This case study is no longer available.
OVERVIEW
This Aerospace project utilised the whole Troax Commercial Partitioning offer. Utilising our Single Skin and Double skin steel partitioning. Using full steel panels, Steel glass steel panels and steel mesh steel panels, this project truly encapsulated all different bespoke offerings. Troax Lee grid ceilings were also installed on this project and half height partitioning also to section off certain areas.
Contact Troax (UK) Ltd by clicking the button below to find out which products were used in this case study.