NBS Source
I'm a manufacturer

"steel"

8,925 results found

Sort by:

Showing 613-648 of 896

Sponsored
Ashmolean Museum, Oxford

Ashmolean Museum, Oxford

Howe Green

The Ashmolean Museum at the University of Oxford underwent a £61 million renovation scheme to meet the needs of modern institutions. BAM Construction specified a number of Howe Green’s 7500 Series Medium Floor Access Covers to provide high performance and discrete access to data cabling concealed beneath flooring in the museum. Installed in internal areas, the covers are capable of tolerating heavy pedestrian traffic and were designed to be infilled with a floor finish to match the surrounding area. The covers were manufactured in stainless steel to resist rust and corrosion and double sealed for optimal hygiene.
Sponsored
The Winter Garden, Bluewater Shopping Centre

The Winter Garden, Bluewater Shopping Centre

Howe Green

Howe Green designed and supplied made-to-measure tree pit covers for a new social dining experience - The Winter Garden at Bluewater. The bespoke panels and frames facilitate access to the root chamber and make maintenance of the highly valuable trees straightforward. The covers were made from 304-grade stainless steel. Each tree pit was manufactured to individual size requirements and to accommodate light fittings. They were supplied with a double-seal to prevent dirt ingress which also helps protect the tree and keep the soil free from contamination.
Sponsored
City Quays II

City Quays II

Kingspan Data & Flooring

Belfast Harbour’s estate spans over 8,000,000 sq. m. The award-winning 'City Quays II' development was completed in 18 months with a construction value of €31 million.Kingspan RMG Simploc was installed on the ground floor Management Suite, with RMG and RMG Simploc fitted on floors three through to seven. RMG performs to PSA medium grade, featuring galvanised steel-encapsulated panels that come with a 25-year total system warranty. The system has also been designed so that the flooring can be easily removed or replaced.
Sponsored
Prestigious international venue uses Franke for washroom redevelopment

Prestigious international venue uses Franke for washroom redevelopment

KWC DVS Limited

Franke Water Systems were thrilled to be chosen to provide the complete range of sanitaryware to the Kia Oval at Kennington for their redevelopment project. Products such as their composite Miranit washtroughs, stainless steel urinals, washbasins and WC’s plus complementing grab rails were all part of the installation. Martin Cosgrove from Mectric Solutions commented “Product quality was a huge factor in deciding on which supplier to choose for such a prestigious project and with a brand name like Franke, we knew we would get the best quality that would last for years to come, and still look good too!"
Sponsored
Murray Royal Hospital specifies Franke for janitorial fit out

Murray Royal Hospital specifies Franke for janitorial fit out

KWC DVS Limited

The new £75 million Murray Royal Hospital, Perth was officially opened by Scotland’s First Minister Alex Salmond last year. The hospital provides state-of-the-art mental healthcare for adults from across Tayside. Franke supplied all manner of janitorial and healthcare washroom products to the project. Specification was exacting to ensure long and efficient product life and savings in water and energy use. Products from Franke Washroom Systems have included; an array of differing formats of HTM63 stainless steels sinks and worktops, disposal and janitorial units.
Sponsored
Bespoke washbasins provided to TBM rail group for Crosscountry trains

Bespoke washbasins provided to TBM rail group for Crosscountry trains

KWC DVS Limited

A fleet change of 220 washroom basins for Cross Country required a bespoke. Franke designed and manufactured a bespoke solution specifically for the project. The final design was the Rondo stainless steel bowl inset into a Miranit resin-bonded worktop in their choice of colour. Miranit combines sturdiness and resilience with outstanding moulding capabilities and has been fire test specifically for use on trains and fully certified to Category 2. Andy Hawker, Managing Director of TBM Group commented “With Franke's 230 years manufacturing expertise the products have the potential to improve passenger experience no end.”
Sponsored
Motorpoint Arena - Sheffield

Motorpoint Arena - Sheffield

KWC DVS Limited

Castle Building Services, specified bespoke urinals from specialist stainless from Franke Sissons. Franke products all comply with CE Mark standards, WRAS and BMA water saving standards too, all products are guaranteed to perform for decades. Alan Castleton, Managing Director of Castle Building Services explains “The refurbishment of the washroom is a prestigious contract for us so we obviously wanted to deliver an outstanding job with products that will perform for many years. Franke has a long and impressive track record with high quality stainless steel and of course they are local too”.
Sponsored
Taking a Bold Step - Elite Loft Ladder case study

