NBS Source
I'm a manufacturer

This version of the case study is no longer available. View latest

LIV Student Accomodation

OVERVIEW

LIV Student Accommodation was completed in early 2020 by ISG Plc. Sertus worked with the project M&E contractors to deliver a smoke control system that coped with the challenges of forty metre extended corridors on the upper stories. The system comprises two Sertus Roof Mechanical Pod Residential (RMP-R) units, one at either end of the V-shaped building. The Pods are fitted with air-inlet dampers to avoid pressure build-up whilst clearing the corridors. The system also interfaces with the fire alarm system and controls a natural smoke control system on the lower levels of the building.

Products featured in this case study

View all products (9)
Shaft Smoke Control Damper for Mechanical Systems

Shaft Smoke Control Damper for Mechanical Systems

Mechanical Extract Fan Pod for Smoke Shafts

Mechanical Extract Fan Pod for Smoke Shafts

Roof Single Leaf AOV Smoke Vent

Roof Single Leaf AOV Smoke Vent

More case studies from Sertus

View all case studies (11)
Sudbury House

Sudbury House

Lily's Walk

Lily's Walk

Grafton Quarter

Grafton Quarter

LIV Student Accomodation

LIV Student Accomodation

More case studies from Natural smoke and heat exhaust ventilators

View all case studies (6)
London Aquatic Centre - Smoke & Natural Ventilation

London Aquatic Centre - Smoke & Natural Ventilation

Ikea, Dublin - Smoke Ventilation

Ikea, Dublin - Smoke Ventilation

Sudbury House

Sudbury House

Grafton Quarter

Grafton Quarter

More case studies from Smoke dampers

View all case studies (4)
Grafton Quarter

Grafton Quarter

Barking Wharf

Barking Wharf

Moxy Hotel

Moxy Hotel

Avantage MP - AOV by Smoke Control Dampers Ltd

Avantage MP - AOV by Smoke Control Dampers Ltd

More case studies from Powered smoke and heat exhaust ventilators

View all case studies (3)
Barking Wharf

Barking Wharf

Fulneck House

Fulneck House

Moxy Hotel

Moxy Hotel