NBS Source
List your products

Network Rail Control Centre, Basingstoke

by Planet Partitioning

  Favourite

Working with GMW architects and BAM Construction, Planet devised a highly effective partitioning strategy. Where trains pull directly into the building, Planet Partitioning used FireStop single-glazed fire-rated partitioning. FireClear and FireStop doorsets were used throughout the rest of the building. p100 double glazed partitioning features throughout offices and meeting rooms, to ensure excellent levels of acoustic performance, with several meeting rooms also created with p20 single glazed …

Show more
Read more

No featured products in this case study

Contact Planet Partitioning by clicking the button below to find out which products were used in this case study.

More case studies from Planet Partitioning

View all case studies(53)