NBS Source
I'm a manufacturer

"basins and sinks vanity units"

3,783 results found

Sort by:

Showing 325-360 of 465

Sponsored
RVH Maternity Hospital Belfast

RVH Maternity Hospital Belfast

Spanwall Facades Ltd

Cladding of the newly constructed RVH maternity unit in Belfast, using Spanwall’s own RF50 Rainscreen system the new Maternity unit will be clad with a combination of 2mm Corten Steel and 1mm zinc
Sponsored
Pendock cleans up with washroom range

Pendock cleans up with washroom range

Pendock

Cubicle and washroom systems from Telford based casing and enclosure specialist, Pendock, provide a comprehensive range of solutions to meet most specifications and requirements for single or multi-cubicle installations, as well as IP panels systems.Originally launched in 2005, the range was later extended with the addition of lockers and changing room products, which together with regular colour and finishes updates, has led to their use in a range of sectors, including education, retail, health, leisure and public buildings.Five systems are available under the Pendock Washroom brand, which include the Classic; Classic Plus; Robust; Ultimate and Education – as well as modular IPS panels and bespoke solutions.The Classic range is manufactured from 18mm thick MFC (melamine faced chipboard) and is designed for use where economy and simplicity are key factors, while the Classic Plus uses the same core, but is faced with high pressure laminate. Both models are edged with 2mm PVC.Designed for high traffic and wet areas, including high humidity zones, Robust cubicles are produced from 12mm compact laminate (CL), which provides high durability, excellent value and design flexibility to meet the demands of most washroom projects.Pendock’s Ultimate cubicles are also manufactured from 12mm CL with a radiused edge. The range provides an exceptionally wide choice of options and can be specified with any finish or colour combination to meet exact interior design or project requirements.The dedicated Education range covers washrooms from nursery through to further education and are available in 18mm MFC or HPL, as well as 12mm CL in a range of colours and finishes including special options for early years and schools through all key stages.For complete design versatility, every aspect the IP panel system and bespoke washroom range can be specified, including the core material, finish colours, graphics, panels and door sizes, as well as pilasters and ironmongery.Vanity units, back panels and accessories are also available across the range, alongside DDA and Approved Document M compliant options, allowing specifiers to maintain design consistency and integrity, whilst providing high levels of versatility and cost-effectiveness.
Sponsored
Logistic Warehouse Heating

Logistic Warehouse Heating

Powrmatic Ltd

OverviewPowrmatic was selected to supply a frost protection warehouse heating solution for a massive 81,000m² building at Plot 2 at the Midland Logistic Park installed by Phase Mechanical Projects. a combination of 7 TE61 heating units and TE61 Destratifcation units were installed.Project BackgroundThe 81,000m² industrial logistic warehouse required frost protection with design parameters of -5°c external and +5°c internal.SolutionOne of our largest installations to date, 4 x TEG61 air rotation heaters were installed by our trusted partners Phase Mechanical Projects. Each TEG61 heaters boasts an impressive 525kW of heat output and were installed alongside 3 x TE61 destratification units to assist with the air turnover due to the size of the building. The 4 TEG61 heater units selected were designed to move 39m3/s of air around the building per unit, and when combined with 3 TE61 destratification units also at 39m3/s this gave a total air volume of 270m3/s which achieved the required 0.8 air movements per hour from the end client.ResultThe newly styled Powrmatic Air rotation units in our new RAL 7015 colour were installed expertly by Phase Mechanical Projects. The racked logistic warehouse will now benefit from a frost protection system which will protect the internal sprinkler system from freezing in the colder months. Each T.E manufactured at Powrmatic is custom built to specific project requirements.
Sponsored
The London Fruit & Wool Exchange

The London Fruit & Wool Exchange

FLOCONTROL LTD

Showcases our capability to supply large scale projects with a mix of product for Fan Coil Units and Air Handling Units and and to liaise with third parties (FCU manufacturers), to meet complex call off schedule deadlines.
Sponsored
Chapters House

