NBS Source
I'm a manufacturer

"electric fires and room heaters"

5,814 results found

Sort by:

Showing 613-648 of 1713

Sponsored
Meridian Wall Coping and DF Rainscreen Panels at Waterford Place, Wiltshire

Meridian Wall Coping and DF Rainscreen Panels at Waterford Place, Wiltshire

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Chippenham, WiltshireProject Type: Retirement HousingDevelopment Cost: £10mProduct: Meridian Wall CopingDF Rainscreen PanelsWindow SurroundsFinish: Syntha Pulvin RAL 7036 Matt Platinum GreyFire rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Client: McCarthy & Stone Retirement HomesArchitects: HGP LtdMain Contractor: McCarthy & StoneSub Contractor: Stafford Rainwater Systems Ltd
Sponsored
Aluminium Weatherstruck coping at Waterside Quarter

Aluminium Weatherstruck coping at Waterside Quarter

Dales Fabrications Ltd - Aluminium Eaves Products

 Location: Waterside quarter, Crown Lane, Maidenhead, Berkshire, SL6 1QRProject type: Mixed useProducts: Weatherstruck Coping SystemFascia Soffit SystemFinish: RAL 7015 MattFire Rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Architect: T.P. ArchitectsMain Contractor: Shanly Homes Thames ValleySub Contractor: John Nason Ltd Photography: a2n & John Nason Ltd
Sponsored
Aluminium Square Contemporary RWP at Gallions Place

Aluminium Square Contemporary RWP at Gallions Place

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Gallions Place, Royal Albert Wharf, London E16 2FEProject type: Mixed useProducts: Weatherstruck copingSquare Contemporary Rainwater pipesFascia Soffit systemFinish: PPC RAL 9011 MattFire Rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Architects: P.R.P ArchitectsContractor: Vistry PartnershipsSub Contractor: Roweaver Developments Ltd Photography: Robert Greshoff
Sponsored
Balcony Soffit Cladding at Catford Green, London

Balcony Soffit Cladding at Catford Green, London

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Catford, LondonProject Type: HousingDevelopment Cost: £8.95mProduct: Self-Draining Balcony Soffit Cladding with Integral Gutter​Finish: Syntha Pulvin RAL 7006 Matt Beige GreyFire rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Client: Barratt Developments PlcArchitects: ATP Group PartnershipMain Contractor: Barratt Developments PlcSub Contractor: Balguard Engineering Ltd
Sponsored
Shadex 100 Brise Soleil at Harrow Business Centre

Shadex 100 Brise Soleil at Harrow Business Centre

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Harrow Business Centre Project: CommercialProduct: Shadex 100 Brise Soleil, 700mm projection Finish: Syntha Pulvin RAL 7046 Matt Telegrau 2 Fire rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018) Support method: First Fix Brackets & Isol8 Chucks: Curtain-walling mullions Architect: KDS Associates Ltd Contractor: Brennan Group Sub Contractor: HKL Specialists Limited
Sponsored
Savoy cinema, Grantham, Lincolnshire

Savoy cinema, Grantham, Lincolnshire

Dales Fabrications Ltd - Aluminium Eaves Products

Project type: CinemaLocation: St Catherine’s Road, Grantham, LincolnshireProduct: Shadex 150 Brise Soleil Horizontal (First Fix Brackets off Curtain Walling)​Finish: Syntha Pulvin RAL 7046 Matt Telegrau 2Fire rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Architect: N. B. D. A.Contractor: G. F. TomlinsonSub Contractor: Optimus Architectural Ltd
Sponsored
Redmond Building (University of Liverpool)

Redmond Building (University of Liverpool)

