NBS Source
I'm a manufacturer

"power supply"

1,317 results found

Sort by:

Showing 613-648 of 781

Sponsored
ROCKFON delivers sustainable solutions for refurbished offices

ROCKFON delivers sustainable solutions for refurbished offices

Rockfon

Festool, a premium brand Power tool manufacturer, has recently refurbished their UK head office to create a healthy acoustic environment. ROCKFON® Tropic™ ceiling tiles were chosen to replace the dated wet felted tiles. ROCKFON Tropic is perfect for a busy office environment offering the highest Class A sound absorption to reduce reverberation and an outstanding fire safety rating, A1. A robust ceiling tile which is easy to clean with a vacuum. It is available in a range of sizes and installation options including semi-concealed and visible grid tiles giving architects the freedom to design offices to any configuration.
Sponsored
Robinson Structures

Robinson Structures

Komfort Partitioning Ltd

Polar double-glazed partitions provided the ideal solution for dividing space in a clever and minimalistic way. The double glazed Polar partitions have impressive acoustic thresholds of up to 49dB (Rw), which is becoming more and more essential in today’s working environment. Providing opportunity for both communicative and inspired work, Polar double glazed’s simplistic method of installation, demountability and powerful acoustic properties makes it an intelligent option for modern offices. Due to Robinson Structures engineering expertise, steel girders were built above and around the Polar single glazed track work to create smaller offices and meeting rooms.
Sponsored
Bi-Fold Gates at Chelsea Waterfront

Bi-Fold Gates at Chelsea Waterfront

Bolton Gate Company

Chelsea Waterfront is a high-specification new development centred around the iconic Lots Road Power Station where car parking is facilitated by a basement accessed by automatic bi-fold gates. Having been specified by Terry Farrell, Bolton Gate Company were chosen to design, manufacture and install a set of gates which included two automatic bi-fold gates with an adjacent personnel gate. The main gates provided secure vehicular access being activated by card reader and the adjacent hinged gate allowed selective personnel access by key fob. A polyester powder coated finish in Basalt Grey was applied to blend in with the surrounding structure.
Sponsored
Dorma Variflex Glass Semi automatic Acoustic moveable wall Style is Motoring Ahead at the British Motor museum

Dorma Variflex Glass Semi automatic Acoustic moveable wall Style is Motoring Ahead at the British Motor museum

Style - Moveable Partition Specialists

After a £2m refurbishment programme, the British Motor Museum recently opened its stunning new hospitality and event facility. A showcase area, the Sky Suite boasts magnificent panoramic views over the Warwickshire countryside. Delivering flexibility to the suite, partitioning expert Style, was contracted to install two Dorma Hüppe Variflex semi-automatic, glazed moveable walls. Allowing the area to be quickly adapted to meet the needs of the day, the toughened glass panels are manually manoeuvred along a whisper-quiet tracking system. Once in place, powerful seals automatically expand to exactly the required pressure to ensure optimum acoustic integrity between the divided areas.
Sponsored
Curragh Race Course

Curragh Race Course

Baldwin Boxall Communications Ltd

ABOUT CURRAGH:Nestled in the glorious countryside of Southern Ireland sits the Curragh Race Course. Initially founded in the coffee rooms of Kildare, the Irish Turf Club was quickly established as the governing body for horse racing throughout Ireland.The first recorded race on the plain took place in 1727 and now Curragh (from the Irish name ‘Cuirreach’ meaning ‘place of the running horse’) is home to Ireland’s five classic races.ABOUT THE PROJECT:The Curragh site has recently undergone a 65 million Euro redevelopment project across its entirety. Works carried out included the stable yard (featuring 135 stables) and the building of a brand new grandstand with a spectacular sweeping roof. Covering 10,500 square metres the new grandstand can cater for up to 6,000 people within its four levels – in fact, the site as a whole, has an incredible crowd capacity of 30,000 - which is a typical number for events such as Derby Day!Visitor enjoyment and responsible ‘crowd’ control during any event at Curragh are equally important to the site owners and managers; therefore, all aspects of this were to be considered carefully during the planning stage of the redevelopment. Ensuring an event at Curragh is a pleasurable experience takes a lot thought and care. Aspects such as creating the right atmosphere for the different areas and ensuring that everyone can hear race commentaries and announcements, all form part of the overall impression of the day’s event. Taking great lengths to provide all visitors with a memorable day is likely to encourage them to return again in the future.To carry out the works required, a selection of top consultants were selected for the different aspects of communication throughout the site. Dublin based, Sound Productions Ltd was chosen to design and commission the PA/VA and EVC, as well as the TV and other audio distribution systems required for the Curragh buildings and surrounding grounds.The brief to Sound Productions was to supply a flexible multi-zone audio and voice alarm system with top quality audio. The specification was for a complex zone arrangement, with multiple audio inputs from broadcast companies, live commentary, background music and TV audio distribution. This included the requirement for a 98dB sound level trackside, with absolute intelligibility throughout all areas (including those with high reverberation) and, for this, a highquality PA/VA system was needed. It was imperative that these works were delivered on schedule, with ‘quality’ to be considered as the prevailing factor, without exception, throughout the project.The PA/VA system was to be delivered over two phases – the first one being the system rack for the Parade Ring; the second to be the New Grandstand, including two main Baldwin Boxall PA/VA VIGIL control racks delivering power to a network of EN54 loudspeakers. The specification for VIGIL to be the PA/VA system for Curragh was due to Baldwin Boxall’s renowned reputation for product quality and reliability, as well as the company’s excellent track record for the delivery of large projects.Now fully installed and operational, the PA/VA system is equipped to cater for up to 24 analogue and 32 digital audio channels all distributed to over 50 zones. Multi-zone general paging is also delivered using Baldwin Boxall’s BVRD TSM touch screen microphones along with BFM series microphones for emergency purposes.The project’s requirement for disabled refuge call points has been fulfilled by the installation of Baldwin Boxall’s Omnicare EVC system, which is controlled via a 16-way control panel situated in the Security Room.Commenting, Peadar Carley, Project Engineer, Sound Productions said “We are delighted to have been involved with such an amazing project. We have a long-standing professional relationship with Mercury Engineering (the project electrical contractors), who share our ethos of being very particular with detail and passionate about providing the best quality. To know that we were chosen due to our ability to deliver large, complex systems and for our audio knowledge, makes us very proud indeed.”When asked about Baldwin Boxall, Peadar continued, “We have been buying, installing and commissioning Baldwin Boxall products for very many years - over 30 in fact. The systems just keep on going - they really are robust! But it is not only for this reason that we return to Baldwin Boxall repeatedly, but also because of the support we can get from them. They know their stuff, are easy to deal with and I recommend them without hesitation.”
Sponsored
Hand Dryer Case Study (Offices) - The Department for Energy and Climate Change

