NBS Source
I'm a manufacturer

"flooring reinforcements toppings"

8,443 results found

Sort by:

Showing 901-936 of 961

Sponsored
St Paul's Cathedral

St Paul's Cathedral

Albion Stone plc

St Paul's Cathedral is Sir Christopher Wren's masterpiece, built in glowing Portland Stone, crowned by the magnificent dome, a famous landmark on the skyline of the City of London.This programme saw St Paul’s repaired and cleaned inside and out, with greatly improved provision for those with disabilities and an enhanced visitor experience through the provision of new exhibition and interpretation galleries.Here at Albion Stone we regularly supply Portland stone to the Masons at St Paul’s Cathedral for maintenance and repairs. We supplied Portland Jordans Basebed and Whitbed for the South Churchyard Improvements. The stone has been used to create seating areas that reinforce the other side of the medieval cloister walk.
Sponsored
HOTEL AND LEISURE - SMUGGLERS COVE, BOURNEMOUTH - EXTERNAL STAIR NOSING

HOTEL AND LEISURE - SMUGGLERS COVE, BOURNEMOUTH - EXTERNAL STAIR NOSING

Quantum Flooring Solutions, a trading name of Quantum Profile Systems Ltd

Smugglers Cove Adventure Golf is a tourist attraction at Bournemouth Beach. The 18 hole course is part of Bournemouth’s famous seafront, which has over 7 million visitors per year. For safety purposes, it was necessary to fit Stair Nosings onto a fire exit staircase at the site.
Sponsored
OFFICE – GRANITE EXCHANGE CO-WORKING SPACE – STAIR NOSING

OFFICE – GRANITE EXCHANGE CO-WORKING SPACE – STAIR NOSING

Quantum Flooring Solutions, a trading name of Quantum Profile Systems Ltd

Granite Exchange offers serviced office space to businesses and individuals. Companies can lease meeting rooms, private offices, or shared desk areas to operate from. The ultra-modern design and high specification facilities in Granite Exchange are ideal for businesses who want to offset high property rates while maintaining a sleek and professional outlook.
Sponsored
HOTEL & LEISURE - BRADLEY HALL GOLF CLUB - STAIR NOSINGS

HOTEL & LEISURE - BRADLEY HALL GOLF CLUB - STAIR NOSINGS

Quantum Flooring Solutions, a trading name of Quantum Profile Systems Ltd

Prestigious Bradley Hall Golf Club is located in over 60 acres of picturesque parkland in central Yorkshire. Golf was first played here in 1906 and considerable investment was spent converting the old house into an outstanding club house. Recently the golf club had a major building upgrade but still retained the quality that had been set up all those years ago. As part of this refurbishment the central entrance of the golf club required an impressive eye catching finish to their traditional style Victorian staircase with a unique large curved bottom step.
Sponsored
Maldron Hotel Swimming Pool Renovation Tiles and Tanking | Precision Building Services

Maldron Hotel Swimming Pool Renovation Tiles and Tanking | Precision Building Services

SMET Building Products Ltd

Job: Maldron Hotel Swimming Pool Renovation, Portlaoise, Co. Laois.Smet Supported Partner:Precision Building Services – Mark PembertonProducts: Sopro Rapidur® B5 Rapid Drying Screed BinderMerlin Barrier CoatSopro RAM 3 (454) Renovation and Levelling MortarSopro GD 749 Universal Floor and Wall PrimerSopro DSF® 523 Tanking MembraneSopro PUK 503 PU AdhesiveSopro VF HF 420 – VarioFlex® High Strength Flexible Tile AdhesiveSopro’s No. 1 Flexible Tile AdhesiveSopro FKM® XL 444 – Extra Light Weight Tile AdhesiveSopro Sanitary SiliconeSopro DE 014/015 Sealing CornersSopro FEP 508Sopro DBF-638Racofix 818Description:SMET supplied Smet Supported Partner, Precision Building Services (Mark Pemberton), for the renovation of the Maldron Hotel Swimming Pool, Portlaoise, Co. Laois. A total area of Floor screed @ 140m² | Wall tiling @125m² | Floor tiling @ 140 m² was completed.New floor installation with fast-track – rapid drying floor screed solution, using Sopro Rapidur® B5 Rapid Drying Screed Binder, a fast-setting screed which was laid to falls prior to waterproofing and tiling providing an early completion. German-made Rapidur® B5 Rapid Drying Screed Binder is a special polymer-modified binder for particularly economical ­production of high-strength, rapid-set cement screed – based on DIN 18560.Rapidur® B5 is suitable for use on heated screeds, bonded screeds, unbonded screeds and floating screeds. This flooring solution is particularly useful for fast-track or tightly scheduled screed laying. The newly laid Rapidur® B5 screed floor is ready to receive floor covering after approx. 3 days – after achievement of moisture content ≤ 1.8 % CM. Sopro Rapidur® B5 is supplied in 25kg bags, with 40 bags per pallet.Sopro Rapidur® B5 was installed directly on top of Merlin Barrier Coat wet on wet. The screed was ready for waterproofing/tiling after 3 days. This system was also used to repair the Jacuzzi’s surrounding walls prior to waterproofing, tiling, and grouting.Sopro RAM 3 levelled the deck area (3-60mm) between the drainage channel edge and pool perimeter movement joint. Sopro RAM 3 was bonded with Sopro GD 749.
Sponsored
Doddington Housing

