NBS Source
I'm a manufacturer
Compare variants

Metsec SFS Infill Wall with Y-Wall Sheathing Board, 12.5 mm Knauf Internal Boards, Rockwool Duo Slab Insulation, Fire performance 120 min

Verified by manufacturer 1 month ago

DXXX-Y1-N90-K22 - 90 mm stud

Metsec (voestalpine Metsec) Variant:
Third party certifications:
  • BES 6001

    BES 6001

    Certificate type

  • BSI Kitemark

    BSI Kitemark

    Certificate type

  • EPD

    EPD

    Certificate type

  • ISO 14001 Environmental Management Systems

    Certificate type

  • ISO 9001 Quality Management

    Certificate type

  • CCPi System

    CCPi System

    Certificate type

Metsec SFS infill wall with Y-Wall sheathing board, Knauf lining and Rockwool Duo Slab insulation.

Jump to:
+44 (0) 121 601 6000 Website

Application

SFS infill wall with insulation and plasterboard lining.

Description

Metsec SFS infill wall with Y-Wall sheathing board, Knauf lining and Rockwool Duo Slab insulation.


Fire performance: 120 minutes (boundary wall and non-boundary wall).


DXXX-Y1-N90-K22, DXXX-Y1-N100-K22, DXXX-Y1-N120-K22, DXXX-Y1-N150-K22, DXXX-Y1-N180-K22, DXXX-Y1-N210-K22, DXXX-Y1-N240-K22, DXXX-Y1-N270-K22, DXXX-Y1-N300-K22, DXXX-Y1-N350-K22

General information

Finish

Galvanized

Guidance for specification option:

Steel.

Material

Steel

Plasterboard

Shape

Other

Length

Bespoke

Width

Bespoke

Height

Bespoke

Warranty description

30 year

Uniclass

Ss_25_10_32_45 Light steel wall framing systemsPrimary

CAWS

G10/20 Steel framing system

G10/150 Steel framing system

Product range

All SFS framing / SFS with RCM external board

Specification data - Light steel wall framing systems

System performance

Structural design supervision and checking.
Design of framing systems generally.

Guidance for specification option:

  • Structural design supervision and checking: by qualified structural engineer.
  • Design of framing systems generally: wind loading to BS EN 1991-4 plus self weight.

Framing members

Cold-formed galvanized steel sections.

Connections

-

Connection fasteners

Self drilling tek screws.

Anchors to concrete and masonry

-

Type of anchor

By structural engineer's design.

Movement joints

Deflection allowance at the top of the wall.

Insulation

External: Rockwool Duo Slab; between framing: n/a.

Guidance for specification option:

Insert requirements for Duo Slab external insulation thickness (minimum 75 mm).

External: Rockwool Duo Slab; between framing: ___.

Guidance for specification option:

Insert requirements for:

  • Rockwool Duo Slab external insulation thickness (minimum 75 mm);
  • Between-framing insulation.

Sheathing board

RCM Y-Wall - 12 mm.

Framing

Metsec SFS 90 mm stud depth.

Guidance for specification option:

Typically at 600 mm centres.

Manufacturer guidance

See Insulation if insulation between framing is required.

Inner layer

Knauf Fire Board, 12.5 mm.

Face layer

Knauf Fire Board, 12.5 mm.

Fasteners

Drywall screws.

System accessories

Flatstrap / partition brace.

Guidance for specification option:

Required behind horizontal board joints.

Internal face

120/ 120 minutes (insulation/ integrity).

External face

120/ 120 minutes (insulation/ integrity).

Fire performance

120 minutes (boundary wall); 120 minutes (non-boundary wall).

Thermal performance (U-value maximum)

Variable.

Air tightness

Variable.

Dimensional constraints

Variable.

Guidance for specification option:

Consult manufacturer for details based on overall specification.