EFFISUS

The Redmonds Building provides the university with a state-of-the-art home for the Faculty of Business and Law, the Liverpool Screen School and the university’s new Professional Centre. The work is taking places in phases over a two-year period and will replace the cladding on the outside of the building. The external works are scheduled to be completed in summer 2021. Fire protection is a main concern for this project and Effisus Breather FR, a fire-resistant breathable membrane, was the chosen membrane for protection of the new façade against moisture, driving rain and wind.
Sponsored
Christies Hospital

Christies Hospital

United Anodisers Ltd

A new cancer research facility at The Christie NHS Foundation Trust in Manchester. Following a devastating fire which caused significant damage to the building in 2017. United Anodisers worked with BDP to produce an A1 fire rated solution for the project.The new building will be a fantastic opportunity to accelerate cancer research.Architect BDP Manchester.Consultants Arup.Contractors Vinci and Robert McAlpineExtrusions Kawneer.Rainscreen panels Taylor Maxwell and AKV.Finish UA Anolok 541™
Sponsored
University of Hull  `Staggering difference`

University of Hull `Staggering difference`

TK-Team Limited

TK-Team were asked to help with reverberation issues in a room used for VC. Below are comments made by Kevin Close of Hull University.With more and more meetings being scheduled online since the pandemic, we had a request to enable a meeting room with video conference facilities. One thing that was immediately noticed, post install, was that people at the far end we’re having issues hearing people in the meeting room due to the acoustics in the room. The configuration of the room with flat solid walls, ceiling and whiteboards meant this space had a lot of reverb/echo. After some thought, it was obvious acoustic treatment was required in the space, we consulted with GVAV who offered us some solutions, we then spoke in depth with Lee from TK-Team who visited us and surveyed the room. Lee identified the main issue being reflection from the ceiling and explained that is where we should start. TK-Team worked with us and designed us a tailor-made solution for the room using Hush Acoustic ceiling tiles, all in our choice of colours and shapes, the solution was procured via GVAV and installation was very smooth and finished in a timely manner.The acoustic quality of the room, not just for local meetings but for remote participants was vastly improved. The difference in the room has been described as ‘staggering’. As such, this is now a heavily used meeting space and has highlighted the advantages of looking at and dealing with acoustic issues within meeting spaces on campus going forward.Kev Close
Sponsored
The JJ Mack Building

The JJ Mack Building

AGC Glass UK Ltd

Pyrobel Vision Line fire-resistant glazed screens for EI30 (30 minutes integrity and insulation)
Sponsored
Hospital Specifies TITAN Lite™ 120:60 From FIREFLY™

Hospital Specifies TITAN Lite™ 120:60 From FIREFLY™

FIREFLY™ TBA

Hospital Specifies TITAN Lite™ 120:60 From FIREFLY™An 18-month contract being carried out by a leading UK fire contractor has involved installing large quantities of the TITAN Lite™ 120:60, manufactured by TBA FIREFLY™, to create fire barriers above ceiling voids throughout many parts of the hospital.The hospital has 660 beds and provides medical and surgical care to a third of a million people with the building dating back to before the beginning of the Second World War. The refurbishment work, concluded at the end of November 2021, was being carried out by Plymouth based Ventro Ltd. whose operatives have had to work in many areas during the evenings and weekends in order to avoid disruption to the hospital’s everyday activities, including the treatment of patients.Following early appraisals of the fire protection requirements within the ageing property and taking into account the large quantities of different mechanical services to be accommodated into the upgrades, the hospital’s estates department decided to raise the specification for the work from 30 minutes integrity rating to a full two hours. The Site Agent for Ventro, John Roberts, commented: “As a specialist fire contractor working across the whole of the UK and beyond, we have employed FIREFLY™ products on many projects over the years and expect to continue doing so. In the early stages of this contract, which began on site in May 2020, it was thought APOLLO Lite™ 30 minutes would be appropriate, but the hospital then switched this to TITAN Lite™ 120:60. We have been installing the TITAN Lite™ in many parts of the hospital, including most recently in the ceiling voids over the kitchens. This has been done by fixing metal angles across the soffits and then using the special tape and staples to secure the fabric to it. Despite the large number of services making the number of penetrations to be deal with quite challenging, our teams find the FIREFLY™ relatively easy to install.”FIREFLY™ TITAN Lite™ 120:60 has been developed as a flexible fire barrier to provide compartmentation of larger concealed spaces within different types of buildings including factories, warehouses and railway stations.By offering 120 minutes integrity and 60 minutes insulation, TITAN Lite™ 120:60 exceeds the minimum requirements relating to Fire Barriers as detailed in the UK Building Regulations: Approved Document B (Fire Safety). Firefly is manufactured using specially treated woven glass fibre fabrics. 
Sponsored
Oxford University Biosciences Building

