NBS Source
I'm a manufacturer

"lightning protection"

1,427 results found

Sort by:

Showing 361-396 of 1018

Sponsored
Woodberry Park

Woodberry Park

SE Controls

Berkeley Homes’ flagship Woodberry Park apartment development in North London is using an advanced smoke and natural ventilation system from SE Controls to not only provide protection for residents in the event of a fire, but to also create a better environment by actively managing any excessive heat build up in corridors.
Sponsored
The Petersham Hotel

The Petersham Hotel

Schlüter-Systems Ltd

Situated in Richmond, Surrey and overlooking the River Thames, the Petersham Hotel undertook a refurbishment of the Tower suite to ensure an unforgettable visit alongside the equally picturesque views. Tile and stone protection experts Schlüter-Systems were on hand to provide a level entry system solution for the bathroom of this stunning area of the hotel.
Sponsored
False fire alarms on the rise across NHS Trusts

False fire alarms on the rise across NHS Trusts

Safety Technology International Ltd

False fire alarms have risen by nearly 16% in just 6 years at NHS trusts across England; stretching resources, unsettling patients, and disrupting vital healthcare.Figures from NHS Digital reveal there were 19,566 false fire alarms at NHS trusts throughout 2020/21, with some trusts recording upwards of 500 false alarms.The worrying results reveal that both in the past year and historically, several patients have sustained ‘injuries during evacuation’, highlighting the damaging effects of an unnecessary evacuation.With appointments cancelled, operations delayed, and a fall in emergency department attendances during the period, we might have expected to see the number of false fire alarms fall significantly during the pandemic.At a time where it is vital to avoid the crowded corridors and large gatherings at assembly points that follow an evacuation, it has become even more pertinent to eradicate the causes of false alarms ensuring a socially distanced environment for vulnerable patients.Of the 19,566 false alarms 5,742 resulted in a callout, firefighters respond to all alarms as if they are real. This exposes the public and fire crews to unnecessary risk in their emergency response to unwanted fire signals, directing them away from real emergencies – threatening to place added pressure on the NHS.Across the 216 NHS trusts listed within the data, a total of 1,175 genuine fires were recorded.False alarms cost businesses and Fire and Rescue Service authorities an estimated £1 billion a year in the UK. In order to recoup this cost, the London Fire Brigade became the first fire service in the country to recover costs from hospitals with a poor false alarm record.A false alarm is a fire alarm signal caused by means other than a genuine fire, which has activated a fire detection and alarm system, these can include: equipment false alarm, environmental influences, accidental damage, and inappropriate human action, including the malicious activation of a manual call point.As recommended in BS 5839-1:2017 manual call points can be fitted with a protective cover to prevent false fire alarms. The British Standard Institute recommends in section 20.2b that: “All MCPs should be fitted with a protective cover, which is moved to gain access to the frangible element.“It is now recommended that a protective cover is fitted to a Type A manual call point to help prevent false alarms.”This is supported by fire safety guidance set out by the Department of Health which outlines the importance of “initiating measures to reduce false alarms and unwanted fire signals,” such as “the provision of lift flaps, or lift flaps combined with a local alarm device [which] are sufficient to control the possibility of undesirable actuation by patients.”Safety Technology International manufacture a range of protective covers, from integral covers to outdoor and sounder models; there are variations to suit all applications. These covers are specifically designed to prevent false alarms whether accidental or malicious.The Call Point Stopper is a protective cover ideal for areas with a risk of accidental activation, such as hospitals and healthcare facilities. The polycarbonate cover does not restrict the legitimate operation of vulnerable call points and helps distinguish a fire call point from a green electronic door release – often located nearby, this is a common cause of false alarms.Fire crews recently attended a false fire alarm at the Royal Blackburn Hospital after a discharged patient broke five break glass call points. If there is a history of malicious activations whereby patients or visitors intentionally activate the fire alarms, causing unwanted evacuations and disrupting important healthcare, the Euro Stopper offers a solution.The Euro Stopper provides a tamper-proof cover featuring the same sturdy UV-stabilised polycarbonate housing as the Call Point Stopper with the useful addition of an optional integral sounder and glow-in-the-dark frame. The 96 dB sounder emits a piercing alarm when the cover is lifted drawing immediate attention to the area, acting as a pre-alarm in a real emergency.If further robust protection is still required the Universal Stopper provides IP56 protection from the elements, with a tough outer dome or low profile cover strong enough to withstand the severest of knocks from hospital beds, trollies, or wheelchairs. An optional sounder and break seal acts as an additional deterrent against malicious activation.Conforming up to IP66, the Enviro Stopper offers the same protection against both accidental and malicious activation whilst guarding against ingress in harsh environments, such as wet rooms or wash down areas.
Sponsored
Stunning Decking Transformation with D1 Pro

