NBS Source
I'm a manufacturer

GBC 5 - VENTEC - NORTEC- FLOOR and more

OVERVIEW

In cooperation with local partner L-Group, Lindner was responsible for the production and installation of the flooring systems: a total of almost 22,000 m² of the FLOOR and more® G30 and FLOOR and more® G40 hollow floor systems were installed.


Despite its low weight, the dry hollow floor impresses with excellent properties in terms of load-bearing capacity, acoustics, fire protection and sustainability.


For the server rooms of the administration building, particularly high demands were placed on the floor: Lindner NORTEC G38 ST and VENTEC S38 R38 raised floors were used here ‒ the extremely stable raised floor panels provide the necessary ventilation via the cavity.

Products featured in this case study

View all products (26)
Calcium sulphate raised access floor - NORTEC

Calcium sulphate raised access floor - NORTEC

More case studies from Lindner Group

View all case studies (18)
Projektreport Allerhuset Denmark

Projektreport Allerhuset Denmark

Maxwell Centre, University of Cambridge

Maxwell Centre, University of Cambridge

John Lewis Oxford Street

John Lewis Oxford Street

Wembley Stadium

Wembley Stadium

More case studies from Raised access floor systems

View all case studies (19)
Gresham Apartments, Raised Acoustic Floor - Nottingham UK

Gresham Apartments, Raised Acoustic Floor - Nottingham UK

SubFloor Acoustic Raised Floor, Renovating 12 Apartments in Nottingham

SubFloor Acoustic Raised Floor, Renovating 12 Apartments in Nottingham

Transforming a Listed Museum Near Liverpool into a modern Meeting Space using SubFloor

Transforming a Listed Museum Near Liverpool into a modern Meeting Space using SubFloor

Transforming an Attic into an Energy-Efficient Storage Space in South Wales with SubFloor Raised Flooring

Transforming an Attic into an Energy-Efficient Storage Space in South Wales with SubFloor Raised Flooring