Taking a Bold Step - Elite Loft Ladder case study

Premier Loft Ladders Ltd

Loft ladders do not come any bolder than this stunning Elite concertina loft ladder from Premier Loft Ladders. It has been finished in 'Sulphur Yellow' powder coat. Two identical ladders were ordered by US steel fabrication and installation specialists Alloy Construction Service. For safety purposes, the loft ladders needed a bright yellow powder coat finish and had to be fitted with two telescopic handrails. Visit Premier Loft Ladders web site to learn more about the Elite and read the full case study.
Sponsored
Easy Glass Pro outdoor glass balustrade - Amsterdam rooftop garden

Easy Glass Pro outdoor glass balustrade - Amsterdam rooftop garden

Q-railing

The vibrant city of Amsterdam has a stunning new architectural highlight. Discover De Boelelaan, a modern building containing both residential and office space. The feature that really sets it apart is a magnificent rooftop garden. Safety barriers are an essential feature. Q-railing’s Easy Glass Pro glass balustrade system offers maximum transparency with the highest standards of safety. In this case, the balustrade is frameless, with a minimalist U-shaped stainless steel Q-railing profile on top. The 245 metres of glass railing also provide a useful wind break.
Sponsored
Private apartment building in Denmark features Easy Glass Slim glass balcony railings

Private apartment building in Denmark features Easy Glass Slim glass balcony railings

Q-railing

Skolegade, a street in the Danish city Aarhus, is known for its interesting restaurants, pubs and characterful timber-framed homes. A brand new three storey apartment building was added to the street. The spacious apartments each have access to an ample balcony surrounded by an Easy Glass Slim full glass balustrade. These balustrades allow maximum visibility of the building’s facade, with its striking steel structures. Easy Glass Slim was installed without making any special adjustments to the existing design. The back of the building features Q-railing Juliet balconies.
Sponsored
Westquay Watermark, Southampton

Westquay Watermark, Southampton

SAS International Ltd

Designed by architects Acme, the stunning WestQuay Watermark bfeatures a dramatic cantilevered box wrapped in a transparent skin of curving stainless steel silver tubes. SAS Special Projects designed, manufactured and installed a bespoke SAS750 Tubeline with a 76mm diameter and suspension system for the external soffit. With the building being near the coast, the external skin required C4 corrosion protection. The material and paint used had to accommodate saline or marine environments and be able to be designed to withstand wind loads. Open to the public, the WestQuay Watermark has now become a centerpiece of Southampton’s regeneration.
Sponsored
Peabody Nods for Stannah Passenger Lifts in St John’s Hill Social Housing Regeneration

Peabody Nods for Stannah Passenger Lifts in St John’s Hill Social Housing Regeneration

Stannah Lifts

Five Xtralifts and two sets of Xtralift duplexes will support access-for-all to 153 apartments ranged over five and seven floors, in two distinct blocks. To match the heavy duty demand of this environment, the nine 8-person lifts are fitted with higher-grade stainless steel lift cars and Dewhurst push-button controls. Eight are traction, without motor rooms, and one is hydraulic, with a motor room. All the lifts have been installed with a range of options, with a mix of vandal-resistant categories 1 and 2. Two models are equipped as firefighter lifts.
Sponsored
Teckentrup Door Solutions supplies 100s of doors for new UK Lidl Stores

Teckentrup Door Solutions supplies 100s of doors for new UK Lidl Stores

Teckentrup UK Ltd

New Lidl stores and stores undergoing refurbishment around the UK are now supplied with Teckentrup steel doors and doorsets. Lidl has a standard footprint for every store, however at each location there are differences. Changes are driven by planning restrictions, site space, etc, and it means each site is unique to some degree.Teckentrup works with LIDL and its contractors to identify the variances and advise on the solutions long before sending products to site. Doors are typically at the end of the build programme; contractor knowledge is limited and specifications are constantly changing. A recipe for potential problems...
Sponsored
2-6 Cannon Street, London