Hand Dryer Case Study (Offices) - The Department for Energy and Climate Change

FW3

The ProjectIn 2012, The Department for Energy and Climate Change (DECC) aimed to improve their sustainability credentials by upgrading washroom facilities across its offices. The goal was to find the most energy efficient, sustainable and user-friendly replacement hand dryers for its numerous washrooms throughout its HQ buildings 3 Whitehall Place and 55 Whitehall.Firstly, DECC wanted to eliminate paper towels, thereby cutting waste disposal costs, as well as minimising the labour hours required for waste collection/disposal. Additionally, they wanted to reduce energy consumption of hand dryers by installing the lowest power rated solutions available, and reduce standby power consumption.Secondly, DECC specified that energy efficiency must be assessed in terms of energy per dry rather than solely kilowatts (kW), recognising that some hand dryers may take longer to complete the drying process than others. Lastly, DECC aimed to enhance the washroom environment for its staff by minimizing noise levels.The SolutionDECC opted to install 54 Biodrier Biolite low energy hand dryers, sourced by their facilities management company, in order to meet these sustainability goals.These compact, yet powerful hand dryers serve an energy-efficient hand drying solution, perfect for companies striving to adopt more eco-friendly practices in the washroom.The ResultsWaste Reduction:In the Greening Government Commitments report published in December 2013, DECC reported good progress towards meeting its waste reduction commitments. It states that DECC has seen a 14% reduction in waste in 2012/13, with part of this improvement attributed to the installation of the hand dryers and phasing out of paper towels.Energy Savings:DECC reports that the Biodrier Biolite hand dryers use significantly less energy, both in use and during standby periods. This is due to the evolution of hand dryer technology, allowing for an adjustable heater element. For organisations like DECC, this provides the opportunity to use the lower energy setting during summer months, as warmer air is not required.Minimising energy consumption when not in use is also key to delivering these energy savings. Solutions like the Biolite have a very low standby usage of just 0.1kW.Lastly, the Biolite hand drying cycle lasts just 10-12 seconds with these, further minimising energy use.Enhanced Washroom Experience:Switching from paper towels to hand dryers delivered an instant visual transformation in the tidiness of the washroom, as well as the bins taking longer to fill.Noise is minimised too with levels limited to just 70 dBa, improving the washroom experience further.Swift Payback Period:The payback period for these Biolite dryers was calculated to be only 17.2 months (based on DECC’s five-day working week).
Sponsored
Gatwick Airport

Gatwick Airport

Savortex Ltd

The ClientWates Smart Space provides Facilities Management services to Gatwick Airport, London. Gatwick is the second-busiest airport in the UK by passenger traffic by volume of annual passengers of around 45m, making London Gatwick the biggest single runway Airport in the World. The airport owners, Global Infrastructure Partners (GIP) have a desire to meet their sustainability targets, to reduce the energy consumption of their estate and introduce operational efficiencies throughout the estate.Their ProblemThe estates washrooms use a mixed range of high speed hand dryers, with power ratings ranging between 1600 and 2300 watts. These dryers are energy hungry costing the estate £0.0044 to £0.00192 per dry, and the units have a high motor failure rate. Further, the estate manager has no way of remotely monitoring washroom hand dryer usage for responsive cleaning against sudden and peak usage surges.Our SolutionSAVORTEX deployed its EcoCurve 550D Smart hand dryer on a trial basis in the male washrooms in the South Terminal where there is high footfall. The EcoCurve Smart uses an advanced digital brush-less motor technology, which consumes power of just 550W and offers 10x more operational life than traditional dryers. The EcoCurve smart dryer uses its patented in-built sensors wirelessly reporting energy usage per dry to the SAVORTEX web portal, allowing estates managers remote access to manage washroom facilities. Over the trial period the estates manager was able to monitor hand dryer usage and washroom footfall of 14,100 pairs of hands being dried, resulting in a consumption of 14.90 KG of C02, and run responsive cleaning schedules based on footfall, introducing new operational efficiencies throughout the estate.
Sponsored
Innovative Swimming Pool Ventilation Solution for Prestigious Residential Property in Belgravia, London

