Hybrid lifting station, for dry, on-the-floor installation in frost-free rooms, outdoor underground installation or installation in a concrete floor in combination with an engineering
system chamber.
Note: The pressure pipe must be connected to a welded
polyethylene (PE) pipe; see manufacturer's literature for product-specific details.
Base section for Ecolift XL hybrid lifting station where fre-standing set-up or installation in ground is required.
Where minimum installation height applies, see the KESSEL Ecolift XL Backwater Pumping Station 4 L/s to 20 L/s - Complete Unit (Minimum Installation Height) product.
Features and benefits: