National Grid Isle of Grain Power Station Case Study

OVERVIEW

The National Grid Site on the Isle of Grain is a very sensitive environmental area, from the site liquefied pressurised gas and electricity is distributed to the Southern UK, France and Belgium. Site required a sewage plant able to treat raw sewage to 15:15:10 standard. Due to the high water table, plant had to be installed above ground. Discharge from the sewage plant was directly into the Thames/Medway estuary. The Marsh UP was installed replacing the existing sewage plant that failed consent standards. The plant has performed better than the 15:15:10 standard set by the EA.

No featured products in this case study

Contact Marsh Industries Ltd by clicking the button below to find out which products were used in this case study.

More case studies from Marsh Industries Ltd

View all case studies (7)
General Binding Rules 2020

General Binding Rules 2020

Separators - Brackmills Gateway, Northampton

Separators - Brackmills Gateway, Northampton

Separators - TSL – Magna Park South – Lutterworth

Separators - TSL – Magna Park South – Lutterworth

Millets Farm Centre - Ultra Polylok Sewage Treatment 125PE & 250PE

Millets Farm Centre - Ultra Polylok Sewage Treatment 125PE & 250PE