2-6 Cannon Street, London

The Outdoor Deck Company Ltd

2-6 Cannon Street is a high-end new build commercial office building located in the City of London. The Outdoor Deck Company were commissioned by Frosts Landscape Construction to supply and install the GRAD decking and rail systems, which were supported by the Buzon DPH pedestal system. This was a particularly challenging project as powder coated steel planters were strategically located in the middle of the roof terrace so installation had to be carried out around the numerous planters. Timber decked steps and ramps were also part of the overall terrace design.
Sponsored
Stair Cladding with Wood Flooring

Stair Cladding with Wood Flooring

The Solid Wood Flooring Company

We are able to manufacture engineered wood stair units to match our flooring with the same colour and finish.The stair units include the tread and riser and can be made to exact sizes if we have detailed drawings. This means installation costs will be less. These stair cladding units can be fully bonded to old stairs, concrete stairs or Steel stair structures.The cost of these stair units are considerably more than our standard stair nosings and a deposit will be required before production because they will be to your specification. Lead times are around 12 weeks.
Sponsored
Google HQ King's Cross, London

Google HQ King's Cross, London

The Outdoor Deck Company Ltd

The current Google HQ, with vast external floor space over several levels. The decking is a bespoke solid section 230 x 30mm composite, commissioned for this site. All fixings are hidden, giving a seamless look to the terraces, and clean lines. The main terrace areas are level and by using the DPH slope correction system, the wheelchair access ramps were easily achieved. A clever feature; the BM Unit travels over the decking, hiding the steel rails below. This enlarges the overall usable terrace space considerably, and gives uninterrupted views from the entire terrace.
Sponsored
Axis Madrid

Axis Madrid

EFFISUS

The property, that has been renamed Axis, has four floors and an amazing facade, composed by a structure of beams and supports that cross diagonally. A feature that allows to minimize energy costs, because of the large stainless steel and glass cube that uses the latest technologies to combine a transparent facade with an outer mesh. Effisus Ecofacade SA Edge membranes were used on this project for sealing facade connections. Effisus Pre-Fab True Seal, a pre-fabricated sealing solution, was developed and applied for sealing difficult facade 3D details, minimizing human error possibility.
Sponsored
SOYO, Quarry Hill, Leeds

SOYO, Quarry Hill, Leeds

Akzo Nobel Powder Coatings Ltd

Built in the 1930s and once famous for the largest social housing scheme in the UK, the site has been home to a number of cultural names since the estate’s demolition in the 1970s, including the West Yorkshire Playhouse, Leeds College of Music and the Northern Ballet. Now, the regeneration of this site continues with an extensive, ambitious new masterplan.Phase 1 incorporates Blocks E & F which provides 515 units for Build to Rent operator Moda Living.Y2208I Sumela and Y2217F Steel Bronze 2 working spectacularly in combination for rainscreen cladding panels and corrugated profiles respectively.
Sponsored
ASF Boston Load Bearing Trough Bollards, Liverpool Football Club

ASF Boston Load Bearing Trough Bollards, Liverpool Football Club

Architectural Street Furnishings part of WB White Foundry

ASF were already supplying the ASF 5002 bollard to this site with an internal heavy duty steel core to make them ram raid resiatent, when we were asked about bollards that would fold into a trough below ground level. These were for the players entrance and would need to sustain a lot of traffic passover as well as fully loaded coaches. The ASF Boston Trough was used which is manufactured to meet the U.S. H20 load bearing capacity, suitable for 'large trucks', HGV's and artics. This has a 32,000lbs axle weight capacity
Sponsored
Llanelli Seafront - Millennium Project

Llanelli Seafront - Millennium Project

Architectural Street Furnishings part of WB White Foundry

ASF were commissioned to help design a range of cast iron products for the Llanelli Millennium Park seafront and visually impressive viewing towers. ASF adapted the popular ASF 211 quayside post and centrifugally galvanised it, a process that offers a finish that is expected to last 50 years with no maintenance. Grade 316L rails were used in conjunction with the cast iron posts. The outcome was a stunning combination of the earthy and organic look of cast iron with the clean cut edges of bright polished stainless steel - the project still looks great after 15 years.
Sponsored
Dundee Waterfront: Roma-3 fencing

Dundee Waterfront: Roma-3 fencing

Lang+Fulton

Three types of fencing were supplied for a prestigious waterfront location on the the River Tay. The design was developed jointly with the City of Dundee Chief Engineer, creating bespoke fencing which made use of modular panels wherever possible to meet the project budget. Roma-3 was used as infill panels to the keyside balustrade. The panel frames were customised with an extensions to carry a hardwood and stainless steel handrail. All the fencing was hot-dip galvanized and polyester powder coated to provide a durable, low maintenance finish to withstand the rigours of the coastal location.
Sponsored
The SSE Hydro: decorative wall cladding for the stage entrance constructed from Stereo-kinetic system.

