NBS Source
I'm a manufacturer

This case study is no longer available.

Oaklands Wedding Venue – East Yorkshire

OVERVIEW

Longfloor where contacted by the owners of Oaklands Wedding Venue in the dark depths of winter to discuss an exciting project build that was due to begin in January for an exclusive wedding venue in a very rural area of East Yorkshire. The brief was very specific, a total floor area of 560m2, on an accelerated build plan and the screed must be dry for covering within 21 days after installation.

No featured products in this case study

Contact Longfloor Liquid Cement Screed by clicking the button below to find out which products were used in this case study.

More case studies from Quick-drying levelling screed mixes

View all case studies (14)
Madrid Airport

Madrid Airport

Tollcross International Swimming Centre

Tollcross International Swimming Centre

Savoy Hotel Restoration Project

Savoy Hotel Restoration Project

It’s a ‘race to the finish,’ as ARDEX UK complete Commonwealth Games Pool refurbishment in 8 weeks

It’s a ‘race to the finish,’ as ARDEX UK complete Commonwealth Games Pool refurbishment in 8 weeks