Stunning Decking Transformation with D1 Pro

Owatrol UK Ltd

This client had an untreated deck that had degraded due to UV exposure and needed it restored and finished. this was achieved by using Net-trol Wood Cleaner & Colour Restorer followed by D1 Pro Saturating Oil.Cleaning and preparing an IPE Deck for FinishingBefore using Net-Trol you need to ensure that your surface is cleared of debris – a good sweep should suffice.The surface then needs to be made wet and Net-Trol should then be scrubbed into the surface. We recommend using a stiff brush, then leave it to stand for approximately 20 minutes.Then it should be rinsed whilst scrubbing ,again with a stiff brush. Try to use the highest pressure water source you can (a pressure washer is ideal but a hose will suffice).Your surface then needs to be left for at least 48 hours to dry completely before applying your finish.Why use Owatrol’s D1 Pro?In this case, the client has chosen to finish their IPE deck with Owatrol’s D1 Pro, a product from our Professional Range which is a saturating wood oil for hardwoods giving a long-lasting natural finish and advanced UV protection.This product is well-suited for use in heavy-traffic areas such as decking and areas exposed to harsh weather. This is because it has a long-lasting finish that will protect in the years to come with minimal maintenance.It’s also perfect for dense, oily or greasy woods which are difficult to impregnate with saturating products. D1 Pro delivers excellent wood penetration and can protect even these more difficult woods from within.As such it was perfect for this project as it is made from IPE Decking which is an extremely hard wood decking (approximately 3 times harder than oak!).Many high street products would not have been able to provide adequate saturation in a wood as hard as this and therefore would not provide the long-lasting protection offered by D1 Pro.Finishing a deck with D1 ProOwatrol’s D1 Pro is a saturating wood oil protection. This means that its place is inside the wood not on top of it.To apply a saturating oil you need to apply ‘wet on wet’ coats. This means that the surface cannot be allowed to dry in between coats. If this was to happen then the D1 Pro that had been absorbed so far would start working and prevent any further moisture from penetrating the wood!This sounds a little scary but it really isn’t.The key is to work on small sections at a time (an area which can be completed in around 15 minutes). You need to apply the first coat and allow it to be absorbed for around 15-20 minutes but do not allow it to become surface dry.You then continue to apply coats until no more oil can be absorbed and the wood is saturated. At this point be sure to brush away any excess D1 Pro sitting on the surface to prevent shiny patches.Be sure to work along the length of your decking boards and always work an entire board at once. Never stop mid-board to prevent uneven coverage.Once this is completed you will have a deck protected for the long-haul with minimal maintenance required.Regular washing with Net-Trol is optional but will help to maintain the look of your deck. The look of the deck will gradually lighten over time; when it returns to a grey colour it is time for a maintenance coat. You apply it in exactly the same way but usually only 1-2 coats is necessary.You can also apply a maintenance coat in just a small localised area if that’s all that is necessary. No sanding or stripping required!The finished resultsAs you can see the results are stunning! The client can be safe in the knowledge that their deck is protected for years to come from damage caused by UV rays and moisture.On top of this, they know that they will need to do minimal maintenance. If the deck begins to look worn in high traffic areas, they’re able to carry out touch-ups easily.
Sponsored
Malicious false fire alarm hits record high