Innovative Swimming Pool Ventilation Solution for Prestigious Residential Property in Belgravia, London

Recotherm Ltd

OverviewRecotherm were instructed by Pool Court Ltd, a renowned UK pool construction company, to design a bespoke air handling unit for a unique project at a prestigious residential property located in Belgravia, London. ChallengesThere were various design challenges to overcome on this project: The unit needed to be installed in the basement with limited access The swimming pool area featured a rising floor, allowing for flexible use of the space The client desired a ventilation solution capable of handling a substantial cooling load to maintain a comfortable environment during eventsThe property was subject to strict local planning regulations prohibiting the use of exterior condensing units normally needed for cooling SolutionRecotherm developed a one-of-a-kind swimming pool ventilation unit.  Integrating the condensing element of the refrigeration process into the unit we overcame the local authority's restriction whilst also providing efficient and effective ventilation that could adapt to changing floor configurations. The basement access was overcome by utilising our flat pack process and building the unit within the plant room. The unit included three fans to ensure the system could operate on full fresh air even when the condenser was running at full speed. This design guaranteed efficient cooling while maintaining optimal air quality during crowded events.  Engineered to prioritise the use of fresh air cooling whenever possible, the unit utilises the extra power required by the refrigeration circuit only when necessary. This approach maximises energy efficiency and reduces overall power consumption. This bespoke solution demonstrates a commitment to delivering customised, intelligent solutions that ensure exceptional performance, energy efficiency, and enhanced comfort for Pool Court’s valued client.  Recotherm delivered:Engineering expertiseBespoke designEasy installation with flat pack componentsCertified installersEnergy efficiency 
Sponsored
Blackstone

Blackstone

Radii

The high-performing FirePro fire rated system — fully developed by Radii’s in-house product development Centre for Excellence — was a key feature in the fit-out for global asset managers Blackstone in London’s Berkeley Square.Working on Level 3 of the building, fire rated solutions comprised FirePro Ei30 glazed fire screens, five FirePro Ei30 single doors and double door sets respectively, and three Firepro Ei60 double door sets. Fire doors were installed with power-assisted openers.Furthermore, our high acoustic performance Linear 50 Plus single glazed partitions (up to Rw 41 dB) and a single glazed Hogan lobby double door set with access control completed the glazed partition package.
Sponsored
The Hotel Bridget – Rutland TS.3204

The Hotel Bridget – Rutland TS.3204

Rutland

Project DetailProject: Hotel BridgetLocation: ParisProduct: TS.3204The Hotel Bridget in Paris is a authentically Parisian corner building in the district of Menilmontant. Inside the decor blends styles to bring to life the culture of eastern Paris. Here, design is taken very seriously and every aspect is cleverly fitted together from Metro-style blue tiling to stonework and word.The TS.3204 in Polished Brass was used for the hotel, an ideal fit to the elegant corner hotel. The classic scissor arm is a perfect addition to the authentic and charming fit out with the Polished Brass finish bringing out the modern aspects of the hotel. The TS.3204 is a fixed power size EN 3 and is Fire tested to one hundred and twenty minutes. With a ten year guarantee, you can’t go wrong with this closer.
Sponsored
The Spirit – Dubai Sports City – Rutland TS.9205

The Spirit – Dubai Sports City – Rutland TS.9205

Rutland

Project DetailProject: The Spirit – Dubai Sports CityLocation: Dubai, UAEProduct: TS.9204 and TS.9205 Architectural door closersProject DescriptionThe Spirit, located on the edge of Dubai Sports City, offers a choice of executive and sanctuary suites and one-bedroom apartments. With facilities including a rooftop jogging track and swimming pool, it is a sought-after location for those seeking a chic, urban address.The Spirit installed 150 TS.9204 closers in the bedroom areas in the main apartments and 22 TS.9205 door closers in the entrance area. They chose these ranges because they:Deliver a neat, consistent aesthetic while catering for the differing usage and power requirements within the complexAre quick and easy to installComplement the sleek design scheme with silver and satin nickel finishes
Sponsored
Patrizia, Endell Street

Patrizia, Endell Street

Radii

The most notable contribution by Radii was an innovative tri-folding glazed sliding door into drywall that separated the multifunction and pantry areas on Level One.Office and meeting room glazed fronts comprised single glazed Linear 50 Plus (Rw 41 dB) and double glazed Parallel 50 (Rw 45 dB) partitions with 'Rio' feature banding, matching Hogan glazed doors (Rw 38 dB) and aluminium-faced MDF tech panels.Furthermore, Radii produced a fire rated glazing package that saw FirePro Ei30 structural fire rated staircase glazing  with steel corners placed on Level Three around the stairwell. On Level Two a FirePro Ei30 fire rated door with power assisted operator was utilised alongside matching fire rated side screens.
Sponsored
The Bodmin Jail Hotel

The Bodmin Jail Hotel

VELUX Commercial

VELUX Glazing Panels bring daylight to an 18th century Cornish jail to support the transformation into a luxury hotelAll that was left of the powerful-looking Victorian Bodmin Jail in Cornwall, was a ruin without a roof, with vegetation slowly taking over. In 2015, Mallino Development appointed the services of Twelve Architects to undertake an impressive redevelopment project of the jail and turn it into a modern and aesthetically quite different hotel. To deliver the modern comforts hotel guests expect during their stay and the thermal efficiency required for sustainable operation of the hotel, a holistic system using VELUX Glazing Panels was designed. It took 214 VELUX Glazing Panels, formerly known as Vitral A98 Glazing, to recapture the original roof lighting sitting above the two historic wings.For more information, read the full case study
Sponsored
A Trail for Everyone: The Brecon Beacons Changing Places Toilet

