NBS Source
I'm a manufacturer
Compare variants

Comdeck - CFA Piling & Concrete Raft Foundations

Verified by manufacturer over a year ago

Standard - Non-Voided

Abbey Pynford Limited Variant:
Third party certifications:
  • BBA Agrément Certificate

    BBA Agrément Certificate

    Certificate type

  • ISO 45001 Health and Safety Management

    Certificate type

  • ISO 9001 Quality Management

    Certificate type

  • QA Certificate

    QA Certificate

    Certificate type

  • CHAS

    CHAS

    Certificate type

  • Constructionline Gold

    Constructionline Gold

    Certificate type

  • CQMS

    CQMS

    Certificate type

  • Certificate of Approval

    Certificate of Approval

    Certificate type

  • Rospa Safety Charity

    Rospa Safety Charity

    Certificate type

  • smas WORKSAFE

    smas WORKSAFE

    Certificate type

A patented piled raft foundation and ground floor system for commercial structures.

Jump to:
01442 212 112 Website

Application

  • Suitable for use in commercial applications.
  • Suitable for all types of construction, such as timber frame, sealed panels or modular.

Description

Comdeck is a patented piled raft foundation and ground floor system for commercial structures, offering cost and programme certainty, and is safer and more environmentally friendly than traditional methods.


Comdeck comprises a reinforced concrete slab supported on CFA piles. There are two basic types: non-voided (deck supported from piles or treated ground, directly on the ground surface) and voided (deck supported by piles, void designed to accommodate ground heave and deal with gassing sites).


Features and benefits:

  • Bespoke design to suit superstructure loads, site levels and any unique conditions
  • Cost certainty - by reducing the program, prelims and cutting out many of the traditional elements, such as excavation for ground beams, reduced piling mat, therefore affording improved cost certainty for a project.
  • Faster – up to 70% faster than traditional methods and offers improved program certainty.
  • Safer – Includes many features that enhance a safer environment on site.
  • Less environmental impact – uses less concrete, requires less spoil removal, and significantly reduced vehicle and plant movement. Reducing the carbon footprint of the site.
  • Replaces the need for traditional strip foundations, or pile and beam.
  • BBA certified and all major warranty provider approved: NHBC, Premier Guarantee & LABC.

General information

Color

Other

Material

Concrete

Stainless steel

Steel

Shape

Other

Length

Bespoke

Width

Bespoke

Height

Bespoke

Uniclass

Ss_20_05_15_72 Reinforced concrete raft foundation systemsPrimary

CAWS

D30/130 Piles

Specification data - Reinforced concrete raft foundation systems

Substructure formwork

Concrete working surface.

Blinding

Concrete blinding.

Reinforcement

-

Type of reinforcement

Steel reinforcement.

Reinforcement accessories

Prefabricated continuity reinforcement strips.

Concrete

Reinforced Comdeck concrete slab.

Cast-in accessories

Not required.

Steel brick support unit (BSU).

Guidance for specification option:

  • Acts as edge formwork system for the raft slab, and as a permanent support system for the outer skin of cavity brickwork.
  • Consists of two components:
  1. Preformed, pre-galvanized mild steel sheet.
  2. Stainless steel tangs (anchors).

Piling

CFA piling.

Guidance for specification option:

  • Piles installed once the working surface is cured.
  • Consult manufacturer for details and insert requirements.

Sustainability data

Contains Red List materials

No

Country of material origin

United Kingdom

Country of product manufacture

United Kingdom

Third party certifications

BBA Agrément Certificate

BBA Agrément Certificate

Abbey Pynford Comdeck and Housedeck Foundation Systems

ISO 45001 Health and Safety Management

ISO 45001 Health and Safety Management

Alcumus ISO 45001: 2018

ISO 9001 Quality Management

ISO 9001 Quality Management

Alcumus ISO 9001: 2015

BBA Agrément Certificate

BBA Agrément Certificate

BBA Technical Approval

QA Certificate

QA Certificate

Builders Profile - Abbey Pynford

CHAS

CHAS

CHAS

CHAS

CHAS

CHAS Elite

Constructionline Gold

Constructionline Gold

Constructionline Gold

CQMS

CQMS

CQMS

QA Certificate

QA Certificate

Federation of Piling Specialists Membership

Certificate of Approval

Certificate of Approval

LABC Housedeck Foundation System

Rospa Safety Charity

Rospa Safety Charity

RoSPA Gold

smas WORKSAFE

smas WORKSAFE

Smas Worksafe

Literature

Comdeck - Product Brochure

Comdeck - Product Brochure

Typical Section - Comdeck - BSU - 300 mm Slab - Non-Voided

Typical Section - Comdeck - BSU - 300 mm Slab - Non-Voided

Typical Section - Comdeck - BSU - 300 mm Slab - Voided

Typical Section - Comdeck - BSU - 300 mm Slab - Voided

Similar products from Abbey Pynford Limited

Floodsafe - CFA Piling & Concrete Raft Foundations

Floodsafe - CFA Piling & Concrete Raft Foundations

Housedeck - CFA Piling & Concrete Raft Foundations

Housedeck - CFA Piling & Concrete Raft Foundations

Treesafe - CFA Piling & Concrete Raft Foundations

Treesafe - CFA Piling & Concrete Raft Foundations