This case study is no longer available.
OVERVIEW
H+H Foundation Blocks are being used for the groundworks with methods including pile foundations, driven pile foundations and strip foundations being utilised. The ground floors will be constructed using concrete slabs, external walls will be built with H+H 100mm Standard Grade Celcon Blocks and the homes are to be topped off with truss roofs. Each property will be finished with external brick work.
Contact H+H UK Ltd by clicking the button below to find out which products were used in this case study.
I-House using Celcon Vertical Wall Panels
Stanpit I-House, Karm Homes
Bottle Lane Self-Build Project
Oyster Reach, Whitstable, Kent