The SSE Hydro: decorative wall cladding for the stage entrance constructed from Stereo-kinetic system.

Lang+Fulton

The SSE Hydro is the biggest performance arena ever designed by Foster + Partners. Lang+Fulton have now supplied a decorative solution for the stage entrance constructed from their STEREO-KINETIC cladding system. Each stainless steel sheet is engraved with name of an artist, commemorating their performance. When the Hydro first opened in 2013 Lang+Fulton supplied the Roma-3 grating fence which secures the perimeter of the complex and storage compounds, as well as a Micro-15 balustrade for the elevated walkway which connects the car parking facilities with the venue. Product: STEREO-KINETIC cladding
Sponsored
Bolton Gate secure retail units in refurbished Victorian Market Hall Vaults

Bolton Gate secure retail units in refurbished Victorian Market Hall Vaults

Bolton Gate Company

As part of a £14 million redevelopment of Bolton’s Market Place Shopping Centre, the extensive historic vaults that lay beneath were uncovered and developed into bar and restaurant units. Bolton Gate were engaged to design, manufacture and install nine collapsible steel gates which spanned the openings some of which were arched and in keeping with the surrounding metalwork, a clear powder coating was applied over the galvanised substrate to match. In addition to the vault gates, Bolton Gate also supplied a series of roller shutters, smoke and fire curtains in the upper development of the project.
Sponsored
APL Case Study - APL SnapLoc™ Cladding - Graven Hill

APL Case Study - APL SnapLoc™ Cladding - Graven Hill

Architectural Profiles Ltd

Project: Graven HillDate: 2020 Background:·        APL were engaged with the project consultant to assist with overcoming design issues with their chosen support structure (by others)·        APL designed a custom sub-frame due to the extreme tolerances on the chosen substrate·        APL provided all structural calculations Systems:·        1,000m² of APL SnapLoc™ traditional standing seam system in steel with a RAL 7016 PUF coating·        APL Tritherm™ GALV sub-framing to APL SnapLoc™ areas·        All flashings, fixings and accessories Building Location:·        Oxford
Sponsored
TBA FIREFLY™ System Sub-Divides Supermarket Roofspace

TBA FIREFLY™ System Sub-Divides Supermarket Roofspace

FIREFLY™ TBA

TBA FIREFLY™ System Sub-Divides Supermarket RoofspaceDuring the recent pandemic supermarket chains have had to continue with property maintenance and improvement programmes to ensure the safety of their premises, including a store in Staffordshire where the APOLLO Lite™ 30:30 barrier, manufactured by TBA FIREFLY™, was installed within the roof-space as part of a major refurbishment project.The work at the store was carried out by sector specialist, The B Team. All of the APOLLO Lite™ 30:30, together with the heavy duty stainless steel staples and other ancillary Firefly products, have been supplied by distributor, CCF.Commenting on the success of the work, The B Team Site Manager Adi, said ”as the architects specified vertical fire barriers in the strategy according to the Approved Document B from the Building regulations, we decided to use APOLLO Lite™ 30:30 from TBA, as we have used it and other FIREFLY™ products on other project in the past: in supermarkets and other types of building. It is easy to cut and install, fixing it vertically to the metal profiles with stainless steel screws to create 20 metre by 20 metre compartments and we used the stainless steel staples to secure the joins in the material, all in line with the manufacturer’s installations manuals.”All of The B Team’s work had to be carried out while minimising any disruption to the store’s long hours of business, with the new APOLLO Lite™ fire barriers being concealed above the building’s reinstated suspended ceilings.The APOLLO Lite™ 30:30 has been developed for use in vertical separation or compartmentation situations, offering 30 minutes integrity and insulation thereby exceeding the minimum requirements of the Building Regulations.It is widely specified to form fire barriers within roof voids and floor voids in many different property types, including tower blocks and other HMOs.The flexible woven and non woven glass fibre material is easy to cut and fix and is treated with a proprietary coating to improve its fire performance properties and therefore prevent temperatures rising in adjoining areas. The system has been fully tested to BS 476 Parts 20 & 22 and is third party certified by IFCC. The six metre long rolls of APOLLO Lite™ 30:30 have a minimum thickness of 6mm and are installed using specialist staples as well as heat resistant adhesive.
Sponsored
GKD: Metal mesh encapsulates gateway to the Campus Melaten

