to its environmental credentials, durability of its sports floor systems and its high-quality aesthetic. The finished installed system worked holistically with the colour and material palette for the school interior, creating a calm, natural and bright school for generations to come.” So far, the project has won the Learning Places Scotland Award: Innovation in Delivering a Sustainable Learning Space; and is shortlisted for a Scottish Design Award 2024. The flooring was installed by Courtcraft. The main contractor was Robertson Construction. 
Sponsored
Security Solutions for Northwood School

Security Solutions for Northwood School

Jacksons Fencing

Northwood School in North West London was redeveloped in a £35 million project, requiring multiple gates and fencing to secure the new layout and various areas of the school. The 650 metres of Jacksons Fencing solutions include Barbican Imperial fencing, EuroGuard welded mesh panels, and Hit & Miss timber fencing.
Sponsored
Pollokshields Primary School

Pollokshields Primary School

Kingspan Insulation

A Grade B listed primary school in Glasgow has three rooms refurbished to offer optimum thermal performance and achieve the most cost-effective solution with the slimmest build-up
Sponsored
University of Cambridge Primary School

University of Cambridge Primary School

VELUX Commercial

Bespoke structural glazing solutions deliver natural light and ventilation to the cutting-edge design of the University of Cambridge Primary School.350 square meters of structural glazing from VELUX Commercial was installed to bring natural light and ventilation to the University of Cambridge Primary School – part of a much larger expansion project
Sponsored
Beckfoot Allerton Primary School

Beckfoot Allerton Primary School

Polyroof Products Ltd

Beckfoot Allerton opened on 19th November 1894, a proud day for the village of Allerton and its people. The school underwent many changes throughout the years surviving and contributing to both war efforts, while continuing to hold their high standards of education. In 1928 the school official became a primary school and later in 1960 a junior and infants’ school further undergoing changes. After a local authority change in 2000 Beckfoot Allerton Primary school was reborn. In the present day the school is much different to when it was opened generations ago and continues to serve as a corner stone of the village and its community.Taking into consideration all of the requirements of the roof, a bespoke specification was prepared to refurbish the roof. Polyroof’s Protec System, a hybrid polymer liquid system with extremely fast curing and installation times, was the chosen system of use for the project. Due to its fully cold-applied application the works could be carried out during the Primary Schools term times, without having to wait for closure periods between terms.

Showing 73-108 of 1086

Feedback