This version of the case study is no longer available. View latest
OVERVIEW
4,300m2 of screeding, tiling and grouting was installed in the new state-of-the-art ticket hall.
Contact Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products by clicking the button below to find out which products were used in this case study.
British Museum - London
Victoria and Albert Museum - London
North Manchester General Hospital
Burj Khalifa - Dubai