GKD: Metal mesh encapsulates gateway to the Campus Melaten

GKD - GEBR. KUFFERATH AG

With 16 research clusters, one of the largest technology-oriented research landscapes in Europe is being created on the RWTH Aachen Campus. The distinguishing feature of the Bio-Medical Engineering Cluster, which can be seen from great distances, is the new CT2 Center for Teaching and Training of the Medical Faculty of the RWTH Aachen University. As the first investor-financed building in this Cluster, it marks another milestone. In a Europe-wide investor selection process, Frauenrath group of companies, Heinsberg, and the architects from slapa oberholz pszczulny | sop architects, Dusseldorf, won the order with their distinctive concept. They designed the building as a standalone construction that is flooded with light and takes on the role of a gateway to the Campus Melaten thanks to its shape and prominent position. Two of the façades are clad with 1,900 square meters of OMEGA 1520 metal mesh from GKD – Gebr. Kufferath AG.As an elite center of learning, RWTH Aachen University is one of the state’s flagship institutions in higher education. Around 44,500 students, 550 professors, and almost ten times as many research associates help secure the reputation of the RWTH as an internationally renowned university – above all for technical and medical degree programs. Founded in 1870, the university’s campuses are spread across the city. With an unprecedented Excellence Initiative, RWTH Aachen University has been expanding its reputation as one of the world’s leading technical universities since 2009. The RWTH Aachen Campus consists of the Campus Central – with the historic main building and the distinctive Super C meeting center in the shadow of the cathedral and city hall –, Campus Melaten and Campus West. The result is a campus that integrates into urban life. On a total area of 800,000 square meters, 16 research clusters are being built successively to answer future questions arising from the challenges of megatrends. Six of these clusters are already in the course of implementation. These include the Bio-Medical Engineering Cluster in the direct vicinity of University Hospital Aachen. This consists of four centers, each of which is dedicated to a specific field. In these operating units, academics from the Faculties of Medicine, Mechanical Engineering, Electrical Engineering, Mathematics and Natural Sciences collaborate with experts from industry on methods and products that are set to revolutionize both diagnosis and therapy.Visually seamless façadeThe CT2 Center for Teaching and Training is the first investor-financed building in the Bio-Medical Engineering Cluster. The seven-storey building was constructed with an investment volume of around €20 million. By networking theory and clinical practice the building offers state-of-the-art training opportunities for students of Medicine, Dentistry, and Biomedical Engineering. It also sets new standards in the further training of physicians and medical personnel, as well as the testing of medical equipment. The aim here was for the CT² to also reflect this function in terms of its architectural design. The architects from sop designed a cube on the slightly sloping terrain that resembles an inverted “U” thanks to its fully glazed upper façades and thereby has the appearance of a gigantic gateway to the campus located behind it. This impression is underlined by the projecting exposed concrete of the side walls which serves to frame the frontal façade. The lateral façades with ribbon windows along their length are spanned by a shimmering skin made of metallic mesh that creates a visually seamless surface. At the same time, the spaces located behind it remain visible thanks to the transparency of the metal fabric. This shell comprises twelve panels of OMEGA 1520 stainless steel mesh – each measuring 29.5 meters long by 5.4 meters wide. There were several reasons behind the decision to go with the woven membrane. These include the fact that the metallic skin underlines the building’s high-tech aspirations and lends the field of biomedical technology both a contemporary and appropriate face. Interacting with the glass façades, it facilitates communication between the interior and exterior. The attachment type is also in keeping with the philosophy of design purism. In line with the patented Fusiomesh NG system, the upper and lower edge of the stainless steel mesh is embedded in a special adhesive between two flat profiles and thereby bonded. Clamping forks ensure that the mesh can be perfectly aligned and handle the requisite static preload based on the anticipated wind and impact loads. The panels are attached to a continuous steel profile in a way that makes them visible at the bottom. At the top edge of the building, on the other hand, the material is bent over backward, so that only a fine edge of the mesh can be seen here. To reduce horizontal movement and the shearing forces at a façade height of 29.5 meters, seven stainless steel tubes run horizontally behind the mesh as intermediate attachment levels. The mesh is then attached to these tubes from the outside with wire clamps that are invisible once fitted. GKD not only manufactured and assembled the mesh for this project, but also took care of the installation.Efficient contribution to sustainabilityBeside the special aesthetics of the metallic membrane, its functional properties were the key reasons for its selection. For example, the stainless steel shell serves as solar protection that reduces the surface temperature of the façade. Yet despite this, the open mesh structure still allows unrestricted natural daylight into the rooms, as well as clear outward views. As such, it not only contributes to improving the building’s energy balance, but also makes it a more pleasant place to spend time and thereby helps boost employee performance. Since stainless steel can be fully recycled at the end of its useful life, the membrane also supports the sophisticated sustainability concept of the new building. The openness and interaction already visible from outside continue consistently into the atrium housed inside the building that is flooded with light. Numerous bridges and wide galleries allow a wide range of visual connections with all floors. The guiding principle of communication and interdisciplinary collaboration then becomes a reality that can be experienced throughout the entire building. Further highlights include a multifunctional auditorium that can house 400 people, as well as a demonstration operating theater equipped with the latest technologies. As and when necessary, these two functional rooms can be combined with the foyer in the basement to create an end-to-end event area which can, for example, be used for symposia. When operated at maximum capacity, the building can then host up to 1,200 guests. Its shimmering stainless steel mesh façade allows the gateway to the future to be seen from great distances.
Sponsored
Nottingham Station