Oxford University Biosciences Building

TK-Team Limited

Sara Bonfield knew what TK-Team could produce and designed multiple rooms that would have our glass writing surfaces. The room pictured shows a custom glass writing wall in conjunction with twin displays and acoustic wall lining. We produced Glass Writing Boards for many meeting rooms and offices and a stylish Glass WriteWall for the main conference room (pictured). The challenge was to ensure all surfaces were level when finished.The project was completed in co-operation with Forrestfield Studio, and Sara Bonfield.
Sponsored
Automated Cycle Wheel Travelators Installed in the Heart of the City

Automated Cycle Wheel Travelators Installed in the Heart of the City

Falco UK Ltd

Falco is pleased to announce another installation of the UK’s only automated cycle wheeling ramp, for 20 Ropemaker Street, located within the heart of the city. The new automatic cycle wheel ramps have been installed by Falco as part of a £240m state-of-the-art development bringing a new commercial building of more than 450,000ft² of Grade A, BREEAM ‘Outstanding’ office space and premium retail provision to a prominent corner site just north of Moorgate Station.The automated bike wheeling ramp known as the ‘VeloComfort®’ is a huge innovation and Falco is once again delighted to bring what is standard Dutch cycling technology to the UK market. These wheeling ramps provide cyclists with the next generation of accessibility and are designed to assist users with manoeuvring their bikes up and down stairs with virtually no effort.This is particularly important where a bike is either heavy or perhaps has a basket or panniers and makes carrying a bike up stairs or even using a traditional wheeling ramp difficult. The VeloComfort® range comes in two patented innovative designs, one for manoeuvring bicycles up the stairs - VeloComfortUp®, and one for down - VeloComfortDown®!Falco supplied and installed 22m of both VeloComfortUp® and VeloComfortDown® designed to meet the client’s exact stair dimensions.The VeloComfortUp® is essentially a mini ‘travellator’ or conveyor belt which starts once the integrated sensors detect a bike and automatically stops if the conveyor is completely free of bicycles. The high quality conveyor (kevlar-based) belt runs in a durable, low-maintenance aluminium double-sided channel and is powered by an electric motor. The entrance and exit of the conveyor are aesthetically, functionally and safely integrated into the system, with the electric motor positioned on the side of the conveyor belt.The VeloComfortDown® is a simple and effective non-electric cycle / bike wheeling ramp designed with a gutter brush to reduce the speed of the bike. The gutter brush is made from a high quality, durable and low-maintenance aluminium double-sided channel, which is equipped with brush strip on both sides. The friction of the gutter brush ensures that the bike slows down, allowing the user to determine his/her own pace during the descent.Falco provide complete supply and installation of the VeloComfort® cycle wheeling ramps as well as free rendering graphics to help the client to visualise the scheme, free UK-wide site surveys and free CAD design and schematics.A video demonstrating the VeloComfort® Bike Wheeling Ramp can be viewed by clicking here.For more information about the innovative VeloComfort® Bike Wheeling Ramp, please contact our helpful sales team on 01538 380080.
Sponsored
Multi-Fold Gates at Elephant Park