Malicious false fire alarm hits record high

Safety Technology International Ltd

A record number of manual call points were maliciously activated across England for the year ending March 2022.The highest annual number of malicious false fire alarms on record came as people returned to public buildings en masse in a period markedly unaffected by COVID-19 lockdowns.The latest Home Office figures reveal there was a total of 3,212 false fire alarms caused by the “malicious activation of [a] fire call point/alarm” in England for the year ending March 2022, surpassing challenged hoax calls as the largest reason for malicious fire alarms.Accidental activations also increased over the period; 14,452 false fire alarms were recorded due to the accidental and careless activation of life safety equipment, including manual call points.Every false alarm is costly, disrupting schools and businesses, placing unnecessary strain on our emergency services and reducing public confidence in fire alarms.Despite online learning, working from home and limits on social contact, false fire alarm numbers, although down, persisted during the pandemic.As schools, offices and shops saw reduced attendance and footfall, malicious false fire alarms survived; now in a post-COVID world, there has been a boom in the number of false alarms plaguing the country.Continuing to be the largest incident type, false fire alarms accounted for 40 per cent of the incidents attended by Fire and Rescue Services in England for the period – fires accounted for just 26 per cent.Repeated false alarms reduce the public’s confidence in fire alarms, contributing to alarm fatigue and a complacent attitude toward evacuations. Alarm fatigue occurs when a person becomes desensitised to an alarm due to repeated false alarms and as a result, fails to react appropriately in an emergency.Safety Technology International manufacture a range of protective covers, specifically designed to prevent false alarms whether accidental or malicious.The STI story began in 1980 with a challenge by a school headteacher who wanted to stop their false fire alarms. Founder, Jack Taylor, used his expertise in security systems to invent the first and original Stopper® polycarbonate protective cover. From integral covers to outdoor and sounder models, there are now variations to suit all applications.The tamper-proof polycarbonate covers ensure call points are protected without restricting legitimate use in a real emergency, a combination of optional warning alarm, flashing beacon and break seal acts as a deterrent against malicious activation.In Wales, malicious false fire alarms rose by 33% to 426 during 2021-22, the highest figure for half a decade. And with similar figures reflected across the UK, over £1 billion is lost every year due to false alarms.To recoup this cost the London Fire Brigade became the first fire service in the country to recover costs from buildings like hospitals, airports and student halls with a poor false alarm record.Firefighters respond to fire signals as if they are real, this exposes the public and fire crew to unnecessary risk in their swift response to false alarms, directing them away from real emergencies.Under The Regulatory Reform (Fire Safety) Order Act 2005, it is the responsibility of the building owner or the “responsible person” to ensure effective fire precautions are in place to protect staff, customers or visitors.Several precautionary steps can be implemented to prevent false fire alarms before they occur; routine testing and maintenance of call points is a must to ensure proper operation, but it is not the only proactive approach.As recommended in BS 5839-1:2017, manual call points can be fitted with a protective cover to prevent false fire alarms. The British Standard Institute recommends in section 20.2b), that: “All MCPs should be fitted with a protective cover, which is moved to gain access to the frangible element.“It is now recommended that a protective cover is fitted to a Type A manual call point to help prevent false alarms.”
Sponsored
Goldman Sachs

Goldman Sachs

CDM Stravitec

The new Headquarters of Goldman Sachs in London is in a great location on Farringdon Street in the City of London. This massive office development of 1.1 million square feet includes a large auditorium which is isolated to protect it from tube train noise and to protect the rest of the building.Sandy Brown specified that the box-in-box construction needed 10Hz bearings supporting it.Our local branch worked with Byrne Brothers to design supply and install the concrete floating floors and structural bearings. The complicated 3-dimensional space is supported on 5 separate floating floors with bearings beneath designed to take the column loads.The floating floors consist of Stravifloor Deck isolation rails supporting composite metal decking, reinforcement and concrete.Some of the columns are supported on Stravibase SEB bearings located outside of the floating floor areas.The new building has been named the ‘groundscraper’ due to its mammoth size – it will become one of London’s new collection of landmark buildings.
Sponsored
Don’t let CUI ruin your investment

Don’t let CUI ruin your investment

Hempel A/S

Owned by Shaanxi Tianhong Silicon Materials Co. Ltd., the Shaanxi Yousr Polysilicon Plant in China will produce polycrystalline silicon material for the solar photovoltaic and electronics industries. When engineering company Fluor was asked to design the plant, it was faced with a specific challenge.Much of the plant’s pipework and equipment is exposed to high temperatures, making it prone to corrosion under insulation. Fluor knew that conventional anti-corrosive solutions are often not able to protect equipment in these conditions, and the company was looking for an alternative but reliable and proven coating solution.Fluor chose our Versiline CUI 56990 coating to provide long-term protection for pipework, equipment and other hot surfaces. Versiline CUI 56990 can resist temperatures up to 650°C/1202°F and thermal shock and cycling in dry or wet service conditions. Versiline CUI 56990 is extremely resistant to micro-cracking and corrosion, even in tough operating conditions.
Sponsored
One Crown Place

One Crown Place

Renson Fabrications Ltd

One Crown Place is a striking, mixed-use development, close to Liverpool Street Station in the commercial heart of London. Two towers providing a mixture of private residential apartments and office and retail spaces.Rising 28 and 33 stories, the towers provide glorious views across the city of London, however it is down at ground level that Renson’s Linius L.050W CLS system was required.Renson worked closely with MACE to achieve a complex design layout for this louvred façade to a ground floor plant area.This highly technical blade, offering significant weather protection up to 3m/s airspeed, whilst still providing excellent airflow at 57% free area & K-Factor of 10.47.We often see the L.050W blade being used in Data Centres due its high performance, providing airflow, reducing humidity and offering significant visual protection.
Sponsored
Hospital Workstation Given New Lease of Life with Yeoman Shield