Chapters House

Bushboard Washroom Systems Ltd

Ogura Ward is one of 6 wards that makes up Chapters House, the mental health facility in Goodmayes Hospital, Ilford. Bushboard supplied high risk healthcare units – healthcare boxed out units with a rigid aluminium frame and panel system – specifically designed for safe ensuites and communal wet rooms in a high security environment. Anti-ligature sanitaryware, crafted from high impact resistant, anti-shatter moulded resin, was pre-plumbed to the units ensuring the safest possible environment.
Sponsored
Southampton NHS Press Release

Southampton NHS Press Release

Tarkett

Tarkett chosen for NHS teenage cancer unit - The unit at Southampton General NHS Hospital was funded by the Teenage Cancer Trust and designed to create a space as comfortable as possible. Featuring six en-suite bedrooms, a four bed day unit, social space and support facilities. The bright and engaging décor of the centre was created using a variety of Tarkett flooring. The Tarkett flooring used included iQ Optima in Yellow, Medium Blue and Green, iQ Eminent in Turquoise and Acczent Excellence 80 in Bamboo.
Sponsored
Washroom solution for Fastlight Ltd

Washroom solution for Fastlight Ltd

KWC DVS Limited

Fastlight Direct have undergone a refurbishment of their washrooms and chose Franke Water Systems as one of the chosen washroom manufacturers. Products provided included:2 x ANMW411 single Quadro Miranit Washbasins1 x ANMW421 double Quadro Miranit Washbasin 4 x F3SV1001 self-closing tapsMaintaining a high standard of hygiene is a key element to consider when specifying any washroom project. Franke’s Miranit composite wash basins are seamlessly moulded in Miranit, an advanced resin and granite composite material with a gelcoat layer, providing a non-porous, robust and hygienic finish. Miranit is several times stronger than ceramic, highly impact-resistant and virtually shatter-proof, making it ideal for busy washroom environments. The F3S self-closing taps are perfect for reducing water consumption with its proven piston-free self-closing water control. These highly durable self-closing F3 taps have been tried and tested over a million times, ensuring a long-lasting solution. The push cap is light and easy to use, with adjustable flow stop time for a one push operation.
Sponsored
Water-Saving Washroom Solutions for Staffordshire Children’s Charity

Water-Saving Washroom Solutions for Staffordshire Children’s Charity

Thomas Dudley

Cauldwell International Children’s School is an £18 million purpose-built complex and the first of its kind in the UK, a national charity based in Staffordshire dedicated to improving the lives of disabled children.A modern but cost-effective solution was required by the client for their new washroom facilities. Due to this being a charitable organisation, there were budget constraints. Products offered by our competitors were too costly. Water saving was also an important factor to consider.Discussions took place with our product, design and specifications teams to fully understand the project. With the clients’ requirements in mind, we presented various options for review. We provided a sample of our stainless steel infra-red basin curved taps. The touch-free modern design was favourable and the sample was approved.Testimonial“We were thrilled with the approach the TYDE professionals took. They considered all of our pain points. Cost restraints made it more difficult but TYDE offer such a broad range of products, they were able to offer us a solution and we didn’t have to compromise on quality. We love the design and the integrated water-saving technology is a big bonus!”
Sponsored
Top Grades To GEC Anderson In Cookery School Kitchen

Top Grades To GEC Anderson In Cookery School Kitchen

Anderson, GEC Ltd

GEC Anderson stainless steel worktops were included in a recent Cornwall kitchen refurbishment, designed and installed by George Robinson Kitchens who produce hand crafted, bespoke kitchens, near Penzance. For homeowners, Mr. & Mrs. Bull, the choice of materials was pivotal to the design of their home kitchen, particularly, as their long-term plan is to use the space as a cookery school. Stainless steel was therefore a key element and was chosen not only for its visual properties and low lifetime cost but also for its ability to withstand heavy usage, to be heat resistant and to remain germ-free. From a visual perspective, the work surfaces make up a significant proportion of the colour and texture in the room. In this Georgian property in Cornwall, the materials and textures chosen make for an eclectic yet functional space. The inherent durability and unsurpassed hygienic properties of the brushed stainless steel elements from GEC Anderson will make it perform extremely well as a professional kitchen. The Tulip wood and Oak wood with its different painted finishes together with the white Silestone quartz top on the central island top provides a striking contrast to the stainless steel in one corner, giving a light and pleasant, contemporary, feel.The L-shaped brushed satin stainless steel worktop and integral sink is made to measure and benefits from being manufactured in one continuous piece thus maximising the use of space in the corner in which it is situated. Furthermore, with no joins at the sink bowl, edges and upstands, the surface remains germ free as well as being free of visual clutter and noise. One side of the L-shape includes a generously sized (500x400mm) single bowl and draining area, whilst the other, provides useful and practical work surface. A 100mm high, integral, back upstand was also specified, providing a neat, practical and watertight junction to walls.Owner Dr Matt Bull says, “My wife and I liked the toughness of the stainless steel and the fact that it can take hot and cold, doesn't stain, reflects light and provides an hygienic surface that is easy to clean. Stainless steel also gains character as it ages, where many surfaces will deteriorate, so that’s a real bonus.” He added, “We struggled to find anyone locally who could manufacture the stainless steel elements of the kitchen to a sufficiently high standard. The neatness of the welding and the configuration of the shape, drainer recess etc. were key to what GEC Anderson could offer.”GEC Anderson stainless steel worktops are supplied fully sound deadened, plastic protected 
Sponsored
Spike Island

Spike Island

Anderson, GEC Ltd

Studio facilities for a community of hardworking contemporary artists need to be durable and easy to maintain yet aesthetically pleasing, so architects Caruso St John specified made-to-measure stainless steel sinktops from GEC Anderson as part of the £2.25 million redevelopment of the Spike Island art complex on Bristol’s harbourside. GEC Anderson stainless steel sinktops were also specified for the IT suite tea-point, artists’ and visitors’ toilets and baby-change areas. Spike Island, a former tea packing warehouse, has housed local artists’ studios since the 1990s when it replaced the earlier Artspace venture. It has grown to become a national centre for the research and development of contemporary visual arts – including painting, sculpture and print-making – with 70 affordable long-let studios and a series of spaces for more commercial cultural industries, such as design studios. The redevelopment, just completed, includes a welcoming entrance, while the new café is Spike Island’s first shared social space. In addition, studio spaces have been improved and the vast exhibition galleries are among the UK’s most impressive. Caruso St John project architect Rod Heyes says: “When it came to specifying the big washing out sinks, we needed something reliable that would still clean up and look good after the artists had poured plaster, paint and various chemicals over them. We have used GEC Anderson products on several other projects and they are our default supplier for stainless steel. We are impressed by the quality of their products as well as their design detailing.”GEC Anderson Managing Director Martin Tye says “Quality stainless steel is a highly versatile material that can be deployed very effectively in applications across the spectrum from workshops to designer kitchens. Stainless steel is also ultimately durable and hygienic. “Spike Island may prove to be one of the tougher environments for GEC Anderson sinks, but with a modest amount of care these sinktops will still perform well and look good after many years.”With creativity uppermost in the minds of Spike Island’s tenants, their surrounding facilities and those also provided for the visiting public were selected for functionality, aesthetics and durability. The Spike Island specification includes made-to-measure stainless steel sinktops all with integrally welded bowls. Within the metal work space, extra large Le70 (700 x 500 x 300mm) bowls, were specified. The baby-change area includes an 800mm wide surface. All sinktops are made from satin finish domestic grade stainless steel.
Sponsored
Industrial stair system - Wolfson Building, University of Glasgow

Industrial stair system - Wolfson Building, University of Glasgow

Safety Fabrications Limited

The Ascent stair unit - Industrial stair system was specified to create a safe means of access over roof mounted mechanical and electrical plant and equipment. The roof area is tightly packed with Air conditioning plant creating a unique challenge to design a safe means of access across it. The Ascent step over / stair unit is able to accommodate spans up to 4.5m and was able to be utilised to create a safe access route. The step over unit is supported on rubber spreader feet which provide a non-penetrative support solution on the flat single ply membrane roof. The stair unit is designed in accordance with BS EN ISO 14122-1:2001 + A1:2010 and Building Reg Part K:2013 and manufactured following 1090 factory production control procedures.
Sponsored
Warm tones and clean lines for bathroom with Altro Walls ShowerKit