Multi-Fold Gates at Elephant Park

Bolton Gate Company

Elephant Park is part of a £2.3 billion regeneration project in Elephant & Castle. It comprises a mixed-use development of 3000 new homes and up to 50 shops /retail units all centred around a new 2-acre park. Bolton Gate assisted the Architect with the design of a large electric Multi-Fold Gate to the Service Bay which consists of twelve equal leaves each constructed from an SHS frame with 50 x 10mm vertical steel fins and internal mesh to prevent the ingress of birds. Matching cladding and balustrades completed the elevation all of which were powder coated black.
Sponsored
Crown Paints celebrates decade of success with earthbalance

Crown Paints celebrates decade of success with earthbalance

Crown Trade, product of Crown Paints Ltd

Crown’s earthbalance scheme sets out the company’s commitment to being more sustainable and less wasteful as well as helping customers and staff make responsible decisions. The earthbalance scheme covers all aspects of Crown’s business and applies to all staff and operations at Crown’s two UK manufacturing plants and network of Crown Decorating Centres. Crown has reduced its overall electricity consumption by 15 per cent, reduced packaging waste by approximately 15 per cent, recycled more than 800 tonnes of paint cans and donated 112 benches made using recycled paint cans through social enterprise NIMTECH.
Sponsored
Residence near Lake Constance

Residence near Lake Constance

Gira Giersiepen GmbH & Co KG

A home owner near Lake Constance has fulfilled his dream of having an office with a view: From the top floor, one can enjoy a fabulous vista of the water and the Alps rising into the sky behind the lake. In terms of building technology, virtually everything that you could wish for in an intelligent home has been installed. All components in the house have been networked via a KNX system, so that they can be controlled centrally and even automatically, when cross-linked with each other.Architect:  Matzke ArchitekturbüroElectrical installation: Contrel - Building Control Systems Photos: Ulrich Beuttenmüller for Gira
Sponsored
Great Blakenham Energy Park

Great Blakenham Energy Park

Marshalls plc

he Great Blakenham incinerator plant is a joint initiative between Suffolk County Council and waste management company SITA UK. This energy-from-waste facility uses the household and business waste left after recycling, burning materials which would otherwise go to landfill, and generates enough electricity to power 30,000 homes. Although operations carried out at the plant are largely industrial, the appearance of the building itself including the suspended, glass fronted office section required hard landscaping to increase overall aesthetics, as well as providing a SuDS solution to ensure safe and practical surface water removal in the car parking areas...
Sponsored
AusNet Services: Increased Safety for Working at Heights on Utility Towers

AusNet Services: Increased Safety for Working at Heights on Utility Towers

MSA Safety (Latchways) – Fall Protection

AusNet Services, formally SP AusNet, is the largest diversified energy network business in Victoria, Australia. The company owns and operates approximately AUD$11 billion of electricity and gas transmission and distribution assets. In March 2004, the Occupational Health & Safety (Prevention of Falls) Regulations 2003 became effective, requiring AusNet Services to cease sole reliance upon dual lanyards, and to consider other attachment methods for climbers during maintenance and other transmission tower operations. MSA provided AusNet Services with not just products, but a complete service package that provided comprehensive support for AusNet Services’ ground installation team.
Sponsored
Boxed Glazed Roof Access - Circle Hospital Bath

Boxed Glazed Roof Access - Circle Hospital Bath

Surespan

Project:Architects Foster + Partners approached Surespan to design and manufacture two roof hatches for Circle Hospital Bath – the new centre of clinical excellence due to open in late 2009. Product:The huge single-leaf glazed roof hatches are electrically operated by push button switches, one hatch incorporating a side door. The high spec glazed lid is supported by heavy-duty aluminium hinges and features an integral ‘wrap over’ edge, incorporating double unbroken EPDM seals. The hatches offer a high level of thermal insulation against heat loss and condensation, together with excellent sound absorption properties.
Sponsored
Shanghai Tower - Interchar 1983 - Infrastructure

Shanghai Tower - Interchar 1983 - Infrastructure

International®, brand of AkzoNobel

Essential Protection for Tall Buildings.As one of the world's leading coatings companies, we strive to be at the forefront of design trends and our International range of protective coatings and passive fire protection products is developed to complement architectural innovations.With its curved façade and spiralling form symbolizing China’s emergence as a global financial power, the Shanghai Tower is world's second tallest building (behind Burj Khalifa in Dubai), after its six-year construction was completed at the end of 2015.Shanghai Tower is one of the most advanced sustainable tall buildings in the world and goes to great lengths to generate its own energy.Around 200,000 liters of our protective coatings and intumescent fire protection products, including Interchar 1983, were used to provide fire protection for stair steel structures and the façade’s supporting steel structures for up to 90 minutes.We were the company of choice for the owner, painting applicators and the fabricator.
Sponsored
Jaguar Land Rover

Jaguar Land Rover

HAG Ltd. - The Door Specialists

OverviewJaguar Land Rover (JLR) is the UK’s largest car manufacturer, built around two iconic British car brands: Land Rover, the world’s leading manufacturer of premium all-wheel-drive vehicles; and Jaguar, one of the world’s premier luxury sports saloon and sports car marques.With the two brands being brought together & established as one company in 2008 by the Tata Group, the brand is not only known by consumers as a creator of luxury cars but they are also considered in the trade as a reborn company of thriving creativity and one who isn’t afraid to tear up the rule book.They were the first car manufacture to cut their third party costs by producing their own steel and in 2014 the Jaguar XR was the first vehicle in the world to use aluminium alloy grade RC5754, which contained up to 75% recycled aluminium. The much lighter body gives a far superior fuel economy and in turn reduces fuel emissions. PartnershipHaving successfully tendered for 4 new sites across the UK, HAG Ltd. specified various fire protection & security products, to not only meet the current fire & safety regulations but also to aesthetically enhance their surroundings.Several major UK construction firms were chosen to complete the new sites, however HAG Ltd. were one of a limited number of contractors that were specified on all sites.This is testament to the excellent reputation that HAG Ltd. has across the UK within the construction industry, being first choice to assist with the completion of these land mark buildings. The ProjectHAG Ltd. worked alongside market leading construction firms such as Midas Construction and MCS Group at new sites in Bristol, Northampton, Brighton & Guildford, fitting fire shutters, fire curtains & steel doors.HAG’s fire protection doors, shutters & fire curtains offer an exceptionally high standard of specification, performance and protection and are fire tested & compliant to the latest standard BS EN 16034:2014 & CE Marked to BS EN 13241-1:2003. HAG were one of the first UK companies to have their entire range tested & verified to these high standards, when the latest Government legislation changed in November 2019.JLR’s impressive new land mark buildings, often follow the Duel Arch concept, bringing together both brands, spacious showrooms, office space, significant outside & roof top parking. For example the new Guy Salmon facility in Bristol, which opened in January 2021, is vast at 72,000 sq-ft and boasts capacity for more than 400 vehicles. This development alone within the JLR brand, cost £12.3m, and it is therefore understandable that not only is it essential to meet all fire & security regulations, that also their significant investment & stock level needs the highest level of protection.The HAG steel door range includes external fire & security doors, which provide excellent fire protection & the highest level of security. These can be fitted to all external access points of the building and are used to ensure security is maintained. Our insurance certified steel doors have triple point sash locks with high security cylinders and are anti-protected to reduce risk of key copying. HAG can supply an alternative high security multi point panic hardware for fire escape situations. Our in house power coating finishes are available in a wide range of colours, which offered JLR complete control over their design and how our products were going to compliment their surroundings.‘As the Jaguar Land Rover range has evolved and grown since our Jaguar and Land Rover showrooms were established in Bristol, our sales and aftersales experience needed to evolve with them. What we’ve created with this new landmark building in Bristol is a luxurious space for our customers not just to use, but to enjoy. We now have the space and facilities to showcase the entire spectrum of the Jaguar Land Rover range, shining the brightest possible light on these great vehicles to our customers in Bristol and beyond.’Simon CraneHead of Business, Guy Salmon Bristol HAG Ltd. offer maintenance & service contracts, as well as a 24 hour repair service. Repair and service is an essential element of HAG’s portfolio, with the company offering a unique and bespoke maintenance and repair programme tailored for each individual client.
Sponsored
Bank of England Leisure Club