Sustainability data

Contains Red List materials

No

Country of product manufacture

United Kingdom

Recyclability

SFS Light Gauge Steel 95-100%

Recycled content

As defined in clause 7.8 of BS EN ISO 14021

60 %

EPD

Third party certifications

BES 6001

BES 6001

BES 6001 Responsible Sourcing of Construction Products

BSI Kitemark

BSI Kitemark

BIM Level 2 Kitemark - For Design and Construction Phase

BSI Kitemark

BSI Kitemark

BSI Kitemarkâ„¢ for BIM Objects

EPD

EPD

Environmental Product Declaration EPD - SFS

ISO 14001 Environmental Management Systems

ISO 14001 Environmental Management Systems

ISO 14001:2015 Environmental Management System

ISO 9001 Quality Management

ISO 9001 Quality Management

ISO 9001:2015 Quality Management System

BSI Kitemark

BSI Kitemark

UKCA Certificate of Conformity of the Factory Production Control

CCPi System

CCPi System

CCPI Light Gauge Steel Framing Systems

Literature

Metsec SFS Specification Manual (2024)

Metsec SFS Specification Manual (2024)

Case studies

Metsec’s lightweight steel framing system, SFS, is being used in the creation of a new £346m riverside residential development in the Barking and Dagenham area of London

Metsec’s lightweight steel framing system, SFS, is being used in the creation of a new £346m riverside residential development in the Barking and Dagenham area of London

Metsec’s SFS steel framing system has helped to create a seamless finish to the façade of a new state-of-the-art custody centre and strategic policing hub for Devon and Cornwall Constabulary.

Metsec’s SFS steel framing system has helped to create a seamless finish to the façade of a new state-of-the-art custody centre and strategic policing hub for Devon and Cornwall Constabulary.

Similar products from Metsec (voestalpine Metsec)

Metsec SFS Infill Wall with CORETEX Sheathing Board, BG Internal Boards, Fire performance 90 min (non boundary)

Metsec SFS Infill Wall with CORETEX Sheathing Board, BG Internal Boards, Fire performance 90 min (non boundary)

Metsec SFS Infill Wall with CORETEX Sheathing Board, BG Internal Boards, Rockwool Duo Slab, Fire performance 120 min

Metsec SFS Infill Wall with CORETEX Sheathing Board, BG Internal Boards, Rockwool Duo Slab, Fire performance 120 min

Metsec SFS Infill Wall with Densglas Sheathing Board, BG Internal Boards, Fire performance 90 min (non boundary)

Metsec SFS Infill Wall with Densglas Sheathing Board, BG Internal Boards, Fire performance 90 min (non boundary)

Metsec SFS Infill Wall with Easyboard Sheathing Board, BG Internal Boards, Fire performance 60 min

Metsec SFS Infill Wall with Easyboard Sheathing Board, BG Internal Boards, Fire performance 60 min

Metsec SFS Infill Wall with G-Board Sheathing Board, BG Internal Boards, Fire performance 120 min (non boundary)

Metsec SFS Infill Wall with G-Board Sheathing Board, BG Internal Boards, Fire performance 120 min (non boundary)

Metsec SFS Infill Wall with Glasroc X Sheathing Board, BG Internal Boards, Fire performance 120 min (non boundary)

Metsec SFS Infill Wall with Glasroc X Sheathing Board, BG Internal Boards, Fire performance 120 min (non boundary)

Metsec SFS Infill Wall with Glasroc X Sheathing Board, BG Internal Boards, Knauf Rocksilk, Fire performance 90 min (non boundary)

Metsec SFS Infill Wall with Glasroc X Sheathing Board, BG Internal Boards, Knauf Rocksilk, Fire performance 90 min (non boundary)

Metsec SFS Infill Wall with Glasroc X Sheathing Board, BG Internal Boards, Rockwool Duo Slab, Fire performance 120 min (non boundary)

Metsec SFS Infill Wall with Glasroc X Sheathing Board, BG Internal Boards, Rockwool Duo Slab, Fire performance 120 min (non boundary)

Metsec SFS Infill Wall with Multipurpose Sheathing Board, BG Internal Boards, Fire performance 90 min (non boundary)

Metsec SFS Infill Wall with Multipurpose Sheathing Board, BG Internal Boards, Fire performance 90 min (non boundary)

Metsec SFS Infill Wall with Versaroc Sheathing Board, BG Internal Boards, Fire performance 120 min (non boundary)

Metsec SFS Infill Wall with Versaroc Sheathing Board, BG Internal Boards, Fire performance 120 min (non boundary)