This case study is no longer available.
OVERVIEW
D+H UK supplied a mechanical smoke ventilation system to Beacon Tower, a renovated block of residential flats in Bristol.
Mechanical smoke ventilation is a Fire Engineered Solution, designed to speedily remove smoke from common areas such as corridors and lobbies. It is a very efficient solution proven to work by using a design system known as CFD Computational Fluid Dynamics.
Contact D+H UK by clicking the button below to find out which products were used in this case study.
London Aquatic Centre - Smoke & Natural Ventilation
Ikea, Dublin - Smoke Ventilation
Sudbury House
Grafton Quarter
CR60 and ONE Reference Project - Resecentrum Göteborg, Sweden