Bank of England Leisure Club

Sauna360 Ltd

Helo installed a steam room and sauna to extend the wet leisure facilities at the Roehampton Club. The project was to provide two attractive, contemporary styled thermal rooms in the existing space. We provided a clean, simple design in both sauna and steam rooms providing good capacity yet with a spacious feel. Delivered on time and on budget
Sponsored
Falkener House, Coventry

Falkener House, Coventry

Keim Mineral Paints Ltd

Falkener House is a 17 storey, residential apartment block located near Coventry city centre. It was originally constructed in 1968 to provide council accommodation.New regulations stipulate that buildings of over 18 metres in height must be fire resistant and classify to A2-s1, d0. KEIM Paints are the only paint manufacturer, to date, that meet this classification.Leicester based Elhance Limited, who specialise in cladding and roofing installation and repair, contacted KEIM to provide a fire resistant paint coating. Bryan Roe, Senior Sales Executive of KEIM Mineral Paints, visited site and produced a comprehensive specification. His findings included moss and green growth over the previously painted concrete, particularly on the south elevation and corners. A power spray was recommended to thoroughly clean the surfaces as part of the pre-paint preparation.Upon cleaning, it was found that the previous paintwork was in good condition. KEIM Soldalit-ME was specified due to its A2-s1, d0 fire classification. Soldalit-ME is a durable exterior paint that has the added benefit of breaking down organic material and contaminants, which will keep the surfaces cleaners for longer.The facades will not require decoration for another 10-15 years, if not more.A further two tower blocks, also situated in Coventry, have been commissioned to be painted using KEIM Soldalit-ME again due to its fire resistant and durable benefits
Sponsored
Dublin Landings, Ireland - Pyroguard Protect

Dublin Landings, Ireland - Pyroguard Protect

Pyroguard UK Ltd

The ChallengeAs part of this strategy, the decision was taken to replace a fully-glazed non-fire-rated internal atrium with a new, high-performance fire-rated solution to ensure the highest levels of fire protection.Spanning five storeys, the atrium would create a functional yet architecturally stunning light-filled centrepiece within the modern office space.Forming part of the broader regeneration of Dublin Landings, bringing this aspect of the project in on time would be critical.As a result, Walls to Workstations were tasked with removing and replacing the five-floor atrium in just six weeks to see the project through to completion.The SolutionWorking closely with W2W, Pyroguard supplied more than 500 square metres of toughened EI30 fire safety glass to the project. Equipping fabricators with the flexibility to deliver on ambitious architectural projects which require large expanses of glazing, Pyroguard toughened glass provides protection against flames, smoke and radiant heat and delivers impact classification of 1B1 to EN12600.Complementing modern architectural ambitions, the inclusion of large areas of toughened glazing within projects helps to safely incorporate natural light into buildings, something which is critical in renovation projects where buildings are being transformed from their original purpose.In practice, this sees spaces flooded with natural light, elevating levels of light transmission throughout a building and having a positive impact on occupants’ wellbeing – crucial in delivering functional and inspiring workspaces.
Sponsored
Engine Manufacturing Facility for Jaguar Land Rover