Nottingham Station

Howe Green

Over 40 of Howe Green’s 7500 Series Medium Duty Stainless Steel Access Covers were installed at The Nottingham Hub as part of the station's comprehensive enhancement project. Flooring specialists DMC Contracts Ltd required a network of access points within the station. They wanted to ensure that essential underfloor drainage, mechanical and electrical services could be reached quickly and easily. The 7500 Series specially designed recessed lids enabled the panels to be tiled with Quiligotti Terrazzo floor tiles. The result - an uninterrupted and continuous surface in the station's south concourse and Grade II listed porte-cochère.
Sponsored
Avant Homes Group

Avant Homes Group

Abode (Part of Norcros Group (Holdings) Ltd)

Delivering where suppliers before them had been unable to, Abode is supplying the versatile R15 Matrix stainless steel sink, coupled with Pico and Althia brassware to Avant Homes developments until at least July 2021. With ongoing and planned developments on over 50 sites, all of which will feature design-led Abode kitchen solutions. An ideal solution for creating a high-end and minimal look, the design of the Matrix R15 stainless sink means it can be installed into any surface, including laminate, enabling the developer to create an undermount look without the expense of solid surface.
Sponsored
Baltic Triangle, Liverpool (2017)

Baltic Triangle, Liverpool (2017)

Artform Urban Furniture Limited

Baltic Triangle in Liverpool is part of a £100m development scheme, combining 308 individual apartments, gym, communal meeting areas, commercial floor space, receptions as well as parking and an external picnic area. The buildings are a stone's throw away from the famous World Heritage Site, Royal Albert Dock. The brief for the external picnic area was to design seating and tables to reflect Liverpool’s industrial heritage. Artform recommended the Spencer Litter Bin and the Pic-Nic Table & Bench for their contemporary finish in corten steel. The table and bench ends incorporated bespoke laser cutting elements into the design.
Sponsored
Bespoke drainage solutions for a high end spa and wellness retreat

Bespoke drainage solutions for a high end spa and wellness retreat

BLÜCHER UK Ltd

Our customer required a solution where the floor drains and channels could withstand the variance of temperature in the spa, and support footfall from the public, whilst maintaining an luxurious appearance in line with the environment. Alongside the drains for the changing room showers, using a bespoke design, BLÜCHER created a circular channel to surround the ice fountain, and an arched channel in grade 304 stainless steel with an infill grating to accompany the experience showers. Our infill gratings were the perfect choice for this spa setting, allowing a flawless finish of the chosen floor type against the drainage, completing the aesthetic appeal of the room
Sponsored
Flexible, sustainable and safe drainage solutions for Leeds Arena