Doddington Housing

Forterra Building Products

13 new dwellings situated in the small village of Doddington, Lincolnshire are providing much-needed affordable housing for people working at nearby Doddington Hall.Located on Main Street, the development enhances this area of the village, providing important infill on the site once occupied by the local school, which was demolished in the 1960s and has latterly been used as a car park and general storage area. It is bordered by a mix of farmland, mature trees and shrubs, and existing housing, and lies partially within a conservation area.The development comprises two 2-bedroomed, five 3-bedroomed and six 4-bedroomed terraced and semi-detached dwellings. One of the terraces fronts onto Main Street while the remainder have been sensitively designed to create an attractive group of dwellings centred around a newly-created ‘village green’.Perhaps the most significant element of the appearance of the scheme is the elevation of the terraces towards Main Street. In developing the specifically tailored to design for this elevation, account was taken of the nature of the surrounding buildings within the village.Although not prominent to public view, the balance of the development has been designed in a manner sympathetic to the architectural vernacular found within the village. With a common thread running-through which will serve to unify the development and reinforce the sense-of-place which is presented by the scheme.In particular, simple, uncomplicated/uncluttered designs have been developed. High quality materials have been utilised for the development, essential in reinforcing the architectural character of the development, reflecting the high-quality of other developments which have been executed within the village recently.The brick selected was Forterra’s Butterley Breckland Multi Reserve, a red brick with a tumbled texture.
Sponsored
Keswick Convention Centre, Keswick Ministries organization

Keswick Convention Centre, Keswick Ministries organization

Sto Ltd

An historic landmark in the Lake District has been given a new lease of life with the installation of StoTherm Mineral K external wall insulation and StoSilco finishing render. Built in 1937, the building in Keswick originally housed the UK’s first pencil factory, and now provides new headquarters and site for the Keswick Convention for the Keswick Ministries organization. After being used by the Cumberland Pencil Company the building had fallen into disrepair. Set at the entrance to Keswick, this important local landmark has now embarked on a £10.5m redevelopment project, split into four phases. The Sto materials have been used on the first phase which has seen the building’s front elevation fully restored, and they have also been specified for the remaining three stages of the work.The BBA-certified StoTherm Mineral K system combines impressive insulation with unrivalled fire protection characteristics. It features Sto-Mineral Fibre thermal insulation boards, which in this case were fixed to the substrate using StoLevell Duo Plus mineral bonding and reinforcing mortar.  “This allows any unevenness in the surface of the substrate to be accommodated and makes installation a fast and easy process,” comments Alan Rees of Eco Rend North East who installed the Sto system. This efficient single-leaf construction allows for excellent thermal performance without reducing the interior space, and as it requires no additional expansion joints, a smooth and unbroken exterior surface can be created.  An additional mineralic reinforcing coat was applied and the exterior surface was finished with StoSilco silicone resin render.  With high CO2 and water-vapour permeability, StoSilco render allows a weather- and water-repellant outer surface to be created in any of the 1,000+ colours available in the StoColor System.  
Sponsored
JACKOBOARD® is the “ideal” companion for underfloor heating