Warm tones and clean lines for bathroom with Altro Walls ShowerKit

Altro

IssueA 15-year-old bathroom in a housing development was looking tired and dated and the owner wanted to refresh the area with minimal disruption in a quick timescale. The bathroom had three walls of ceramic tiles, and a sink splashback, which were in good condition but were unfashionable and required high levels of maintenance to remove limescale and mould.The property, a first floor flat, had easy access but no lift, so equipment, materials and any waste needed to be carried up and down the stairs.Approach“We wanted to replace the ceramic tiles, without having to re-plaster the bathroom walls which would mean a complete renovation and redecoration project,” said Helen Green, the owner. “We live in an area with hard water and limescale is a real problem so a wall that is easy to keep clean would be ideal.”SolutionAfter liaising with Altro customer services, the new Altro Walls ShowerKit was recommended as being the ideal solution as the wall panels can be installed over existing ceramic tiles and provides ease of maintenance for residents. There is also no requirement for construction materials or heavy equipment as Altro Walls ShowerKit is lighter to transport than ceramic tiles.
Sponsored
Splashbacks, Hampstead

Splashbacks, Hampstead

Anderson, GEC Ltd

Stainless steel splashbacks, by GEC Anderson, were recently deployed in an apartment kitchen, overlooking London’s Hampstead Heath. The specification was a little challenging due to the shape and size of the required pieces. In particular, the curved corner within the kitchen gave the project very much a one-off feel. Rather than merely being an internal feature, the curve follows the outer form of the brick building.The subtle blend of colours exudes calmness but does not appear cold. This is probably due to the lighting as well as the contrasting colours in the adjacent spaces, notably, the red bench seating but also the dark bookshelf that also follows the curvature of the room.The stainless steel splashbacks were made to measure, to precisely suit the design and requirements and were produced in GEC Anderson’s standard brushed satin finish. Measuring and installation was also undertaken by GEC Anderson.GEC Anderson (founded in 1962) specialise in purpose made stainless steel sinks, worktops, cabinets, shelving and splahsbacks. Their products have been specified in a great number and variety of projects, ranging from residential kitchens to commercial and public spaces, including health, education, infrastructure, retail, offices and the arts.
Sponsored
70 ST MARY AXE (Can of Ham)

70 ST MARY AXE (Can of Ham)

Ambar Kelly Ltd

Mace Group purchased the units directly and free-issued them to the steel frame contractor, VBH JV (a joint venture ofHollandia and Victor Buyck). Some of the units were 7m x 1.5m wide which Ambar Kelly designed to incorporate horizontal fire protection and drylined fire walls as part of the RiserSafe® system. This allowed for a group of shafts, or openings, to be combined into one unit, which reduced the number of trimmer steels and concrete beams required for walls, thereby reducing crane lifts and construction time. (Courtesy of James Reid Photography.
Sponsored
New Facebook Data Centre. Ireland

New Facebook Data Centre. Ireland

Flexi Support Systems at DiversiTech International Ltd

Products: Flexi heavy – Modular Frameworks & Flexi Access – Bespoke access platforms. Services: Air-handling units & associated access requirements. Roof build-up: Warm roof design – PIR/PUR insulation with PVC/TPO field membrane. Pump House were proud to have been chosen as the preferred supplier of building services support systems to the project, with support frames required to fourteen rooftop air-handling units. Each framework was also accompanied by a bespoke access platform to one longitudinal side of the air-handling units for maintenance purposes.
Sponsored
Industrial stair system - Edinburgh Airport

Industrial stair system - Edinburgh Airport

Safety Fabrications Limited

The Ascent Up and Over step unit / Industrial stair system was specified to create a safe means of access up & over items of mechanical plant & equipment to the roof of the airport terminal building. The Industrial stair unit is supported on rubber spreader feet which provide a non-penetrative support solution on the flat single ply membrane roof. The stair unit is designed in accordance with BS EN ISO 14122-1:2001 + A1:2010 and Building Reg Part K:2013 and manufactured following 1090 factory production control procedures.
Sponsored
Tottenham Hotspur Football Club