A Trail for Everyone: The Brecon Beacons Changing Places Toilet

Astor Bannerman

At the core of the Brecon Beacons National Trust, amidst the striking landscapes of Pont ar Daf and Pen y Fan, inclusivity becomes a primary focus. The recent inclusion of the Changing Places Toilet facility stands as evidence of Astor Bannerman and the National Trust’s dedication to establishing an environment that caters to everyone’s accessibility needs.Changing Places Facilities Situated at Bannau Brycheiniog in the Brecon Beacons, the Changing Places Toilet facility addresses the needs of individuals with profound and multiple disabilities. This facility is equipped with state-of-the-art amenities, including the:Astor OT200 Overhead Ceiling Track HoistAstor CT Nivano Wall Mounted Height Adjustable Changing and Showering StretcherKwickScreen Wall Mounted Privacy ScreenThe inclusion of these specialised features ensures that visitors with varying mobility requirements can now enjoy the stunning surroundings without facing the barriers that might have restricted their access in the past. The Astor OT200 Overhead Ceiling Track Hoist facilitates safe and efficient transfers, while the Astor CT Nivano Stretcher provides a comfortable changing and showering experience. The KwickScreen Privacy Screen adds an extra layer of dignity and privacy to the entire process.Power In PartnershipThe Astor Bannerman team collaborated closely with the National Trust to design and implement a facility that not only meets the highest standards of accessibility but also blends into the natural charm of the Brecon Beacons. This case study stands as a beacon of inspiration for other natural reserves and parks, encouraging them to embrace inclusivity and make their spaces welcoming to everyone.As visitors embark on the scenic walk through the Brecon Beacons, they can now do so with the assurance that accessibility is at the forefront. The Changing Places Toilet at Bannau Brycheiniog exemplifies the power of collaboration and innovation in transforming landscapes, ensuring that the beauty of nature is accessible to all, regardless of their abilities.Feel free to reach out if you require assistance or guidance with your Changing Places project, or if you need additional support regarding the equipment specifications for Changing Places facilities.
Sponsored
Waterproofing an Air Traffic Control Tower, Scotland

Waterproofing an Air Traffic Control Tower, Scotland

Newton Waterproofing Systems

Heavy rainfall on the Orkney Islands meant that the basement room of Kirkwall Air Traffic Control Tower suffered from frequent flooding, with water levels reaching 1.2m at their highest point. Newton Waterproofing and Specialist Contractor Wise Basement Systems were called in to remove the existing water and then waterproof the structure to protect it from future flooding, all in just one week.Kirkwall airport is located on the main island of the Orkneys, 10-miles off the North coast of Scotland. Presented with a logistically challenging location and a tight project timescale of just 1 week, Newton had no hesitation in recommending the expertise of Wise Basement Systems as the specialist contractor to Building Surveyor Pick Everard.Getting involved at the very start of the project, Wise were immediately able to design, advise on and install a system to remedy the 2 inches of water in the existing basement of the Air Traffic Control tower.Cavity Drain Waterproofing, or ‘Type C’ waterproofing as it is defined by BS 8102:2009 is often the most effective means of achieving a completely dry ‘Grade 3’ environment in an existing structure below ground. It was therefore no surprise that Wise Basement Systems designed a Newton CDM System for this existing basement area.To begin, Wise installed 120m2 of Newton 508 on the walls and 80m2 of the recycled Newton 520 eco to the floor, above the closed-cell Fibran XPS 500-C insulation. The drainage membranes were supplemented with a perimeter channel of Newton Basedrain, directed to a Titan-Pro sump chamber containing two NP400 Pumps to remove the water.Finally, to ensure that the system will continue to work in all eventualities, even in a complete power outage, Wise installed a backup system with dual Northstar batteries and a Victron Power Inverter.Even with a project located 10 miles from the mainland, and 1 week to waterproof a basement with only a 600mm wide access hatch, Wise Basement Systems delivered a completely dry space for the client that was also compliant with BS 8102:2009 and backed by their guarantee.
Sponsored
WoodWool at Next Generation McDonalds to assist with Sound Absorption

WoodWool at Next Generation McDonalds to assist with Sound Absorption

Soundis

“From the materials used throughout the build process to how it’s powered, along with creating new areas of natural habitat to enhance the biodiversity of the site and local area, we’re bringing together skills and expertise from across McDonald’s and the partners we work with. From 2023 furniture and construction materials in new and refurbished restaurants will be made with recycled or certified materials and designed to be recycled or reused at end of life ”Construction Director, McDonald’s UK & Ireland The Absorb-R ToughSound acoustic-panels are environment friendly, fully recyclable natural components that offer optimal sound absorption and extensive resistance to fire. Surface applications include ceiling and wall mounting.Absorb-R ToughSound is a high performing high impact sound absorbing wood wool system, concept with excellent eco credentials which store heat from the ambient air.
Sponsored
Car park resurfacing for a busy, town centre supermarket

