Concrete foundations of a wind energy plant: Due to the influences of the weather over the years, the following damages were noticed: •Cracks due to movement •Moisture into the structure •Spalling of the concrete •Corrosion of the reinforcement •Flaking paint The first step in the restoration of the foundation was pressure injecting the cracks - through which an elastic closure of the cracks was realized. The total surface was strengthened with a unique sillicate liquid. A waterproof sloped layer was installed; finally, the moving joint between the foundations and the steel tower of the wind energy plant was sealed elastically.

Products featured in this case study

View all products (34)
Koster NB1 Grey Cementitious Sealing Slurry

Koster NB1 Grey Cementitious Sealing Slurry

Structural Crack repair using Epoxy Injection

Structural Crack repair using Epoxy Injection

Koster Façade Cream

Koster Façade Cream

More case studies from Koster Aquatecnic Ltd

View all case studies (20)
Flat roof overlay at historic lighthouse.  Koster TPO Membrane.

Flat roof overlay at historic lighthouse. Koster TPO Membrane.

Schneider Electronics Factory - Koster Flooring Systems

Schneider Electronics Factory - Koster Flooring Systems

Glasgow Underground.  Koster Injection Systems.

Glasgow Underground. Koster Injection Systems.

Koster Flooring Systems, 96 Middlesex St. London

Koster Flooring Systems, 96 Middlesex St. London

More case studies from Concrete sealers

View all case studies (16)
Schneider Electronics Factory - Koster Flooring Systems

Schneider Electronics Factory - Koster Flooring Systems

Koster Flooring Systems, 96 Middlesex St. London

Koster Flooring Systems, 96 Middlesex St. London

Koster Floor coatings to a domestic garage.

Koster Floor coatings to a domestic garage.

Aintree Racecourse - Koster Flooring Systems to Grandstand

Aintree Racecourse - Koster Flooring Systems to Grandstand

More case studies from Crystallization active slurry mortars

View all case studies (6)
Park Plaza Hotel in London

Park Plaza Hotel in London

Waterproofing to domes on Historic Building

Waterproofing to domes on Historic Building

Aintree Racecourse - Koster Flooring Systems to Grandstand

Aintree Racecourse - Koster Flooring Systems to Grandstand

Koster Injection G4 - London Underground

Koster Injection G4 - London Underground

More case studies from Concrete crack repair or filling systems

View all case studies (3)
Koster Flooring Systems, 96 Middlesex St. London

Koster Flooring Systems, 96 Middlesex St. London

Aintree Racecourse - Koster Flooring Systems to Grandstand

Aintree Racecourse - Koster Flooring Systems to Grandstand