by Fixfast Ltd
Fixfast supplied a complete package here, not on the drains and guards but all the fasteners required for fixing the roofing system. For this project, Fixfast also helped by providing the necessary rainwater calculations required to complete the project, ensuring the efficient and reliable drainage expected of the FarBo range once installed
Contact Fixfast Ltd by clicking the button below to find out which products were used in this case study.
Leeds Arena
America's Test Cup Building
Pondwick's Close, St Albans
Worthing Pools
© 2022 NBS Enterprises Ltd. All rights reserved.
1 / 1