Car park resurfacing for a busy, town centre supermarket

Tarmac

Resurfacing was required for this busy supermarket and public car park serving Billericay town centre. In addition to replacing the old surface, works included reconfiguring the layout with additional parent & child and disabled parking bays and the creation of pedestrian walkways with clear demarcation. Tarmac’s ULTIDRIVE 6mm asphalt was selected as it has a close texture finish to provide a surface that is both durable and able to resist the effects of tight turning vehicles. ULTIDRIVE is a specialist asphalt with an advanced modified binder that provides enhanced workability during installation. This assists with compaction and finish, especially when hand laying around ironwork. It also provides improved resistance to rutting and deformation from vehicle loading and to scuffing and abrasion from power-assisted steering. ULTIDRIVE has a higher softening point temperature than conventional materials and resists occasional fuel and oil spills.
Sponsored
The Wellington Hospital – London, UK – Rutland TS.9205

The Wellington Hospital – London, UK – Rutland TS.9205

Rutland

Project DetailProject: The Wellington HospitalLocation: London, UKProduct: TS.9205 DABC High usage architectural door closerProject DescriptionThe Wellington Hospital is the largest private acute hospital in the UK and is known for having state-of-the-art facilities. It required 385 door closers that could cope with high levels of traffic but would also be easy for the elderly and small children to open. The TS.9205 DABC closer was chosen because it is:Very efficient, which makes it easy to open regardless of age or abilityPower adjustable from size EN 2-5Extremely durable thanks to advanced engineering, making it ideal for high-use environmentsCompliant with the Equalities Act‘It’s been on our doors for 4 years and is still as good as new. It shuts quietly and opens easily.’ – Richard Metcalfe, Facilities Manager
Sponsored
Hollinwood Business Park

Hollinwood Business Park

Marley Ltd

Following the acquisition of planning permission, the Hollinwood Business Park, a former brown field site, will see seven new office buildings constructed, all in the style of cotton mills built in the 1800s.The first of these buildings, Block G, has now been constructed and is benefitting from the installation of renewable solar PV technology to ensure the new business park can have a sustainable future in the decades ahead.The project has seen the installation of 114 Marley SolarTile® panels on to the roof of a large building that forms part of the all-new Hollinwood Business Park in Oldham.Marley’s SolarTile® solution was specified to provide access to a sustainable energy source that will help power the newly constructed site, helping to control energy costs and provide an additional attractive incentive to companies looking to relocate to the business park.
Sponsored
Reliable Washroom Solutions for Jigsaw Care Home

Reliable Washroom Solutions for Jigsaw Care Home

Thomas Dudley

Jigsaw Care Home required a reputable supplier to provide quality washroom facilities suitable for their residents.Our specifications team worked in collaboration with the main contractor to understand fully how best to meet the customer's needs. They required products that were gloss white and looked like porcelain to give sanitaryware a less institutionalised feel. Anti-ligature was a must so our Resan range ticked all the right boxes.All options were discussed before deciding on the Resan pan with blue rim, the phantom Pushflo with anti-ligature button and anti-ligature basin with pneumatic controls, large mirror and shelf. Our infra-red touch-free sensors can be used in through-wall applications and with no electrical power required minimising installation costs and ongoing maintenance.Testimonial“The quality of the products is excellent and the installation was hassle-free”
Sponsored
Hand Dryer Case Study (Junior School) - South Farnborough Junior School, Farnborough

Hand Dryer Case Study (Junior School) - South Farnborough Junior School, Farnborough

Dryflow

The challengeThe school had conventional hand dryers in place that were about 15 years old. They had a slow dry time of around 30 seconds and a rated power of 2300 kW, which isn’t very energy efficient for a hand dryer. They wanted something more cost effective, as they were renting the machines and it was costing them a lot of money year on year. “They are really good, compact, quiet, easy to keep clean and most of all reliable. The children seem to like the fact there is no button to push” Graeme Davie - Premises ManagerAbout South Farnborough Junior SchoolThis is a non-denominational Junior School catering for boys and girls from seven to eleven years of age, situated in Farnborough, Hampshire.It caters for approx. 400 pupils and has a Resourced Provision for Learning Difficulties that provides provision for 20 children.The solutionProviding a great balance between low noise levels, energy efficiency and quick dry times, this highly robust hand dryer has a motor expectancy that exceeds all others on the market Model: Dryflow Classic PLUS MKIIDry time range: 15-20 secondsRated power: 1400WGuarantee length: 7 yearsThe resultsEstimated annual cost to use old hand dryers: £644*Estimated annual cost to use new hand dryers: £235.20*Annual cost savings: £408.80*Estimated annual old hand dryer carbon production: 2898+ Kg/CO2Estimated annual new hand dryer carbon production: 1058.40+ Kg/CO2Annual carbon savings: 1839.60 Kg/CO2Estimated return on investment period:Payback period: approx. 2.4 yearsEstimated annual savings using new high-speed hand dryers compared to if paper towels were used**: Cost Savings: £4,804.80Carbon Savings: 5,241.60kg/CO2Trees Saved: 33.6* Based on 12p per kW/h; + Based on 1kW = 0.54 kg/CO2; **Based on 3 paper towels used per dry, 0.6p per paper towel, 22.5gms/CO2 per dry)
Sponsored
Hand Dryer Case Study (Large leisure and sports facilities) - Sheffield City Trust, Sheffield

Hand Dryer Case Study (Large leisure and sports facilities) - Sheffield City Trust, Sheffield

