OVERVIEW
In cooperation with local partner L-Group, Lindner was responsible for the production and installation of the flooring systems: a total of almost 22,000 m² of the FLOOR and more® G30 and FLOOR and more® G40 hollow floor systems were installed.
Despite its low weight, the dry hollow floor impresses with excellent properties in terms of load-bearing capacity, acoustics, fire protection and sustainability.
For the server rooms of the administration building, particularly high demands were placed on the floor: Lindner NORTEC G38 ST and VENTEC S38 R38 raised floors were used here ‒ the extremely stable raised floor panels provide the necessary ventilation via the cavity.
NORTEC U 34 ST x H - Calcium Sulphate
Lindner Hollow Floor Pedestals Type L
Lindner Raised Floor Pedestals Type SWH120
Lindner FLOOR and more® G 40 x L/D
FLOOR and more® - Dry Hollow Floor System
Lindner Raised Floor Pedestals Type S
Lindner Hollow Floor Pedestal Type P
Calcium sulphate raised access floor - NORTEC
Projektreport Allerhuset Denmark
Maxwell Centre, University of Cambridge
John Lewis Oxford Street
Wembley Stadium
Tour Alto, La Défense, Paris - Knauf DB Green Raised Floor System
Terrazzo Raised Floor System – Cottam House, Kings Cross, London
Lucent House, Hackney
Wembley Stadium
HAUSER CB - Metal Ceilings, LIGNA and NORTEC raised floors
Central Station Berlin Completed Works: - Metal Ceiling - FLOOR and more - NORTEC - Plasterboard partition systems - Fire protection doors
AMG Brand Centre - FLOOR and more power
MOL campus - Floor and more G40 and NORTEC
Nova N2 Development - London - Modular Washrooms
MOL campus - Floor and more G40 and NORTEC
INTERNATIONAL RUGBY EXPERIENCE -> FLOOR and more®
Global Tower - Raised floor systems, Heated and chilled metal ceilings, Partitions