NBS Source

Loughborough College

by Ardex Ltd – Flooring, Tiling & Screeding products

Each floor posed a different challenge during the refurbishment of this 1960s building. Some substrates contained bitumen, or old adhesive residues, whilst others had uneven and damaged concrete with rising damp. ARTIDEX NA was the only choice, as it covers all subfloors without the need to prime, and ARDEX DPM 1 C provided the ultimate moisture control solution.

Products featured in this case study

View all products (88)
ARDEX DPM 1 C One Coat Damp Proof Membrane

ARDEX DPM 1 C One Coat Damp Proof Membrane

ARDITEX NA Ultra Rapid Levelling Compound

ARDITEX NA Ultra Rapid Levelling Compound

More case studies from Ardex Ltd – Flooring, Tiling & Screeding products

View all case studies(50)
ARDEX Completes Another ‘Historic’ Project

ARDEX Completes Another ‘Historic’ Project

DAVID LLOYD LEISURE CLUB

DAVID LLOYD LEISURE CLUB

St George's Chapel - Westminster Cathedral London

St George's Chapel - Westminster Cathedral London

Scottish Parliament

Scottish Parliament