Tottenham Hotspur Football Club

Steintec

An extensive hard landscape setting for the new Tottenham Hotspur Football Club stadium. The large 11,000 m2 paved area has been constructed in a combination of granite and concrete block paving units. Although the area is mainly pedestrian the brief required that the units be completely and permanently bonded into position. This was achieved using Steintec tuffbond in combination with tuffbed 2-pack Type 35 bedding mortar to achieve a minimum 2MPa adhesion between the paving units and the supporting layers. Steintec tufftop Type 40 jointing mortar was used to complete the installation.
Sponsored
Circonomy Cycle Shelter - Severn Beach, Avonmouth

Circonomy Cycle Shelter - Severn Beach, Avonmouth

IAE

Cycle storage for new industrial units and office spaceAs part of a new development near Bristol, which included 4 new industrial units set for various uses, IAE Shelter Division supplied a series of Circonomy Cycle Shelters to provide dry and secure cycle storage, with the aim of encouraging more cycle use on the daily commute.The industrial units varied in size and included manufacturing, warehousing, and office space.As the units varied in size, each unit required a different number of cycle spaces. This is both for practical purposes, and to ensure the development meets BREEAM guidelines, which require a certain amount of dry, secure cycle storage spaces, depending on the number of people occupying the building, and the size of the building.Extendable Modular DesignThe Circonomy Cycle Shelters modular design meant it was ideal to meet these requirements. An individual Circonomy Cycle shelter fits 5 cycle hoops and is suitable to securely store 10 bicycles. Extensions can be added to the end of the shelter to increase capacity as needed. Individual shelter units, cycle hoops and extensions are all available from stock at IAE Shelters.The modular design meant the same style of shelter could be used across all the different sized units on the development to provide a consistent look across the site.Low Impact StylingBREEAM guidelines also state that the cycle storage has to be in a prominent, easy to access location to encourage cycle use, and not hidden around the back of the unit to hide it from site.The low impact styling of the Cicrconomy Cycle Shelter provides an unobtrusive look and means the shelter can be easily dropped into a site layout without concerns about it affecting the overall look of the project.To finish the design, the galvanised frames were powder coated anthracite grey to give a contemporary look.Specifying IAE SheltersThe Circonomy Cycle Shelter is IAE's most popular shelter, with hundreds installed around the country. To add the shelter to your project check out the featured products section below, or contact IAE Shelters directly.
Sponsored
ARM (The Global Technology Company) Peterhouse Technology Park. Cambridge.

ARM (The Global Technology Company) Peterhouse Technology Park. Cambridge.

Flexi Support Systems at DiversiTech International Ltd

Products: Flexi heavy – Modular Frameworks Services: Air-handling units. Roof build-up: Warm roof design – PIR/PUR insulation with bituminous felt membrane. The air-handling unit support frames were supplied via a wholesaler in Hampshire to the building services engineers working on site. There were four large air-handling units to support in total, all circa 6000kg in weight each. All our frameworks were designed to manage the imposed loads of the AHU sections being supported, to ensure uniform load distribution through the frame feet was achieved.
Sponsored
Monkwearmouth Hospital - Sunderland

Monkwearmouth Hospital - Sunderland

Johnstone's Trade Paints - a brand of PPG Industries

Products from Johnstone’s Trade’s portfolio have created a lasting impression on patients at a state-of-the-art, 24-bed dementia unit in Sunderland. Helping a Gateshead-based decorating contractor win a prestigious Johnstone’s Painter of the Year Award. Thousands of litres of Johnstone’s Covaplus Vinyl Matt, Premium Contract Matt and Acrylic Eggshell were used throughout the unit by the decorators during a tight four-month timescale. The paint was used on corridors, offices, washrooms, stairwells, lounges, dining areas and doors throughout the unit, all of which now boast bold, fresh looks.
Sponsored
Warm and quiet accommodation for the upholders of the law at Gray’s Inn