Dryflow

The challengeSome of the venues had mixed conventional warm air hand dryers varying from 2kw to 2.5kw rated power with 30 to 45 second drying cycles. Some units were manual operation so continued to use energy while not in use. Typical energy consumption was 20 to 30 watt-hours per dry.“The Turboforce were selected because of their high energy efficiency, the units have been well received in all our sites and the upgrade has massively improved the perception of our washroom facilities and cut energy use by 90% compared to our previous hand dryers”S.Midgley - Deputy Head of Estates, Sheffield City TrustWho are Sheffield City Trust?It was established in 1990 with a mission to improve the health and wellbeing of the people of Sheffield. It manages the venues that were built for the 1991 World Student Games and has acquired many more since. It has millions of people through its doors each year with over 15 sport, leisure and entertainment venues under the Sheffield City Trust umbrella.The solutionEnergy efficient, high speed Turboforce hand dryers were installed. All units start immediately when hands are placed under and stop as soon as they are removed. Typical energy consumption is 2.33 to 5.33 watt-hours per dry.Model: Dryflow TurboforceDry time range: 10-15 secondsRated power: 350W – 1600W (4 settings available)Guarantee length: 5 yearsThe results“IFS carried out a comprehensive site survey of all our facilities which highlighted the inefficiency of the current hand dryers. They had an excellent range of hand dryers designed to suit the rigours of intense use and were even able to make technical adjustments to the product to specifically meet our requirements.” S.Midgley - Deputy Head of Estates, Sheffield City TrustThe total project was calculated to cost £38,000 and deliver a £10,000 per annum saving, (3.8 year payback period). Total CO2 reduction was calculated at 51 tCO2e perannum.
Sponsored
ICC Wales

ICC Wales

Umbra

A Shading Revamp for ICC WalesThis was a project in which both functionality and aesthetics played a large role. It was important that the shading system installed not only provided a professional aesthetic, but also could boast robust performance.This particular project shows Umbra's top of the range automation systems at their best, the ability to power a whole room of blinds at the press of a button is one that suits large office spaces perfectly.Besides the automation aspect, the KuroLok blackout blinds themselves suited the professional and stylish nature of the project with ease. Self-Zipping edges mean that the blind itself never falls out of the side channels, thus eliminating unwanted light leaks, and the high quality, full blackout fabric provided the privacy and security the project needed.The slim side channels of KuroLok and Umbra's in house powder coating services meant that the blinds matched the style of the room flawlessly providing a professional look.
Sponsored
Shanghai Tower - Interchar 1983 - Infrastructure

Shanghai Tower - Interchar 1983 - Infrastructure

International®, brand of AkzoNobel

Essential Protection for Tall Buildings.As one of the world's leading coatings companies, we strive to be at the forefront of design trends and our International range of protective coatings and passive fire protection products is developed to complement architectural innovations.With its curved façade and spiralling form symbolizing China’s emergence as a global financial power, the Shanghai Tower is world's second tallest building (behind Burj Khalifa in Dubai), after its six-year construction was completed at the end of 2015.Shanghai Tower is one of the most advanced sustainable tall buildings in the world and goes to great lengths to generate its own energy.Around 200,000 liters of our protective coatings and intumescent fire protection products, including Interchar 1983, were used to provide fire protection for stair steel structures and the façade’s supporting steel structures for up to 90 minutes.We were the company of choice for the owner, painting applicators and the fabricator.
Sponsored
GreenCoat PLX Pro Mountain Grey Snaplock Seam - "Almost Invisible Solar"

GreenCoat PLX Pro Mountain Grey Snaplock Seam - "Almost Invisible Solar"

Metal Solutions Limited

Turning a roofscape into a power station just got better. The combination of GreenCoat PLX with integrated, almost invisible solar functions to deliver green energy and good looks. The solar modules are bonded directly onto the metal roof within the controls of a factory environment at Metal Solutions Ltd, Bolton. Lightweight and maintenance free with no access requirements for cleaning the solution is a real game changer. Each module is 358mm wide and sits between the Snaplock® standing seam profile. In harmony with GreenCoat Mountain Grey the solar modules are virtually invisible from the street. A traditional Glass Crystalline module would add substantial weight, wind sheer load on the standing seam fixings and require access for bi-annual cleaning with the then risk of damage during that process.The thin, flexible solar modules do not detract from the design of the house and offer an excellent yield even in low light conditions.
Sponsored
Hand Dryer Case Study (Supermarket) - Lidl Stores UK

Hand Dryer Case Study (Supermarket) - Lidl Stores UK

FW3

The ProjectLidl spans across 960+ stores in the UK, making it one of the largest, and most popular, supermarket chains in the UK.Searching for an hand dryer to roll out across their stores, which met their specification, was a big task. Main features that were key in their decision included cost-effectiveness, energy efficiency, fast dry times, and hygiene.The SolutionLidl worked closely with us here at FW3, to find a solution that met their specification exactly, deciding on the Biodrier Biolite (HD-BL09). Don't just take it from us though, take it from Lidl's construction consultant, Henry Foxall:‘Opting for the Biodrier Biolite hand dryer in our stores was a no-brainer for us – it not only met our specification, but exceeded it. The hand dryer’s energy efficiency, powerful nature, and cost-effectiveness, in comparison to competitors, were the primary features that sold us on the BL09.’ - Henry Foxall (Lidl Construction Consultant)Cost Effectiveness:This was a huge factor for Lidl when choosing a hand dryer. The BL09 offered a hand drying solution which was extremely cost effective, in comparison to competitors and alternatives. The low running costs, thanks to it's ultra-energy efficiency, coupled with the fast dry times of just 10 seconds, ensured Lidl saved money both short, and long-term.Energy Efficiency:Using just 650-900W energy, the Biolite hand dryer offered an environmentally friendly hand drying solution, usingup to 90% less energy than conventional hot air hand dryers. This was a key point for Lidl when selecting a hand dryer, as conventional hot air alternatives can typically use around 2500W.Fast Drying:The BL09 is compact, yet powerful. Drying hands in under 10 seconds, it ensures high foot traffic is effectively managed, and energy usage is decreased. Having a hand drying solution in place, which can withstand high foot traffic is key for a busy supermarket.The ResultsSo far, the Biodrier Biolite has been rolled out across every Lidl store in the UK, with a scope to continue rolling out these hand dryers across any future stores.
Sponsored
Tough, heavy duty asphalt for fire station

