With previous roof re-coverings proving problematic, two key requirements were highlighted, building the thermal performance to help save energy, and improving robustness, to mitigate damage caused by vandalism. The architect worked closely with Sarnafil to ensure the chosen roofing products provided the required detail, specification and performance. A Sarnafil HD bonded system was specified guaranteeing a high quality and durable roof. By combining the thickest single ply membrane available – 2mm – and the robust insulation board – SarnaTherm HD – the Sarnafil HD system offered a long-term, resilient and well-insulated roofing system with very low thermal conductivity.
Contact Sika Sarnafil by clicking the button below to find out which products were used in this case study.
Leeds Arena
Norwich Castle
Center Parcs, Longleat
Ewart Grove, London
© 2022 NBS Enterprises Ltd. All rights reserved.
1 / 1