JACKOBOARD® is the “ideal” companion for underfloor heating

BEWI UK Construction

The JACKOBOARD range from BEWI is “ideal” for use as a tile backerboard on projects where increasingly popular underfloor heating systems are being installed, the company says.Made from extruded polystyrene foam (XPS), the construction boards are said to be inherently waterproof because the structure of the board does not allow water to penetrate. They are designed to be easy to work with and cut, as well as truly lightweight.They are finished on both sides with a special coating and reinforced fibreglass mesh, ready to be tiled, rendered or plastered. The boards are said to possess excellent thermal insulation properties, which give them enormous advantages over plasterboard or cement board. They are especially suitable for interior construction, the company says, especially in rooms subject to high moisture levels.According to BEWI, JACKOBOARD goes “beyond bathrooms” and can be used in any room of the house and as a backerboard for virtually any tiling project.The boards are suitable for quickly and effectively levelling uneven walls and floors, for partition walls, compensating for cracks in substrates and for creating substrates for laying tiles on non-adhesive surfaces.JACKOBOARD is also said to provide the best waterproof, insulated, tiling substrate for underfloor heating projects. Whether electric mats or hot water systems are being installed, BEWI says, JACKOBOARD – laid underneath the heating elements or pipework – will help to decrease warm-up times of the system by pushing the heat directly up to the tile layer. In this way, the heat generated by the system is used in the most efficient way, not just during the initial heat-up stage, but in general usage with the continued thermostat-controlled use of the heating system.As builders are forced to reduce the carbon footprint of their projects, the materials they choose to build with can provide a key to unlocking the thermal performance of a building. The XPS foam used on JACKOBOARD products reportedly achieves excellent insulation properties. It’s designed to help maximise the energy efficiency of walls and floors, improving the overall thermal performance of any property.www.bewi.com
Sponsored
City of Glasgow College - City Campus

City of Glasgow College - City Campus

Indeglås

Next Generation Super Campus for Open and Inspiring Teaching - City of Glasgow College, City Campus is already nominated for top architectural and construction awards.
Sponsored
Fragatta Tower, Colombia

Fragatta Tower, Colombia

Genesis Global Systems Limited

The construction company wanted a strong aluminium profile that provides a simple, safe secure edge for steps covered in ceramic tiles. The flange sits underneath the tile and the top section protects the riser tile and prevents water ingress into the joint gap. The top section provides a perfect step edge with a grooved profile face for extra grip and has a generous 10-12mm deep front face to highlight the step edge from the bottom of the steps. Contractors decided Genesis NLM123 would fit perfectly and have since ordered 303 linea meters to be installed in Fragatta Tower, Colombia.
Sponsored
The Caledonian, Inverness

The Caledonian, Inverness

Keim Mineral Paints Ltd

The Caledonian in Inverness is a 19th Century, Grade A Listed Public House. The sandstone surfaces were previously painted with approximately 8-10 layers of paint – some areas had been stripped and in other areas existing paint coatings remained. For the deep repairs to the sandstone, we recommended using KEIM Restauro Grund and for the finishing layer over the repairs, we advised using KEIM Restauro Top, which was dress back in a manner to suit the surrounding stonework. To give an opaque matt finish, we specified KEIM Soldalit in the same colour as the KEIM Restauro Top.
Sponsored
ASF Balmoral PGR Panel Post, Keighley Town Centre

ASF Balmoral PGR Panel Post, Keighley Town Centre

Architectural Street Furnishings part of WB White Foundry

ASF were approached by Bradford Council to manufacture and supply the Balmoral Posts with Panels set up as a guardrail - with a vertical infill panel in the lower section and topped with a sight gap and top rail.The site had a variety of straight and curved sections with slight gradients in some areas of both.ASF manufactured the posts and panels to meet the needs of each individual part of the site, whether that be a straight run, cambered around a gentle curve or with the panels following the physical curves if needed.All posts are 100% recycled, made from used vehicle brake discsThe system meets and exceeds 1.5kN loading
Sponsored
One Hyde Park

One Hyde Park

SuperFoil Insulation

One Hyde Park, owned by CPC Group, is a high-end residential and retail park. Due to the nature and standard of the construction, developers required the highest quality tools, equipment and materials to construct the building. The ambition was to keep the design lines sleek, elegant and spacious, while still achieving the required high thermal performance expected in in a modern prestigious development in the heart of London. Insulating the floors introduced another level of complexity and so the search for something that was up to the challenge began.After meeting with developers, our experts concluded that SuperFOIL SFUF would be the most practical and efficient solution to the project. With a slim profile of just 6mm and R value of 0.8, SFUF gives a great solution where floor depths are limited. SFUF has a slightly different build-up to our typical roof / wall products in that it doesn’t include layers of wadding, this makes it much slimmer and less compressible, making it an ideal combination for solid floor applications. Unlike our other products, SFUF is also typically installed with no air gaps which, again, contributes to its slim profile. The top layer of SFUF is a polythene membrane which provides protection allowing it to be screeded onto directly with no need for additional layers to be installed. This also makes SFUF ideal for use with underfloor heating systems. The application of SuperFOIL SFUF was a success and the building was finished in 2010. Starting at £20million, One Hyde Park residential properties began selling soon after the completion of the complex. SuperFOIL SFUF provided a solution to achieve a high level of thermal performance in this prestigious development. SFUF has an impressive thermal r-value achieving excellent performance in a minimal amount of space 
Sponsored
Laminate Metal Lockers at Isca Academy