Tough, heavy duty asphalt for fire station

Tarmac

The new, purpose-built Community Fire and Police Station on a two acre site in Prescot required a durable surface for the main yard area, car park and access road. This was a large site, incorporated three fire engine bays, a practice drill tower and community meeting rooms. Having replaced two local fire stations it was expected to be a busy station used by a range of vehicles. With each fire engine weighing up to 13 tonnes and using power-assisted steering the new surface would be subject to extreme turning forces. It would need to offer long-term durability and loss of aggregate due to surface abrasion. After considering the options, Tarmac’s ULTIPHALT HD was chosen, a tough, high performance 10mm asphalt with advanced modified binder. ULTIPHALT HD has been proven to deliver enhanced resistance in challenging environments like container ports and distribution centres. The modified binder enhances durability but also helps to maintain workability and aid compaction, even in low temperatures.
Sponsored
Long lasting car park surface for police centre

Long lasting car park surface for police centre

Tarmac

As part of a £44m project to build a major new police operational command centre, surfacing was required for the large parking area and access roads. The parking area would be used by more than 1,200 officers and support staff and a wide range of vehicles from police cars to heavy goods vehicles. Originally an AC 10 close graded surface course material had been specified. However, after early engagement with the surfacing and main contractor, it was clear that a more robust and durable solution was required that could withstand the high volumes of traffic using the site.Tarmac’s ULTIDRIVE asphalt was chosen as the solution. Designed to resist the long term effects of daily vehicle movement, ULTIDRIVE is a high performance asphalt with a smooth and highly durable finish. An advanced modified binder enhances the toughness of the surface, provides improved resistance to scuffing and abrasion from power-assisted turning and reduces softening in hot weather. It also gives enhanced resistance to temporary fuel and oil spills compared to conventional asphalt surfacing.
Sponsored
Detached House Veluwe

Detached House Veluwe

Trespa UK Ltd

Pura® NFC by Trespa as connecting factor between two building volumesIn close cooperation with Guus Vedder (2•1 Architecten), architect Hendrik Jan van der Valk (Van der Valk Woudst ra) has designed a modern villa, consisting of two main volumes. The villa was for a private client and is located in a rural village in the Veluwe region. One volume is used as living/ dining room and kitchen, while the bedrooms, bathrooms, playroom and technical area are located in the other.The client had a number of explicit requirements for the design of the villa which is located on a large plot in a wooded area. In addition to various aesthetic aspects, the villa had to be sustainable and energy neutral. The facades, roofs and floors were therefore very well insulated and of airtight construction. All window frames have aluminium profiles with optimum insulation and have triple glazing. The whole house is equipped with domotics and all installations are powered by the solar panels that were fitted; there is therefore no need for a gas connection.
Sponsored
Primary School De Verwondering

Primary School De Verwondering

Forbo Flooring Systems

Creating better education environments Primary School De Verwondering is a fully bio-based school building and the first example of a new generation of bio-based school buildings that recognizes and harnesses nature's powerful effcet on learning.The beautiful wooden building - which runs on circular energy - has a vegetation roof with chickens, green facades and remarkably large windows. The primary school recently won the 2021 Golden Frog award for sustainable construction in the Netherlands.The interior and exterior of the school have a positive influence on the well-being and performance of the pupils. The environment outside blends with the natural elements of the building, such as wood and bamboo, while inside the interior architect chose a CO2 neutral (cradle to gate) Marmoleum floor covering. Marmoleum Cocoa is made of natural and renewable raw materials with the addition of a waste product from the cocoa industry and, in that respect, it fits the building perfectly. Marmoleum is one of the flooring industry's most beautiful and also oldest bio-based products.
Sponsored
A Highland Home

A Highland Home

SuperFoil Insulation

A 200 sqm, highly energy-efficient new build project in a remote location in the Highlands of Scotland. Built using sustainable materials, and with the timber frame sourced locally and wood fibre insulation used alongside SuperFOIL Insulation throughout. Powered throughout the year using solar PV and battery storage.Looking to increase the thermal resistance of the building envelope in order to reduce energy usage. With the building using an air source heat pump and underfloor heating, they wanted to make sure that any heat loss was minimised and it was vital that they chose the correct insulation for the walls and roof.Solution: SuperFOIL SF19+ is a multifoil product with a total of 11 layers, made of wadding, aluminium coated PET layers and Foil Laminated Outer Layers. At only 40mm thick and providing an R-value of 2.14 when used in a roof, SF19 can be used on its own or in combination with other types of insulation. A fully flexible product that provides a vapour control layer as well as acting as a radiant barrier.
Sponsored
LABTECH - Camden