Engine Manufacturing Facility for Jaguar Land Rover

Norwood Group Limited

PROJECT OVERVIEW Jaguar planned a £500m investment for their first in-house engine manufacturing facility. Opened by Her Majesty, it currently produces 400,000 Ingenium petrol and diesel engines a year. Norwood worked with Interserve to deliver this ground-breaking project to the highest standards. The overall project won the Regeneration award at the RICS Awards Grand Final.OUR SCOPE OF WORKThe main challenge was to provide a 120Min fire-rated demountable compartment wall at 11 meters high. Norwood teamed up with Interserve, developing our 200mm Mediline system, which was subjected to excessive laboratory testing to achieve the 120Min Fire Rated certification. In addition to solid partitions, Norwood supplied a 90Min fire-rated 9-meter high glazed partition wall which provided a viewing gallery from the grand reception onto the manufacturing floor.In addition to the fire-rated compartment walls, Norwood provided a self-supporting machine and QC enclosures. The enclosures had to give a clean environment to a GMP standard; therefore, they had their own mechanical equipment, which was all supported by the Norwood enclosure. This was delivered by designing and installing a bespoke PodSolve system which consisted of a hidden ceiling joist system that provided the structural support for the mechanical equipment.Norwood often returns to Jaguar Land Rover providing modifications without business interruption to the build as their product cycle changes.
Sponsored
Fascia SFP Soffit at Green Park, Reading

Fascia SFP Soffit at Green Park, Reading

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Green Park, Reading, BerkshireProject Type: HousingProduct: Raking Fascia with Secret Fix Panel SoffitFinish: Syntha Pulvin RAL 7015 Matt Slate GreyProduct: Meridian CopingsFinish: Syntha Pulvin RAL 9003 Matt Signal WhiteFire rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Client: Berkeley HomesArchitects: Broadway MalyanMain Contractor: St Edwards Homes Ltd
Sponsored
Shadex 150 Brise Soleil Horizontal (First Fix Brackets) at The Wing Memorial

Shadex 150 Brise Soleil Horizontal (First Fix Brackets) at The Wing Memorial

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Folkestone, KentProject Type: Educational & Historial monumentDevelopment Cost: Educational & Historial monument, £3.5mProduct: Shadex 150 Brise Soleil Horizontal (First Fix Brackets)Finish: Syntha Pulvin RAL 7040 Matt Window Grey: Marine SpecificationFire rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Client: Battle of Britain Memorial TrustArchitect: Godden Allen LawnSub Contractor: John Nason Fascia, Soffit & Guttering
Sponsored
Aluminium Dove Gutter system at Elms Field, Wokingham

Aluminium Dove Gutter system at Elms Field, Wokingham

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Wellington Road, Wokingham, Berkshire RG40 2AGProject type: Mixed useProject Cost: £38mProducts: Dove Gutter system76.2mm Sq Contemporary Rainwater pipesFascia Soffit systemFinish: PPC RAL 7005 Gloss Mouse GreyFire Rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Client: Wokingham Borough CouncilArchitects: Benoy ArchitectsComprehensive Design ArchitectsContractor: McLaughlin & Harvey Ltd Photography: a2n
Sponsored
Aluminium Fascia Soffit at Magpas Air Ambulance HQ & Aviation Base

Aluminium Fascia Soffit at Magpas Air Ambulance HQ & Aviation Base

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Magpas Air Ambulance HQ & Aviation Base, Ermine Street, Alconbury Weald, Cambridge, PE28 4WXProject type: HealthcareProducts: Fascia Soffit systemFinish: PPC RAL 2003 – Pastel OrangeFire Rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Architects: Moses Cameron Williams Architects LtdContractor: Lindum Group LtdSub Contractor: W.S.F Contracts LtdPhotography: Lindum Group Ltd
Sponsored
Aluminium Eaves System at Wymondham Library, Norfolk

