This scheme comprised 3 blocks of apartments each having 3 stories requiring a total of just over 3000 square meters of screed. As the client was in control of the design he called upon the expertise of our technical team to help him to decide the best route and the most cost effective design. He opted for pre-completion sound testing which allowed him to design the floors in such a way as to mitigate the costs of the testing. Our specification manager advised Gypsol Classic screed as the most cost effective and appropriate material and completed a NBS specification.
Contact GYPSOL - LKAB by clicking the button below to find out which products were used in this case study.