OVERVIEW
The Project
Yorkswood Primary School forms part of Solihull’s Regeneration Project, investing in the area through the creation of new schools, housing, parks, village centres, and local enterprise.
The £5.7m new school will replace the current outdated buildings as part of the £60m scheme in place to improve every single primary school in the North Solihull Regeneration Area benefitting the learning of over 4,000 children.
The Challenge
The Architects vision for the washrooms was to create a vibrant, innovative space with multi coloured cubicles working in harmony throughout the colour pallet.
The challenge for us was to ensure full usage of the core material was utilized throughout the scheme to ensure optimal yield and competitive pricing.
Construction took place alongside the existing occupied school buildings, and therefore keeping the school operational and safeguarding the pupils and staff was an important factor for this project.
The Solution
Repeating the pallet throughout the washroom areas ensured as much of the core material as possible was utilised.
Harlequin Mariner & Harlequin Peardrop Cubicles and Duct panelling were used through the scheme.
Solid Grade Laminate is the perfect choice of material for the Education Sector offering extremely high levels of durability.
Specification
Product Range: Harlequin Mariner
Doors: 20mm Laminate Faced Compact Density Fibreboard
Pilaster: 12mm Compact SGL, Polyrey Érable Nordique E028
Partition: 12mm Compact SGL, Polyrey Érable Nordique E028
Ironmongery: SBAA
Available Finishes:
These Systems Are Available In The Following Finishes:
• High Pressure Laminate
• High Gloss Laminate