Laminate Metal Lockers at Isca Academy

Helmsman

Isca Academy is Part of Ted Wragg Multi-Academy Trust to raise the aspirations and outcomes for their students enabling them to become fulfilled, and confident students. The school prides itself on being a true full school with students having a broad range of skills and ambitions on entry. Helmsman supplied and installed 205 four-compartment Laminate Metal Lockers. The specifications of the lockers were 1775mm high, 300mm wide, and 450mm deep. The school requested a mixture of sloping top and flat top. Sloping tops are a popular option for schools as they can prevent safety hazards as items can’t be stored on the top as well as accumulation of dust and dirt.It was requested to have a Laminate Metal Locker. The metal body of the lockers was coated in our standard shade of ‘Ice’. Whereas the Laminate doors were powder coated in Paradise blue, Yellow Crisp, Orange, and Hot Pepper. The laminate metal lockers were finished with oval laminated number plates above the Camlocks. Camlock is a great lock option for school lockers as it secures students’ personal belongings safe.Laminate metal lockers are a great option for schools since the material gives the look modern and sleek. In addition, the material will hold up better to dents, scratches, and other damage over time, which is an excellent material for schools as it can last long term.It was great working with Ted Wragg Multi-Academy Trust on this project again! Get in touch today if you have a similar project, give us a call at 01284 530 427.
Sponsored
Fulham Jetty

Fulham Jetty

Bauder Ltd

Fulham JettyBauder Bakor 790-11 hot melt structural system with Bauderflex waterproofing system and BauderGREEN sedum systemSynopsisFulham Wharf is a landmark regeneration scheme that began in 2013 and included the ecological enhancement of an abandoned jetty on the River Thames. This redevelopment was designed to provide the local community with an ecological education centre and bio-diverse wildlife reserve.Bauder Building BoardProject:Fulham JettyLocation:LondonRoof Area:1,000m²Specifier:FabrikApproved Contractor:Accurate RoofingProject challenges One of the major challenges for this roof was installing the central sloped section, which required exceptional levels of technical input and workmanship. This roofing area was waterproofed with the same bituminous green roof system as the upper roof; however a special timber design for retaining the substrate and sedum blanket was also needed. Since its official opening in October 2013, the lower wildflower roof has become a haven for a variety of different birds and insects.The resultThe building’s new roof swoops down to become a continuum with the jetty deck and is covered with a green habitat providing three distinct environments for wildlife; one on the flat roof, one on the slope and the third on the jetty deck. The education centre roof was waterproofed with Bauder’s root resistant bitumen membrane before then having a sedum blanket fitted. On the lower roof, 650m² of Bauder’s hot melt structural waterproofing was installed along with a wildflower blanket, providing an instant carpet of vegetation. Systems installedBauderflex bituminous waterproofing system1 BauderPLANT E 42A torch applied, SBS elastomeric bitumen capping sheet. The product features chemically treated bitumen to deliver superior root resistance which has been tested and approved by the FLL. The membrane is reinforced with 250g/m² spunbond polyester fleece to allow the finished product to cope with structural movement without fracture.2 BauderTEC SPRINT DUOSelf-adhesive bitumen underlayer with “DUO” lap technology to ensure thorough sealing of lap joints, even in lower temperatures. The product features a glass fleece reinforcement for strength and stability. The product benefits from cleaner, safer, and faster installation than traditional torch-applied membranes.3 BauderPIR FA-TELightweight, PIR flatboard insulation board with aluminium foil facing on both sides. This product has zero ozone depletion potential.4 BauderTEC KSD FBSSelf-adhesive air and vapour control layer with a mica finished upper surface to allow easy bonding of insulation using the specified Bauder Insulation AdhesiveBauder Bakor 790-11 hot melt waterproofing system1 BauderPLANT E 42Torch-on root-resistant, green capping sheet. Reinforced with spunbond polyester fleece to allow the finished product to cope with structural movement without fracture.2 790-11 with reinforcement layerHot melt rubberised bitumen asphalt with a percentage of post-consumer recycled materials that infills and fully bonds to all minor deviations in the deck.3 DeckPrimed concrete.Bauder XF 301 Sedum system1 BauderGREEN XF 301Sedum vegetation blanket instantly providing at least 90% coverage on an extensive green roof. Integrated water retention and filter layer.2 BauderGREEN AL 4040mm high perforated edge/drainage trim frames and retains the Bauder XF 301 sedum system.3 BauderGREEN SDFMulti-functional drainage and filtration layer which prevents the roots of sedum plants from becoming waterlogged.4 BauderPLANT ETorch-on root-resistant capping sheet green
Sponsored
Blackhorse Lane

