NBS Source
I'm a manufacturer

Sheffield Hallam University

OVERVIEW

Sheffield Hallam University’s new three-floor, purpose-built teaching facility, the Heart of the Campus Building, is another eye-catching addition to this burgeoning northern university. Planet Partitioning used p100 double glazing to glaze around 50 room frontages, including seminar and study rooms, installing IsoClear single glass doors throughout to ensure excellent acoustic performance. This involved using a minimum framework to help create a modern, contemporary look and feel. Planet Partitioning also installed large angular atrium glass screens on the top floor of the communal area to form an impressive 50-metre long ‘U’ shape.

Products featured in this case study

View all products (54)
PURE100 Double Glazed Panel Partition System

PURE100 Double Glazed Panel Partition System

More case studies from Planet

View all case studies (57)
Ampersand, London

Ampersand, London

Santander UK HQ in London

Santander UK HQ in London

Network Rail HQ, Milton Keynes

Network Rail HQ, Milton Keynes

Equinox Gyms, London

Equinox Gyms, London

More case studies from Partition panels

View all case studies (52)
cGMP Advanced Manufacturing Area for Orthoplastics

cGMP Advanced Manufacturing Area for Orthoplastics

Compound Semiconductor Innovation Centre for CSA Catapult

Compound Semiconductor Innovation Centre for CSA Catapult

The Compound Semiconductor Facility for IQE

The Compound Semiconductor Facility for IQE

cGMP Global Packing Centre for AstraZeneca

cGMP Global Packing Centre for AstraZeneca