NBS Source
I'm a manufacturer
Sika Limited

Sika Limited

Manufacturer of speciality chemical products for the construction industry and industrial markets

+44 (0)1707 394444 Website

Sort by:

Showing 37-46 of 46

Sponsored
Segro Park

Segro Park

Sika Limited

Repair and restoration of decaying structure
Sponsored
Sika Project Revisited 13 Years on at Eco Flats In Leeds

Sika Project Revisited 13 Years on at Eco Flats In Leeds

Sika Limited

In 2010, Protech where approached by The Clegg Group for a renovation project of an eight storey 1930’s building.Originally known as Shaftesbury House, the building was opened in 1938 to house migrant workers in Leeds that had previously been living in appalling conditions. The development had deteriorated and was eventually closed and boarded up in 1998. As part of a regeneration programme of the area, Leeds City Council co ordinated the redevelopment of the site into what is now known as Greenhouse, a mixed-use block of eco-flats.  
Sponsored
St George's College

St George's College

Sika Limited

Celebrating its 150th anniversary in 2019, St. George’s Weybridge – a Roman Catholic private day school in Surrey – marked the occasion with the introduction of an exciting new architectural development.Transforming its existing, functionally simple sports hall into an inspiring, beautifully designed facility, the College’s accommodation brief comprised a premiership level hockey pitch and six-court sports hall, as well as a strength and conditioning suite, dance studio and flexible multi-use areas for group activities, meetings, presentations, exhibitions, open days and ‘match teas’.Designed by global architectural practice Scott Brownrigg, the architect’s vision was to create a contemporary and timeless building that would inspire students to achieve their very best.With plans including a stunning tree canopy-like roof structure draping over the internal spaces, the roof needed to achieve 30m clear spans across the main hall and the design needed to be clever and sensitive to the fact that the site’s location sits within the green belt. It also required a flexible and durable waterproofing solution to ensure the building leaves a lasting legacy for future generations of Georgians.Roofing:SARNAFIL G410-ELF lead grey.SARNAVAP 5000.120 M SARNATHERM G insulation board.SIKA SOLARMOUNT-1.
Sponsored
StayCity Apart Hotel, Manchester

StayCity Apart Hotel, Manchester

Sika Limited

As an impressive feature in the Manchester city skyline, the stunning and contemporary StayCity Apart Hotel required a roof that was every bit as unusual and eye-catching as the overall building design.Roofing:ROOFING: Sarnafast® System.SikaBit® VB SA-724.Sikatherm®.
Sponsored
THE CUNARD BUILDING

THE CUNARD BUILDING

Sika Limited

SIKA SUPPLIES PROVEN TOP TO BOTTOM SOLUTION FOR HISTORIC BUILDING REFURBISHMENT Sika showcased the scope of its construction sector specialisms during the refurbishment and conversion of an historic, Grade II-listed building – with its industry-leading products selected for both roof and basement works.
Sponsored
Twickenham Stadium Resin Flooring

Twickenham Stadium Resin Flooring

Sika Limited

Sika ComfortFloor® supplied the superior surface solution as part of a major overhaul of the ‘home of rugby’.
Sponsored
Uni of Reading Library, Berkshire

Uni of Reading Library, Berkshire

Sika Limited

A £40 million investment, 13 roof areas, eight different roof levels, and a steady stream of visiting students to keep happy throughout – the University of Reading (UoR) Library’s complete refurbishment was a large and challenging project spanning three years.Originally opened in 1964 and later extended in 1985, the library’s internal and external revamp was designed to increase space, improve facilities for individual study, provide better access and security across the building, and improve energy efficiency.In addition to a new-build Café extension, a new entrance canopy, a new ground-to-roof level lift and stair core extension – each featuring a new flat roof area – there were also 10 existing flat roof areas refurbished, coupled with the replacement of windows and re-cladding of the building’s exterior.Following a competitive tender based on an outline specification, Owlsworth Roofing, Sika Sarnafil single ply flat roofing specialists, impressed with the level of detail included in their quote and were awarded the contract by main contractor ISG.Roofing:Sika® Sarnafil G410-12 ELF.Sika® Sarnafi G410-12 EL.Sarnavap®-5000E SA.Sarnavap® HD SA.Primer 600.Sikatherm® PIR Insulation and Sarnacol®-2162.
Sponsored
Victorian Basement, London

Victorian Basement, London

Sika Limited

Sika supplied a high-quality waterproof solution to facilitate the conversion of a former Victorian warehouse basement into modern office space and guarantee its long-term protection against damp and water ingress.
Sponsored
West Grove, Jersey

West Grove, Jersey

Sika Limited

The small housing development scheme incorporated waterproofing a new block of garages to ensure they were fit-for-purpose for the four new-build apartments.
Sponsored
Working in Wood, Salford

Working in Wood, Salford

Sika Limited

Salford community project, Working in Wood, is run by Incredible Education CIC, a social enterprise providing nature-based services for local communities through horticulture and forest school activities. The Cleavley Community Forest Garden also has wood kitchen, a poly tunnel, outdoor learning area, an edible garden that supplies fruit and veg and a coffee shop & cafe that serves plant-based and healthy food.

Showing 37-46 of 46