Blackhorse Lane

Langley Waterproofing Systems Ltd

The purpose:Taylor Wimpey’s Eclipse development was the final phase of the large-scale modernisation and renewal strategy for the London Borough of Walthamstow Forest, known as The Blackhorse Lane Action Plan. Eclipse would offer affordable social and private housing via 500 homes in two six-storey apartment blocks.To help satisfy one of the Plan’s objectives- “to ensure new developments incorporate the highest levels of sustainable design and their impact on climate change is minimised”- we installed green roofs on both blocks. As it was the final development phase, space was limited; time was also an influencing factor in facilitating the tight build programme,avoiding delays, and enabling the client to deliver much-needed new homes.Our solutionTo enable fulfilment of the brief, we recommended our HM-40 Paratech Hot Melt Roofing System as the inverted waterproofing base for the green roof. A fully-bonded system, HM-40 is a robust, durable, and highly flexible monolithic, self-healing hot-melt waterproofing system for protected roofs, green roofs, terraces, and podium decks with a 40-year durability statement. In addition, it is firerated for unrestricted use when covered with a green or ballast roof.Unlike other hot melt systems that use fleeces, the Paratech system incorporates a reinforcement mesh: this allows the system to be rolled out, making waterproofing installation faster, thereby enabling the contractor to lay the top roofing layer of artificial grass and landscaped green roofs. Unfortunately, an on-site compound to store the roofing components was unavailable. We worked closely with T&T Roofing and Taylor Wimpey to ensure deliveries arrived in build sequence for immediate use, but without adversely impacting residents who had already moved into their newhomes.“The features of the flat roof system provided a seamless, issue-free roof installation, with rapid installation time causing minimal disruption. Langley’s technical team was always on hand to provide assistance when necessary, working collaboratively to guarantee a consistent and highquality installation.”
Sponsored
Shard Place Riser Install, London

Shard Place Riser Install, London

Dura Composites Ltd

Dura Grating Riser Installation | Case StudyShard Place is the third phase of the £3.5 billion redevelopment of the estate next to London Bridge station, known as Shard Quarter. Reinforced concrete frame and groundwork specialists Getjar were appointed as the formwork contractor by the principal contractor Mace and chose the Dura Composites Riser Install team to take on some of the complex install challenges of the service risers.Dura’s unrivalled expertise and full install capabilities meant they could deliver a bespoke solution for a large triangular shaped riser on all 26 storeys that required the use of galvanized steel supports and bracketing in conjunction with GRP Dura Grating to allow for cutouts to be performed whilst maintaining the integrity of the riser.
Sponsored
Apartment building in the St. Johann district

Apartment building in the St. Johann district

Schöck Ltd

A house dating back to around 1910 was dismantled in the St. Johann district of Basel to make way for a new building on the narrow plot. The construction company was forced to allow car, bicycle and pedestrian traffic to continue and had to make do with a building site that was severely restricted.The ten staircase elements were precast in architectural concrete at the factory, treated with Schöck Tronsole® products and shipped to the site where a crane lowered them individually into their exact position in the stairwell through an opening on the top floor. All of which took place without any standard fastening the elements – each weighing two tons – at the sides or on supports. After all, the challenge was to minimise the transmission of impact sound.Installation was performed by the on-site construction manager in Davidsbodenstrasse. It did not take long to win foreman Paul Willig over to the product: "The self-adhesive technology of Tronsole® makes it quick to install, without the need for tools.” Depending on the construction workflow, the impact sound insulation can also be easily applied at the prefabricating plant.
Sponsored
Orbis OS211 Glass Balustrades for Blackpool Victoria Hospital

Orbis OS211 Glass Balustrades for Blackpool Victoria Hospital

Delta Balustrades Ltd

Orbis OS211 Glass Infill Top FixOrbis OS200 Vertical Bar Infill Side FixThe main NHS hospital for Blackpool and the Fylde Coast, Blackpool Victoria Hospital has undergone a £16.4 million upgrade to create a new main entrance and a multi-storey car park.The new entrance includes a pharmacy, retail units, café, main reception, waiting area and office accommodation. Featuring extensive curtain walling, the new main entrance has been designed to maximise natural light and provide a feeling of openness. The use of glass for the balustrades helped to enhance this design style throughout the main feature areas and voids, using Delta Balustrades’ Orbis system.Delta Balustrades also supplied the balustrades and handrails for the main and rear staircases in the new multi-storey car park. Delta Balustrades calculated the loadings for all areas of the hospital installation and specified multiple fixing details for the atrium to accommodate variations in floor levels and construction.
Sponsored
Coplanar Doors - EKU Frontino