Aluminium Eaves System at Wymondham Library, Norfolk

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Wymondham, Norfolk Project: Educational Product: Curved Meridian Aluminium Wall Coping, Aluminium Eaves System with hidden gutter & support-work, Rainwater pipes & Brise Soleil Shading System Finish: Syntha Pulvin RAL 7012 Matt Basalt Grey Fire rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018) Architect: NPS Property Consultants Ltd Main Contractor: Morgan Ashurst Sub Contractor: Roweaver Developments Ltd
Sponsored
Aluminium Eaves System with Secret Fix Soffit Panels at The Gade, Hemel Hempstead

Aluminium Eaves System with Secret Fix Soffit Panels at The Gade, Hemel Hempstead

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Hemel Hempstead, HertsProject Type: Local Authority OfficesDevelopment Cost: £11.2mProduct: Aluminium Eaves SystemSecret Fix Soffit PanelsMonocoque Support System & Curtain-Wall Surround​Finish: Syntha Pulvin RAL 2001 MattFire rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Client: Dacorum Borough CouncilArchitect: Aukett SwankeMain Contractor: R.G.Carter LtdSub Contractor: Drayton Windows Ltd
Sponsored
Bingham Methodist Church

Bingham Methodist Church

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Bingham, NottinghamshireProject Type: EcclesiasticalDevelopment Cost: £1.6mProduct: Meridian Coping Curved to 2-RadiiAluminium Fascia SoffitMonocoque Support System100mm Round Contemporary Rainwater PipeFinish: Syntha Pulvin RAL 7043 Matt Verkehrsgrau BFire rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Client: Bingham Methodist ChurchArchitect: Allan Joyce ArchitectsMain Contractor: A & S Enterprises Limited
Sponsored
150 Solar Shade System at The Exchange, London

150 Solar Shade System at The Exchange, London

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Twickenham, LondonProject Type: Community & LeisureDevelopment cost: £5mProduct: Shadex 150 Solar Shade Horizontal (First Fix Brackets)Finish: Syntha Pulvin RAL 7009 Gloss Green GreyFire rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Client: Berkeley Homes for LB of RichmondArchitect: Buller Welsh Chartered ArchitectsMain Contractor: Berkeley HomesSub Contractor: AJE Facades Ltd
Sponsored
Creek Harbour - Dubai

Creek Harbour - Dubai

EFFISUS

This development includes a tower that will exceed the height of the Burj Khalifa, and a sanctuary development with exclusive villas and a canal district. Sustainability is at the heart of development, with a road and transport network designed to minimize environmental impact, as well as various ecological initiatives, including artificial forests and open green spaces. In this project, it is being used the A2 Class fire rated weatherproofing membrane Effisus Vapour FR to protect façade from environmental agents with superior fire resistance, and the bi-adhesive tape Effisus 2Bond DS, to seal the connections on the façades.
Sponsored
Innovation Campus, Cardiff University

Innovation Campus, Cardiff University

Lorient

Cardiff University’s state-of-the-art Innovation Campus, which boasts exciting new centres that act as a magnet for research and investment, is scheduled to open in 2021. Home to two world-leading scientific research establishments - the Institute for Compound Semiconductors and Cardiff Catalysis Institute – the campus will also host SPARK, the world’s first social science research park, and an Innovation Centre – a creative space for start-ups, spinouts and partnerships. Lorient supplied LAS8001 si drop seals, fire seals, and DS acoustic, smoke and fire seals to the project.
Sponsored
Commercial rainscreen cladding at Welcome Break services

Commercial rainscreen cladding at Welcome Break services

Technowood UK

A fast paced commercial project for Welcome Break motorway services at Newark. A2-s1,d0 fire rating was mandatory here, yet the design intent was to use wooden cladding to make the building pop from far away. Contemporary design with traditional materials are trending now, but often the strict fire regulations rule out materials that would be preferred. Technowood UK was able to supply a real wood veneered aluminium cladding that is compliant with all the regulations, and PSBK Limited was able to complete this installation in just 3 weeks.

Showing 613-648 of 1713

Feedback