LABTECH - Camden

Savortex Ltd

The ClientLABTECH owns Camden Market, the 3rd most popular tourist and shopping location in the world with an annual footfall of 28m. The Group is also redefining co-working for businesses of any size, with state-of-the-art-locations throughout London attracting mass affluent professionals with unrivalled technology and contemporary smart design office spaces. The group is currently valued at £2.bn, offering Retail and Co-work spaces to affluent audiences. The owners of LABS have a desire to exceed their environmental targets, while engaging their community of local businesses to increase revenues by implementing innovative and Smart technologies that offer shared value to their community.Their ProblemThe estate has 12 washrooms in 3 locations in London using Dyson hand dryers in their washrooms with a power rating of 1600 watts. Further, due to the unusually high footfall at Camden Market, washroom maintenance is proving challenging due to sudden peak surges. The client was looking for a technology solution to reduce their energy and operational costs, and new ways to engage its users to drive additional revenue based on shared values with its community.Our SolutionSAVORTEX deployed 20 of its revolutionary adDryerTM hand dryers on a pilot in 2 of the busiest washrooms at Camden Market. The adDryer uses an advanced digital brush-less motor technology, which consumes power of just 550W, offers 10x more operational life than traditional dryers and comes with an in-built Video screen, connected to a content management system and shows a full motion advert or internal message in response to users drying their hands.The dryer wirelessly reports the energy usage per dry and washroom footfall to the SAVORTEX web portal, allowing estates managers to remotely manage their washroom facilities, and drive responsive cleaning for enhanced hygiene and sustainability. Over the trial period the estates manager was able to monitor hand dryer usage and washroom footfall of 45,100 people per month with an average drying time of 8.8 seconds, triggering 1,100 washroom inspections per week, resulting in significant operational savings throughout the estate. Further, the Marketing team at Camden Market Management inspiredlocal business to drive adverts via a the SAVORTEX contentmanagement system on-line direct to users drying hands. 19 out of the 30 local Businesses signed up and pushed daily offers and adverts direct to users to drive traffic into their store.
Sponsored
Sidney Stringer Academy - Education

Sidney Stringer Academy - Education

Aspex UK Limited

The principal finish of ironmongery supplied was Stain Stainless Steel, and the majority of the lever handles supplied were Salto Proximity Lever Handle sets, which worked in conjunction with the Salto Hardwired system which we supplied to the M&E Contractor.
Sponsored
Ichthys Venturer - Chartek 7E - Floating Production Storage & Offloading (FPSO) vessel

Ichthys Venturer - Chartek 7E - Floating Production Storage & Offloading (FPSO) vessel

International®, brand of AkzoNobel

Based on a proven formulation that has been used in more than 60% of the world’s offshore oil and gas facilities, Chartek 7E was the natural PFP choice to secure the specified lifetime of this vessel. This tried-and-tested formulation is the result of AkzoNobel’s decades of technology leadership and continuous innovation, powered by unrivalled testing capabilities that allow coatings to be exposed to a wide array of extreme conditions in order to measure resistance. Combined with the expertise gathered from protecting more than 6 million square meters of steelwork over the last 25 years with Chartek 7 alone, AkzoNobel is highly equipped to provide PFP solutions to the oil and gas industry worldwide.Chartek 7 is one of the core products of the Chartek range, with a track record of over 20 years providing exceptional protection against pool and jet fires, with proven long-term resistance against fire damage and corrosion. Chartek 7E applies the same technology with a self-reinforced formula that is mesh-free, helping to achieve weight reduction through a safety-first approach.
Sponsored
McDonald’s Restaurants

McDonald’s Restaurants

dormakaba UK & Ireland Ltd

dormakaba sets high standard at quick service restaurants nationwideAs part of a national refurbishment programme for McDonald’s, dormakaba was appointed to install high quality automatic doors from dormakaba at 169 restaurants across the UK, helping to deliver the utmost levels of safety and convenience.dormakaba’s modern, sleek and stylish automatic doors help provide a reliable and pleasant experience for customers entering the restaurants, as well as offering a stable and comfortable environment for those dining inside.McDonald’s Restaurants (GBR)dormakaba ES 200 automatic door operators were specified for their sleek design, reliability and service backup. For entrances where space is restricted, such as with refurbishment schemes, swing door operators are a convenient solution.dormakaba’s contribution to the projectSpecified for their robustness, reliability, green credentials and nationwide backup service, dormakaba ED 100 Low Energy units enable doors to be opened under power when required.In Automatic mode, dormakaba ED 100 operators are especially suitable for external doors where they recognise and compensate for tough weather effects. 
Sponsored
Parliament Building Vienna - FLOOR and more® , FLOOR and more® comfort

Parliament Building Vienna - FLOOR and more® , FLOOR and more® comfort

Lindner Group

Project DescriptionThe capital of Austria, Vienna, is home to one of the country's most powerful structures: The parliament building from the 19th century comprises the seat of the two chambers of parliament, the National Council as well as the Federal Council of the Republic of Austria.As part of the general renovation of the historic building complex on Vienna's Ringstrasse, Lindner GmbH was involved in the construction project with numerous products and services. In addition to the repair of damage to the building fabric, the main objective was the general modernization of the property within the framework of the preservation of historical monuments. The combination of Lindner's modern hollow floor system FLOOR and more® and the historic overlay therefore met all the requirements. In order to continue to preserve the classic look of the wall and ceiling surfaces, the entire building services were installed in the access floor - completely in line with the maxim of sustainability.Completed Works:Floors:Calcium sulphate panels                         - FLOOR and more® comfort                - FLOOR and more®Cement fibre panels:                               - HYDRO comfortCeilings:Heated and Chilled Plasterboard Ceilings-Plafotherm® GK HEKDA®Insulation Engineering

Showing 613-648 of 781

Feedback