Coplanar Doors - EKU Frontino

Hawa Sliding Solutions AG

The unique furniture ranges combine the core values of Wackenhut at the highest level. Quality craftsmanship and technical know-how in demanding implementations make bedroom and living room furniture, that meets the highest of design demands and stands out with timeless aesthetics, possible. EKU Frontino 20, the fitting for flush top or bottom running applications, fulfils these demanding requirements. EKU Frontino 20: flush-fitting hardware solution for design-oriented sliding at sideboards and cupboards, and is suitable for creations in modern living rooms, kitchens and office environments. Multi-faceted product range – One hardware system for top and bottom running applications
Sponsored
ASF 5006 Handrailing at Bradford Library Steps

ASF 5006 Handrailing at Bradford Library Steps

Architectural Street Furnishings part of WB White Foundry

ASF were approached to replace some tired yet serviceable handrailing at the old Bradford Library in a change of use project. ASF used the popular 5006 posts with mitred tops and supplied a large central double handrail alongside a single handrail for a walled section. There was also a small section of single handrail supplied for a small side entry to the area. Pleasingly, ASF mitred the top of the bollard to match the angle of descent of the steps rather than just do them at the usual 45 degrees.ASF combined this with glass balustrade for the elevated walkway on the building concourse, which can be seen on some of the images.
Sponsored
ITV

ITV

Zip Water

As the largest commercial television network in the UK, ITV employ some of the best and brightest in the industry. Creating a collaborative and innovative working environment and keeping staff at the top of their game is a priority for the broadcaster.
Sponsored
EDUCATION - LOGAN HALL UNIVERSITY COLLEGE LONDON, LONDON, STAIR NOSINGS

EDUCATION - LOGAN HALL UNIVERSITY COLLEGE LONDON, LONDON, STAIR NOSINGS

Quantum Flooring Solutions, a trading name of Quantum Profile Systems Ltd

Logan Hall is an auditorium at the University College London. It is a venue based in the famous 20 Bedford Way building, and is used for various events such as award ceremonies, film screenings and conferences.
Sponsored
Actis

Actis

Scanomat UK Ltd

Leading global sustainable infrastructure investment firm, Actis, installed two TopBrewers in their employee-led office space.Actis worked with Loop Interiors to design their London workspace, which is located in the iconic 2 More London Riverside.When their project manager recommended TopBrewer as a premium coffee solution, the Actis team knew it was the right choice. Its unique design encourages collaboration, which plays a vital role in the Actis ethos, and on top of this, the top-quality coffee and sustainable features made it the perfect commercial coffee machine for their space."We liked the fact that TopBrewer could be installed in a collaborative area and act as a draw for employees to socialise and chat as they grab a coffee."
Sponsored
Kindred House, Croydon

Kindred House, Croydon

Cellecta Ltd

Kindred House is a 25-storey block made up of 128 one to three bedroom residential apartments overlooking the Croydon Flyover. Of these homes, 60 are affordable, and includes above flexible office and retail space, and 1000m² of flexible commercial space adjacent to the road. These all act as a buffer for the affordable apartments on the opposite side of the plan. The building has been stabilised with RC lift cores and RC shear walls and supported on reinforced concrete piled foundations.Cellecta’s YELOfon HD5 was specified by Pitman Tozer Architects on this project for its excellent high impact sound deadening properties ideal for a block of flats. It is a lightweight, easy to install non-crosslinked polyethylene foam.Henry Construction was awarded the 10,000m² contract to construct these modern apartments.
Sponsored
HM Land Registry

HM Land Registry

Ampteam Ltd

More than 150 metres of UNIFOLD® was installed at HM Land Registry, Coventry.This installation utilized the UNIFOLD® patented clip-joint system designed to allow joints to be competently and successfully completed behind obstructions and where access is particularly difficult.The existing gutter systems installed on the roof of the building were manufactured from GRP (Glass Reinforced Polyester).The GRP gutter joints had broken down due to thermal movement, for which this material is particularly prone.In order to ensure the integrity of the lining, system expansion joints were strategically introduced to induce Unifold to move in complete unison with the gutters beneath.This was the second HM Land Registry building to receive UNIFOLD®. The previous installation was in Leicester.
Sponsored
Assima Tower