Hospital Workstation Given New Lease of Life with Yeoman Shield

Yeoman Shield, trading name of Harrison Thompson & Co Ltd

Ward Firth 9 at The Northern General Hospital underwent a complete refurbishment as part of an essential maintenance project recently which included redecoration and new flooring as well as the installation of Yeoman Shield Wall Protection Panels and Guardian Handrail.After the work was completed the ward lookedsmart and refreshed which left the originalNurses Station lack lustre, as pictured to the left.Yeoman Shield were able to offer a solution to theworn work-unit with the application, to the sidesof the desk, of 2.0mm thick FalmouthEx protectionpanels in light grey to match the surrounding décor.The tops of the work stations were covered withYeoman Shield Satin Pastel Smooth panels in thecolour Clay.Not only did the covering of the nurse’s stationwith Yeoman Shield products reflect the newsmart décor of the wards but also gave them anextra lease of life with a durable impact resistantand easy to clean hygienic finish.
Sponsored
22 Bishopsgate, London

22 Bishopsgate, London

Boon Edam Limited

22 Bishopsgate accommodates a community of up to 12,000 occupiers and visitors. In an emergency or evacuation, a highly reliable entrance control solution was required to ensure safe, secure, and seamless access for the building's community. The specification called for unobtrusive, slim-speed gates to maximise throughput while providing effective protection against tailgating.
Sponsored
Gas storage compound security solution

Gas storage compound security solution

Jacksons Fencing

As part of the 'Dover Western Docks Revival' a new propane gas storage compound was required, situated next to the newly built Marina Office in the heart of the new tourist targeted waterfront. The compound therefore needed to be secure and protected from unauthorised access, but also needed to look as good as possible. Jacksons installed
Sponsored
Rose Hall Cottage, Flood Resilience Project

Rose Hall Cottage, Flood Resilience Project

Delta Membrane Systems Ltd

Delta’s design philosophy was to devise a suitable flood resilience measure that would protect this property from the effects of future flooding, like what had previous occurred. Information gleaned from the survey visit enabled Delta to offer a fully effective solution for the intermittent yet long term flooding problem.
Sponsored
Glazed A5000 Hotel Lift in Finland

Glazed A5000 Hotel Lift in Finland

CIBES Lift UK

Gustavelund Hotel is family-run business offering lodging, food, activities and a wide range of services, all set against a backdrop of Finnish art, architecture and design. Given that the hotel is a protected building, it was important to select an accessibility lift which preserved the structural frame and was in keeping with the interior design of this architectural gem.
Sponsored
70 St Mary Axe, London

70 St Mary Axe, London

Siderise Group

The distinctive, semi-elliptical shape of the new 90m high glass and steel office building at 70 St Mary Axe in London required proven passive fire protection and acoustic solutions that could fit with the unique curved frame. Leading manufacturer of fire, acoustic and thermal insulation products, Siderise, met the challenge.
Sponsored
100 Liverpool Street, London

100 Liverpool Street, London

Siderise Group

Products used: CW-FS | Perimeter Barriers and Firestops for Curtain WallingWhen it came to providing a proven range of fire protection solutions for a revitalised building in London highlighted by a sweeping and technically ambitious curved façade, Siderise was able to meet the challenge with its CW-FS curtain wall fire stop system.
Sponsored
FIREFLY System Upgrades Roofspaces At Ashfield Wellbeing Centre

