Following a successful park and ride facility in the west of the city and to reduce traffic further, an east park and ride facility comprising 1800 car parking spaces as part of a regeneration scheme. The park and ride design focused on sustainability and protecting local habitats. Due to restrictions on run off levels Cornwall council opted for Porous Paving. ABG Sudspave 40 permeable pavers were installed on free draining aggregate to enhance surface water drainage. Sudspave was supplied pre assembles for rapid installation. The panels can be filled with topsoil, gravel or seeded.
Contact ABG creative geosynthetic engineering by clicking the button below to find out which products were used in this case study.
Vegetated Retaining Wall, Cutting Stabilisation, Webwall,Saundersfoot, UK
Retaining Wall, Webwall, Westfield, Pembrokeshire, UK
Blue Roof, Green Extensive, Huddersfield University, UK
Green Roof, Biodiverse, Regent Street, Piccadilly, London, UK