Assima Tower

Bobrick Washroom Equipment Ltd

At a time when hygiene and budgets are top of mind, the B-824 SureFlo® Automatic Soap Dispenser revealed itself to be the economical hygiene solution the design teams could get behind.
Sponsored
Staff Lockers at Alexander Dennis Ltd

Staff Lockers at Alexander Dennis Ltd

Helmsman

Our team at Helmsman had the pleasure of manufacturing and installing a variety of staff lockers and bench seating. Helmsman team manufactured 60 one-compartment metal lockers with sloping tops and 4 of fifteen-compartment garment dispensers. All the staff lockers are manufactured with a sloping top, which is a great addition as it reduces the pose of hazards if items are stored and prevents the growth of dust and dirt on top of the lockers.The specification of the metal locker was 1800mm high, 380mm wide and 450mm deep, however, the sloping top adds 150mm to the height. The staff lockers were all powder coated from Helmsman standard colour charts. The carcass of the metal lockers and the garment dispenser was powder-coated in ‘Ice’, whereas the doors were powder-coated in ‘Skye’ which creates an uplifting mood for the staff with the brightness of the colour.The lockers were completed with a vedette laminated number plate as well as a Helmsman locking system of cam locks, which is a great secure lock, assuring the employees that their personal belongings are safe whilst being at work.Additionally, with this order, clients also requested bench seats in a wet spec, which is suitable for an environment that has high humidity. The specification of the bench seats was 450mm high, 3250mm long and 350mm wide. Bench seating is an excellent addition as it allows employees to sit down when they need to change their shoes rather than having to balance, which can cause a hazard.It was great working with Alexander Dennis once again, we look forward to working together again in the future.Should you have a project where staff lockers are required and you want more information, give us a call on 01284 530495 or contact us here.
Sponsored
Centenary Quay

Centenary Quay

Axter Ltd

This project was part of the vibrant regeneration of Southampton’s waterfront, including 102 apartments with high rise penthouse flats, retail and commercial space. Phase three of the project incorporated a bio-diverse living roof as well as amenity space built above a Morrisons supermarket.ChallengesWith fully accessible amenity gardens including a flowing water feature, it was vital a robust specification was delivered. Due to this space being built above a Morrisons supermarket, careful design consideration was essential to ensure that Axter’s driving philosophy of the right system in the right place was successfully employed.SolutionsFor the main roof area, a robust system was required. The Wilotekt-Plus was specified for system on the podium, main roof and terraces (5000m2). This system is the original and industry renowned second generation hot melt structural waterproofing system. Its pure polymer modified bitumen compound formulation, combined with reinforcement mesh and high strength protection membrane, resulted in a tough, seamless, flexible, self-healing monolithic waterproofing system, with incredibly fast installation speeds, that will last the lifetime of the building.Ecoflex PVC single ply waterproofing (450m2) installed on the canopies, idea due to the system being incredibly lightweight, typically 2-3kg per m2. Ecoflex systems are strong and flexible, are fully reinforced and available for mechanically fixed and adhered applications.Working alongside horticulture specialists and substrate and seed providers, we ensured all elements of the roof complied with the Biodiversity Design Report for the development. This included specially selected grass and flower species, chosen for their ability to withstand windy coastal conditions. When established, these plants will provide shelter and forage to a range of invertebrates and birds.Systems in useWilotekt®-PlusEcoflex®Biodiverse Living Roof
Sponsored
ASF 5006 post and rail, post and panel and step handrailing, Sale Town Hall

ASF 5006 post and rail, post and panel and step handrailing, Sale Town Hall

Architectural Street Furnishings part of WB White Foundry

ASF produced the full gamut of variants for this project, all using the ASF 5006 mitred top post system to give continuity. 114mm diameter post uprights were used to offer a substantial framework for these barrier and handrail systems. Some areas needed only handrail so a single sided underslung system was provided, with wrap around end profiles offering a pleasing end point to individual sections.On the post and panel sections a 48mm diameter top rail was used in conjunction with stainless steel perforated panels. These meshed perfectly into the step units that swapped seamlessly from post mounted to wall mounted handrail.Curves, corners and steps were included on this project
Sponsored
2LG

2LG

Zip Water

Top journalist for the past 15 years, writing for the likes of Red, Elle Decoration and The Sunday Times Style Magazine, Pip McCormac’s flat refurbishment called for an ‘Instagrammable’ open-plan kitchen, with appliances to match.
Sponsored
BAFTA Headquarters