FIREFLY System Upgrades Roofspaces At Ashfield Wellbeing Centre

FIREFLY™ TBA

A programme of works carried out at a Nottinghamshire hospital has seen a number of products from the FIREFLY range employed to upgrade the passive fire protection throughout the roof spaces, with the manufacturer providing site specific design details to assist the highly experienced contractor complete the project on time. DC Fire Protection Ltd., based at Wellingborough in Northamptonshire, works right across the country covering multiple sectors of the construction industry, installing active as well as passive fire protection systems.  For its 10 week contract at the Ashfield Health and Wellbeing Centre at Kirby in Ashfield, the specialist installed dozens of rolls of the Titan Lite™ fire barrier as well as the Apollo Horizontal barrier, Collaroll and two of the 1200 x 600mm FR120 Access Panels to link some of the safety zones being created. Built in 2007, Ashfield Health and Wellbeing Centre is conjoined to the existing Ashfield Community Hospital and offers extended health services to the local community, supplementing the current services by providing purpose-built rehabilitation facilities, physiotherapy, occupational therapy and other community health services.  It also offers consulting rooms, treatment rooms and an activities of daily living suite, rehabilitation and gym areas.A Director of DC Fire Protection, Daniel Mabbott, commented: “We have been dealing with FIREFLY for a number of years, including buying large quantities of the Titan Lite™ and Apollo Lite , which we use for commercial contracts as well as other work.  We often propose the use of FIREFLY systems to clients and in this instance, where we were simply given the performance standard the client required, we proposed the use of Titan Lite plus Apollo Horizontal to upgrade the exiting fire walls which no longer comply with current requirements.” “There were a number of plastic PVC-U soil stacks rising through the roof in what was specified as a Controlled Zone, for which FIREFLY provided us with a bespoke detail to protect them where they passed through the barriers, while we installed a couple of their FR120 Access Panels in addition to the fire doors which we fitted in a number of locations throughout the roof.  The project was completed on time and we have now moved onto another contract where we are again using a number of FIREFLY products.”Third party approved, FIREFY Apollo Horizontal 30:30 provides 30 minutes integrity and insulation to exceed the minimum requirements within the Building Regulations relating to fire barriers.  In common with other FIREFY products, Apollo Horizontal is manufactured using specially treated woven glass fibre fabric, being flexible and lightweight making it easy to install. Specifiers and specialist fire contractors wishing to find more information about the full range of products available from FIREFLY can visit www.tbafirefly.comImages shown are taken during installation and some sections of the installation might be incomplete.
Sponsored
Stables Market - Commercial Awnings

Stables Market - Commercial Awnings

Able Canopies Ltd

Adcrest Ltd. is an electrical contracting company that was working on a new refurbishment project for Stables Market in Camden, London. Stables Market was in need of a number of new awnings to provide weather protection to the entrances of their shops. They had existing awnings in place that had been there for a number of years and were no longer fit for purpose and therefore needed replacing.
Sponsored
Stannah’s NEW Microlift Evo: a Prinny-approved not-so-dumb waiter?

Stannah’s NEW Microlift Evo: a Prinny-approved not-so-dumb waiter?

Stannah Lifts

Whisking food, drink and tableware between the ground-floor dining room and lower-ground kitchen, a dumbwaiter makes life so much easier for everyone in The Charm, a plush 19th-century boutique hotel in Brighton's Kemptown. Not only does it improve service for patrons, it also protects personnel from the pressures of manual handling.
Sponsored
Silverstone Primary School

Silverstone Primary School

Twinfix Limited

In these uncertain times, as schools find their new ‘norm’, government guidelines advise schools to increase outdoor play. In response to this guidance, many schools are looking at ways to utilise their outdoor space and provide protection from the inclement British weather. Canopies, outdoor shelters and covered walkways could be a great investment for any education establishment.
Sponsored
Procheck Adapt - Montrose

Procheck Adapt - Montrose

A Proctor Group Ltd

A series of 10 newly built affordable Council houses in Montrose, Scotland has been fitted with a high-performing variable-permeability vapour control layer from the A. Proctor Group. Procheck® Adapt is designed to protect the building fabric from the potential risks of condensation and act as an effective airtight barrier.The project, led by Angus Council comprises of a mix of one, two and threebedroom properties which will be built with energy efficiency in mind, providing residents with high-quality affordable homes which will be low-cost to heat and run.Jason Noble, Architect with Angus Council commented on the requirement for a high-performance solution to achieve the desired levels of vapour control and airtightness. “We required a high performing vapour barrier and air tightness layer, that could be installed on site by our contractor and achieve our performance specification. We wanted an effective vapour barrier and airtightness layer that when installed in accordance with the manufacturer’s recommendations and in combination with the timber kit construction would provide an effective airtightness rating of 4 when tested.”Contractor, Andrew Shepherd Construction proposed the use of the Procheck Adapt available from the A. Proctor Group, who has been serving the construction industry for 50 years with an extensive portfolio of technically advanced thermal, acoustic and membrane products.Thanks to its unique design, the Procheck Adapt membrane offers variable permeability which adapts to changes in humidity levels and allows the structure to dry out in the summer and in sunny days during spring and autumn while protecting it from moisture overload in the winter. This is possible because the membrane adapts its vapour resistance to the environment i.e., vapour tight in the winter and more vapour open in the summer.This ensures that the building fabric is protected from damaging moisture levels during cold, wet winter months, and allows the fabric to dry out effectively in warmer, drier months. The introduction of Procheck Adapt will ensure that it provides a high level of protection throughout the lifespan of the properties.Procheck Adapt has a translucent structure which eases fixing to structural frames and in combination with its integral tape allows for a fast installation time. Procheck Adapt is suitable for a variety of commercial and residential applications and provides airtightness to the structure as well as vapour control.
Sponsored
The Wing, Battle of Britain Memorial - Capel-Le-Ferne, Kent

