NBS Source
I'm a manufacturer

This version of the case study is no longer available. View latest

The Island Quarter

OVERVIEW

Featuring 20 restaurants, bars and cafes, the three-storey, canal-side destination is located within a 36-acre nature-filled landscape that has been commercially-reimagined, with designers using the site’s Victorian train station and warehouse buildings as inspiration. The nearby historic Lace Market, the epicentre of the world’s lace industry during the 19th century and now a protected heritage area, was also an influence on the Island Quarter’s architectural form.


With the creation of 1,600 new homes and 6,000 office jobs included as part of the masterplan architects claim, that as a verdant archipelago, The Island Quarter is ‘setting the scene for something really different’ for city centre mixed-used developments. For this high-profile, complex project, IG Masonry Support was selected to design and manufacture 19 Brick Slip Arches that met the structural and aesthetic requirements for The Canal Turn building within the development.


IG Masonry Support was selected for The Island Quarter programme following its successful completion of similarly complex projects in conjunction with brickwork contractor, Lee Marley. Our brief was to design and manufacture 19 Brick Slip Arches, 17 at ground level, and two at fourth-floor level, of the site’s main building. The greatest challenge in this respect was coordinating the brickwork configuration of two deep-soffit arches, which were to meet at a 90-degree angle at the structure’s ground level corner.


In addition, the siting and size of two large arches at the building’s uppermost level provided a potential issue.


The experience and expertise of IG Masonry Support’s technical team was essential to ensuring the 90-degree corner arches’ unique formation complemented the surrounding building work. Following extensive research and detailed assessments, a complex system involving a large volume of steel and brickwork was designed and embedded within the structure’s corner section, thus providing a suitable base for the deep-soffit arches to meet at the correct angle. For the finish, our half-arch solution combined with our innovative B.O.S.S. deep-soffit system, proved ideal.


In terms of the logistical operation to install the two large arches on the building’s fourth level, we required engagement with Nottingham City Council to implement appropriate road closures during their delivery. Due to their size, the arches were delivered separately and once on site, were carefully craned towards the top of the building. This process was particularly challenging, as there was little space (half-metre) for the contractor to install the heavy structures into the correct position.


Thanks to the design skills of our technical team in supplying a solution that was bespoke and precision-made for this application, the corner arches were an identical fit. They provided the impressive building with a unique feature and an aesthetically-pleasing finish. The prefabricated nature of the arches not only guaranteed their controlled and high-quality manufacture, it led to a more rapid and cost-effective installation, with the units being delivered straight to site for immediate implementation. This outcome would not have been possible with traditional brickwork and might have delayed The Island Quarter’s scheduled and much-anticipated opening in late 2022.

No featured products in this case study

Contact IG Masonry Support Ltd by clicking the button below to find out which products were used in this case study.

More inspiration from IG Masonry Support Ltd

View inspiration
Keybridge, London

Keybridge, London

Kindred House, Croydon

Kindred House, Croydon

Borough Yards, London

Borough Yards, London

Ilona Rose House, London

Ilona Rose House, London