Warm and quiet accommodation for the upholders of the law at Gray’s Inn

Selectaglaze Ltd

Working with the estates team at Gray’s Inn, one of the four Inns of Court in London, Selectaglaze installed secondary glazing for thermal and noise insulation at Gray’s Inn’s Holborn estate in 1999. 65 windows were treated with large Series 60 tilt-in vertical sliders. In 2017, 40 units were installed; a mixture of Series 10 horizontal sliding units and Series 20 vertical sliding units were installed. The Inn’s Tim Bell comments;“Having worked with Selectaglaze for a number of years, their secondary glazing is of high quality and definitely raises the thermal and noise insulation of the original glazing”
Sponsored
Newport School

Newport School

Excelsior Panelling Systems Ltd

The Project New two storey Sixth Form facility to house teaching, exhibition and social learning spaces.The facility is intended for use by the school and the local community & hoped to be a hive for activity in the local area.  The Challenge Propose and deliver a system suitable for a heavy use environment whilst also offering a commercial style space expected by the wider public.  Durability, ease of cleaning and maintenance are key drivers in the decision process as these areas will be used for extended periods and by a diverse sector.  The washrooms are likely be used by all visitors and it is paramount that the facilities compliment the building and impress the user. The SolutionExcelsior Flush 30 Cubicles with Stainless Steel Ironmongery create an opulent seamless wall within the washroom space Solid Surface bespoke vanity troughs with full height mirrors above open up the space and add a commercial fit out touch.Wall panelling has been included to completement the systems and enclose the WC working mechanisms whilst providing ease of access to the onsite maintenance teams.The project was managed by the contracts team at excelsior and delivered to an extremely high standard by our trusted team of fitters.
Sponsored
Dukes Court washroom refurbishment

Dukes Court washroom refurbishment

Ecoprod Technique

Ecoprod recently undertook a complete refurbishment of the washrooms at Dukes Court – 220,000 sq ft of premium office space in central Woking. The project started in January 2020 and handover was July 2020, somewhat later than expected due to the effect of the Covid 19 lockdown in Spring 2020.This project was delivered in collaboration with Designer Contracts Interiors UK Ltd who managed the flooring, walls, ceilings, doors, lighting, tiling, decorating and mirrors. Ecoprod supplied and managed the installation of the cubicles and IPS systems, all mechanical works, and the sanitaryware schedule and equipment.Cubicle and IPS systems – Petrus range by Formwise and Abet Laminati finish in Grey Zebrano5 WCs – Siamp Samoa Deluxe3 waterless urinals – URIMAT Ceramic Compact C22 URIMAT ESG urinal privacy dividers5 miscea LIGHT taps2 Tristone pure white wash troughs2 URIMAT Favorit hand dryers1 Mitsubishi Smart hand dryer1 Bespoke shower enclosure by Mega Glass1 Triton 80i shower setAccessible toilet – WC and handrail set by Disabled Toilets, basin by Conti +, tap Ultra by Conti+
Sponsored
Canaletto residential tower

Canaletto residential tower

Schöck Ltd

The Canaletto residential tower at 257 City Road in London is located halfway between Old Street and Angel Stations in Islington, alongside the regenerated City Road Basin. It comprises a 31-storey tower with 190 luxury one, two and three bedroom apartments built to the standards of Code 4 Sustainable Homes Level 4.The tower is concrete frame and has a curving facade of metal and glass that breaks the volume into a series of three-to-four storey clusters. In turn, each cluster contains grouped balcony terraces, which are a striking feature of the building. The balconies are of steel construction connected to the concrete frame and as always with cantilever construction elements of this nature, one of the early design considerations had to be the prevention of thermal bridging.For the high specification Canaletto project the Schöck Isokorb® T type SK offers the ideal solution. It is a concrete-to-steel connectivity module that sits between the outer and inner structural connection points and blocks the outflow of heat through the use of high quality polystyrene insulation foam. The Isokorb® T type SK provides a clean and unobtrusive connection detail, minimises on-site assembly time and enables a high level of prefabrication.
Sponsored
Water-Saving WC's for Windsor Castle