The Wing, Battle of Britain Memorial - Capel-Le-Ferne, Kent

BPD Building Product Design Ltd

The visitor centre roof has been set at 6 degrees to form an exact replica of two spitfire wings. This unique construction meant the need for superior materials, such as Protect 5000 Façade, TF200® and BarriAir, that could cope with the challenges of the design. The materials also needed to be resilient to cope with the harsh coastal conditions in the South of England.
Sponsored
Bawtry Mayflower School

Bawtry Mayflower School

Intastop Ltd

Bawtry Mayflower Primary School were experiencing a considerable amount of damage to the corners of its interior walls from everyday wear and tear. it therefore needed to find an effective way of protecting both pupils and the fabric of its building whilst retaining much of its existing colour scheme and minimising the need for ongoing maintenance work.
Sponsored
Kautex Unipart– NGFS

Kautex Unipart– NGFS

Eurosafe Solutions Ltd

"Reducing the risk of working at height is a key focus for Kautex. Providing safe access and fall protection to maintain our machinery is critical."Eurosafe Solutions provided the client with a safe method of accessing these areas, utilising both structural steelwork on the machine itself and the steel frame of the building to provide overhead Latchways ManSafe Systems and PPE Anchor Points.
Sponsored
Waterproofing to domes on Historic Building

Waterproofing to domes on Historic Building

Koster Aquatecnic Ltd

The renovation to the domes on the historic Harrods Repository was a fascinating project to have become involved in. Extensive concrete repairs were carried out using Koster corrosion protection and mortar repair materials followed by waterproofing systems installed internally and facade treatments externally on the tiled surfaces.These domes will dominate the London skyline for many years to come!
Sponsored
British Museum - Egyptian Gallery

British Museum - Egyptian Gallery

Lonsdale Patent Glazing & Rooflights

The Egyptian Gallery was the first of many projects at the Museum to benefit from a replacement duo-pitch rooflight using Lonsdale’s ThermGard Roof Light System.After having procured roof lanterns of varying quality and with disappointing results from different manufacturers, the Client was determined to establish a design that met their very high criteria for thermal performance and protection of the priceless exhibits from damaging UV light. Whilst wanting the benefits of modern aluminium systems, there was a requirement for a ‘heritage’ appearance so that any replacement roof lanterns mirrored the original timber construction. High performance solar control glass was also specified to reduce harmful UV light to the exhibits below. Solar protection was further enhanced by the fitting of external shading blinds to the overhead glazing which produce the slightly ‘eerie’ affect that can be seen in this image. Such was the success of this initial project, the Client has held Lonsdale as the benchmark by which other roof light manufacturers are measured and we repay this loyalty by ensuring a first class job every time.
Sponsored
Distribution Warehouse Heating

Distribution Warehouse Heating

Powrmatic Ltd

OverviewPowrmatic supplied a TEG41 air rotation heater for a large distribution warehouse facility in Bristol which was installed by our trusted partners at RSY Air Conditioning.Project BackgroundSupplying the motor trade for over 50 years, Apec Braking is firmly established as the leading specialist braking supplier to motor factors throughout the UK and Ireland. The 10,488 m² distribution warehouse required frost protection with design parameters of -5°c external and +10°c internal.SolutionJust one TEG41 air rotation heater was installed by our trusted partners RSY Air Conditioning. This TEG41 heater was designed to deliver an impressive 420kW of heat output. The TEG41 heater uses high volume, low velocity, air-circulation to distribute conditioned air to large open space and is the perfect solution for any distribution warehouse heating requirements. Due to the customers requirement to maximise the amount of racking within the warehouse area the distance of the unit from racking was much less than would be usually recommend (it was under 2mtrs from face of heater to face of full height racking).ResultThe newly styled Powrmatic Air rotation units in our new RAL 7015 colour were installed by RSY Air Conditioning. The unit was redesigned at the top of the unit to be top exit rather than the conventional design. The theory behind this was to direct the leaving air towards the roof and use the internal profile of the roof to aid with stratifying the air across the building length. The racked distribution warehouse will now benefit from a frost protection system which will protect the internal sprinkler system from freezing in the colder months.
Sponsored
Novotel Hotel, NineB Restaurant – Leicester

