NBS Source
List your products

Western Red Cedar Battens

by Millworks Ltd

  Favourite

Cambridge based architects ChadwickDryerClarke approached Millworks to supply Western Red Cedar cladding for this contemporary extension. The best grade of Western Red Cedar was chosen (no 2 clear and better). The Cedar battens were planed all round (MW-6) to 43x43mm, to create a clean and striking look. Full lengths of timber were supplied in set lengths, for quick installation and added aesthetic appeal. Factory coated UV protection was applied to the cladding battens, maintaining the amazing array of Cedars natural colours. Summary: UV factory coated Grade. No 2 Clear and Better Width. 43x43mm Profile. PAR PEFC certified

Read more

No featured products in this case study

Contact Millworks Ltd by clicking the button below to find out which products were used in this case study.

More case studies from Millworks Ltd

View all case studies from Millworks Ltd (3)