Water-Saving WC's for Windsor Castle

Thomas Dudley

We were approached by engineering and construction company Planet Construction to help with a project at Windsor Castle.Our experts met the professionals at Planet Construction on-site to gain a deeper understanding of what was required. The toilets located in the St George's area needed upgrading. The facilities needed to be robust yet stylish and in keeping with the fixtures and fittings. It became clear that the cisterns required weren't a standard size so further investigations were needed to ensure the correct products were installed.After discussions, our specifications team suggested the Dudley Electroflo range encompassing infra-red WC flushing and basin taps. This range was specifically developed to save water and maintain hygiene. A trial took place to ensure the bespoke cisterns wouldn't present any problems before the full installation was carried out. The Electroflo products are also easy to service, saving both time and money on-site which was another important factor.Testimonial“We wanted to use a supplier who had a good reputation for providing quality products with great service. The facilities needed to be upgraded and hygiene was an important factor so the touch-free infra-red technology was ideal and the modern design was very complimentary. Installation was simple with no issues at all.”
Sponsored
Bitterne Park School, Southampton.

Bitterne Park School, Southampton.

Flexi Support Systems at DiversiTech International Ltd

Products: Flexi Everyday – H Frame Kits and Flexi-Feet, Flexi Light – Base & Extender frames, Flexi heavy – Modular Frameworks & Custom Frame Services: Cable trays, Ducts, A/C Splits & Air-handling units. Roof build-up: Warm roof design – PIR/PUR insulation with PVC/TPO field membrane. An assortment of products was required to support various services such as cable trays, ductwork, condensers and air-handling units. In addition, due to one of the air-handling units being extremely wider than usual, we also had to manufacture a bespoke custom framework for this item.
Sponsored
Retail Store, Sheffield.

Retail Store, Sheffield.

Flexi Support Systems at DiversiTech International Ltd

Products: Flexi light, Flexi heavy & Flexi access. Services: Plantroom, Generator, Air-handling units, VRF condensers and bespoke access solutions. Roof build-up: Inverted roof design. The mechanical services contractor on the project, had a number of different heavy building services that required supporting. This included a 6000kg plantroom, 6000kg generator, two 4500kg air-handling units and a 1150kg air-handling unit. Utilising our Flexi-Heavy Duty range of supports, we designed and calculated individual frameworks for each item of plant, paying particular attention to ensuring that the correct load management through our frames.
Sponsored
Premium Plus roller blinds in 8ème Art

Premium Plus roller blinds in 8ème Art

Bandalux Industrial SA

The project is located in a strategic and symbolic place in Marseille. It is close to representative buildings such as the Unité d'Habitation, designed by Le Corbusier.It has 676 housing units, 90 units for elderly people and the Renault concession with its garage and offices.Our Premium Plus roller shades are crank-operated and have double brackets to reduce the space between each system.Polyscreen® 365 fabric fits perfectly with the system, providing thermal efficiency and visual comfort as well as aesthetic value. Also, our products helped achieve HQE Certification for offices and services.Pyramides d’Argent, 1st prize in the “Directional building” category. (2019)
Sponsored
GEC Anderson Stainless Steel Is Salt Of The Earth

GEC Anderson Stainless Steel Is Salt Of The Earth

Anderson, GEC Ltd

The Old Saltings has been created on the middle floor of a nineteenth century saltings, situated right on the beach at Porthmeor in St Ives, Cornwall. What was once a place where pilchards would have been packed and salted, has now been dramatically transformed into a stunning contemporary apartment sleeping up to 8 guests.The spacious kitchen has been designed to make the most of the sea views as well as top of the range appliances and fittings. The brushed-satin stainless steel sinktop from GEC Anderson further enhances the light and contemporary living space. Practical, twin sink bowls are seamlessly integrated within the continuous stainless steel worktop-run that also includes an integrated hob. The back upstand provides water safe and hygienic detailing that is typically demanded by discerning and knowledgeable specifiers.Architect Cany Ash of Ash Sakula said, “The GEC Anderson stainless steel worktop provided edge detailing and a finish which was better than the usual alternatives normally associated with catering applications. We especially like the jointless, continuous nature of the surface area. The other benefit of stainless steel is that it is hard wearing, which is very important in a holiday apartment where it will get significant use.
Sponsored
Lady Godiva’s medieval legacies enhanced with Selectaglaze secondary glazing