Novotel Hotel, NineB Restaurant – Leicester

Roché Systems Ltd

THE CLIENTThe Novotel Leicester is a modern hotel in the heart of the city, convenient for business or leisure guests. The hotel boasts easy access to many of Leicester most exciting attractions, close to the Leicester Tigers Stadium and King Power Stadium, the National Space Centre and The Curve Theatre. THE CHALLENGETo provide shading to expand their outdoor dining area for the NINEB Restaurant, as well as added brand visibility with the addition of sign writing on the awning and side blindsTHE SOLUTIONThe Markilux Pergola was chosen for the frame and roof, with the addition of Markilux 790 side blinds to offer additional wind protection, partitioning and brand awareness.Markilux PergolaThe Markilux Pergola awning shelters large areas from the sun. Two slender support posts at the front provide excellent stability, even during showers, and unobtrusive lateral guide tracks. The pitch of Markilux Pergola is easily adjustedMade to measure and manufactured in GermanyRated for wind speeds up to 30mph (Beaufort 6)Water resistant, dirt proof, non fading acrylic fabric with UPF 50+ sun protection4 frame colours and hundreds of fabrics choices as standardChoice of electric or remote control operationExtended product and workmanship guarantee availableMarkilux 790The Markilux 790 is simple to operate and has a compact cassette which fits to the wall vertically. It extends manually and fixes to a freestanding post or bracket fixture on a fence railing.Made to measure and manufactured in GermanyWater resistant, dirt proof, non fading acrylic fabric with UPF 50+ sun protection4 frame colours and hundreds of fabrics choices as standardExtended product and workmanship guarantee available
Sponsored
Remediation Project at Horizons Assisted Living, Poole

Remediation Project at Horizons Assisted Living, Poole

AliDeck

The contractor for the project, Spetisbury Construction, replaced the existing composite decking boards with our non-combustible aluminium decking. The decking boards specified for this project were our ridged Senior Board, chosen for its strength and stability, but also for its excellent slip resistance. This was an important feature to help protect the elderly residents from falls in wet weather.
Sponsored
Teesbay Retail Park, Hartlepool (2015)

Teesbay Retail Park, Hartlepool (2015)

Artform Urban Furniture Limited

Teesbay is an out of town retail park in Hartlepool. A safe environment was required for pedestrians walking around the site, and cycle parking was needed to visitors and employees. Artform provided Corten steel bollards and cycle stands to compliment the facades of the existing shops and eateries. The products chosen provided a coordinated finish, durability and ultimate protection which matched the clients needs.
Sponsored
Historic Bridge Restoration - Bervie Jubilee Bridge, Scotland

Historic Bridge Restoration - Bervie Jubilee Bridge, Scotland

C-Probe Systems

Jubilee Bridge was constructed in 1977 - chloride contamination was causing corrosion of the suspended and cantilever reinforced concrete support beams, half-joint elements and the soffits of the beamsICCP was used to protect cantilever beams, half-joints and suspended slab elements. Over 8,500 anodes were drilled in and are controlled in 20 zones with separate control of the beams and the half-joints.
Sponsored
MEDITE® TRICOYA® EXTREME stands up to the elements of the Lake District

MEDITE® TRICOYA® EXTREME stands up to the elements of the Lake District

MEDITE SMARTPLY

In order to protect budding hikers, climbers and visitors to the area, Coniston Mountain Rescue has been patrolling the territory for over 70 years. Pivotal to their job is the ability to store lifesaving equipment, such as stretchers, warm clothes and ropes, in the mountainous region, which is why they have constructed their iconic blue boxes throughout the region,with MEDITE® TRICOYA® EXTREME.
Sponsored
St John's Beaumont School

St John's Beaumont School

DYNAMIK Sports Flooring

The Sports Hall was built to replace the former gymnasium originally designed by John Francis Bentley, the architect of Westminster Cathedral in 1888. Although the primary function of the hall is for sporting activities, the school needed a hall for exams, general assemblies, presentations, parents' evenings and plays. So DYNAMIK installed several methods to protect the floor when not being used for sport.
Sponsored
Student Accommodation, Coventry

Student Accommodation, Coventry

Nullifire – a brand of Tremco CPG UK Ltd

To comply with passive fire protection requirements, Nullifire worked with trusted contactor Protek Interiors to install both SC602 Intumescent Base Coat (On-Site) and SC802 Water Based Intumescent Base Coat (On-Site) to this 2500m2 project. The combination of these projects worked well given the challenging circumstances and allowed for Protek Interiors to fully adhere to the fire strategy of the building.
Sponsored
The Seed

The Seed

Russwood Ltd

The Seed is a blueprint for sustainable construction. This new build home used next to no concrete, is insulated with recycled paper, was built around a tree and root protection plan, and incorporates a plan for deconstruction and reuse at the end of its life. Our timber products were another key sustainable element that was carefully specified by the architect, and they are used inside and out for cladding, decking and flooring.
Sponsored
Playground & Decorative Railing - Lost Kingdom, Paultons Park

Playground & Decorative Railing - Lost Kingdom, Paultons Park

IAE

Paultons Park expands with new Dinosaur-Themed Adventure ParkAs part of an expansion project, Paultons Park located in The New Forest, Hampshire, added a new dinosaur-themed adventure park called ‘Lost Kingdom’.The development includes two world-class roller coasters, Jurassic-themed family rides, and adventure play parks and playgrounds.IAE Fencing was approached by the development contractor to supply decorative railings around the playgrounds and along the roller coaster and family rides queueing paths to increase safety and manage the visitor foot traffic.IAE Playspec Playground FencingAround the playgrounds, IAE recommended IAE Playspec Playground Fencing. This is a BS EN 1176 Playground Equipment and RoSPA compliant metal railing system designed to clearly demarcate play areas, and be safe for children. It has no pointy edges or trap or pinch points, to minimise the chase of injury.Access to the play areas was provided by IAE’s Prosafe Playground Gate. This is a speed controlled self closing unit complying with the same safety specifications as the Playspec Playground Fence.To complete the look the railing was colour-matched to the theme of the park, as shown in the images above.IAE Blore Ball Top RailingsFor the railing along the roller coaster ride paths, the contractor chose IAE Blore Ball Top Railings. This system provided an elegant solution to managing the queues and keeping park visitors away from potentially hazardous areas under the roller coasters. It was finished off with an eye-catching alternating colour finish.IAE Duex Edge ProtectionA section of IAE Duex Edge Protection was also supplied to guard against a steep drop falling away from a path that ran alongside a visitor area. This system has been load tested up to 1.5kN/m and specified as suitably robust for the application, providing the necessary safety factor, without being too intrusive on the overall look of the park.Specifying IAE’s Playspec Fencing, Blore Railing, and Duex Edge ProtectionIAE's Playspec Playground Fencing, Blore Ball Top Railings, and Duex Edge Protection are all popular systems installed on hundreds of sites across the country and can be specified with confidence. For further details on the systems and to specify them on your project, check out the featured products sections below, or contact IAE Fencing Division directly.
Sponsored
Fingersafe door safety at home

Fingersafe door safety at home

Fingersafe® Group

We recently received this review from a customer who had enquired about finger safety guards for her home. We were more than happy to advise and help prevent this kind of awful accident happening in her house again.“I first saw the Fingersafe door guard at my son’s specialist school in the office after he stuck his finger in the bathroom door at home and broke it. In a panic being told there was a 4-5 hour wait for an ambulance I went straight to school where he was bandaged up properly but advised to go hospital. My 7 year old attends a SEMH provision and has autism and no sense of danger. The fact his school has these guards I knew who to call after we returned from hospital. I only wish I had bought them sooner.  I made 1 phone call and sent some snaps in and now my house is Fingersafe protected on every door including 2 bedrooms, bathroom, kitchen, living room and the garden door. Whatever the door Fingersafe have the right guard for you. The service I had from my initial telephone was reassuring and incredible. This company took away all my worries and concerns and genuinely felt my pain. I couldn’t recommend Fingersafe highly enough. Personally, these guards should be in every home whether you have a SEN child or not. Until my son broke his finger, I never knew how unsafe my doors were. Delivery was next day. I have included some pics of the products too. Thank you to Gina and Sue. Fingersafe went above and beyond to prevent future accidents”The finger safety guards products we recommended for her home can be found across our website and included the MK1A Fingersafe® MK1A | Buy Now | Door Finger Protection | Fingersafe UK (fingersafegroup.com) and the MK1B FINGERSAFE® MK1B | Fingersafe Door Protection | (fingersafegroup.com) both as shown fitted onto her doors in the photographs.Also, as we have various colours available of all our Fingersafe products, we were able to supply the MK1C in different colours to match her external uPVC doors too FINGERSAFE® MK1C | Shop Now | Fingersafe Door Protection Products (fingersafegroup.com)

Showing 361-396 of 1018

Feedback