Hand-applied glazing compound / putty for bedding and external fronting single glass into primed softwood and hardwood frames, sealed hardwood and concrete, and primed steel frames which will subsequently be painted.
For painting as soon as the putty has formed a skin firm enough. Apply the first coat within 7-21 days. The final coat should be applied within 28 days.
Hand-applied glazing compound.
Features and benefits:
Applications:
For painting as soon as the putty has formed a skin firm enough. Apply the first coat within 7-21 days. The final coat should be applied within 28 days.
Material | Drying oil |
Uniclass 2015 |
Product Reference | In accordance with BS 8000-7 |
Third-party certification | Consult manufacturer |
Material | Drying oil |
Class | Type O to BS 6262 |
Colour | BrownNatural |
Fire performance | Consult manufacturer |
Standard product features | Technical characteristics:
|