Lady Godiva’s medieval legacies enhanced with Selectaglaze secondary glazing

Selectaglaze Ltd

The newly renovated Grade II* Listed 3-5 Priory Row are a collection of stunning cottages which date back to the 15th Century. As part of the works, Selectaglaze were sub-contracted to manufacture and install the secondary glazing units for thermal and acoustic insulation.38 units were produced from across the slimline range of secondary glazing; Series 10 – 2 and 3 pane sliders were used for the smaller windows and 4 pane horizontal sliding units for those spanning just shy of 2 metres. Series 45 hinged casements were installed, a couple of which were glazed with satinovo glass to provide privacy.
Sponsored
Three Brewers Court, Cardiff

Three Brewers Court, Cardiff

Cellecta Ltd

Three Brewers Court consists of two connecting blocks of 4 and 5 storeys of affordable housing units within a sustainable brownfield location. These units consist of 10 two-bedroom apartments and 40 one-bedroom dwellings. The scheme also includes a commercial unit, car parking, bike store and outdoor communal space. Previously occupied by a car sales garage and the Three Brewers pub, these establishments were demolished for this new apartment block. After Wales and West Housing Association’s partner Jehu Group announced it was going into administration, they reached out to Hale Construction to complete the project.Cellecta’s ScreedBoard 30 was specified by Pentan Architects due to its composite acoustic overlay treatment specifically for concrete separating floors. The board’s high density and superior compressive strength resilient layer provides outstanding acoustic performance and an ideal base to accept a multitude of floor finishes.Hale Construction was supplied 3,287m² of Cellecta products to develop these units in Penylan.
Sponsored
Shoreline - Folkestone

Shoreline - Folkestone

DAD - DECAYEUX

RImex letterboxes unit with printing on the doors
Sponsored
Consort Claudgen’s Wi-Fi Enabled Heaters Upgrade for Cambridge School of Visual & Performing Arts (CSVPA) Student Accommodation

Consort Claudgen’s Wi-Fi Enabled Heaters Upgrade for Cambridge School of Visual & Performing Arts (CSVPA) Student Accommodation

Consort Claudgen

Cambridge School of Visual & Performing Arts (CSVPA) required energy-efficient heating solutions for their student accommodation units. To reduce ongoing energy costs, CSVPA approached Consort Claudgen for an upgrade to their existing heating system. Consort Claudgen recommended Wi-Fi enabled heaters with bespoke screens to meet the heating requirements of CSVPA’s 286 student apartment units.
Sponsored
The Crescent

The Crescent

Specwall SP

Location: Salford, UKSpecwall was instructed on a retail unit situated below a residential apartment block in The Crescent Salford. The unit needed to be separated into three with a split-level mezzanine aspect which presented some serious design issues for both blockwork and metal frame walls. The versatility of Specwall and the ease of installation made it the perfect choice to complete this job
Sponsored
Apex Hotel London

Apex Hotel London

Wedi Systems (UK) Ltd

wedi Primo completes luxury in central London Hotel.The Apex Temple Court Hotel is a luxury 4 star hotel, just off Fleet Street central London. Full architectural and interior design was by Ian Springford Architects, Edinburgh.A key factor in the selection of the wedi shower units for each of the 184 bedrooms was the requirement to achieve a high performance quality waterproof bespoke solution capable of adapting to the on site conditions. Ian Springford Architects has specified wedi shower units since 2004 and Apex Temple Court is the fourth Apex hotel where they have been successfully installed. Bespoke pre-fabricated shower units - Fast installation. The key benefits of using wedi were that the Fundo shower design provided simple, fast adaption to the individual shower configurations on site, as well as the detail of enabling the units to extend under the shower door to promote drainage back into the shower area from water falling off the door when in use.Complete prefabricated shower units allow fast dry and accurate construction in ONE integrated product system rather than a combination of different individual manufacturer’s products creating the risk of potential failures between the different systems during assembly and installation. The finished result was a fast track installation of a factory prepared shower system capable of on-site adjustment, delivering a completely waterproof system backed by warranty.
Sponsored
HSBC Bank

HSBC Bank

Forster Profile Systems (UK) Ltd

Project: HSBC Bank, Southampton, United Kingdom

Showing 325-360 of 465

Feedback