BAFTA Headquarters

3v Architectural Hardware Ltd

Architect/Designer: BenedettiLocation: London Project OverviewFront of house refurbishment including developing bespoke signage and hardware to meet the client and architect’s requirements. ServiceFull hardware scheduling service. Bespoke signage & ironmongery. Project Details 3v worked alongside Benedetti architects to provide a full interior hardware package for the beautiful refurbishment of the British Academy of Film & Television Arts headquarters at 195 Piccadilly. This project included development of bespoke signage panels and hardware designed to complement the overall design aesthetic for the refurbishment of this Grade II listed building.The Expansion includes new top floor by raising & restoring two large Victorian rooflight structures & decorative plasterwork considered ‘lost’ for 40 years, from the original 1883 Royal Institute of Painters in Water Colours Gallery, built in ‘opposition’ to the Royal Academy across the road.Facilities include: doubled capacity, two cinema theatres, banqueting hall, multipurpose event and exhibition spaces, members’ bars/restaurant/club, roof terraces, judging/meeting rooms and offices.
Sponsored
The Department Store Studios

The Department Store Studios

Leviat

Located in Brixton, The Department Store Studios is a five-storey contemporary office building, offering flexible co-working space alongside generous amenities including a bike storage, showers, lockers, a screening room and a bar and restaurant. The workspace has been designed and built by renowned architecture firm Squire and Partners, to be used as an addition to its own London office, in a new build property framed by cross-laminated timber. Early involvement with brickwork contractor, Lyons & Annoot, allowed for a seamless, homogenous brick build on this project. Working alongside main contractor Lyons and Annoot, from tender stage to completion, Leviat designed and manufactured a bespoke masonry restraint system which was used in the internal blockwork walls, as well as Ancon Wall Ties, Head Restraints and AMR Masonry Reinforcement in the façade.
Sponsored
Schwimmbad Berlin

Schwimmbad Berlin

Wedi Systems (UK) Ltd

Projects Information: Type: Public Swimming Pool Room: Shower area for women/men, shower Location: Berlin Kaulsdorf Construction company: Heidrich Fliesen, Zernitz-Lohm Project Description: 50m pool Non-swimmer pool with slide 2 sauna cubicles 95°C, steam bath, samarium 4 water wheelchairs, no lift, but flat, rounded Disabled parking spaces Products/Systems used: wedi Building Boards in different thicknesses wedi 610 Adhesive and Sealing Material wedi Tools Reinforcement Tape Special production (8 units each) with Fundo Requirements: Very short assembly times on site Support from AD + AWT in setup/instruction Very short drying times Water-tight material Quick processing
Sponsored
Rye Lane

Rye Lane

Forterra Building Products

The ChallengeSituated in the Rye Lane conservation area in Peckham, South London, the four to seven storey mixed-use development in Rye Green – comprising 27 residential units laid out across six floors, with two retail units on the ground floor – would provide affordable housing for people in the community who are most in need.The scheme had to consider two elements, the first being the redevelopment of the frontage building (Rye Lane) with the retention of its façade, and the second being the six-storey (with set-back seven-storey) block to the rear, on the site of the existing fish warehouse.The SolutionThe architectural design of this residential development incorporates traditional and modern features with an existing brick façade.PROJECT INFOPRODUCT DETAILThe seven-storey block is rectangular in form and has been built with a striking yellow facingbrick with protruding red brick paneling. The contrast between red and yellow brickwork is exaggerated with the introduction of green glaze facing brickwork at street level. This change in texture and brick finish works well with the local vernacular.The new second and third floor additions are set back from the retained frontage.The design is simple and functional, and the specified fabric responds to the historic character of the conservation area.Three facing bricks from Butterley Brick were selected for the build. Arden Special Reserve, a red, light textured brick, and buff Village Harvest Multi – also light textured – were used as the facing material for the main body of the buildings. Wilncote Blue Smooth, a dark toned brick. was used to define the base of the buildings. The set-back top floor of the seven-storey block is clad in zinc shingles to reflect its roof-like character.The BenefitsThe high quality development, together with its associated external landscaping, has contributed positively to its place in Peckham.Butterley Brick offers a range of high quality facing bricks manufactured from locally sourced raw materials; the range carries BES 6001 Responsible Sourcing certification. The bricks contribute to thermal mass and can be recycled at the end of their use.
Sponsored
MTX creates stunning roof terrace and BBQ area

MTX creates stunning roof terrace and BBQ area

MEDITE SMARTPLY

A once neglected roof terrace on the top of a luxury private residence in South Kensington has been transformed by Paul Newman Landscapes, using MEDITE® TRICOYA® EXTREME (MTX) in two exciting applications.

Showing 901-936 of 961

Feedback