Flexible, sustainable and safe drainage solutions for Leeds Arena

BLÜCHER UK Ltd

The Leeds Arena, when completed, will be a 13,500 capacity entertainment focused arena. BLUCHER® have supplied over 70 drains from their adaptable range of floor drains for the concourse, plant room and kitchen areas. BLUCHER® also supplied BLUCHER® EuroPipe, their push fit stainless steel drainage pipework system which was installed in the kitchen and conference areas. BLUCHER® EuroPipe was specified over other metallic or plastic systems for two specific reasons, due to the potential heat of the waste to be drained through the pipework and A1 fire rating of the exposed pipework in general.
Sponsored
2-6 Cannon Street, London

2-6 Cannon Street, London

Buzon UK Ltd

2-6 Cannon Street is a high-end new build commercial office building located in the City. This new-build includes an unusual shaped roof which has been designed to create a stunning exterior roof terrace. Buzon UK were commissioned to supply and install the DPH pedestal system to support GRAD decking and rail systems. This was a challenging project as steel planters were located in the middle of the roof terrace so the installation of the adjustable support pedestals had to be carried out around the planters. Timber decked steps and ramps were also part of the terrace design.
Sponsored
Ascot Cycle Compound

Ascot Cycle Compound

Cyclepods Ltd

The Ascot Cycle Compound can help contribute towards gaining ENE8 Cycle storage credits when used in the appropriate situation Shelter manufactured from hot dipped steel Galvanised box section to BSEN ISO1461 Several cladding options including; Wooden slats Wooden boards Waved sheet metal Perforated sheet metal Toughened glass Polycarbonate Aluminium fixing straps Anti climb end panels No crawl under perimeters Angled roof Various gate options i.e swing, slide or automated Padlock/Hasp locking mechanism, swipe or keyed.
Sponsored
Brighton Two-Tier Shelter

Brighton Two-Tier Shelter

Cyclepods Ltd

The Brighton Two tier shelter is a stylish and versatile two tier shelter; units can be added to form a larger shelter. Shelter manufactured from hot dipped steel Galvanised 70 x 70 box section to BSEN ISO1461 Transparent PET 4mm roof Aluminium fixing straps All fixings to be galvanised or aluminium Nyloc nuts are used for safety Angled roof BREEAM AND CODE FOR SUSTAINABLE HOMES COMPLIANT This bike shelter can help contribute towards gaining ENE8 Cycle storage credits when used in the appropriate situation, under the Code for Sustainable Homes
Sponsored
Shadex 260 Elliptical solar shade system in aluminium reduces costs on £1.1 million renovation at Beths Grammar School, Bexley

Shadex 260 Elliptical solar shade system in aluminium reduces costs on £1.1 million renovation at Beths Grammar School, Bexley

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Bexley, Greater LondonProject Type: EducationalDevelopment Cost: £1.1mProduct: Curved Plain Fascia with THX Soffit PanelsMeridian Wall CopingShadex 260 Drop-in Cassettes (Structural Steel Supports)Contemporary Rainwater Pipes​Finish: Syntha Pulvin RAL 7011 Matt Iron GreyFire rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Client: Beths Grammar School, BexleyArchitect: Ingleton Wood ArchitectsMain Contractor: Horizon ConstructionSub Contractor: Specialised Fixings of Ipswich
Sponsored
Nobu Shoreditch RubberBond FleeceBack EPDM Single Ply

Nobu Shoreditch RubberBond FleeceBack EPDM Single Ply

Flex-R

Nobu Hotel is a new development in Shoreditch, East London, and was opened by Hollywood legend Robert De Niro and Japanese chef Nobu Matsuhisa in May 2018.The design of the five-storey building – which has 150 hotel rooms and suites – is a nod to the area’s industrial past with a ‘frayed edge’ look of stepped balconies formed with glass fibre, reinforced concrete and cantilevered steel beams. The design has also been likened to that of a cruise ship and received much critical acclaim.The roofing system covered 1500 sq. m, which included a green roof area and tiered balconies.

Showing 613-648 of 896

Feedback