OVERVIEW
Job Description
Larsen Streetscape ECO BS7533 FBC Fine Bedding Concrete, FJM Flowable Jointing Mortar (Natural) and PS Priming Slurry were used at the Hallsville Quarter, Canning Town, London. Phase 3 completes the main public pedestrian spaces, with a new civic square, park and new homes for the area.
Job Details
Phase 3 completes the main public pedestrian spaces at Hallsville Quarter in Canning Town, London. With a new civic square and park for the area, this area is surrounded by high street retail, cafes, and restaurants with outdoor dining.
Phase 3 also provides 620 new homes across eight buildings arranged around the shared podium garden courtyards above street level. A new health centre is to be built and there will be over 8,500m² of commercial space which includes retail and leisure units.
Another iconic public realm refurbishment #BuiltWithLarsen!
What is Larsen Streetscape BS 7533 Eco Paving Mortar System?
The Larsen Streetscape BS 7533 Eco Paving Mortar System was developed as a solution to the ongoing mission for using more environmentally conscious building products across the industry.
By using Larsen Streetscape BS 7533 Eco Paving Mortar System, your street works project can save on CO₂ production, deliver on strength and meet the requirements of BS 7533 code of practice standard.
Larsen Products Used within This Project
We’re proud to share that Larsen Streetscape Eco BS 7533 products were used to install the paving at the main public pedestrian spaces, square and park at Hallsville Quarter in Canning Town, London.
Larsen Streetscape ECO BS 7533 Products Used:
Contact Larsen Building Products by clicking the button below to find out which products were used in this case study.
Larsen x Ashton Under Lyne
Larsen x Midland Metropolitan University Hospital
Larsen x Hollywood Road London
Larsen x Hub Victoria London