OVERVIEW
Modular buildings are becoming a more popular solution as they demonstrate cost savings, shorter construction time and sustainability benefits. Go Modular Technologies (UK) Ltd manufactured ten flats constructed by nine large modules on three levels over the concrete commercial ground floor for this project in Poole. We were able to offer an affordable A2 fire rated solution to finish the building envelope which resulted in the facade being completed in Hardie® Architectural Panel. The planning approval was originally for render and buff brick so we were able to provide a similar look with our Smooth Sand texture which was chosen in three of our core colours to give this coastal location a modern and contemporary look.
Hardie® Architectural Panel Cladding - Smooth Sand 8mm
Hardie® VL Plank - Project Zed House
Hardie® VL Plank - The transformative effect of interlock cladding
Hardie® Backer - Weight Matters
Hardie® Backer - Hole in One at Shifnal
The Edge at Abbey Park, Colchester
Bridgend Road, Pontyclun
Bridgnorth Rugby Club
Heathlands School